Background
Verified Service Provider in South Africa

Relocation, De-Installation, Decommissioning & Disposal in South Africa Engineering Excellence & Technical Support

Comprehensive Relocation, De-Installation, Decommissioning & Disposal solutions. High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Expert Relocation of Critical Infrastructure

We specialize in the meticulous relocation of sensitive and high-value industrial equipment across South Africa, ensuring minimal downtime and adherence to stringent safety protocols. Our team manages the entire process, from complex de-installation to secure transportation and precise re-installation, safeguarding your operational continuity.

Specialized De-Installation & Decommissioning Services

Our certified technicians possess extensive experience in safely and efficiently de-installing and decommissioning a wide range of industrial plant and machinery. We provide comprehensive site preparation, adherence to environmental regulations, and detailed documentation throughout the decommissioning lifecycle, ensuring compliance and responsible asset management in South Africa.

Sustainable & Compliant Asset Disposal Solutions

We offer end-to-end disposal services for redundant or obsolete industrial assets in South Africa. Our solutions prioritize environmental sustainability, including responsible recycling, material recovery, and certified destruction of hazardous components. We ensure full compliance with all local and national environmental legislation, offering peace of mind and value recovery.

What Is Relocation, De-installation, Decommissioning & Disposal In South Africa?

In South Africa, the category of Relocation, De-Installation, Decommissioning & Disposal (often abbreviated as RDD) refers to the comprehensive process of moving, dismantling, rendering inoperable, and ultimately discarding equipment, assets, or entire facilities. This is particularly critical in the healthcare sector, where specialized medical equipment, sensitive infrastructure, and strict regulatory compliance are paramount. RDD encompasses the entire lifecycle of an asset once its operational phase ends or when it needs to be moved to a new location. This includes everything from the initial planning and logistical arrangements for relocation, to the safe and compliant disconnection of power and other services (de-installation), to the formal process of officially retiring the equipment or facility from service (decommissioning), and finally, its responsible and environmentally sound removal and disposal.

AspectImportance in SA HealthcareScope
Maintaining Operational ContinuityMinimizing disruption to patient care during equipment or facility moves is paramount. Improper RDD can lead to extended service outages.Includes meticulous planning for phased relocations, off-hours work, and temporary service provision.
Ensuring Patient Safety & Data SecurityDecommissioning and disposal must ensure sensitive patient data is irrecoverably erased. Improper handling of de-installed equipment can pose safety risks.Involves secure data sanitization protocols for electronic devices and safe handling of medical devices with potential biohazards or residual chemicals.
Environmental ResponsibilitySouth Africa has strict regulations regarding waste disposal, especially for medical and electronic waste. Responsible RDD prevents environmental contamination and promotes sustainability.Covers adherence to waste management legislation, proper segregation of waste streams, and partnering with certified disposal facilities.
Cost-Effectiveness & Asset Lifecycle ManagementEfficient RDD processes can reduce disposal costs, allow for the resale or donation of usable assets, and inform future procurement decisions.Involves inventory management, assessing the condition of assets for potential reuse or resale, and negotiating competitive disposal contracts.
Regulatory Adherence & Legal ComplianceNon-compliance with RDD regulations can result in significant fines, legal action, and reputational damage for healthcare institutions.Requires thorough understanding and implementation of all relevant national and provincial legislation pertaining to health, safety, and the environment.

Key Components and Considerations of RDD in South African Healthcare:

  • Relocation: This involves the planning, packing, transportation, and re-installation of medical equipment, laboratory apparatus, or even entire departments or facilities to a new site. Challenges include specialized handling requirements for sensitive equipment, maintaining calibration and functionality during transit, and minimizing downtime for critical healthcare services.
  • De-Installation: This is the physical process of safely disconnecting equipment from all utilities (power, water, data), removing any associated infrastructure, and preparing it for transport or disposal. This often requires qualified technicians with expertise in specific medical equipment to ensure no damage occurs and safety standards are met.
  • Decommissioning: This is the formal process of retiring equipment or a facility from active service. It involves documentation of the retirement, ensuring all data is securely erased (especially for electronic medical devices), and certifying that the equipment is no longer operational and poses no safety risks. For larger facilities, decommissioning can involve complex environmental and structural assessments.
  • Disposal: This is the final stage, involving the responsible and compliant removal and disposal of equipment. In South Africa, this must adhere to environmental regulations and may involve specialized waste management protocols for medical waste, hazardous materials, or electronic waste (e-waste). Prioritizing recycling, refurbishment, or donation of functional equipment is increasingly encouraged.
  • Regulatory Compliance: RDD processes in South African healthcare are heavily regulated. This includes adherence to the National Health Act, environmental laws (e.g., for hazardous waste), occupational health and safety regulations, and potentially specific guidelines from medical councils or professional bodies.
  • Cost Management: RDD projects can be expensive, involving logistics, specialized labor, disposal fees, and potential site remediation. Careful planning and budgeting are essential to control costs.
  • Risk Mitigation: Improper RDD can lead to safety hazards, environmental damage, data breaches, and legal liabilities. Robust planning and execution are crucial to mitigate these risks.
  • Asset Management: RDD is a critical component of an organization's asset management strategy, ensuring that assets are tracked throughout their lifecycle and managed efficiently.
  • Specialized Expertise: Healthcare RDD often requires the involvement of specialized contractors with experience in medical equipment handling, IT data sanitization, hazardous material disposal, and facility decommissioning.

Who Benefits From Relocation, De-installation, Decommissioning & Disposal In South Africa?

Relocation, de-installation, decommissioning, and disposal of healthcare facilities and equipment in South Africa involve a complex interplay of stakeholders, each with distinct benefits and responsibilities. This process is crucial for ensuring the safe, efficient, and compliant transition of healthcare services, whether due to facility upgrades, closures, or technological advancements. The benefits extend beyond the immediate parties involved, impacting patients, staff, regulatory bodies, and the broader healthcare ecosystem.

Stakeholder GroupHealthcare Facility Types BenefitingPrimary Benefits Derived
Government and Regulatory BodiesAll (Public and Private Hospitals, Clinics, Laboratories, Research Institutions)Ensuring compliance with safety, environmental, and healthcare standards; facilitating public health infrastructure modernization; managing efficient resource allocation; reducing environmental hazards.
Healthcare Facility Owners/OperatorsAll (Public and Private Hospitals, Clinics, Specialized Centers, Laboratories)Cost savings through efficient asset management; improved operational efficiency in new or upgraded facilities; risk mitigation (e.g., environmental, safety); enhanced facility utilization; successful transition to new technologies or service models.
Healthcare Professionals and StaffAll (Hospitals, Clinics, Outpatient Centers, Laboratories)Access to modern, safe, and functional equipment and facilities; improved working environment; enhanced patient care capabilities; reduced risk of accidents or exposure to hazardous materials.
Patients and the PublicAll (Hospitals, Clinics, Community Health Centers)Improved access to quality healthcare services in updated or relocated facilities; reduced waiting times due to efficient operations; enhanced patient safety and experience; continuity of care.
Specialized Service ProvidersAll (Providers of Relocation, De-installation, Decommissioning, Disposal Services)Business growth and revenue generation; job creation; development of specialized expertise and skills; contribution to the circular economy through recycling and refurbishment.
Equipment Manufacturers and SuppliersAll (Especially those supplying new medical technology)Opportunities for sales of new equipment to replace decommissioned items; opportunities for refurbishment and resale of used equipment; reduced burden of disposal for their own products.
Environmental and Waste Management AgenciesAllEffective and compliant disposal of hazardous and non-hazardous medical waste; reduction of environmental pollution; promotion of sustainable waste management practices and recycling.
Financial Institutions and InsurersAllReduced risk associated with aging or non-compliant infrastructure; opportunities for financing new equipment and facility upgrades; facilitating smooth asset transitions and insurance claims.

Target Stakeholders and Healthcare Facility Types

  • Government and Regulatory Bodies
  • Healthcare Facility Owners/Operators
  • Healthcare Professionals and Staff
  • Patients and the Public
  • Specialized Service Providers (Relocation, De-installation, Decommissioning, Disposal)
  • Equipment Manufacturers and Suppliers
  • Environmental and Waste Management Agencies
  • Financial Institutions and Insurers

Relocation, De-installation, Decommissioning & Disposal Implementation Framework

This framework outlines the comprehensive lifecycle for Relocation, De-Installation, Decommissioning, and Disposal (RD3) projects. It details each step from initial assessment through to final sign-off, ensuring a structured and efficient process.

PhaseStepDescriptionKey ActivitiesDeliverablesResponsible Party
Phase 1: Assessment & Planning1.1 Initial Scope DefinitionUnderstanding the overall objectives, assets involved, and timeline.Define project goals, identify assets for RD3, establish preliminary budget and timeline.Project Charter, Initial Asset RegisterProject Manager, Stakeholders
1.2 Site Surveys & Risk AssessmentEvaluating the physical environment and identifying potential hazards.Conduct site visits, assess access, identify safety concerns, environmental impact assessment.Site Survey Report, Risk Assessment MatrixFacilities Management, Safety Officer
1.3 Asset Inventory & Condition AssessmentDetailed cataloging and evaluation of each asset's condition.Document asset details, capture condition, determine suitability for relocation or disposal.Detailed Asset Inventory, Condition ReportsTechnical Team, Asset Manager
1.4 Develop RD3 PlanCreating a detailed roadmap for the entire process.Define de-installation procedures, relocation logistics, decommissioning requirements, disposal methods, resource allocation, procurement strategy.Comprehensive RD3 Plan, Procurement PlanProject Manager, Technical Leads
Phase 2: De-Installation2.1 Pre-De-Installation PreparationsEnsuring readiness for safe and efficient removal of assets.Isolate power/services, secure work areas, acquire necessary tools and equipment, brief teams.Pre-De-Installation ChecklistTechnical Team, Site Supervisor
2.2 Asset De-InstallationCareful and safe removal of assets from their current location.Execute de-installation procedures per plan, document progress, manage waste generated.De-Installation Records, Waste ManifestsTechnical Team, Supervisors
2.3 Packaging & StagingPreparing assets for transport or storage.Package sensitive items, label clearly, group for efficient movement.Asset Packing Lists, Staging Area MapLogistics Team, Technical Team
Phase 3: Relocation (if applicable)3.1 Transportation PlanningOrganizing the safe and timely movement of assets.Select transport vendors, schedule routes, obtain permits, ensure insurance.Transportation Schedule, Vendor ContractsLogistics Manager, Procurement
3.2 Asset TransportationExecuting the physical movement of assets.Load, transport, and unload assets, monitor during transit.Proof of Delivery, Transit LogsLogistics Team, Transport Vendors
3.3 Site Preparation (New Location)Ensuring the destination is ready for asset arrival.Prepare receiving areas, confirm utility connections, clear pathways.New Site Readiness ReportFacilities Management (New Site)
3.4 Asset Re-Installation (if applicable)Installing assets at the new location.Execute re-installation procedures, connect services, initial testing.Re-Installation RecordsTechnical Team (New Site)
Phase 4: Decommissioning4.1 Decommissioning PlanningDefining the process for rendering assets permanently inoperable.Determine methods for disabling systems, removing hazardous materials, data sanitization.Decommissioning Procedures, Data Sanitization PlanTechnical Team, Compliance Officer
4.2 Asset DecommissioningCarrying out the planned decommissioning activities.Execute decommissioning steps, document completion, ensure compliance.Decommissioning Certificates, Hazardous Material Disposal RecordsTechnical Team, Environmental Health & Safety
Phase 5: Disposal5.1 Disposal Vendor SelectionChoosing appropriate vendors for waste and asset disposal.Identify certified recyclers, auctioneers, or waste management companies, due diligence.Approved Vendor List, Disposal ContractsProcurement, Environmental Compliance
5.2 Asset & Waste DisposalExecuting the disposal of assets and associated waste.Transfer assets/waste to vendors, obtain documentation of disposal.Disposal Certificates, Waste Transfer NotesLogistics Team, Disposal Vendors
5.3 Data Destruction VerificationConfirming that all sensitive data has been irrecoverably destroyed.Review vendor reports, audit data destruction processes.Data Destruction CertificatesInformation Security Officer, Compliance
Phase 6: Verification & Sign-off6.1 Final Site InspectionConfirming that all RD3 activities are complete and sites are cleared.Walkthrough of de-installation and decommissioning sites, verify cleanliness and safety.Final Site Inspection ReportProject Manager, Facilities Management
6.2 Documentation ReviewCompiling and reviewing all project documentation.Gather all reports, certificates, logs, and invoices.Project Close-out DocumentationProject Manager, Administrative Staff
6.3 Financial ReconciliationFinalizing all project expenditures.Process final invoices, reconcile budget against actual costs.Final Budget ReportFinance Department, Project Manager
6.4 Project Sign-offFormal acceptance of project completion by stakeholders.Obtain formal sign-off from all relevant parties.Project Sign-off DocumentKey Stakeholders, Project Sponsor
6.5 Lessons LearnedCapturing insights for future projects.Conduct post-project review, identify successes and areas for improvement.Lessons Learned ReportProject Team

Relocation, De-Installation, Decommissioning & Disposal (RD3) Lifecycle

  • Phase 1: Assessment & Planning
  • Phase 2: De-Installation
  • Phase 3: Relocation (if applicable)
  • Phase 4: Decommissioning
  • Phase 5: Disposal
  • Phase 6: Verification & Sign-off

Relocation, De-installation, Decommissioning & Disposal Pricing Factors In South Africa

Relocation, de-installation, decommissioning, and disposal of equipment and assets is a complex process with a wide range of pricing factors. In South Africa, these costs are influenced by geographic location, the type and complexity of the items being moved or retired, the services required, and market dynamics. This document aims to provide a detailed breakdown of these cost variables and their typical ranges.

Cost VariableDescriptionTypical Range (ZAR)Notes
De-installation LabourSkilled technicians for dismantling equipment.R400 - R1,500 per hour per technicianVaries based on skill level and complexity of equipment (e.g., IT vs. industrial).
Specialised Tools & EquipmentRental or purchase of specific tools for intricate de-installation.R500 - R5,000+Highly dependent on the type of machinery or electronics.
Packaging & CratingMaterials and labour for secure packaging of items.R100 - R2,000+ per itemInfluenced by item size, fragility, and required protection.
Transportation (Local)Moving items within a metropolitan area.R500 - R3,000 per loadBased on distance, vehicle size, and number of items.
Transportation (Long Distance)Moving items between cities or provinces.R2,000 - R20,000+ per loadSignificant cost driver, dependent on distance, weight, and volume.
Site Preparation/RemediationMinor structural modifications, cleaning, or safety enhancements at sites.R1,000 - R10,000+Can be highly variable based on site conditions.
Data Sanitisation/DestructionSecure erasure or physical destruction of data-bearing media.R100 - R1,000+ per deviceEssential for IT equipment; rates vary by method (software vs. shredding).
Recycling FeesCosts associated with processing items for recycling.R50 - R500 per item/kgDepends on material type and recycling facility charges.
Hazardous Waste DisposalDisposal of materials requiring special handling (e.g., chemicals, certain electronics).R500 - R5,000+ per consignmentStrict regulations apply; costs are higher due to specialised treatment.
Resale/Donation FacilitationServices to assess, market, or arrange for resale or donation.Commission-based (e.g., 10-30% of resale value) or fixed fee R1,000 - R5,000+Can offset disposal costs.
Project ManagementCoordinating the entire relocation/decommissioning process.5-15% of total project cost or R1,000 - R5,000+ per dayEnsures efficiency and adherence to timelines.
Permits & Regulatory FeesCosts for necessary permits (e.g., environmental, transport).R200 - R5,000+Varies significantly by local and national regulations.
InsuranceCoverage for damage or loss during transit and handling.1-5% of asset value or a fixed daily rateCrucial for high-value or sensitive items.

Key Pricing Factors for Relocation, De-installation, Decommissioning & Disposal in South Africa

  • Type and Volume of Items: The nature of the equipment (e.g., sensitive IT hardware, industrial machinery, office furniture) and the sheer quantity significantly impact costs.
  • Complexity of De-installation: Intricacy of dismantling, specialised tools required, and the need for technical expertise.
  • Logistics and Transportation: Distance of relocation, accessibility of sites, vehicle type, and insurance.
  • Site Conditions: Accessibility, potential need for structural modifications, safety requirements, and environmental considerations at both origin and destination.
  • Disposal Method: Options range from recycling, resale, donation, to hazardous waste disposal, each with varying costs.
  • Specialised Services: Need for data sanitisation, secure destruction, environmental compliance, or specific regulatory approvals.
  • Time Constraints: Urgent relocations or decommissioning often incur premium pricing.
  • Geographic Location within South Africa: Major metropolitan areas (Johannesburg, Cape Town, Durban) may have higher labour and transport costs compared to rural areas.
  • Market Demand and Supplier Availability: Competition among service providers can influence pricing.
  • Downtime and Business Interruption: The cost associated with the period the asset is out of service during the process.
  • Permits and Regulatory Fees: Costs associated with obtaining necessary approvals for transport, disposal, or environmental compliance.

Value-driven Relocation, De-installation, Decommissioning & Disposal Solutions

Navigating the complex landscape of relocation, de-installation, decommissioning, and disposal (often referred to as RDD&D) requires a strategic approach to maximize value and ensure a strong return on investment (ROI). This process involves moving physical assets, safely dismantling equipment, retiring facilities, and responsibly managing waste. Optimizing budgets in this category is not just about cutting costs, but about smart resource allocation, risk mitigation, and identifying opportunities for asset recovery and sustainability. A well-executed RDD&D strategy can significantly contribute to operational efficiency, financial savings, and environmental stewardship.

CategoryOptimization LeversPotential ROI ImpactKey Considerations
RelocationEfficient packing & crating, optimized logistics, precise scheduling, specialized moversReduced transit time & costs, minimal asset damage, less downtimeAsset fragility, security requirements, operational continuity
De-installationSkilled technicians, specialized tools, phased removal, documentation of connectionsFaster disassembly, reduced risk of damage, simplified re-installationComplexity of equipment, safety protocols, data security
DecommissioningEnvironmental assessments, hazardous material abatement, controlled demolition, stakeholder engagementMinimized environmental liabilities, compliance with regulations, reduced cleanup costsSite conditions, regulatory framework, public perception
DisposalAsset valuation for resale/donation, certified recycling partners, responsible waste management, waste minimization strategiesRevenue generation from assets, reduced landfill costs, environmental complianceMaterial types, local regulations, ethical sourcing
Overall Project ManagementIntegrated planning, robust vendor management, clear communication, technology adoption, risk assessmentCost savings across all phases, improved efficiency, minimized disruptions, enhanced complianceProject complexity, stakeholder alignment, budget contingency

Key Strategies for Optimizing RDD&D Budgets and ROI

  • Early Planning and Phased Approach: Integrate RDD&D considerations into strategic planning from the outset. Break down large projects into manageable phases to allow for better cost control and resource allocation.
  • Detailed Asset Inventory and Valuation: Conduct a thorough inventory of all assets to be moved, de-installed, or disposed of. Assign realistic valuations to identify potential resale or donation opportunities.
  • Competitive Bidding and Vendor Selection: Solicit bids from multiple reputable RDD&D service providers. Evaluate proposals not only on price but also on experience, safety record, sustainability practices, and proposed methodologies.
  • Negotiate Favorable Contracts: Secure clear, comprehensive contracts that outline scope of work, timelines, deliverables, payment terms, and liability. Look for opportunities to negotiate volume discounts or bundled services.
  • Prioritize Asset Recovery and Resale: Maximize the value of functional or reusable assets through strategic sales, auctions, or transfers to other internal departments. Explore certified refurbishment and resale programs.
  • Embrace Circular Economy Principles: Investigate opportunities for material recycling, component reuse, and responsible disposal of non-recoverable materials. Partner with specialized recycling and waste management firms.
  • Leverage Technology for Efficiency: Utilize project management software, digital inventory systems, and real-time tracking to enhance operational visibility and streamline processes.
  • Risk Management and Compliance: Proactively identify and mitigate potential risks, including safety hazards, environmental liabilities, and regulatory non-compliance. Ensure all activities adhere to relevant industry standards and legal requirements.
  • Sustainability Integration: Incorporate environmental considerations into every stage of RDD&D. This includes reducing waste, minimizing energy consumption, and choosing eco-friendly disposal methods, which can often lead to cost savings and enhanced brand reputation.
  • Post-Project Analysis and Lessons Learned: Conduct a comprehensive review of the RDD&D project to identify successes, challenges, and areas for improvement in future endeavors. This feedback loop is crucial for continuous optimization.

Franance Health: Managed Relocation, De-installation, Decommissioning & Disposal Experts

Franance Health is your trusted partner for comprehensive Managed Relocation, De-Installation, Decommissioning, and Disposal services for medical equipment. We understand the critical nature of these processes and provide expert solutions designed to minimize downtime, ensure regulatory compliance, and maximize the value of your assets. Our extensive experience and strong relationships with Original Equipment Manufacturers (OEMs) set us apart, guaranteeing professional and efficient handling of your valuable medical technology.

Service AreaKey Features & BenefitsRelevant Credentials & OEM Partnerships
Managed RelocationOn-site assessment and planning, specialized moving equipment, risk mitigation, project management, minimal disruption, insurance coverage.ISO 9001 Certification, certified equipment handlers, OEM-specific relocation guidelines, partnerships with leading medical equipment manufacturers (e.g., GE Healthcare, Siemens Healthineers, Philips Healthcare).
De-InstallationQualified technicians, proper disconnection and packing, adherence to manufacturer specifications, site restoration.ANSI/AAMI standards compliance, manufacturer-trained technicians, OEM maintenance agreements, direct support from equipment vendors.
DecommissioningData sanitization (HIPAA compliant), asset tagging and tracking, environmental impact assessment, regulatory documentation.Data privacy certifications, OEM-recommended data wiping procedures, partnerships with certified e-waste recyclers, compliance with environmental regulations.
DisposalEnvironmentally sound recycling and disposal, hazardous waste management, certificate of destruction, asset resale opportunities.EPA compliance, R2 Certified Recycling, partnerships with specialized medical equipment recyclers, OEM take-back programs.

Our Core Services for Medical Equipment Lifecycle Management

  • Managed Relocation: Seamless and secure movement of medical equipment within your facility or to new locations, adhering to strict protocols.
  • De-Installation: Expert removal of medical equipment by certified technicians, ensuring no damage to the device or surrounding infrastructure.
  • Decommissioning: Comprehensive process to safely and compliantly render medical equipment out of service, including data sanitization.
  • Disposal: Responsible and environmentally conscious disposal of medical equipment, meeting all regulatory requirements.

Standard Service Specifications

This document outlines the standard service specifications, detailing the minimum technical requirements and deliverables expected for the successful provision of our services. Adherence to these specifications ensures quality, consistency, and timely delivery.

Requirement CategoryMinimum Technical RequirementDeliverable StandardVerification Method
PerformanceService response time must be under 2 seconds for 95% of requests.Performance test report with clear metrics and analysis.Load testing and response time monitoring tools.
SecurityAll data transmission must be encrypted using TLS 1.2 or higher.Security audit report and compliance statement.Vulnerability scanning and penetration testing.
ReliabilityService availability must be 99.9% uptime (excluding scheduled maintenance).Availability monitoring logs and incident reports.Automated uptime monitoring services.
ScalabilityThe system must be able to handle a 50% increase in user load within 24 hours.Scalability test results and architectural recommendations.Stress testing and capacity planning exercises.
InteroperabilityAPIs must adhere to RESTful principles and use JSON for data exchange.API documentation and integration test results.Automated API testing tools and manual integration checks.
MaintainabilityCodebase must be modular, well-commented, and follow established coding standards.Code review reports and adherence to style guides.Static code analysis tools and peer code reviews.

Key Service Deliverables

  • Project Plan: Comprehensive outlining of scope, timeline, resources, and milestones.
  • Regular Status Reports: Weekly or bi-weekly updates on progress, risks, and challenges.
  • Technical Documentation: User manuals, API documentation, system architecture diagrams.
  • Testing Reports: Unit testing, integration testing, and user acceptance testing results.
  • Final Project Report: Summary of achievements, lessons learned, and recommendations.
  • Source Code (if applicable): Well-commented and organized codebase.
  • Training Materials (if applicable): Guides and resources for end-users or administrators.

Local Support & Response Slas

This document outlines our commitment to providing reliable service and prompt support across all operational regions. We define Service Level Agreements (SLAs) for both system uptime and incident response times to ensure consistent performance and timely assistance for our users.

Service LevelMetricTargetMeasurement Period
UptimeAvailability99.9%Monthly (per region)
Support ResponseAcknowledgement of Critical Incidents< 15 minutesReal-time
Support ResponseInitial Response to All Requests< 1 hourReal-time

Key Service Level Agreements

  • Uptime Guarantee: We guarantee a minimum of 99.9% uptime for our services, measured monthly on a per-region basis.
  • Response Time Guarantee: We commit to acknowledging critical support requests within 15 minutes and providing an initial response to all other requests within 1 hour.
  • Resolution Time Objectives: While not a strict SLA, our teams strive for the fastest possible resolution for all issues, with specific targets for different severity levels.
  • Regional Consistency: These SLAs are applied uniformly across all active geographical regions to ensure a consistent service experience globally.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your Relocation, De-Installation, Decommissioning & Disposal in South Africa project in South Africa.

Speak to Sales