Installation, Commissioning & Acceptance in Mauritius
Engineering Excellence & Technical Support
Comprehensive Installation, Commissioning & Acceptance solutions. High-standard technical execution following OEM protocols and local regulatory frameworks.
Seamless Installation & Configuration of Advanced Telecommunications Network
Successfully completed the end-to-end installation and intricate configuration of a state-of-the-art fiber-optic network across key urban and rural areas in Mauritius. Our team ensured optimal performance and adherence to international standards, laying the foundation for enhanced connectivity and digital transformation.
Rigorous Commissioning & Performance Validation for Smart City Infrastructure
Undertook comprehensive commissioning and rigorous performance validation for a critical smart city infrastructure project, including intelligent traffic management systems and smart lighting solutions. Ensured all components met stringent operational requirements and achieved full system integration and reliability for seamless municipal operations.
Client Acceptance & Operational Readiness for Renewable Energy Plant
Achieved successful client acceptance and confirmed operational readiness for a significant solar power generation plant in Mauritius. This involved meticulous pre-commissioning checks, on-site testing, and comprehensive training for local operators, ensuring a smooth transition to sustainable energy production.
Select Your Service Track
What Is Installation, Commissioning & Acceptance In Mauritius?
Installation, Commissioning, and Acceptance (ICA) in Mauritius, particularly within the local healthcare sector, refers to the systematic process of bringing new medical equipment, systems, or infrastructure into operation. It ensures that these assets are not only physically installed correctly but also function precisely as intended, meet all specified requirements, and are formally handed over for use. This multi-stage process is critical for guaranteeing the safety, efficacy, and reliability of healthcare technologies and facilities in Mauritius.
Importance:
- Patient Safety: Improperly installed or commissioned equipment can lead to misdiagnoses, treatment errors, or even direct harm to patients. ICA ensures equipment functions within safe parameters.
- Operational Efficiency: Well-commissioned systems reduce downtime, minimize malfunctions, and ensure that healthcare professionals can rely on their tools to provide timely and effective care.
- Regulatory Compliance: Mauritius, like other nations, has regulations governing medical devices and healthcare facilities. ICA ensures adherence to these standards, preventing legal and operational issues.
- Financial Investment Protection: Healthcare institutions invest significant capital in equipment and infrastructure. ICA verifies that this investment is yielding the expected performance and longevity, protecting the financial viability of the institution.
- Performance Verification: It confirms that the equipment or system meets or exceeds the manufacturer's specifications and the end-user's operational needs.
- Training and Familiarization: The commissioning phase often includes training for relevant staff, ensuring they are competent in operating and maintaining the new assets.
Scope in Local Healthcare:
The scope of ICA in Mauritian healthcare is broad, encompassing a range of critical areas:
- Medical Devices: From complex imaging machines (MRI, CT scanners) and surgical robots to diagnostic equipment (blood analyzers, ECG machines) and patient monitoring systems.
- Laboratory Equipment: Installation and commissioning of sophisticated laboratory instruments for pathology, microbiology, and other diagnostic services.
- Hospital Infrastructure: This can include building management systems, HVAC (Heating, Ventilation, and Air Conditioning) systems essential for sterile environments, medical gas supply systems, and power backup systems.
- Information Technology (IT) Systems: Implementation and integration of Electronic Health Records (EHR), Picture Archiving and Communication Systems (PACS), and other critical IT infrastructure supporting healthcare delivery.
- Specialized Treatment Units: Installation and commissioning of equipment for radiotherapy, dialysis units, intensive care units (ICUs), and operating theaters.
- Ambulance and Emergency Services Equipment: Ensuring that specialized equipment within ambulances and emergency response vehicles is properly installed and functional.
- Pharmaceutical and Pharmacy Management Systems: Including automated dispensing systems and cold chain monitoring equipment.
| Stage | Description | Key Activities in Mauritian Healthcare |
|---|---|---|
| Installation | The physical placement and connection of equipment or systems according to manufacturer specifications and site requirements. | Ensuring correct power supply, plumbing, ventilation, and structural support for medical devices. Securing medical imaging equipment to walls or floors as per safety standards. |
| Pre-commissioning | Initial checks to verify that all components are correctly installed, connections are secure, and basic system functionalities are ready for testing. | Checking all electrical and mechanical connections for new laboratory analyzers. Verifying network connectivity for EHR systems before full activation. |
| Commissioning | Systematic testing and verification of all functions and capabilities of the installed equipment or system to ensure it operates as designed and meets specified performance criteria. | Running diagnostic tests on an MRI scanner. Testing alarms and safety interlocks on a ventilator. Validating the accuracy of a new blood glucose monitoring system. |
| Performance Testing | Testing the equipment or system under simulated or actual operating conditions to confirm it meets performance benchmarks, efficiency targets, and all functional requirements. | Performing image quality tests on X-ray machines. Verifying throughput and accuracy of a high-volume laboratory sample processing system. Stress-testing the hospital's IT network during peak hours. |
| Acceptance | The formal sign-off by the end-user (healthcare institution) confirming that the installation, commissioning, and performance testing have been successfully completed and the equipment or system is ready for operational use. | Signing the 'Acceptance Certificate' for a new operating theater. Receiving the final 'Handover Document' for a hospital-wide HIS. Formal documentation of successful validation of sterilization equipment. |
Key Stages of Installation, Commissioning & Acceptance (ICA)
- Installation
- Pre-commissioning
- Commissioning
- Performance Testing
- Acceptance
Who Benefits From Installation, Commissioning & Acceptance In Mauritius?
The successful installation, commissioning, and acceptance of healthcare equipment and infrastructure in Mauritius are critical processes that bring benefits to a wide range of stakeholders, ultimately contributing to the enhancement of healthcare services across the nation. These benefits extend from the direct users of the facilities and equipment to the regulatory bodies, the private sector, and the wider Mauritian population. The specific benefits can vary depending on the type of healthcare facility involved, from small community health centers to large tertiary hospitals.
| Healthcare Facility Type | Key Stakeholders Benefiting | Specific Benefits Derived |
|---|---|---|
| Public Hospitals (Tertiary, Secondary, District) | Doctors, Nurses, Patients, Ministry of Health, Facility Management, Suppliers, Public | Improved diagnostic capabilities, enhanced treatment efficacy, reduced patient waiting times, better patient safety, increased operational efficiency, compliance with national standards, access to advanced medical technologies. |
| Primary Healthcare Centers (Community Health Centers, Dispensaries) | Nurses, Patients, Ministry of Health, Facility Management, Suppliers | Improved access to basic healthcare, early detection of diseases, enhanced preventative care services, greater community satisfaction, efficient resource utilization. |
| Private Hospitals and Clinics | Doctors, Nurses, Patients, Facility Management, Investors, Suppliers | Competitive advantage through advanced technology, improved patient outcomes, enhanced service reputation, increased patient throughput, adherence to international best practices, return on investment. |
| Specialized Medical Centers (e.g., Dialysis Centers, Diagnostic Imaging Centers, Dental Clinics) | Specialist Doctors, Technicians, Patients, Facility Management, Suppliers | Access to specialized diagnostic and treatment equipment, improved accuracy of results, enhanced patient comfort and experience, specialized service delivery, increased patient volume. |
| Medical Laboratories | Lab Technicians, Doctors, Patients, Facility Management, Suppliers | Accurate and timely diagnostic testing, improved quality control, expanded testing capabilities, compliance with accreditation standards, efficient workflow. |
Target Stakeholders and Healthcare Facility Types Benefiting from Installation, Commissioning & Acceptance in Mauritius
- Healthcare Professionals (Doctors, Nurses, Technicians, etc.)
- Patients and the General Public
- Healthcare Facility Management and Administration
- Government Ministries and Regulatory Bodies (e.g., Ministry of Health and Quality of Life, Ministry of Finance, Economic Planning and Development)
- Equipment Suppliers and Manufacturers
- Installation and Commissioning Service Providers
- Healthcare Insurance Providers
- Medical Research and Educational Institutions
Installation, Commissioning & Acceptance Implementation Framework
The Installation, Commissioning & Acceptance Implementation Framework provides a structured, step-by-step lifecycle for managing the critical stages of bringing a new system, equipment, or facility into operational readiness. This framework ensures a thorough and documented process from initial assessment through final sign-off, minimizing risks and maximizing successful deployment.
| Stage | Description | Key Activities | Deliverables | Key Stakeholders |
|---|---|---|---|---|
| Stage 1: Pre-Installation Assessment & Planning | Defining project scope, requirements, and readiness for installation. | Site surveys, risk assessments, resource planning, development of I&C plan, procurement of materials and equipment, definition of acceptance criteria. | Installation & Commissioning (I&C) Plan, Risk Register, Procurement Documentation, Acceptance Criteria Document. | Project Manager, Engineering Team, Operations Team, Procurement Department, Client/End-User. |
| Stage 2: Installation | Physical setup and integration of the system/equipment. | Unpacking, positioning, connecting, and assembling components according to design specifications and manufacturer guidelines. Adherence to safety protocols. | Installed System/Equipment, Installation Reports, Material Reconciliation. | Installation Team, Engineering Team, Site Supervisors, Safety Officers. |
| Stage 3: Pre-Commissioning | Initial checks and basic functional tests before full operational startup. | Mechanical checks, electrical continuity tests, loop checks, static functional tests, cleaning, lubrication, and system flushing. | Pre-Commissioning Checklists (completed), System Status Reports, Preliminary Test Results. | Commissioning Team, Engineering Team, Vendor Representatives, Maintenance Team. |
| Stage 4: Commissioning | Bringing the system/equipment to an operational state and verifying basic functionality. | Powering up, initial startup procedures, calibration, functional testing of individual components and sub-systems, safety system verification. | Commissioning Test Procedures (executed), Commissioning Reports, Calibration Certificates, Safety System Test Results. | Commissioning Team, Engineering Team, Vendor Representatives, Operations Team. |
| Stage 5: Performance Testing & Verification | Evaluating the system's performance against specified operational parameters. | Dynamic testing under various load conditions, efficiency tests, throughput tests, environmental impact assessments (if applicable), verification against design specifications. | Performance Test Reports, Verification Certificates, As-Built Drawings, Deviation Reports. | Commissioning Team, Engineering Team, Quality Assurance (QA), Client/End-User. |
| Stage 6: User Acceptance Testing (UAT) | End-users validate the system meets their functional and operational needs. | Users executing predefined test cases based on real-world scenarios, documenting any discrepancies or issues. | UAT Test Cases (executed), UAT Report, Defect Log, User Feedback. | End-User Representatives, Operations Team, Project Manager, QA. |
| Stage 7: Training & Documentation Handover | Ensuring users are competent to operate and maintain the system and that all relevant documentation is transferred. | Operator training, maintenance training, handover of operation & maintenance manuals, as-built documentation, spare parts lists, warranties. | Training Records, Operation & Maintenance Manuals, As-Built Documentation Package, Warranty Certificates. | Training Personnel, Operations Team, Maintenance Team, Project Manager, Documentation Specialist. |
| Stage 8: Final Acceptance & Sign-off | Formal acceptance of the system by the client/end-user, marking the completion of the I&C phase. | Review of all documentation and test results, resolution of outstanding issues, formal sign-off of the acceptance certificate. | Final Acceptance Certificate, Project Closeout Report, Lessons Learned Document. | Client/End-User Representative, Project Sponsor, Project Manager. |
Key Stages of the Installation, Commissioning & Acceptance Lifecycle
- Stage 1: Pre-Installation Assessment & Planning
- Stage 2: Installation
- Stage 3: Pre-Commissioning
- Stage 4: Commissioning
- Stage 5: Performance Testing & Verification
- Stage 6: User Acceptance Testing (UAT)
- Stage 7: Training & Documentation Handover
- Stage 8: Final Acceptance & Sign-off
Installation, Commissioning & Acceptance Pricing Factors In Mauritius
This document outlines the key pricing factors and their estimated cost ranges for Installation, Commissioning, and Acceptance (ICA) services in Mauritius. These services are critical for ensuring the successful deployment and operational readiness of various systems, equipment, and infrastructure. The cost of ICA is influenced by a multitude of variables, which can be broadly categorized into project scope and complexity, technical requirements, resource allocation, geographical considerations, and vendor-specific factors.
| Cost Variable Category | Specific Cost Drivers | Estimated Cost Range (MUR) - Low | Estimated Cost Range (MUR) - High | Notes/Influencing Factors |
|---|---|---|---|---|
| Project Scope & Complexity | Size and scale of the project (e.g., number of units, square footage) | 5,000 | 50,000+ | Larger, more intricate projects naturally incur higher costs. |
| Project Scope & Complexity | Number of interdependencies between systems/components | 10,000 | 75,000+ | Complex integrations require more time and expertise. |
| Project Scope & Complexity | Level of customization required | 7,500 | 60,000+ | Bespoke solutions demand more engineering and configuration effort. |
| Technical Requirements & Specializations | Nature of the equipment/system (e.g., IT, industrial machinery, renewable energy) | 15,000 | 150,000+ | Specialized equipment often requires certified technicians and specific tools. |
| Technical Requirements & Specializations | Required certifications or licenses for personnel | 5,000 | 30,000+ | Mandatory certifications can increase labor costs. |
| Technical Requirements & Specializations | Integration with existing infrastructure | 10,000 | 80,000+ | Compatibility testing and potential modifications add to the cost. |
| Resource Allocation & Labor Costs | Number of technicians/engineers required | 2,000 (per person, per day) | 15,000 (per person, per day) | Depends on skill level and experience. Seniority commands higher rates. |
| Resource Allocation & Labor Costs | Duration of installation and commissioning phase | 3,000 (per day for team) | 25,000 (per day for team) | Longer project durations directly correlate with higher labor costs. |
| Resource Allocation & Labor Costs | Overtime or weekend work | 1.5x standard rate | 2x standard rate | Often charged at a premium. |
| Geographical Location & Accessibility | Remoteness of the installation site | 5,000 | 40,000+ | Increased travel and accommodation expenses for personnel. |
| Geographical Location & Accessibility | Accessibility challenges (e.g., difficult terrain, limited access points) | 2,000 | 15,000+ | May require specialized equipment or planning, increasing logistics costs. |
| Geographical Location & Accessibility | Site readiness and existing infrastructure (e.g., power, network) | 0 | 10,000+ | If pre-installation work is needed, it adds cost. |
| Vendor-Specific Factors | Vendor reputation and brand premium | 10% | 25% | Well-established vendors may charge more for their expertise and reliability. |
| Vendor-Specific Factors | Service Level Agreements (SLAs) and warranty provisions | Variable (contractual) | Variable (contractual) | More comprehensive SLAs and extended warranties will have associated costs. |
| Testing & Validation Protocols | Complexity and number of test cases | 5,000 | 50,000+ | Rigorous testing requires more time and specialized equipment. |
| Testing & Validation Protocols | Third-party testing and certification | 10,000 | 75,000+ | Independent verification often involves significant fees. |
| Documentation & Training | Provision of comprehensive manuals and reports | 2,000 | 15,000+ | Detailed documentation adds to the project overhead. |
| Documentation & Training | On-site or remote training for client personnel | 5,000 | 30,000+ | Training requires dedicated resources and expertise. |
| Project Timeline & Urgency | Standard project timeline | Included in base cost | Included in base cost | Assumes a typical project schedule. |
| Project Timeline & Urgency | Expedited timeline / Rush jobs | 20% | 50%+ premium | Requires prioritization and potentially additional resources. |
| Permitting & Regulatory Compliance | Costs associated with obtaining necessary permits | 1,000 | 10,000+ | Varies significantly by project type and local regulations. |
| Permitting & Regulatory Compliance | Compliance with specific Mauritian standards (e.g., building codes, electrical regulations) | 2,000 | 20,000+ | Ensuring adherence to local laws is essential. |
| Risk Assessment & Contingency | Contingency buffer for unforeseen issues | 5% | 15% | A standard practice to account for potential delays or complications. |
Key Pricing Factors for ICA in Mauritius
- Project Scope and Complexity
- Technical Requirements and Specializations
- Resource Allocation and Labor Costs
- Geographical Location and Accessibility
- Vendor-Specific Factors and Contractual Agreements
- Testing and Validation Protocols
- Documentation and Training
- Project Timeline and Urgency
- Permitting and Regulatory Compliance
- Risk Assessment and Contingency Planning
Value-driven Installation, Commissioning & Acceptance Solutions
Optimizing budgets and ROI for Value-Driven Installation, Commissioning & Acceptance Solutions requires a strategic approach focusing on efficiency, risk mitigation, and long-term value realization. This involves meticulous planning, leveraging technology, and fostering strong partnerships throughout the project lifecycle. The goal is to ensure that the invested capital in these critical project phases delivers maximum return through operational excellence, reduced downtime, and enhanced asset longevity.
| Area | Budget Optimization Tactics | ROI Enhancement Strategies |
|---|---|---|
| Planning & Design | Early involvement of SMEs, detailed scope definition, BIM integration for clash detection, modular design principles. | Reduced design changes, optimized material usage, improved constructability, faster project timelines. |
| Execution | Standardized work packages, pre-fabrication, skilled labor deployment, lean construction techniques, digital checklists. | Increased productivity, reduced labor costs, minimized rework, improved quality, faster commissioning cycles. |
| Technology | IoT sensors for real-time monitoring, drone inspections, VR/AR for training and remote support, cloud-based project management platforms. | Early anomaly detection, reduced site visits, enhanced safety, faster issue resolution, improved data-driven decision-making. |
| Risk Management | Failure Mode and Effects Analysis (FMEA), HAZOP studies, contingency planning, phased commissioning. | Minimized downtime during startup, reduced safety incidents, avoidance of costly repairs, protection of asset value. |
| Acceptance & Handover | Clear acceptance criteria, comprehensive punch lists, digital documentation, performance testing, training for end-users. | Faster project closeout, reduced post-handover issues, improved operational readiness, enhanced client satisfaction, documented performance guarantees. |
| Vendor Management | Performance-based contracts, strong contract negotiation, clear SLAs, regular performance reviews, collaborative problem-solving. | Improved vendor accountability, competitive pricing, reliable service delivery, reduced contractual disputes, alignment with project goals. |
Key Strategies for Optimizing Budgets and ROI:
- Early Engagement & Integrated Planning: Involving installation, commissioning, and acceptance teams from the initial project design phase allows for better risk identification, scope alignment, and resource allocation, preventing costly changes later.
- Standardization & Modularization: Developing standardized procedures, checklists, and modular installation components streamlines processes, reduces custom engineering, and accelerates execution, leading to lower labor and material costs.
- Technology Adoption & Digitalization: Implementing digital tools for project management, data capture (e.g., IoT sensors for performance monitoring), remote assistance, and virtual reality (VR) for training and simulations can significantly improve efficiency, accuracy, and reduce travel costs.
- Risk-Based Approach: Prioritizing efforts on critical systems and high-risk areas ensures that resources are focused where they will have the most impact on operational reliability and safety, minimizing potential costly failures.
- Performance-Based Contracts: Structuring contracts with clear performance metrics for installation, commissioning, and acceptance incentivizes vendors to deliver high-quality, efficient services that contribute directly to project ROI.
- Skilled Workforce & Continuous Training: Investing in a skilled and well-trained workforce ensures faster and more accurate execution, reducing rework and errors. Ongoing training on new technologies and best practices is crucial.
- Robust Verification & Validation Processes: Implementing rigorous verification and validation steps throughout the process helps identify and rectify issues early, preventing them from escalating into costly operational problems or warranty claims.
- Leveraging Data Analytics: Collecting and analyzing data from installation and commissioning phases can provide insights into trends, identify bottlenecks, and inform future project planning and cost optimization strategies.
- Collaborative Partnerships & Vendor Management: Building strong, collaborative relationships with experienced and reliable vendors fosters trust, open communication, and a shared commitment to project success and cost-effectiveness.
- Proactive Maintenance Integration: Ensuring that the commissioning process establishes a foundation for effective proactive maintenance strategies can prevent unexpected failures and reduce long-term operational and repair costs, thereby enhancing ROI.
Franance Health: Managed Installation, Commissioning & Acceptance Experts
Franance Health is your premier partner for comprehensive Managed Installation, Commissioning, and Acceptance services. We ensure your medical equipment is deployed seamlessly, fully functional, and meets all regulatory and performance standards. Our expertise is backed by a robust network of Original Equipment Manufacturer (OEM) partnerships, granting us unparalleled access to their knowledge, resources, and approved methodologies. This collaborative approach guarantees that every installation, commissioning, and acceptance process is executed with the highest level of precision and adherence to OEM specifications.
| OEM Partner | Service Expertise | Key Benefits of Partnership |
|---|---|---|
| Siemens Healthineers | Installation, Commissioning, Acceptance Testing for Imaging Modalities (MRI, CT, X-ray) | Access to specialized training, software updates, and direct technical escalation. |
| GE Healthcare | Deployment and Validation of Diagnostic & Life Support Equipment | Utilizing OEM-specific verification tools, standardized workflows, and best practices. |
| Philips Healthcare | Managed Rollout of Medical Imaging & Patient Monitoring Systems | Ensured compliance with manufacturer's quality standards and optimal system performance. |
| Canon Medical Systems | Installation & Commissioning of Advanced Imaging Technologies | Leveraging manufacturer's technical bulletins, engineering support, and certification programs. |
| Mindray | Installation & Verification of Patient Monitoring & Anesthesia Devices | Adherence to OEM calibration procedures and safety standards for critical care equipment. |
| Esaote | Installation and Acceptance of Ultrasound and MRI Systems | Direct access to OEM documentation and troubleshooting guides for specialized equipment. |
Our Credentials & OEM Partnerships
- Certified Installation Teams: Our technicians are extensively trained and certified by leading medical equipment manufacturers.
- OEM-Approved Processes: We strictly follow manufacturer-specific protocols for installation, calibration, and testing.
- Advanced Diagnostic Tools: Utilization of the latest OEM-provided and industry-standard diagnostic equipment.
- Direct OEM Support: Access to direct technical support and troubleshooting from manufacturers when needed.
- Warranty Compliance: Ensuring all installations and commissioning adhere to warranty requirements.
- Regulatory Adherence: Expertise in navigating and meeting diverse international and local regulatory standards (e.g., FDA, CE, IEC).
- Project Management Excellence: Proven track record in managing complex, multi-site installations.
- Comprehensive Documentation: Providing detailed reports and documentation for each phase of the process.
Standard Service Specifications
This document outlines the minimum technical requirements and deliverables for standard service provision. Adherence to these specifications ensures consistent quality, reliability, and compatibility across all standard services offered. These requirements are designed to be foundational, with specific project or client needs potentially necessitating additional or more stringent criteria.
| Service Area | Minimum Technical Requirement | Deliverable | Verification Method |
|---|---|---|---|
| Network Connectivity | Minimum upload/download speeds of 100 Mbps, latency < 50ms, packet loss < 1%. Redundant network paths. | Network topology diagram, performance test results (speed, latency, packet loss), uptime reports (99.9% availability). | Automated monitoring tools, periodic independent testing. |
| Server Infrastructure | Minimum of 8 vCPUs, 32 GB RAM, 500 GB SSD storage per instance. High availability clustering. | Server configuration documentation, resource utilization reports, high availability test results. | Infrastructure-as-Code (IaC) validation, performance monitoring, simulated failover tests. |
| Software Development | Adherence to industry-standard coding practices (e.g., PEP 8 for Python). Comprehensive unit and integration tests. Code reviews. | Source code repository access, test coverage reports (>80%), deployment package, API documentation. | Automated code analysis tools, CI/CD pipeline integration, peer code reviews. |
| Data Storage & Management | Minimum of 1 TB cloud-based storage with daily backups. Data encryption at rest and in transit. | Storage configuration details, backup schedule, restore test results, data encryption certificate. | Cloud provider console verification, scheduled backup and restore drills, security audits. |
| Security Protocols | Implementation of OWASP Top 10 mitigation. Regular vulnerability scans (monthly). Multi-factor authentication (MFA) for all administrative access. | Security policy documentation, vulnerability scan reports, penetration test results, audit logs. | Automated security scanning tools, independent penetration testing, security log analysis. |
| User Support & Maintenance | Response time for critical issues < 4 hours. 24/7 availability for urgent support. Regular system patching and updates. | Support ticket system access, service level agreement (SLA) adherence reports, patch management logs. | Ticketing system reporting, customer satisfaction surveys, incident response simulations. |
Key Service Areas
- Network Connectivity
- Server Infrastructure
- Software Development
- Data Storage & Management
- Security Protocols
- User Support & Maintenance
Local Support & Response Slas
This document outlines the Service Level Agreements (SLAs) for local support and response, detailing uptime and response guarantees across various geographical regions.
| Region | Uptime Guarantee | Critical Incident Response | Standard Incident Response |
|---|---|---|---|
| North America | 99.95% | 1 hour | 4 business hours |
| Europe | 99.9% | 2 hours | 6 business hours |
| Asia-Pacific | 99.8% | 3 hours | 8 business hours |
| Rest of World | 99.5% | 4 hours | 12 business hours |
Key Regional Support & Response SLAs
- North America:
- Uptime Guarantee: 99.95%
- Response Time (Critical Incident): 1 hour
- Response Time (Standard Incident): 4 business hours
- Europe:
- Uptime Guarantee: 99.9%
- Response Time (Critical Incident): 2 hours
- Response Time (Standard Incident): 6 business hours
- Asia-Pacific:
- Uptime Guarantee: 99.8%
- Response Time (Critical Incident): 3 hours
- Response Time (Standard Incident): 8 business hours
- Rest of World:
- Uptime Guarantee: 99.5%
- Response Time (Critical Incident): 4 hours
- Response Time (Standard Incident): 12 business hours
Frequently Asked Questions

Ready when you are
Let's scope your Installation, Commissioning & Acceptance in Mauritius project in Mauritius.