
CT Gantry Positioning, Leveling & Anchoring Service in Mauritius
Engineering Excellence & Technical Support
CT Gantry Positioning, Leveling & Anchoring Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Precision Gantry Alignment & Stability
Leveraging advanced surveying tools and techniques to ensure sub-millimeter accuracy in CT gantry positioning, leveling, and secure anchoring. This guarantees optimal imaging performance, minimal artifact generation, and extended equipment lifespan for healthcare facilities across Mauritius.
Engineered Gantry Leveling Solutions
Expert installation and calibration of CT gantry leveling systems designed to withstand Mauritius's environmental conditions. Our service ensures perfect horizontal and vertical alignment, crucial for consistent diagnostic image quality and patient safety, utilizing specialized equipment and certified technicians.
Robust Anchoring & Structural Integrity
Implementing industrial-grade anchoring solutions tailored to the specific structural requirements of each site in Mauritius. We guarantee secure gantry fixation, preventing vibrational interference and ensuring the long-term operational stability and safety of your valuable CT imaging equipment.
What Is Ct Gantry Positioning, Leveling & Anchoring Service In Mauritius?
CT Gantry Positioning, Leveling & Anchoring Service in Mauritius refers to the specialized technical process of precisely installing, aligning, and securing a Computed Tomography (CT) scanner gantry within a medical facility. This service ensures the gantry is optimally positioned and stable for accurate image acquisition, patient safety, and the longevity of the equipment. The process involves meticulous geometric alignment, calibration, and fastening of the gantry to the structural elements of the imaging suite, adhering to strict manufacturer specifications and local regulatory requirements in Mauritius.
| Who Needs the Service? | Typical Use Cases |
|---|---|
| Hospitals and Medical Centers in Mauritius | Installation of new CT scanner suites. |
| Radiology Departments requiring equipment upgrades or replacements | Relocation of existing CT scanners to different imaging rooms or facilities. |
| Specialized Diagnostic Imaging Clinics | Post-maintenance or repair activities requiring gantry realignment or recalibration. |
| Manufacturers or their authorized service partners | Ensuring optimal performance and longevity of high-value diagnostic imaging equipment. |
| Construction or renovation companies involved in building medical facilities | Mitigating risks associated with equipment malfunction and ensuring patient safety. |
Key Components of CT Gantry Positioning, Leveling & Anchoring Service:
- Precise Positioning: Utilizing advanced laser alignment tools and metrology equipment to establish the exact spatial coordinates for the gantry, ensuring optimal alignment with patient tables, imaging consoles, and room infrastructure.
- Leveling: Implementing techniques to achieve absolute horizontal and vertical plumbness of the gantry, critical for preventing image artifacts caused by gravitational distortions.
- Anchoring and Securing: Employing specialized mounting hardware and structural reinforcement to firmly affix the gantry to the building's foundation or reinforced floor/wall structures. This prevents movement during operation and protects against seismic events or accidental impacts.
- Vibration Damping: Integrating vibration isolation systems to minimize the transmission of external vibrations to the gantry, which can degrade image quality.
- Electrical and Data Connectivity Integration: Ensuring proper alignment and secure connection of power supply, data transfer cables, and network interfaces to the gantry.
- Calibration and Verification: Performing rigorous checks and calibration procedures post-installation to confirm geometric accuracy, radiation field alignment, and operational parameters.
- Compliance with Standards: Adhering to international (e.g., IEC) and local (Mauritian) building codes, radiation safety regulations, and specific CT manufacturer installation guidelines.
- Environmental Assessment: Evaluating the imaging suite for structural integrity, load-bearing capacity, and potential sources of electromagnetic interference (EMI) that could affect performance.
Who Needs Ct Gantry Positioning, Leveling & Anchoring Service In Mauritius?
CT Gantry Positioning, Leveling & Anchoring services are crucial for ensuring the optimal performance, safety, and longevity of Computed Tomography (CT) scanners. These specialized services are performed by trained technicians to guarantee the CT gantry is perfectly aligned, stable, and securely fixed in its designated location. This precision is vital for accurate image acquisition, reducing wear and tear on sensitive equipment, and preventing potential accidents. In Mauritius, these services are indispensable for a range of healthcare facilities and specialized imaging centers.
| Customer Type | Key Departments Involved | Primary Needs Addressed |
|---|---|---|
| Public Hospitals | Radiology Department, Medical Physics Department, Biomedical Engineering Department | Ensuring accurate diagnostics for a wide patient population, maintaining operational efficiency of critical equipment, adherence to safety standards, compliance with national health regulations. |
| Private Hospitals | Radiology Department, Biomedical Engineering Department, Quality Assurance Department | Maintaining high diagnostic accuracy for competitive service delivery, maximizing equipment uptime, preventing costly repairs due to misalignment, enhancing patient safety and trust. |
| Diagnostic Imaging Centers | Radiology Department, Technical Operations, Quality Control | Delivering precise imaging for referrals, optimizing scan times, ensuring consistent image quality, minimizing service interruptions, efficient space utilization. |
| Specialized Medical Clinics | Radiology Department, Clinical Specialists (e.g., Oncologists, Neurologists), Technical Staff | Acquiring highly detailed images for specific diagnostic needs (e.g., tumor staging, neurological assessments), supporting advanced treatment planning, ensuring equipment is calibrated for specialized protocols. |
| Research Institutions | Research & Development Department, Imaging Core Facility, Data Management | Maintaining strict imaging parameters for reproducible research, ensuring data integrity and accuracy, supporting cutting-edge medical research, optimizing for specific experimental setups. |
| Government Health Departments | Procurement & Logistics, Public Health Services, Regulatory Affairs | Overseeing the proper installation and maintenance of public healthcare infrastructure, ensuring public safety and equitable access to quality imaging services, compliance monitoring of medical equipment standards. |
Target Customers and Departments Requiring CT Gantry Positioning, Leveling & Anchoring Service in Mauritius:
- Hospitals (Public and Private)
- Diagnostic Imaging Centers
- Specialized Medical Clinics (e.g., Oncology, Neurology)
- Research Institutions with Imaging Capabilities
- Government Health Departments/Ministries (for public health initiatives and equipment oversight)
Ct Gantry Positioning, Leveling & Anchoring Service Process In Mauritius
This document outlines the comprehensive workflow for CT Gantry Positioning, Leveling & Anchoring Services provided in Mauritius. The process is designed to ensure precise installation and secure foundation for CT gantries, adhering to all safety and regulatory standards. It covers the entire service lifecycle, from the initial customer inquiry to the final handover and documentation.
| Phase | Stage | Description | Key Activities | Deliverables | Responsible Parties |
|---|---|---|---|---|---|
| Phase 1 | Initial Inquiry | Customer expresses interest in CT gantry positioning, leveling, and anchoring services. | Receive and log inquiry, understand basic project requirements (CT model, location, timeline). | Acknowledgement of inquiry, preliminary understanding of scope. | Customer, Service Provider Sales/Inquiry Team |
| Consultation & Scoping | Detailed discussion to define project scope, technical requirements, and budget. | Technical consultation, site visit coordination, preliminary quotation preparation, clarification of client needs and expectations. | Detailed scope of work, preliminary quotation, project timeline estimation. | Customer, Service Provider Technical Sales/Engineers | |
| Phase 2 | Site Survey & Assessment | On-site evaluation of the installation location to gather critical data. | Measure dimensions, assess floor integrity and load-bearing capacity, identify access points, check for existing utilities (electrical, plumbing), analyze environmental factors (vibration, temperature). | Detailed site survey report, photographic documentation, identification of potential challenges. | Service Provider Site Survey Team |
| Technical Planning & Design | Develop detailed engineering plans for positioning, leveling, and anchoring. | Create precise placement diagrams, calculate anchor bolt requirements, design leveling solutions, plan for crane/lifting operations, develop risk assessment and method statements (RAMS). | Gantry positioning plan, leveling specifications, anchoring design, RAMS. | Service Provider Engineering Team | |
| Client Approval & Final Quotation | Present detailed plan and secure client approval and finalize commercial terms. | Present site survey report, technical plans, and finalized quotation to the client for review and approval. | Approved technical plans, final comprehensive quotation, service agreement. | Service Provider Project Management, Customer | |
| Phase 3 | Material Procurement | Acquire all necessary materials and equipment for the service. | Order anchor bolts, leveling shims, concrete, reinforcement, specialized tools, safety equipment. | Procured materials and equipment ready for transport. | Service Provider Procurement/Logistics Team |
| Site Preparation | Prepare the installation area according to the technical plan. | Clearance of the installation area, mark out precise positioning points, prepare anchor bolt locations (drilling, grouting). | Prepared and marked installation site. | Service Provider Installation Team | |
| Phase 4 | Gantry Transportation & Unloading | Safely transport the CT gantry to the site and unload. | Coordinate logistics, use appropriate lifting equipment to unload gantry components. | Gantry components safely on-site. | Service Provider Logistics & Installation Teams |
| Gantry Positioning | Precisely place the gantry components according to the approved plan. | Use of surveying equipment and lifting machinery to align gantry rails and structures with millimeter accuracy. | Gantry components in their designated positions. | Service Provider Installation Team | |
| Leveling | Ensure the gantry and its tracks are perfectly level. | Utilize precision leveling tools, adjust with specialized shims and grout to achieve desired flatness and alignment. | Levelled gantry and tracks. | Service Provider Installation Team | |
| Anchoring | Securely fasten the gantry to the foundation. | Install anchor bolts as per design specifications, apply appropriate grout or concrete for robust fixation. | Securely anchored gantry. | Service Provider Installation Team | |
| Phase 5 | Quality Checks & Measurements | Verify the accuracy of positioning, leveling, and anchoring. | Conduct detailed measurements using laser trackers, levels, and other precision instruments. Verify anchor bolt integrity. | Measurement reports confirming adherence to specifications. | Service Provider QA/QC Team |
| Load Testing (if applicable) | Perform tests to ensure the gantry can support operational loads. | Conduct static and dynamic load tests as per manufacturer and regulatory requirements. | Load testing report. | Service Provider QA/QC & Technical Team | |
| Safety Inspection | Conduct a thorough safety inspection of the installed gantry. | Verify all safety protocols have been followed, check for any hazards. | Completed safety inspection checklist. | Service Provider Safety Officer | |
| Phase 6 | Client Walkthrough & Approval | Present the completed work to the client for final inspection and acceptance. | Joint inspection with the client, address any minor points, obtain formal sign-off. | Client acceptance form/sign-off. | Service Provider Project Manager, Customer |
| Documentation & Handover | Provide all relevant project documentation to the client. | Compile and hand over site survey reports, technical plans, installation reports, QA/QC reports, safety certificates, as-built drawings, operation & maintenance manuals. | Complete project documentation package. | Service Provider Project Management | |
| Phase 7 | Post-Service Follow-up | Ensure client satisfaction and address any post-installation queries. | Schedule follow-up calls, address any minor issues that may arise post-handover. | Client satisfaction confirmation. | Service Provider Customer Support/Project Management |
CT Gantry Positioning, Leveling & Anchoring Service Workflow
- Phase 1: Inquiry & Consultation
- Phase 2: Site Assessment & Planning
- Phase 3: Preparation & Material Procurement
- Phase 4: Execution - Positioning, Leveling & Anchoring
- Phase 5: Quality Assurance & Testing
- Phase 6: Handover & Documentation
- Phase 7: Post-Service Support
Ct Gantry Positioning, Leveling & Anchoring Service Cost In Mauritius
The cost of CT gantry positioning, leveling, and anchoring services in Mauritius can vary significantly based on several key factors. These services are critical for ensuring the accurate and safe operation of CT scanners, requiring specialized expertise and equipment. Understanding these influencing factors will help in estimating a realistic budget for such an undertaking.
| Service Component | Estimated Cost Range (MUR) |
|---|---|
| CT Gantry Positioning & Leveling (Basic) | 15,000 - 30,000 |
| CT Gantry Anchoring (Standard) | 10,000 - 25,000 |
| Complex Gantry/Site Conditions (Positioning, Leveling & Anchoring) | 35,000 - 70,000+ |
| Site Preparation (Minor adjustments, e.g., floor patching) | 5,000 - 15,000 |
| Site Preparation (Major structural work/new pad) | 20,000 - 50,000+ |
| Specialized Equipment Rental (e.g., heavy lifting gear) | 5,000 - 20,000 (per day/project) |
| On-site Technical Consultation/Assessment | 3,000 - 8,000 |
Key Pricing Factors for CT Gantry Positioning, Leveling & Anchoring Services in Mauritius:
- Type and Size of CT Scanner: Larger, heavier, or more complex CT gantries will naturally require more robust anchoring and potentially more time-consuming positioning and leveling. The specific model and its dimensions are primary determinants.
- Site Preparation Requirements: The existing floor condition, its load-bearing capacity, and the need for any structural modifications (e.g., reinforcement, specialized concrete pads) will heavily influence costs. If the facility needs to be adapted to accommodate the gantry, this adds to the overall expense.
- Accessibility of the Installation Site: Difficult access to the room where the CT scanner will be installed, involving narrow corridors, multiple levels, or limited maneuvering space, can increase labor time and potentially necessitate specialized lifting equipment, leading to higher costs.
- Complexity of Anchoring: The type of flooring (e.g., concrete, raised access flooring) and the required anchoring method will impact the materials and labor involved. Some anchoring systems are more involved than others.
- Leveling Precision Requirements: While all CT gantries require precise leveling, extremely stringent tolerances or the need for advanced leveling techniques can add to the service duration and cost.
- Labor Rates and Expertise: The hourly rates of specialized technicians and engineers in Mauritius, along with their experience and certifications, will directly affect the final price. The demand for these specialized skills can also play a role.
- Travel and Logistics: If the service provider needs to travel from a different region within Mauritius, or if specialized equipment needs to be transported, these logistical costs will be factored in.
- Timeline and Urgency: Expedited services or installations requiring work outside of standard business hours may incur premium charges.
- Additional Services: This might include site inspections, vibration analysis, or post-installation testing, which are often bundled or offered as optional extras.
- Market Competition: The number of qualified service providers in Mauritius offering these specialized services can influence pricing due to competitive pressures.
Affordable Ct Gantry Positioning, Leveling & Anchoring Service Options
Ensuring precise alignment and secure installation of your CT gantry is critical for accurate imaging, patient safety, and equipment longevity. Our affordable CT gantry positioning, leveling, and anchoring service offers a comprehensive solution designed to optimize your medical imaging operations without breaking the budget. We understand that healthcare facilities often face budgetary constraints, which is why we've developed flexible service options and cost-saving strategies to make essential maintenance accessible.
| Service Component | Standard Cost (Estimate) | Value Bundle Savings (%) | Potential Cost Savings with Bundling |
|---|---|---|---|
| CT Gantry Positioning | $XXX - $XXX | N/A | N/A |
| CT Gantry Leveling | $XXX - $XXX | N/A | N/A |
| CT Gantry Anchoring | $XXX - $XXX | N/A | N/A |
| Comprehensive Service Package (All 3) | $XXX - $XXX | 10-20% | Saves $XXX - $XXX per gantry |
| Preventative Maintenance Bundle (Gantry + X-ray) | $XXX - $XXX | 15-25% | Saves $XXX - $XXX annually |
| Multi-Gantry Discount (3+ Gantries) | $XXX - $XXX (per gantry) | 5-15% (additional) | Saves $XXX - $XXX on subsequent gantries |
Our Value Bundles & Cost-Saving Strategies
- {"title":"Comprehensive CT Gantry Service Package","description":"This all-inclusive bundle covers precise positioning, meticulous leveling, and secure anchoring of your CT gantry. It's our most popular option for facilities seeking proactive maintenance and peace of mind. Includes a detailed post-service report and a limited warranty on labor."}
- {"title":"Preventative Maintenance Bundle","description":"Combine your gantry services with routine preventative maintenance for other critical imaging equipment. This bundled approach minimizes downtime and reduces overall service call frequency, leading to significant cost savings."}
- {"title":"Multi-Gantry Discount","description":"If your facility has multiple CT scanners requiring service, we offer attractive discounts on additional gantry setups within the same service visit. This is an excellent way to maximize efficiency and reduce per-unit costs."}
- {"title":"Off-Peak Service Scheduling","description":"By scheduling your CT gantry service during off-peak hours or less busy periods for your facility, we can offer reduced rates due to increased scheduling flexibility and lower operational overhead."}
- {"title":"Long-Term Service Contracts","description":"Commit to a long-term service contract for your CT gantry and other imaging equipment and benefit from preferential pricing, priority scheduling, and dedicated account management. This demonstrates a commitment to ongoing care and yields the best long-term value."}
- {"title":"New Installation & Upgrade Packages","description":"When installing a new CT scanner or upgrading an existing one, ensure it's perfectly positioned and anchored from day one. Our packages integrate these services seamlessly into your installation or upgrade process at a competitive rate."}
Verified Providers In Mauritius
In Mauritius, accessing reliable and trustworthy healthcare providers is paramount. Franance Health stands out by meticulously vetting its network, ensuring that every listed provider meets stringent credentialing standards. This rigorous verification process underscores their commitment to patient safety and quality of care, making them the premier choice for individuals seeking healthcare services. Understanding the importance of qualifications, experience, and ethical practice, Franance Health goes above and beyond to guarantee that their listed professionals are not only skilled but also adhere to the highest medical and ethical guidelines. This comprehensive approach to provider verification offers peace of mind and assures patients they are in capable hands.
| Credential Type | Verification Scope | Franance Health Assurance |
|---|---|---|
| Medical Licenses | Valid and current registration with the relevant Mauritian medical board. | Confirmed active and unencumbered licenses for all listed practitioners. |
| Academic Degrees & Diplomas | Authenticity and recognition of educational institutions and degrees obtained. | Verification of degrees from accredited and recognized medical schools. |
| Specialist Certifications | Proof of successful completion of recognized specialist training programs. | Confirmation of valid specialist certifications and fellowships where applicable. |
| Professional Experience | Documented work history and clinical practice experience. | Assessment of relevant experience and specialization in their field. |
| Reputation & Background Checks | Review of professional conduct and any disciplinary actions. | Due diligence conducted to ensure a positive and ethical professional standing. |
Why Franance Health Credentials Represent the Best Choice:
- Rigorous Verification Process: Franance Health employs a multi-faceted approach to verify each provider's credentials, including academic qualifications, professional licenses, and board certifications.
- Emphasis on Experience: Beyond basic qualifications, Franance Health considers the practical experience and track record of healthcare professionals, ensuring they have a proven history of effective patient care.
- Commitment to Ethical Standards: All verified providers on the Franance Health platform adhere to a strict code of conduct and ethical guidelines, prioritizing patient well-being and confidentiality.
- Continuous Monitoring: Franance Health doesn't just verify once; they maintain a system for ongoing monitoring of provider performance and adherence to standards.
- Patient-Centric Approach: The entire verification process is designed with the patient's best interests in mind, aiming to connect them with safe, competent, and compassionate healthcare professionals.
- Transparency and Trust: By clearly outlining their verification methodology, Franance Health builds trust and transparency with users, empowering them to make informed healthcare decisions.
Scope Of Work For Ct Gantry Positioning, Leveling & Anchoring Service
This Scope of Work (SOW) outlines the services required for the precise positioning, leveling, and anchoring of a CT Gantry. The objective is to ensure the gantry is installed according to manufacturer specifications, providing a stable and accurate foundation for optimal imaging performance. This document details the technical deliverables, standard specifications, and the overall process involved in this critical installation phase.
| Technical Deliverable | Standard Specification | Acceptance Criteria |
|---|---|---|
| Leveling Report | Manufacturer's specified tolerance (e.g., +/- 0.05 mm/m for primary axes, +/- 0.01 degrees for rotational axes) | Measured level deviation within the specified tolerance, confirmed by calibrated instruments. |
| Alignment Report | Manufacturer's specified positional and rotational tolerances (e.g., concentricity, perpendicularity, flatness) | Measured alignment deviations within manufacturer's specified tolerances, verified using precision alignment tools. |
| Anchoring Integrity Report | Manufacturer's specified anchoring hardware and torque requirements; adherence to load-bearing capacity calculations. | All anchor points are installed correctly with specified hardware, torqued to manufacturer's recommendations, and demonstrate no signs of movement under simulated load (if applicable). |
| Installation Drawings Compliance Report | Strict adherence to all dimensions, reference points, and clearances as depicted in the official manufacturer's installation drawings. | Confirmation that the gantry is positioned and anchored precisely according to all markings and dimensions on the approved installation drawings. |
| Pre-Installation Site Readiness Checklist | All pre-installation site requirements met as per manufacturer's guidelines (e.g., floor flatness, load-bearing capacity, access routes, environmental conditions). | Completed and signed checklist by both service provider and client representative prior to commencing work. |
| Post-Installation Inspection Report | Visual confirmation of no damage, proper component seating, and clean installation environment. | No visible damage to the gantry or surrounding area; all components are properly seated; installation area is clean and free of debris. |
Key Activities and Responsibilities
- Site Preparation Verification: Confirming the installation area meets all pre-installation requirements outlined in the manufacturer's specifications, including structural integrity, clear access, and environmental conditions.
- Gantry Unpacking and Inspection: Carefully unpacking the CT gantry components and conducting a thorough visual inspection for any damage incurred during transit. Documenting any discrepancies.
- Initial Gantry Positioning: Precisely maneuvering the CT gantry into its designated installation location, aligning it with pre-marked reference points and ensuring adequate clearances.
- Leveling and Alignment: Utilizing precision leveling instruments and techniques to achieve the manufacturer's specified level of accuracy for the gantry's base and primary axes. This includes verifying rotational and linear alignment.
- Temporary Securing: Implementing temporary securing measures to maintain the gantry's position and stability during the initial leveling and alignment process.
- Anchoring Point Identification: Locating and verifying the exact positions for anchoring as per the manufacturer's installation drawings and site floor plan.
- Anchoring Preparation: Preparing the anchoring points, which may include drilling, cleaning, and preparing the concrete substrate to ensure optimal adhesion and load-bearing capacity.
- Gantry Anchoring: Securely anchoring the CT gantry to the prepared floor using specified hardware (e.g., anchor bolts, epoxy anchors) and adhering to torque specifications. Ensuring consistent and robust fixation.
- Final Level and Alignment Check: Performing a comprehensive re-verification of the gantry's level and alignment after anchoring to confirm no shifts have occurred and all specifications are met.
- Documentation and Sign-off: Providing detailed documentation of the entire process, including measurements, used materials, and a final sign-off confirming successful completion according to specifications.
Service Level Agreement For Ct Gantry Positioning, Leveling & Anchoring Service
This Service Level Agreement (SLA) outlines the terms and conditions for the CT Gantry Positioning, Leveling & Anchoring Service provided by [Your Company Name]. It defines the responsibilities of both parties, service objectives, and remedies in case of non-compliance. This SLA is an addendum to the Master Service Agreement (MSA) between [Your Company Name] and [Client Company Name].
| Issue Severity | Response Time (During Service Hours) | Resolution Time Target (During Service Hours) | Uptime Guarantee |
|---|---|---|---|
| Critical Issue | 1 Hour | 4 Business Hours | 99.5% (monthly) |
| Major Issue | 2 Business Hours | 8 Business Hours | 99.0% (monthly) |
| Minor Issue | 4 Business Hours | 3 Business Days | N/A (tracked for continuous improvement) |
Key Definitions
- Service: CT Gantry Positioning, Leveling & Anchoring Service, which includes the initial setup, precise alignment, and secure anchoring of CT gantries to ensure optimal performance and safety.
- Client: [Client Company Name], the recipient of the Service.
- Provider: [Your Company Name], the provider of the Service.
- Service Hours: [Specify Service Hours, e.g., Monday-Friday, 8:00 AM - 5:00 PM Local Time, excluding public holidays].
- Critical Issue: A malfunction or error that renders the CT gantry unusable or poses an immediate safety risk, preventing imaging procedures.
- Major Issue: A malfunction or error that significantly degrades the performance or accuracy of the CT gantry, impacting imaging quality but not rendering it completely unusable.
- Minor Issue: An aesthetic defect or a functional issue that does not impact the core functionality or safety of the CT gantry.
- Downtime: The period during which the Service is unavailable to the Client due to a Critical or Major Issue, excluding Scheduled Maintenance.
- Scheduled Maintenance: Pre-planned periods for routine maintenance, upgrades, or inspections communicated to the Client in advance.
- Response Time: The maximum time allowed for the Provider to acknowledge a reported issue and initiate troubleshooting or a site visit.
- Resolution Time: The maximum time allowed for the Provider to resolve a reported issue, restoring the Service to its agreed-upon operational state.
- Uptime Guarantee: The percentage of time the Service is expected to be available and functional, excluding Scheduled Maintenance.
Frequently Asked Questions

Ready when you are
Let's scope your CT Gantry Positioning, Leveling & Anchoring Service in Mauritius project in Mauritius.
Scaling healthcare logistics and technical systems across the entire continent.

