Strategic Asset Condition Assessment & Modernization

Leveraging advanced NDT (Non-Destructive Testing) and diagnostic tools, we meticulously assess the structural integrity and operational efficiency of existing industrial assets. Our expert engineers then design and implement tailored refurbishment and upgrade packages, integrating modern technologies to enhance performance, extend lifespan, and improve safety compliance in Zambia's critical infrastructure.

Electrical System Modernization & Life-Extension

We specialize in the comprehensive refurbishment and upgrade of aging electrical distribution and control systems for mining, manufacturing, and utility sectors in Zambia. This includes replacing outdated switchgear, transformers, and control panels with state-of-the-art, energy-efficient alternatives, significantly reducing operational costs and ensuring reliable power supply for decades to come.

Mechanical Component Re-engineering & Performance Optimization

Through precision machining, material science expertise, and advanced simulation techniques, we re-engineer and refurbish critical mechanical components such as pumps, turbines, and heavy machinery. Our focus is on restoring original performance, enhancing durability, and often exceeding original specifications to maximize the operational life and productivity of vital Zambian industrial equipment.

What Is Refurbishment, Upgrades & Life-extension In Zambia?

Refurbishment, upgrades, and life-extension in the Zambian healthcare sector refer to the processes of restoring, improving, and prolonging the operational lifespan of existing medical equipment and facilities. This encompasses a range of activities, from minor repairs and aesthetic enhancements to significant technological modernizations and structural improvements. These initiatives are crucial for ensuring the continued functionality, efficiency, and safety of healthcare infrastructure, ultimately impacting the quality of patient care.

CategoryDefinitionScope in Zambian Healthcare
RefurbishmentThe process of cleaning, repairing, and restoring medical equipment or facilities to a good working condition and appearance. It focuses on returning an item to its original or near-original state of functionality and aesthetics.Includes: Servicing of x-ray machines, dental chairs, patient monitors, laboratory equipment, and general ward furniture. Painting and minor structural repairs to clinics and hospitals.
UpgradesInvolves enhancing existing medical equipment or facilities by incorporating newer technologies, improved components, or software modifications to boost performance, add new features, or increase efficiency.Includes: Software updates for imaging equipment, adding new modules to diagnostic machines, replacing older components with more advanced ones (e.g., upgrading a traditional microscope to a digital one), or improving the IT infrastructure of a healthcare facility.
Life-ExtensionA broader strategy that encompasses refurbishment and upgrades, with the primary goal of significantly extending the operational lifespan of medical equipment and facilities beyond their originally anticipated service life.Includes: Comprehensive maintenance programs, component replacements, major overhauls, and retrofitting of older equipment to meet modern medical standards and demand. This can also involve re-purposing older but still functional equipment for less demanding roles.

Importance of Refurbishment, Upgrades & Life-Extension in Zambian Healthcare

  • Cost-Effectiveness: Often significantly cheaper than purchasing new equipment, allowing for better allocation of limited healthcare budgets.
  • Improved Patient Care: Ensures that vital medical devices remain operational and meet current diagnostic and treatment standards, leading to better patient outcomes.
  • Extended Asset Lifespan: Maximizes the return on investment for previously acquired medical technology, reducing the need for premature replacements.
  • Enhanced Efficiency and Performance: Upgrades can introduce newer, more efficient technologies, leading to faster diagnostics, improved workflows, and reduced downtime.
  • Reduced Environmental Impact: Extends the life of existing assets, diverting them from landfills and reducing the environmental footprint associated with manufacturing new equipment.
  • Addressing Equipment Shortages: By keeping existing equipment functional, these processes can help alleviate shortages of essential medical devices, especially in underserved areas.
  • Compliance and Safety: Ensures that equipment meets current safety regulations and performance standards, protecting both patients and healthcare professionals.
  • Skill Development: Provides opportunities for local technicians to develop specialized skills in maintenance, repair, and upgrading of medical technology.

Who Benefits From Refurbishment, Upgrades & Life-extension In Zambia?

In Zambia, refurbishment, upgrades, and life-extension initiatives within the healthcare sector offer significant benefits to a diverse range of stakeholders and healthcare facility types. These investments aim to improve the quality, accessibility, and sustainability of healthcare services across the nation.

Healthcare Facility TypeSpecific Benefits of Refurbishment, Upgrades & Life-Extension
Central Hospitals (Tertiary Level)Enhanced capacity for specialized procedures, advanced diagnostics (e.g., MRI, CT scanners), improved intensive care units (ICUs), upgraded surgical theaters, extended lifespan of critical infrastructure.
Provincial/District Hospitals (Secondary Level)Improved outpatient and inpatient services, upgraded laboratory facilities, better maternity wards, enhanced pharmacy services, more reliable power and water systems.
Health Centers (Primary Level)Basic but critical upgrades to consultation rooms, maternal waiting shelters, essential equipment (e.g., refrigerators for vaccines), improved sanitation facilities, enhanced accessibility for remote populations.
Specialized Medical Units (e.g., TB Centers, HIV Clinics, Maternity Units)Tailored upgrades to specific functional requirements, improved infection control measures, installation of specialized diagnostic or treatment equipment, enhanced patient comfort and privacy.
Administrative and Support Facilities (e.g., Medical Stores, Training Centers)Improved storage conditions for pharmaceuticals and supplies, enhanced capacity for staff training and development, modernized IT infrastructure, better research facilities.

Target Stakeholders Benefiting from Healthcare Refurbishment, Upgrades & Life-Extension in Zambia:

  • Patients and the Public: The primary beneficiaries, experiencing improved health outcomes through access to better-equipped facilities, reduced waiting times, and enhanced quality of care. This also includes increased trust and confidence in the public healthcare system.
  • Healthcare Professionals (Doctors, Nurses, Technicians, etc.): Benefit from modern, safe, and functional working environments. Upgraded equipment and facilities enhance their ability to diagnose, treat, and manage patient conditions effectively, leading to increased job satisfaction and reduced burnout.
  • Ministry of Health (MoH) and Government Agencies: Achieve national health goals, improve public health indicators, and demonstrate effective resource allocation and governance. Life-extension of infrastructure reduces the need for costly new construction.
  • Local Communities: Experience improved health and economic well-being. Well-functioning local health centers can reduce the need for travel to distant facilities, while refurbishment projects can create local employment opportunities.
  • Medical Equipment Suppliers and Manufacturers: Benefit from increased demand for new, upgraded, and replacement equipment. This also includes opportunities for after-sales service and maintenance contracts.
  • Construction and Engineering Firms: Directly benefit from contracts to undertake refurbishment, renovation, and upgrade projects, fostering local industry growth and job creation.
  • Healthcare Training and Educational Institutions: Can utilize upgraded facilities for practical training and skill development of future healthcare professionals, ensuring a skilled workforce.
  • International Development Partners and Donors: Achieve their objectives of supporting Zambia's health sector development, seeing tangible results of their investments and contributing to sustainable healthcare solutions.
  • Private Healthcare Providers: While primarily focused on public facilities, the overall improvement in the health sector can lead to a more robust ecosystem, potentially creating opportunities for collaboration and knowledge sharing.
  • Policymakers and Regulators: Gain insights into the effectiveness of infrastructure investment strategies, informing future policy decisions and resource allocation for the health sector.

Refurbishment, Upgrades & Life-extension Implementation Framework

This framework outlines the step-by-step lifecycle for implementing refurbishment, upgrades, and life-extension projects. It covers the entire process from initial assessment and planning through to final sign-off and handover, ensuring a structured and effective approach to maximizing asset value and performance.

PhaseKey StagesActivitiesDeliverables
Phase 1: Assessment & PlanningAsset Condition AssessmentConduct comprehensive review of asset's current state, performance, and remaining useful life. Identify deficiencies, obsolescence, and future operational requirements. Perform risk assessment. Develop business case and define project objectives and scope.Condition Report, Risk Assessment Report, Business Case, Project Charter, High-Level Scope Definition.
Phase 1: Assessment & PlanningFeasibility Study & Option AnalysisEvaluate different refurbishment, upgrade, and life-extension strategies. Analyze technical, economic, and operational feasibility of each option. Select preferred approach.Feasibility Study Report, Option Analysis, Preferred Strategy Recommendation.
Phase 1: Assessment & PlanningProject Planning & BudgetingDevelop detailed project plan, including timelines, resources, budget allocation, and stakeholder engagement strategy. Define key performance indicators (KPIs) and success criteria.Detailed Project Plan, Budget, Resource Plan, Stakeholder Register, KPI Definitions.
Phase 2: Design & EngineeringConceptual & Detailed DesignDevelop detailed engineering designs and specifications for proposed modifications, upgrades, and refurbishments. Ensure compliance with relevant standards and regulations.Conceptual Design Report, Detailed Engineering Drawings, Specifications, Bill of Materials (BOM).
Phase 2: Design & EngineeringProcurement DocumentationPrepare tender documents, including scopes of work, technical requirements, and contractual terms, for procurement of materials, equipment, and services.Tender Packages, Request for Proposal (RFP) Documents.
Phase 3: Procurement & LogisticsSupplier Selection & Contract AwardEvaluate supplier proposals, conduct negotiations, and award contracts for materials, equipment, and specialized services. Establish logistics and supply chain management.Supplier Evaluation Reports, Awarded Contracts, Logistics Plan.
Phase 3: Procurement & LogisticsMaterial & Equipment AcquisitionProcure, inspect, and deliver all necessary materials and equipment to the project site. Manage inventory and storage.Materials & Equipment Delivery Records, Inventory Management System.
Phase 4: Execution & ImplementationSite Preparation & MobilizationPrepare the work site, establish safety protocols, and mobilize project teams and equipment. Implement necessary permits and environmental controls.Site Preparation Plan, Safety Plan, Mobilization Report, Permits.
Phase 4: Execution & ImplementationRefurbishment, Upgrade & InstallationExecute the planned refurbishment, upgrade, and installation activities according to the design specifications and project plan. Supervise and manage contractors.Progress Reports, Work Completion Records, Quality Control Checklists.
Phase 4: Execution & ImplementationQuality Assurance & ControlImplement quality assurance and control procedures throughout the execution phase to ensure work meets specified standards and requirements.Quality Inspection Reports, Non-Conformance Reports (NCRs), Corrective Action Reports (CARs).
Phase 5: Testing & CommissioningPre-Commissioning & System ChecksConduct preliminary checks and functional tests of individual components and systems to verify proper installation and operation.Pre-Commissioning Reports, System Test Results.
Phase 5: Testing & CommissioningCommissioning & Performance TestingPerform integrated system testing and performance validation to ensure the asset operates as intended and meets performance KPIs. Conduct trial runs.Commissioning Plan, Performance Test Reports, Trial Run Records.
Phase 5: Testing & CommissioningDefect RectificationAddress and rectify any defects or non-conformances identified during testing and commissioning.Defect Resolution Logs, Rework Records.
Phase 6: Handover & ClosureFinal Inspection & AcceptanceConduct final inspections with stakeholders and obtain formal acceptance of the refurbished or upgraded asset.Final Inspection Report, Acceptance Certificate.
Phase 6: Handover & ClosureDocumentation & TrainingCompile and hand over all relevant documentation, including as-built drawings, operation & maintenance manuals, and training materials. Provide training to operational staff.As-Built Drawings, O&M Manuals, Training Materials, Training Records.
Phase 6: Handover & ClosureProject Closure & Post-Implementation ReviewFormally close the project, conduct a post-implementation review to assess project performance against objectives, capture lessons learned, and archive project documentation.Project Closure Report, Post-Implementation Review Report, Lessons Learned Document, Archived Project Files.

Refurbishment, Upgrades & Life-Extension Implementation Framework

  • Phase 1: Assessment & Planning
  • Phase 2: Design & Engineering
  • Phase 3: Procurement & Logistics
  • Phase 4: Execution & Implementation
  • Phase 5: Testing & Commissioning
  • Phase 6: Handover & Closure

Refurbishment, Upgrades & Life-extension Pricing Factors In Zambia

This document outlines the key pricing factors and cost variables associated with refurbishment, upgrades, and life-extension projects in Zambia. These projects are crucial for extending the operational lifespan and enhancing the performance of existing assets across various sectors, including mining, energy, manufacturing, and infrastructure. The cost of such initiatives is influenced by a complex interplay of technical requirements, material sourcing, labor expertise, logistical challenges, and regulatory compliance specific to the Zambian context.

Cost VariableDescriptionTypical Cost Range (USD)Notes for Zambia
Scope DefinitionClarity of work, extent of refurbishment/upgradeMinimal direct cost, but poor definition can add 50-100% to unforeseen costsCrucial for fixed-price contracts.
Condition AssessmentInspection, diagnostics, root cause analysis1,000 - 20,000+Can be higher for complex or critical assets. Specialist inspection services may be needed.
Materials & Spare Parts (General)Consumables, seals, bearings, minor components10% - 30% of total project costImport duties and VAT on imported parts increase costs significantly. Local sourcing can be cost-effective if quality is assured.
Major Component Replacement/UpgradeEngines, gearboxes, pumps, electrical panels5,000 - 500,000+OEM parts are substantially more expensive than reputable aftermarket options. Lead times for specialized parts can be long.
Skilled Labor (e.g., Mechanical Fitters, Electricians)Hourly/daily rates for experienced technicians25 - 100+ per hourRates are competitive with regional averages. Shortage of highly specialized skills can drive up costs.
Engineering & DesignFeasibility studies, detailed design, CAD5% - 15% of total project costMay involve international consultants for highly specialized designs, adding travel and accommodation costs.
Fabrication & MachiningCustom parts, structural modifications1,000 - 100,000+Local fabrication capacity varies. Larger projects may require sourcing from South Africa or further afield.
Logistics & TransportationMovement of equipment and materials to site2% - 10% of total project costSignificant factor for projects outside major urban centers (e.g., Copperbelt). Road infrastructure quality is a consideration.
Installation & CommissioningLabor, tools, testing equipment10% - 25% of total project costRequires careful scheduling to minimize asset downtime.
Project ManagementSite supervision, planning, administration5% - 15% of total project costCan be outsourced or managed internally. Includes safety officers and site personnel.
ContingencyBuffer for unforeseen issues10% - 20% of estimated costEssential due to potential for site-specific challenges and market volatility.
Testing & Quality AssuranceNDT, performance testing, certification1% - 5% of total project costMay require specialized third-party inspection agencies.
Import Duties & TaxesOn imported materials and equipmentVaries (5% - 30%+) depending on itemA major cost adder for imported components. Exemptions may apply for critical industrial equipment.

Key Cost Variables & Ranges for Refurbishment, Upgrades & Life-Extension in Zambia

  • 1. Scope of Work Definition: The clarity and comprehensiveness of the project scope are paramount. This includes the specific components to be refurbished, the extent of upgrades, and the desired life-extension period. A well-defined scope minimizes unforeseen costs.
  • 2. Asset Condition Assessment: A thorough assessment of the existing asset's condition is essential. This dictates the extent of repairs, potential hidden issues, and the overall complexity of the project.
  • 3. Equipment/Component Selection & Sourcing: The choice between original equipment manufacturer (OEM) parts, reputable aftermarket suppliers, or custom-fabricated components significantly impacts cost. Local vs. imported sourcing also plays a role.
  • 4. Material Costs: This includes the cost of raw materials, spare parts, consumables (welding rods, lubricants, sealants, paints), and specialized coatings. The volatility of global commodity prices and import duties in Zambia are key influencers.
  • 5. Labor Costs: This encompasses skilled labor (engineers, specialized technicians, welders, electricians), semi-skilled labor, and general workforce. Rates vary based on experience, qualifications, and the demand for specific skills in Zambia.
  • 6. Engineering & Design Services: Costs associated with detailed engineering, design modifications, feasibility studies, and simulation are critical for complex upgrades and life-extension.
  • 7. Fabrication & Manufacturing: If custom parts or modifications are required, fabrication costs, including workshop time, specialized machinery, and skilled labor, will be incurred.
  • 8. Logistics & Transportation: Moving equipment, materials, and personnel to and from the project site, especially in remote areas of Zambia, can be a substantial cost driver. This includes road, rail, or air freight, handling, and insurance.
  • 9. Installation & Commissioning: The labor and resources required to install refurbished components, new equipment, and test the entire system to ensure optimal performance.
  • 10. Testing & Quality Assurance: Rigorous testing, non-destructive examination (NDE), and quality control procedures add to the overall cost but are vital for project success and safety.
  • 11. Project Management: Overhead costs associated with project planning, scheduling, resource allocation, risk management, and site supervision.
  • 12. Contingency: An allocation for unforeseen issues, scope creep, or market fluctuations is standard practice and typically ranges from 10-20% of the estimated project cost.
  • 13. Regulatory Compliance & Permits: Obtaining necessary permits, adhering to local safety regulations, and environmental compliance can incur direct costs and potential delays.
  • 14. Training & Skill Development: If upgrades introduce new technologies, training for the client's operational and maintenance staff might be required.
  • 15. Currency Exchange Rates & Inflation: Fluctuations in the Zambian Kwacha (ZMW) against major currencies, particularly for imported goods and services, significantly impact final costs. Inflation rates also need to be considered for long-term projects.

Value-driven Refurbishment, Upgrades & Life-extension Solutions

Optimizing budgets and Return on Investment (ROI) for refurbishment, upgrades, and life-extension solutions requires a strategic, data-driven approach. These initiatives are crucial for maintaining asset value, ensuring operational efficiency, and deferring costly capital replacements. Success hinges on rigorous planning, accurate assessment, smart vendor selection, and continuous monitoring.

Strategy ElementBudget Optimization TacticROI Enhancement Tactic
Asset Assessment & PrioritizationFocus resources on assets with the highest potential for improvement and longest remaining life. Avoid unnecessary overhauls.Prioritize investments that yield the greatest impact on operational efficiency, uptime, and energy savings.
Clear Objectives & ScopePrevent scope creep through detailed planning and change control processes.Ensure projects deliver tangible, quantifiable benefits that align with strategic goals.
Data-Driven DecisionsUse historical data to forecast needs and avoid reactive, costly emergency repairs.Justify investments with data demonstrating expected improvements in efficiency, reliability, and reduced operating costs.
TCO AnalysisConsider long-term operational and maintenance costs when selecting solutions, not just initial price.Select solutions that offer the lowest total cost of ownership over their extended lifespan, maximizing value.
Vendor SelectionSeek competitive bids and negotiate favorable terms. Leverage bulk purchasing if applicable.Partner with vendors who can demonstrate proven ROI and offer performance guarantees.
Phased ImplementationBreak down projects to spread costs and allow for incremental budget allocation.Realize benefits and ROI sooner by implementing in stages.
Performance MonitoringTrack project expenditures against budget meticulously.Measure and verify actual performance improvements against projected ROI metrics.

Key Strategies for Optimizing Budget and ROI

  • Comprehensive Asset Assessment & Prioritization: Thoroughly evaluate the condition, performance, and remaining useful life of assets. Prioritize refurbishment and upgrade projects based on their potential to improve efficiency, reduce downtime, enhance safety, or extend operational life. Quantify the benefits of each potential investment.
  • Define Clear Objectives & Scope: Establish specific, measurable, achievable, relevant, and time-bound (SMART) goals for each project. Clearly define the scope of work to avoid scope creep, which can significantly inflate costs and delay timelines.
  • Data-Driven Decision Making: Leverage historical data on asset performance, maintenance costs, and failure rates. Use this data to predict future needs, justify investments, and benchmark performance against industry standards. Predictive analytics can identify potential issues before they become costly problems.
  • Total Cost of Ownership (TCO) Analysis: Move beyond initial purchase or refurbishment costs. Consider the entire lifecycle cost, including operational expenses, maintenance, energy consumption, and potential downtime, when evaluating different solutions. This holistic view ensures long-term value.
  • Strategic Vendor Selection & Negotiation: Conduct thorough due diligence when selecting refurbishment, upgrade, or life-extension service providers. Seek multiple competitive bids, evaluate vendor expertise, track record, and financial stability. Negotiate clear contracts with defined deliverables, timelines, and performance guarantees. Explore opportunities for bundled services or long-term partnerships.
  • Phased Implementation & Modular Upgrades: Where feasible, break down large projects into smaller, manageable phases. This allows for early wins, better budget control, and the ability to adapt to changing needs or technologies. Modular upgrades permit incremental improvements, reducing upfront capital outlay.
  • Standardization & Modularity: Wherever possible, standardize on specific refurbishment processes, upgrade components, or approved vendor technologies. This can lead to economies of scale in procurement, streamlined maintenance, and simplified training.
  • Risk Management & Contingency Planning: Identify potential risks associated with refurbishment projects (e.g., unforeseen damage, supply chain disruptions, regulatory changes). Develop contingency plans and allocate a realistic budget for unforeseen circumstances.
  • Performance Monitoring & Verification: Establish key performance indicators (KPIs) to track the success of refurbishment and upgrade projects. Regularly monitor asset performance post-completion to verify that objectives have been met and that the expected ROI is being realized. This feedback loop is crucial for continuous improvement.
  • Explore Innovative Financing & Leasing Options: Investigate alternative financing models, such as performance-based contracts, leasing agreements, or energy performance contracts (EPCs), which can shift risk and upfront costs.

Franance Health: Managed Refurbishment, Upgrades & Life-extension Experts

Franance Health stands as a leading provider of managed refurbishment, upgrades, and life-extension services for medical equipment. Our deep industry expertise, coupled with strong relationships with Original Equipment Manufacturers (OEMs), ensures that your vital healthcare assets are maintained at peak performance, maximizing their lifespan and operational efficiency. We understand the critical nature of medical technology and are dedicated to offering reliable, cost-effective solutions that uphold the highest standards of quality and patient care.

OEM PartnerSupported Equipment CategoriesService Expertise
GE HealthcareCT Scanners, MRI Systems, Ultrasound, Patient MonitoringRefurbishment, Upgrades, Life-Extension, Parts Sourcing
PhilipsMRI Systems, CT Scanners, X-ray, UltrasoundRefurbishment, Upgrades, Life-Extension, Certified Parts
Siemens HealthineersCT Scanners, MRI Systems, X-ray, Digital RadiographyRefurbishment, Upgrades, Life-Extension, OEM Compliance
Canon Medical SystemsCT Scanners, MRI Systems, UltrasoundRefurbishment, Upgrades, Life-Extension, Performance Optimization
FujifilmX-ray, Mammography, EndoscopyRefurbishment, Upgrades, Life-Extension, Diagnostic Imaging Solutions
MindrayPatient Monitoring, Anesthesia Machines, VentilatorsRefurbishment, Upgrades, Life-Extension, Critical Care Equipment

Our Credentials & OEM Partnerships

  • Extensive experience in refurbishing, upgrading, and extending the life of a wide range of medical equipment, including imaging systems, patient monitoring devices, surgical instruments, and laboratory equipment.
  • Certified technicians with specialized training and hands-on experience across various OEM platforms.
  • Adherence to stringent quality control processes and regulatory compliance (e.g., FDA, ISO).
  • Commitment to utilizing genuine OEM parts and adhering to manufacturer specifications during all refurbishment and upgrade processes.
  • Dedicated project management teams to ensure seamless execution and minimal disruption to clinical operations.
  • Proven track record of delivering significant cost savings and improved equipment reliability for our clients.

Standard Service Specifications

This document outlines the standard service specifications, including minimum technical requirements and deliverables. It is intended to ensure consistent quality and performance across all provided services.

Requirement CategoryMinimum Technical RequirementDeliverable
Infrastructure99.9% UptimeServer logs, uptime reports
PerformanceResponse time < 2 secondsPerformance test results, load testing reports
SecurityPCI DSS ComplianceSecurity audit reports, vulnerability scan results
Data ManagementDaily Backups, 30-day retentionBackup logs, recovery test results
Support24/7 Availability, 1-hour response timeSupport ticket logs, resolution times

Key Service Components

  • Service Level Agreement (SLA) adherence
  • Technical documentation
  • User training materials
  • Performance metrics reporting
  • Security compliance

Local Support & Response Slas

Our commitment to reliable service extends across all our operating regions. We guarantee specific uptime percentages and provide defined response times for support requests, ensuring you receive consistent and dependable assistance regardless of your location.

MetricStandard GuaranteeResponse Time (Critical Issues)Response Time (General Inquiries)
Uptime99.95%
Regional AvailabilityIncluded15 Minutes60 Minutes
Support Channels24/7Email, Chat, PhoneEmail, Chat

Key Service Level Agreements (SLAs):

  • Guaranteed Uptime: We strive for maximum availability, with regional uptime guarantees designed to minimize service interruptions.
  • Response Times: Our support team is committed to acknowledging and initiating action on your requests within predefined timeframes.
  • Regional Consistency: SLAs are applied uniformly across all supported geographical areas.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your Refurbishment, Upgrades & Life-Extension in Zambia project in Zambia.

Speak to Sales