
Equipment Disposal & Decommissioning in Tunisia
Engineering Excellence & Technical Support
Safe equipment decommissioning and disposal services High-standard technical execution following OEM protocols and local regulatory frameworks.
Specialized Decommissioning & Hazardous Material Management
Expert-led decommissioning of complex industrial equipment in Tunisia, adhering to stringent safety protocols. Our services include meticulous identification, containment, and safe removal of hazardous materials like asbestos, PCBs, and lead-based paints, ensuring full environmental compliance and minimizing site contamination.
Maximizing Value Through Asset Recovery & Responsible Recycling
We employ advanced techniques for equipment assessment to maximize the recovery of valuable components for reuse and resale in the Tunisian market. Non-recoverable materials are directed to certified recycling partners, diverting waste from landfills and promoting a circular economy for industrial assets.
Streamlined Permitting & Regulatory Adherence
Navigating the complexities of Tunisian environmental regulations for equipment disposal. We manage the entire permitting process, from initial applications to final reporting, ensuring full compliance with local and national legislation for all decommissioning and disposal activities. This guarantees a smooth and legally sound project completion.
What Is Equipment Disposal & Decommissioning In Tunisia?
Equipment Disposal & Decommissioning in Tunisia refers to the structured process of safely and compliantly removing, dismantling, and managing end-of-life, surplus, or obsolete industrial equipment. This service encompasses a range of activities critical for asset lifecycle management, environmental stewardship, and regulatory adherence within Tunisian operational contexts. It is a multi-faceted service ensuring that the cessation of equipment usage is handled with meticulous planning, execution, and documentation, adhering to both national environmental regulations and international best practices.
| Who Needs Equipment Disposal & Decommissioning Services in Tunisia? | Typical Use Cases | ||||||
|---|---|---|---|---|---|---|---|
| Industrial Manufacturers: Companies with aging production lines, outdated machinery, or facility expansions leading to the retirement of old equipment. | Oil and Gas Sector: Decommissioning of offshore platforms, refineries, pipelines, and exploration equipment nearing the end of their operational life or subject to regulatory mandates. | Power Generation Facilities: Retirement of old turbines, generators, transformers, and associated infrastructure from thermal, nuclear, or renewable energy plants. | Telecommunications Companies: Disposal of obsolete network infrastructure, data centers, and communication towers. | Mining and Extractive Industries: Removal of heavy machinery, processing plants, and infrastructure from closed or transitioning mining sites. | Chemical and Pharmaceutical Plants: Decommissioning of reactors, storage tanks, processing units, and laboratories, often involving complex hazardous material management. | Research and Development Institutions: Disposal of specialized laboratory equipment, experimental apparatus, and pilot plant facilities. | Government Agencies and Public Utilities: Retirement of public infrastructure, vehicles, and equipment no longer in service. |
| Facility Closure or Relocation: When a manufacturing plant, research center, or operational site is permanently closed or moved to a new location. | Technological Obsolescence: Replacement of outdated equipment with newer, more efficient, or technologically advanced systems. | Mergers and Acquisitions (M&A): Rationalization of duplicated or redundant assets following corporate consolidation. | Regulatory Compliance: Mandated decommissioning and disposal requirements, especially for environmentally sensitive industries or those dealing with hazardous materials. | Asset Lifecycle Management: Proactive planning and execution of asset retirement as part of a broader strategy for resource optimization and cost management. | Site Redevelopment: Preparing industrial sites for new uses by removing all existing structures and contaminated materials. | Environmental Risk Mitigation: Eliminating potential environmental hazards associated with dormant or abandoned equipment. |
Key Components of Equipment Disposal & Decommissioning Services:
- Asset Inventory and Assessment: Comprehensive cataloging of all equipment slated for decommissioning, including technical specifications, operational history, and current condition. This phase informs the subsequent disposal strategy.
- Decommissioning Planning: Development of detailed project plans outlining methodologies for safe shutdown, isolation of utilities (power, water, hazardous materials), dismantling procedures, and waste management strategies.
- Hazardous Material Identification and Management: Identification, testing, segregation, and safe removal of any hazardous substances (e.g., asbestos, PCBs, refrigerants, oils) in accordance with Tunisian environmental protection laws and international standards.
- Dismantling and Decontamination: The physical disassembly of equipment, often requiring specialized tools and techniques. This includes rigorous decontamination to remove residual hazardous materials or operational contaminants.
- Waste Segregation and Characterization: Categorization of all generated waste streams (e.g., metals, plastics, hazardous waste, general refuse) for appropriate treatment, recycling, or disposal.
- Environmental Remediation: Addressing any soil or groundwater contamination resulting from the equipment's operational history, in compliance with environmental regulations.
- Recycling and Reuse Valorization: Maximizing the recovery of valuable materials through recycling and, where feasible, identifying opportunities for equipment reuse or component refurbishment.
- Secure Disposal: The environmentally sound and legally compliant disposal of non-recyclable or hazardous waste at authorized facilities within Tunisia.
- Documentation and Certification: Comprehensive record-keeping of all activities, including disposal manifests, certificates of destruction, and environmental impact assessments, to ensure regulatory compliance and provide auditable trails.
Who Needs Equipment Disposal & Decommissioning In Tunisia?
Equipment disposal and decommissioning in Tunisia are essential services for a wide range of businesses and organizations. These services are critical for managing end-of-life assets, ensuring data security, complying with environmental regulations, and freeing up valuable space. The demand stems from various sectors that utilize specialized equipment throughout its lifecycle.
| Customer Type | Key Departments Involved | Specific Needs |
|---|---|---|
| Telecommunications Companies | IT Operations, Network Engineering, Facilities Management, Security | Disposal of servers, routers, switches, network cables, old mobile infrastructure, ensuring secure data erasure from storage devices. |
| Financial Institutions (Banks, Insurance) | IT Department, Compliance, Risk Management, Facilities | Secure disposal of ATMs, servers, teller machines, workstations, and any equipment containing sensitive customer data. Strict adherence to data destruction protocols. |
| Manufacturing & Industrial Companies | Production Management, Maintenance, Operations, EHS (Environment, Health, and Safety) | Decommissioning and disposal of old machinery, production lines, testing equipment, and factory components. Focus on safe dismantling and responsible material recycling. |
| Oil & Gas / Energy Sector | Operations, Engineering, HSE, Procurement | Disposal of exploration and drilling equipment, laboratory instruments, aging control systems, and offshore platform components. Requires specialized handling and disposal procedures due to potential hazardous materials. |
| Healthcare Providers (Hospitals, Clinics) | IT Department, Biomedical Engineering, Facilities Management, Procurement | Decommissioning and disposal of medical imaging devices (X-ray, MRI), laboratory equipment, patient monitoring systems, and IT hardware. Emphasis on regulatory compliance and data privacy for patient information. |
| Educational Institutions (Universities, Schools) | IT Department, Facilities Management, Research Labs | Disposal of old computer labs, scientific equipment, administrative hardware, and classroom technology. Often involves bulk disposal and focus on cost-effectiveness. |
| Government & Public Sector Agencies | IT Management, Procurement, Facilities, Security | Decommissioning of legacy IT systems, office equipment, vehicles, and specialized government machinery. Strict procurement and disposal regulations apply. |
| Retail Chains | IT Department, Store Operations, Facilities | Disposal of Point-of-Sale (POS) systems, back-office servers, security cameras, and store fixtures. Focus on efficient and timely removal to facilitate store upgrades or closures. |
Target Customers & Departments for Equipment Disposal & Decommissioning in Tunisia:
- Companies with aging IT infrastructure
- Organizations undergoing digital transformation or upgrades
- Businesses seeking to optimize space utilization
- Firms needing to comply with data privacy regulations
- Manufacturers with obsolete production machinery
- Research and development facilities with retired lab equipment
- Government agencies with legacy systems
- Healthcare providers with outdated medical devices
Equipment Disposal & Decommissioning Process In Tunisia
This document outlines the standard workflow for equipment disposal and decommissioning within Tunisia. It covers the process from the initial inquiry by a client or internal department to the final execution of the disposal or decommissioning service. The process is designed to ensure compliance with Tunisian environmental regulations, safety standards, and data security requirements.
| Stage | Description | Key Activities | Responsible Parties | Tunisian Regulations/Considerations |
|---|---|---|---|---|
| Inquiry & Initial Consultation | The process begins with an external client or an internal department expressing a need for equipment disposal or decommissioning. | Receive and review the request, gather preliminary information about the equipment and the client's needs, schedule an initial meeting. | Client/Internal Department, Service Provider (Disposal/Decommissioning Company) | N/A |
| Site Assessment & Equipment Inventory | A thorough evaluation of the site and the equipment to be decommissioned or disposed of. | Conduct on-site visit, identify all equipment, document model numbers, serial numbers, condition, quantities, and potential hazards. Assess accessibility and necessary safety precautions. | Service Provider, Client/Site Manager | Workplace safety regulations, environmental impact assessment requirements. |
| Proposal & Quotation | Based on the assessment, a detailed proposal and cost estimate are prepared. | Outline proposed services (decommissioning, disassembly, transport, data destruction, recycling), provide a breakdown of costs, specify timelines, and include any relevant certifications or permits. | Service Provider | Fair competition practices. |
| Contract & Agreement | Formalization of the service agreement between the client and the service provider. | Draft and review the contract, ensure all terms and conditions are understood and agreed upon, obtain signatures. | Client, Service Provider | Contract law in Tunisia. |
| Planning & Scheduling | Detailed planning of the operational execution. | Develop a detailed project plan, including timelines, resource allocation, manpower requirements, and coordination with the client and relevant authorities. | Service Provider, Client/Site Manager | Workplace safety plans, permits for specific activities (e.g., handling hazardous materials). |
| Pre-Decommissioning Preparations | Tasks to be completed before commencing on-site work. | Obtain necessary permits, inform relevant stakeholders, ensure safety equipment is available, prepare the site for work, disconnect power and utilities. | Service Provider, Client/Site Manager | Environmental protection laws, hazardous substance regulations, permits from local municipalities or relevant ministries (e.g., Ministry of Environment, Ministry of Industry). |
| On-Site Decommissioning & Disassembly | The physical process of dismantling and preparing equipment for removal. | Safely disassemble equipment according to plan, manage hazardous materials, ensure compliance with safety protocols. | Service Provider (trained personnel) | Occupational Health and Safety (OHS) regulations, specific guidelines for handling hazardous materials (e.g., refrigerants, oils, electronic components). |
| Transportation & Logistics | Moving the decommissioned equipment from the site to the designated disposal or recycling facility. | Securely load equipment onto transport vehicles, ensure compliance with transportation regulations for waste or used equipment. | Service Provider | Tunisian road transport laws, regulations concerning the transport of waste or potentially hazardous materials. |
| Data Destruction (if applicable) | Ensuring all sensitive data is securely erased from electronic devices. | Implement certified data erasure methods (e.g., physical destruction, software-based wiping) to meet security standards. | Service Provider | Data protection laws, industry-specific data security standards. |
| Recycling & Resale (if applicable) | Processing of equipment for reuse or material recovery. | Sort materials for recycling, identify components for potential resale, transfer to certified recycling facilities. | Service Provider, Certified Recycling Partners | Waste management regulations, regulations on e-waste recycling and material recovery, export/import regulations for used equipment if applicable. |
| Hazardous Waste Management (if applicable) | Proper handling and disposal of any identified hazardous materials. | Segregate, package, and transport hazardous waste to licensed disposal facilities in accordance with regulations. | Service Provider, Licensed Hazardous Waste Disposal Facilities | National environmental laws on hazardous waste management, specific permits for treatment and disposal of hazardous substances. |
| Final Documentation & Certification | Providing proof of completed services and regulatory compliance. | Issue certificates of disposal, data destruction certificates, waste transfer notes, and final reports detailing the process and outcomes. | Service Provider | Requirements for environmental reporting, proof of compliance for clients. |
| Project Closure & Billing | Concluding the project and processing financial aspects. | Submit final invoice to the client, obtain client sign-off on project completion, archive all project documentation. | Service Provider, Client | Payment terms as per contract. |
Equipment Disposal & Decommissioning Workflow in Tunisia
- Inquiry & Initial Consultation
- Site Assessment & Equipment Inventory
- Proposal & Quotation
- Contract & Agreement
- Planning & Scheduling
- Pre-Decommissioning Preparations
- On-Site Decommissioning & Disassembly
- Transportation & Logistics
- Data Destruction (if applicable)
- Recycling & Resale (if applicable)
- Hazardous Waste Management (if applicable)
- Final Documentation & Certification
- Project Closure & Billing
Equipment Disposal & Decommissioning Cost In Tunisia
The cost of equipment disposal and decommissioning in Tunisia is influenced by a variety of factors, leading to a wide range of pricing. These factors include the type and size of the equipment, its condition, the materials it's made from, the required disposal methods (e.g., recycling, landfill, hazardous waste treatment), transportation distances, and the specific service provider chosen. Specialized handling for electronic waste (e-waste) or industrial machinery often incurs higher costs due to the need for specific expertise and facilities. The current economic climate, including inflation and currency exchange rates (Tunisian Dinar - TND), also plays a role in local pricing.
| Equipment Category | Estimated Cost Range (TND) | Notes |
|---|---|---|
| Small Office Equipment (Computers, Printers, Monitors) | 50 - 300 TND per item | Primarily recycling/e-waste handling costs. Volume discounts may apply. |
| Large Office Equipment (Copiers, Servers) | 150 - 600 TND per item | Heavier, more complex, potentially containing more sensitive components. |
| Industrial Machinery (Small Scale) | 1,000 - 5,000 TND | Requires dismantling, specialized transport. Varies greatly by type. |
| Industrial Machinery (Large Scale/Complex) | 5,000 - 50,000+ TND | Significant dismantling, specialized lifting, transport, and hazardous material management often required. Site-specific assessment crucial. |
| Vehicles (End-of-Life) | 300 - 1,500 TND | Includes towing, draining fluids, and authorized dismantling for recycling. |
| Construction Debris (per Ton) | 100 - 300 TND per ton | Depends on material type and disposal site fees. |
| Hazardous Waste Disposal (per kg/liter) | 5 - 50+ TND per kg/liter | Highly dependent on the specific hazardous material and certified disposal facility. |
Key Pricing Factors for Equipment Disposal & Decommissioning in Tunisia
- Equipment Type & Size: Larger and more complex machinery will naturally cost more to dismantle and remove than smaller items.
- Material Composition: Equipment containing hazardous materials (e.g., refrigerants, heavy metals in electronics) requires specialized and often more expensive disposal methods.
- Condition & Age: Severely damaged or outdated equipment might be harder to handle and may have different recycling or disposal values.
- Decommissioning Complexity: The ease of access, dismantling requirements, and the need for specialized tools or techniques all impact costs.
- Transportation: Distance to the disposal or recycling facility, along with the volume and weight of the equipment, affects transport costs.
- Disposal Method: Options like recycling, resale of components, landfilling, or incineration have varying associated fees.
- Regulatory Compliance: Adherence to Tunisian environmental regulations for waste disposal can add to the overall expense.
- Service Provider: Different companies will have varying pricing structures, overheads, and profit margins.
- Market Demand for Recyclables: The value of scrap metal or reusable components can sometimes offset disposal costs.
Affordable Equipment Disposal & Decommissioning Options
Disposing of and decommissioning old equipment can be a significant undertaking, often involving substantial costs. Fortunately, there are affordable options available that can minimize expenses without compromising environmental responsibility or operational efficiency. This guide explores value bundles and cost-saving strategies to help businesses manage equipment disposal and decommissioning effectively.
| Cost-Saving Strategy | Description | Potential Savings |
|---|---|---|
| Bulk Disposal & Scheduling | Consolidate multiple disposal needs into a single service request. Scheduling disposals during off-peak times or in conjunction with other facility maintenance can also reduce costs. | Reduced per-item fees, lower logistical expenses. |
| Prioritize Refurbishment & Resale | Before discarding, assess equipment for its potential to be refurbished and resold. Many companies specialize in buying and refurbishing used IT equipment, offering a credit or payment for functional items. | Revenue generation, reduced disposal fees. |
| Negotiate Service Level Agreements (SLAs) | For ongoing disposal needs, negotiate long-term contracts or SLAs with providers. This can secure better pricing, guaranteed service levels, and priority scheduling. | Volume discounts, predictable costs, enhanced service. |
| Data Erasure vs. Physical Destruction | While physical destruction is the most secure, data erasure (wiping) can be more cost-effective for certain types of equipment if data security requirements are met. | Lower processing costs for erasure. |
| Responsible Recycling Partners | Choose certified e-waste recyclers who adhere to ethical and environmental standards. Some recyclers may offer rebates for valuable materials recovered. | Potential rebates, avoided environmental fines. |
| Internal Resource Assessment | Evaluate if any internal resources (staff, space) can be leveraged for basic dismantling or sorting of equipment before professional disposal, reducing labor costs for the vendor. | Reduced vendor labor charges. |
| Leverage Manufacturer Take-Back Programs | Some manufacturers offer take-back or recycling programs for their products, sometimes at a reduced cost or even free. | Reduced or free disposal costs. |
Key Value Bundles for Affordable Equipment Disposal & Decommissioning
- {"title":"Comprehensive Service Packages","description":"These bundles combine multiple services like asset removal, data destruction, recycling, and refurbishment into a single, often discounted, package. This streamlined approach reduces administrative overhead and can offer better per-service pricing."}
- {"title":"Data Destruction & Recycling Bundles","description":"Ideal for businesses with strict data privacy requirements, these packages focus on secure data wiping or physical destruction coupled with environmentally sound recycling of IT assets. This ensures compliance and reduces the risk of data breaches."}
- {"title":"Refurbishment & Resale Programs","description":"For functional equipment, these bundles include evaluation, refurbishment, and potential resale of your old assets. This can offset disposal costs, and in some cases, even generate revenue, making it a highly cost-effective solution."}
- {"title":"Environmental Compliance & Reporting","description":"This bundle ensures all disposal and decommissioning processes adhere to local, national, and international environmental regulations. It typically includes proper waste segregation, documentation, and certification, providing peace of mind and avoiding potential fines."}
- {"title":"On-site vs. Off-site Services","description":"Some providers offer tiered pricing based on whether the services are performed at your location or at their facility. On-site services may be more convenient but can incur higher labor costs, while off-site services might be more economical for bulk disposals."}
Verified Providers In Tunisia
When seeking healthcare services in Tunisia, especially those requiring specialized expertise or international standards, identifying 'Verified Providers' is paramount. This verification signifies a commitment to quality, safety, and ethical practices. Franance Health stands out as a leading entity in this regard, offering a curated network of healthcare professionals and facilities that have undergone rigorous vetting. Their credentials are not merely bureaucratic checkboxes; they represent a deep-seated dedication to patient well-being and superior medical outcomes. By choosing Franance Health's verified providers, patients gain access to a higher caliber of care, characterized by advanced medical technologies, highly skilled practitioners, and transparent operational standards. This ensures a safer, more efficient, and ultimately more successful healthcare journey.
| Key Credential | Franance Health Verification Means | Benefit to Patient |
|---|---|---|
| Medical Licensure & Accreditation | Providers hold valid national and, where applicable, international accreditations. Facilities meet stringent health and safety regulations. | Guarantees practitioners are qualified and facilities are safe and compliant. |
| Specialist Expertise & Experience | Thorough review of medical degrees, certifications, specialized training, and years of practice in specific fields. | Ensures access to highly skilled professionals with proven track records in their respective specialties. |
| Technological Advancement | Verification of access to and proficiency with modern medical equipment and diagnostic tools. | Facilitates accurate diagnoses and effective, up-to-date treatment options. |
| Patient Care Protocols | Assessment of established protocols for patient safety, infection control, pre- and post-operative care, and patient satisfaction. | Promotes a secure, comfortable, and supportive patient experience. |
| Ethical Conduct & Transparency | Adherence to a strict code of ethics, including informed consent, privacy, and fair billing practices. | Builds trust and ensures patients receive honest and respectful treatment. |
Why Franance Health's Verified Providers are the Best Choice:
- Rigorous Vetting Process: Franance Health employs a comprehensive evaluation of medical expertise, facility infrastructure, adherence to international standards, and patient safety protocols.
- Access to Top Medical Talent: Our network comprises leading specialists and surgeons renowned for their experience and innovative treatment approaches.
- State-of-the-Art Facilities: We partner with clinics and hospitals equipped with advanced diagnostic and therapeutic technologies.
- Patient-Centric Approach: Verified providers prioritize patient comfort, clear communication, and personalized care plans.
- Ethical and Transparent Practices: Franance Health ensures all partners adhere to the highest ethical guidelines and provide transparent pricing and treatment information.
- Global Recognition and Trust: Our verification process aligns with international healthcare quality benchmarks, fostering trust among patients worldwide.
Scope Of Work For Equipment Disposal & Decommissioning
This Scope of Work (SOW) outlines the requirements for the complete disposal and decommissioning of specified equipment. The objective is to ensure safe, environmentally responsible, and compliant removal and disposal of all designated assets. This includes site preparation, equipment disconnection, removal, transportation, and final disposal or recycling.
| Category | Specification Standard | Description | Applicable Documentation |
|---|---|---|---|
| Safety | OSHA 29 CFR 1926 (Construction Industry Standards) | Ensures safe working practices, including hazard communication, personal protective equipment (PPE), fall protection, and lockout/tagout procedures. | Method Statements, Risk Assessments, PPE Matrix |
| Environmental | EPA RCRA (Resource Conservation and Recovery Act) | Governs the generation, transportation, treatment, storage, and disposal of hazardous waste. Includes proper identification and handling of hazardous materials. | Waste Manifests, Disposal Certificates, Environmental Impact Assessment |
| Equipment Handling | ANSI B30 Standards (Safety Standards for Cableways, Cranes, Derricks, Hoists, Hooks, etc.) | Specifies safe operating procedures and equipment requirements for lifting and moving heavy machinery. | Lifting Plans, Crane Certifications |
| Transportation | DOT (Department of Transportation) Regulations | Covers the safe transport of goods, including vehicle requirements, driver qualifications, and placarding for hazardous materials. | Bill of Lading, Hazmat Declarations, Permitting Documentation |
| Data Security (for IT equipment) | NIST SP 800-88 (Guidelines for Media Sanitization) | Ensures secure erasure or destruction of sensitive data on electronic media to prevent unauthorized access. | Data Sanitization Certificates |
| Materials Handling | Local Building Codes & Fire Safety Regulations | Regulations pertaining to the removal of materials from buildings, ensuring structural integrity and fire safety during the process. | Permits for demolition/removal, Site Clearance Reports |
| Recycling | R2 (Responsible Recycling) or e-Stewards Certification Standards | Ensures environmentally responsible recycling of electronic waste, prioritizing reuse and minimizing landfill. | Recycling Certificates, Waste Stream Analysis |
| Documentation | Company-Specific Quality Management System (e.g., ISO 9001) | Ensures consistent, accurate, and verifiable record-keeping throughout the project lifecycle. | All submitted deliverables |
Key Deliverables and Standard Specifications
- Detailed Project Plan: Including timelines, resource allocation, safety protocols, and communication plan.
- Site Survey Report: Documenting existing conditions, access routes, and any pre-disposal preparation required.
- Equipment Inventory and Condition Report: A comprehensive list of all equipment to be decommissioned, including make, model, serial numbers, and current condition.
- Decommissioning & Disconnection Procedures: Step-by-step technical procedures for safely disconnecting and preparing each piece of equipment for removal.
- Transportation Plan: Detailing routes, vehicle requirements, and any necessary permits for equipment transport.
- Disposal Certificates: Proof of environmentally sound disposal or recycling for all equipment and associated materials.
- Waste Manifests: Documenting all hazardous and non-hazardous waste generated during the decommissioning process.
- Final Site Clearance Report: Confirming the site is clean, safe, and free of all decommissioned equipment and debris.
- Safety & Environmental Compliance Documentation: Including risk assessments, method statements, and evidence of adherence to all relevant regulations (e.g., EPA, OSHA).
- As-Built Documentation (if applicable): Recording any changes made to site infrastructure during the decommissioning process.
Service Level Agreement For Equipment Disposal & Decommissioning
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Equipment Disposal & Decommissioning services provided by [Service Provider Name] to [Client Name]. This SLA is effective as of [Start Date] and will remain in effect until [End Date], or until superseded by a new agreement. The scope of this SLA includes all aspects of the equipment disposal and decommissioning process, from initial site survey and planning to final reporting and data sanitization.
| Service Metric | Service Level Target | Measurement Method | Client Notification |
|---|---|---|---|
| Response Time for Urgent Issues | Within 2 business hours | Time from initial client contact (phone or email) to acknowledgement and initiation of troubleshooting. | Automated email confirmation and direct phone call for critical issues. |
| Response Time for Standard Inquiries | Within 8 business hours | Time from initial client contact (email) to acknowledgement and assignment to a service representative. | Automated email confirmation. |
| Downtime/Service Interruption Guarantee | Less than 4 hours per 30-day period (excluding scheduled maintenance) | Measured from the time an issue is reported until service is restored. Excludes client-initiated delays or site access issues. | Immediate notification via email and phone call for any unplanned downtime exceeding 1 hour. |
| Data Sanitization Verification Time | Within 2 business days of completion | Time from the completion of the physical disposal/sanitization of equipment to the delivery of the verification report. | Email notification upon report generation and delivery. |
| Project Completion within Agreed Timeline | 95% of projects completed on schedule | Based on mutually agreed-upon project milestones and deadlines. Delays caused by client-side issues or unforeseen external factors are excluded. | Weekly progress reports and immediate notification of any potential delays, with a proposed mitigation plan. |
Key Service Metrics
- Response Time for Urgent Issues: Critical issues impacting the immediate progress of decommissioning or posing a security risk.
- Response Time for Standard Inquiries: General questions, scheduling requests, or minor technical issues.
- Downtime/Service Interruption Guarantee: The maximum allowable downtime for critical decommissioning activities, excluding scheduled maintenance or unforeseen force majeure events.
- Data Sanitization Verification Time: The time taken to provide confirmation and reporting of successful data sanitization.
- Project Completion within Agreed Timeline: Guarantee of completing the decommissioning project within the mutually agreed-upon project schedule.
Frequently Asked Questions

Ready when you are
Let's scope your Equipment Disposal & Decommissioning in Tunisia project in Tunisia.
Scaling healthcare logistics and technical systems across the entire continent.

