Background
Verified Service Provider in Tunisia

Medical-Grade Copper Piping Installation Service in Tunisia Engineering Excellence & Technical Support

Medical-Grade Copper Piping Installation Service High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Uncompromising Purity and Hygiene

We specialize in the installation of medical-grade copper piping systems designed to meet the stringent purity and hygiene standards required for healthcare facilities in Tunisia. Our meticulous installation process ensures the integrity of the copper, preventing contamination and safeguarding patient health.

Expert Craftsmanship & Compliance

Our certified technicians possess extensive expertise in installing medical-grade copper piping according to international and local Tunisian regulations. We employ precision techniques and high-quality materials to guarantee durable, leak-free systems for critical medical gases and fluids.

Reliability for Life-Saving Systems

We understand the critical nature of medical gas and fluid delivery systems. Our medical-grade copper piping installations in Tunisia are engineered for maximum reliability, ensuring uninterrupted and safe supply to life-saving equipment and patient care areas, backed by robust warranties.

What Is Medical-grade Copper Piping Installation Service In Tunisia?

Medical-grade copper piping installation service in Tunisia refers to the specialized process of designing, fabricating, and installing copper piping systems that adhere to stringent medical gas standards and regulations. These systems are critical for the safe and reliable delivery of medical gases, such as oxygen, nitrous oxide, medical air, and vacuum, within healthcare facilities. The installation requires certified professionals, specific materials that meet purity and non-reactivity requirements, and rigorous testing to ensure system integrity and patient safety. The service encompasses initial consultation, system design, material procurement, pipe fitting and welding (often orbital welding for critical connections), pressure testing, purging, and final commissioning. Adherence to national (e.g., Tunisian Ministry of Health regulations) and international standards (e.g., NFPA 99, ISO 7396 series) is paramount.

Who Needs Medical-Grade Copper Piping Installation Service?Typical Use Cases
Hospitals: All departments requiring medical gases, including operating rooms, intensive care units (ICUs), emergency rooms, patient wards, recovery rooms, and neonatal intensive care units (NICUs).Surgical Suites: Reliable supply of oxygen, nitrous oxide for anesthesia, and medical air for pneumatic surgical tools. ICUs and Wards: Continuous supply of oxygen for respiratory support and medical air for ventilators and other breathing apparatus. Emergency Departments: Immediate availability of medical gases for resuscitation and critical care. Dental Clinics: Supply of nitrous oxide for conscious sedation and oxygen for procedures. Veterinary Clinics & Hospitals: Similar to human healthcare facilities, for anesthesia and respiratory support. Research Laboratories: In specific research applications requiring controlled gas mixtures or sterile gas delivery.
Specialized Medical Centers: Facilities focused on specific treatments or patient populations that rely on medical gas therapy.Rehabilitation Centers: Providing oxygen therapy for patients with chronic respiratory conditions. Ambulatory Surgery Centers: Ensuring safe and efficient medical gas delivery for outpatient surgical procedures. Long-Term Care Facilities: Supplying oxygen for residents with respiratory ailments. Mobile Medical Units: Installation of compact and robust medical gas systems for temporary or mobile healthcare operations.
Healthcare Facility Developers & Constructors: For new builds or major renovations requiring the installation or upgrade of medical gas infrastructure.New Hospital Construction: Establishing the entire medical gas pipeline infrastructure from source to patient bedside. Hospital Expansions & Renovations: Integrating new medical gas lines into existing or modified facility layouts. Upgrade Projects: Replacing outdated or non-compliant medical gas piping systems with modern, standards-compliant installations.

Key Components and Considerations of Medical-Grade Copper Piping Installation Service:

  • Material Specification: Utilization of medical-grade copper tubing (e.g., C12200 alloy or equivalent) with specific wall thicknesses and surface finishes to prevent particulate contamination and ensure gas purity.
  • System Design & Layout: Engineering of efficient and accessible piping networks that minimize pressure drops, facilitate maintenance, and comply with safety egress requirements.
  • Welding & Joining: Employing specialized techniques like orbital welding for critical connections to ensure leak-proof joints and maintain system integrity. Brazing with appropriate silver-based alloys may be used for less critical junctions, adhering to strict cleanliness protocols.
  • Pressure Testing & Leak Detection: Comprehensive hydrostatic and pneumatic testing to verify system integrity and identify potential leaks under operational pressures.
  • Purging & Cleaning: Rigorous purging procedures using high-purity nitrogen to remove all foreign matter, moisture, and contaminants from the piping system.
  • Gas Outlet & Alarm Integration: Installation of medical gas outlets (e.g., DISS, NIST fittings) and integration of alarm systems that monitor pressure, flow, and gas purity.
  • Regulatory Compliance: Strict adherence to Tunisian healthcare facility regulations and relevant international standards for medical gas systems.
  • Certification & Documentation: Provision of detailed documentation, including as-built drawings, test reports, and certifications of materials and installation procedures.

Who Needs Medical-grade Copper Piping Installation Service In Tunisia?

Ensuring the highest standards of hygiene and durability is paramount in many sectors across Tunisia. Medical-grade copper piping, known for its antimicrobial properties, corrosion resistance, and longevity, is a critical component for facilities where purity and safety are non-negotiable. This specialized installation service is essential for a range of institutions and departments that rely on a sterile and robust water and gas delivery system.

Target Customer/DepartmentKey Needs & ApplicationsSpecific Considerations
Hospitals & ClinicsSterile water supply for patient care, surgical theaters, dialysis units, oxygen and medical gas lines. Antimicrobial properties are crucial for infection control.Compliance with international healthcare standards (e.g., HTM, EN), specialized welding and joining techniques, segregation of medical gases.
Laboratories (Research & Diagnostic)Pure water for experiments, chemical distribution lines, inert gas supply, vacuum systems. Resistance to corrosion from various chemicals.High purity requirements for water (e.g., ASTM Type I), compatibility with specific chemicals, precise pressure regulation.
Pharmaceutical ManufacturingUltra-pure water (UPW) for drug production, ingredient delivery systems, sterile cleaning processes. Preventing contamination is vital.cGMP compliance, traceability of materials, non-reactive surfaces, stringent quality control during installation.
Food & Beverage ProcessingPotable water supply, process water, steam lines, beverage ingredient delivery. Ensuring hygiene and preventing microbial growth in product contact areas.Food-grade certifications, smooth internal surfaces to prevent buildup, resistance to cleaning agents.
High-End ResidentialPremium water quality for drinking and bathing, particularly for individuals with health concerns. Enhanced longevity and aesthetic appeal.Focus on water purity, silent operation, and integration with luxury plumbing fixtures.
Veterinary ClinicsClean water for animal care, surgical suites, and laboratory areas. Similar hygiene demands to human healthcare facilities.Durability and ease of maintenance, preventing cross-contamination between animal species.
Educational Institutions (Science Faculties)Water and gas supply for chemistry labs, biology labs, and research facilities. Safe and reliable distribution of utilities.Durability in high-usage environments, safety features for student use, potential for future expansion.
Research InstitutesSpecialized gas lines (e.g., nitrogen, argon), pure water for sensitive experiments, corrosive material handling. Precision and reliability are paramount.Customized solutions for unique research needs, adherence to strict safety protocols, advanced monitoring systems.

Target Customers & Departments for Medical-Grade Copper Piping Installation in Tunisia

  • Hospitals and Clinics
  • Laboratories (Research & Diagnostic)
  • Pharmaceutical Manufacturing Facilities
  • Food and Beverage Processing Plants
  • High-End Residential Buildings (focused on health and luxury)
  • Veterinary Clinics and Animal Hospitals
  • Educational Institutions with Science Faculties
  • Research Institutes

Medical-grade Copper Piping Installation Service Process In Tunisia

This document outlines the comprehensive workflow for the installation of medical-grade copper piping services in Tunisia, from the initial client inquiry to the final handover and post-installation support. Our process is designed for efficiency, precision, and adherence to the strictest medical standards, ensuring the integrity and safety of the medical gas systems we install.

StageDescriptionKey ActivitiesDeliverables/Outcomes
Initial Inquiry & ConsultationUnderstanding the client's needs and project scope.Initial meeting, information gathering, preliminary project discussion.Client requirements document, preliminary project scope.
Site Assessment & Design PlanningDetailed evaluation of the installation site and development of the system design.On-site visit, site surveys, review of architectural plans, development of detailed piping schematics, material selection.Detailed design drawings, Bill of Materials (BOM), compliance plan.
Quotation & Contract AgreementProviding a comprehensive cost estimate and formalizing the project.Cost estimation, proposal generation, negotiation, contract signing.Formal quotation, signed contract.
Procurement & LogisticsSourcing and acquiring high-quality medical-grade copper piping and related materials.Ordering certified materials, quality checks, inventory management, transportation to site.Certified materials delivered, logistics plan.
Pre-Installation PreparationPreparing the installation site and ensuring all necessary safety measures are in place.Site preparation, safety briefing, team mobilization, equipment setup.Ready installation site, safety protocols established.
Piping System InstallationThe physical installation of the medical-grade copper piping network.Pipe cutting, bending, fitting, securing pipes to structural elements, following design schematics.Installed primary piping network.
Welding & BrazingJoining copper pipes using approved medical gas welding and brazing techniques.Specialized brazing of joints, adherence to ASSE 6010 and NFPA 99 standards, inspection of welds.Secure and leak-proof pipe joints.
Pressure Testing & Leak DetectionVerifying the integrity and leak-free nature of the installed piping system.Pressurizing the system with inert gas (e.g., nitrogen), leak detection using electronic sniffers and soap solutions.Pressure test report, confirmed leak-free system.
Purging & CleaningRemoving any contaminants from the piping system to ensure gas purity.Purging with high-purity nitrogen, flushing with appropriate cleaning agents (if required), final nitrogen purge.Clean and contaminant-free piping system.
System Commissioning & ValidationTesting the system's functionality and ensuring it meets all performance specifications.Gas flow rate testing, pressure regulation checks, alarm system verification, interface with medical equipment.Commissioning report, validated system performance.
Documentation & HandoverProviding all necessary documentation for regulatory compliance and operational use.Compilation of as-built drawings, test reports, material certifications, operation and maintenance manuals, formal handover to client.Complete project documentation package, client acceptance.
Post-Installation Support & MaintenanceOffering ongoing support and maintenance to ensure continued optimal performance.Warranty support, scheduled maintenance, emergency repair services, system audits.Long-term system reliability and client satisfaction.

Key Stages of Medical-Grade Copper Piping Installation in Tunisia

  • Initial Inquiry & Consultation
  • Site Assessment & Design Planning
  • Quotation & Contract Agreement
  • Procurement & Logistics
  • Pre-Installation Preparation
  • Piping System Installation
  • Welding & Brazing
  • Pressure Testing & Leak Detection
  • Purging & Cleaning
  • System Commissioning & Validation
  • Documentation & Handover
  • Post-Installation Support & Maintenance

Medical-grade Copper Piping Installation Service Cost In Tunisia

Installing medical-grade copper piping in Tunisia involves several key factors that influence the overall cost. These factors range from the complexity of the project and the specific materials used to the labor involved and the location within Tunisia. Medical-grade copper piping is crucial for healthcare facilities due to its antimicrobial properties, resistance to corrosion, and ability to maintain purity of medical gases and fluids. Therefore, specialized knowledge and adherence to strict standards are paramount, which can also contribute to the pricing.

Service ComponentEstimated Cost Range (TND - Tunisian Dinar)Notes
Medical-Grade Copper Piping (per linear meter)50 - 150 TNDVaries based on diameter and specific grade. Includes the pipe material only.
Fittings and Connectors (per unit)20 - 100 TNDElbows, tees, couplings, etc. Price depends on size and material.
Valves (per unit)50 - 300 TNDSpecialized valves for medical gases can be expensive.
Skilled Labor (per hour)40 - 80 TNDFor experienced technicians specializing in medical gas systems.
Ancillary Materials (Insulation, Supports, etc.)10% - 20% of piping costEstimates for these supplementary materials.
Installation (excluding materials, for small to medium projects)3000 - 15000 TNDThis is a broad range and heavily dependent on complexity and duration. Can be significantly higher for large hospitals.
Design & Engineering Fees (for new systems)5% - 15% of total project costIf professional design services are required.
Certification & Inspection Fees500 - 3000 TNDDepending on the scope of work and regulatory requirements.

Factors Influencing Medical-Grade Copper Piping Installation Costs in Tunisia

  • Project Scope and Size: The total length and diameter of the piping system required directly impact material and labor costs. Larger facilities or complex distribution networks will naturally be more expensive.
  • Type and Grade of Copper: While "medical-grade" is specified, there can be slight variations in purity and specific alloys that might affect pricing. High-purity oxygen-grade copper, for example, might have a premium.
  • Complexity of Installation: Obstacles like existing infrastructure, difficult access points, the need for specialized welding or brazing techniques, and the number of connection points will increase labor time and cost.
  • Ancillary Materials: Beyond the copper pipes themselves, costs include fittings (elbows, tees, couplings), valves, insulation, supports, hangers, and potentially gas distribution manifolds and regulators, all of which need to meet medical standards.
  • Labor Costs: Skilled technicians with experience in medical gas piping installations are essential. Their hourly rates, availability, and the duration of the project are significant cost drivers. Tunisian labor rates vary by region and skill level.
  • Geographic Location: Installation costs can differ slightly between major cities like Tunis, Sfax, or Sousse compared to smaller towns or more remote areas, due to variations in labor availability and transportation expenses.
  • Regulatory Compliance and Certification: Ensuring the installation meets national and international medical gas standards (e.g., NFPA 99 in the US, or equivalent Tunisian regulations) may require inspections and certifications, adding to the overall project cost.
  • Design and Engineering Fees: If a new design or significant modifications to an existing system are required, professional engineering and design services will add to the initial cost.
  • Site Preparation and Demolition: If existing piping needs to be removed or significant modifications to walls and ceilings are necessary to accommodate the new system, these costs will be additional.

Affordable Medical-grade Copper Piping Installation Service Options

Choosing medical-grade copper piping for healthcare facilities is crucial for maintaining sterile environments and preventing the spread of pathogens. While the initial investment might seem high, the long-term benefits in terms of infection control and patient safety are invaluable. This service focuses on providing high-quality installation with a commitment to affordability through strategic planning, efficient execution, and transparent pricing. We offer various value bundles and cost-saving strategies to make this essential upgrade accessible to a wider range of healthcare providers.

Service ComponentStandard Cost (Estimate)Value Bundle Savings (%)Cost-Saving Strategy Impact
Medical-Grade Copper Piping Material$X per linear foot10-15%Bulk procurement, material optimization
Skilled Labor & Installation$Y per hour5-10%Efficient project management, experienced technicians
Ancillary Fittings & Connectors$Z per set8-12%Optimized material selection
System Sterilization & Flushing$A per systemVariable (included in premium bundles)Standardized, efficient protocols
Design & Consultation$B per consultationIncluded in bundlesEarly planning to avoid rework
Testing & Certification$C per testIncluded in bundlesThorough initial testing to prevent future issues
Overall Package Savings (e.g., Enhanced Safety Bundle)
15-25%Synergistic benefits of bundled services and cost-saving strategies

Understanding Medical-Grade Copper Piping Installation Service Options

  • Why Medical-Grade Copper Piping?
    • Antimicrobial Properties: Copper naturally inhibits the growth of bacteria, viruses, and fungi, significantly reducing the risk of healthcare-associated infections (HAIs).
    • Durability & Longevity: Medical-grade copper piping is designed for a long lifespan, minimizing future replacement costs and disruptions.
    • Corrosion Resistance: It resists corrosion, ensuring water purity and system integrity over time.
    • Compliance & Standards: Adheres to stringent industry regulations for healthcare applications, guaranteeing safety and performance.
  • Value Bundles Explained: Value bundles are curated packages designed to offer comprehensive services at a more economical price than individual component pricing. These bundles often include:
    • Basic Installation Package: Covers essential piping work, material procurement, and standard labor.
    • Enhanced Safety Package: Includes basic installation plus advanced sterilization techniques, specialized antimicrobial coatings (where applicable and approved), and detailed system flushing protocols.
    • Full-Service Medical Suite Package: The most comprehensive option, encompassing initial consultation, design and planning, all piping installation, advanced safety features, system testing, certification, and post-installation maintenance recommendations.
  • Cost-Saving Strategies: We employ several strategies to ensure our medical-grade copper piping installation services are as cost-effective as possible without compromising on quality or safety.
    • Bulk Material Procurement: Leveraging our network to purchase copper piping and fittings in larger quantities allows for significant discounts passed on to our clients.
    • Efficient Project Management: Streamlined planning, scheduling, and on-site coordination minimize labor hours and reduce project timelines.
    • Experienced & Certified Technicians: Our skilled team works efficiently and accurately, reducing the likelihood of errors and rework.
    • Modular Installation Techniques: Where feasible, pre-fabrication of certain piping sections can speed up on-site installation and reduce labor costs.
    • Phased Installation Options: For larger facilities, we can work with clients to implement the piping installation in phases, spreading the cost over a longer period.
    • Energy-Efficient System Integration: Designing the system to integrate seamlessly with existing or new HVAC and water heating systems can lead to long-term operational cost savings.

Verified Providers In Tunisia

In the realm of healthcare, particularly for those seeking specialized medical treatments and services in Tunisia, identifying 'verified providers' is paramount. This verification assures patients of adherence to quality standards, ethical practices, and professional competence. Franance Health plays a crucial role in this ecosystem by rigorously credentialing and endorsing healthcare providers across Tunisia. Their meticulous vetting process ensures that listed providers meet stringent criteria, offering patients peace of mind and access to reliable medical expertise.

CategoryFranance Health Verification FocusPatient Benefit
Medical ExpertiseCredentials, experience, specialization, continuous professional developmentAccess to highly qualified doctors and surgeons.
Facility StandardsAccreditation, equipment quality, hygiene protocols, technology adoptionSafe and well-equipped medical environments.
Patient CareCommunication, empathy, post-operative support, patient satisfactionA supportive and attentive healthcare experience.
Ethical ConductCompliance with medical ethics, patient privacy, transparent pricingTrustworthy and fair treatment.
Administrative EfficiencySmooth booking, clear communication, pre- and post-treatment coordinationA hassle-free medical travel process.

Why Franance Health Credentials Represent the Best Choice:

  • Unwavering Commitment to Quality: Franance Health's credentialing process goes beyond superficial checks. It involves in-depth assessments of medical facilities, equipment, staff qualifications, and patient care protocols, ensuring a high standard of medical service.
  • Enhanced Patient Safety: By verifying providers, Franance Health significantly reduces the risks associated with seeking medical care abroad. Patients can be confident in the safety and efficacy of the treatments they receive.
  • Ethical Practice Assurance: Franance Health scrutinizes providers for adherence to ethical medical practices and patient rights, ensuring a transparent and trustworthy healthcare experience.
  • Access to Specialized Expertise: The verification process often highlights providers with specific specializations and advanced techniques, connecting patients with the most suitable medical professionals for their needs.
  • Streamlined Healthcare Journey: Partnering with Franance Health-verified providers simplifies the complex process of international medical travel, offering a curated selection of reliable options.
  • Trust and Credibility: The Franance Health badge is a recognized symbol of excellence and reliability, building trust between patients and healthcare providers.

Scope Of Work For Medical-grade Copper Piping Installation Service

This Scope of Work (SOW) outlines the requirements for the installation of medical-grade copper piping systems. The objective is to provide a safe, reliable, and compliant installation adhering to all relevant industry standards and client specifications. This SOW covers all labor, materials, equipment, and quality control measures necessary for the successful completion of the project.

ItemDescriptionStandard Specification/ReferenceTechnical Deliverable
1.0Material ProcurementASTM B88 (Type K or L Copper Tubing); ASTM B280 (Seamless Copper Tube for Air Conditioning and Refrigeration Service); Manufacturer's DatasheetsCertified material mill test reports (MTRs); Certificate of Conformance (COC); Verified material submittals
2.0Piping Fabrication & AssemblySMACNA Medical Gas Systems Handbook; NFPA 99: Health Care Facilities Code; Manufacturer's Installation GuidelinesFabricated pipe sections with identified lengths and connections; Pre-assembled manifolds and headers; Quality control records of fabrication process
3.0Piping InstallationANSI/ASME B31.3: Process Piping; Manufacturer's Installation Guidelines; Client's Architectural & Mechanical DrawingsInstalled piping runs as per drawings; Secured pipe supports (spacing and type per calculations and standards); Proper pipe slopes for drainage (if applicable)
4.0Joint Preparation & Brazing/SolderingASTM B828 (Standard Practice for Brazing Copper and Copper Alloys); AWS D18.1 (Specification for Welding of Austenitic Stainless Steel for Medical Gas Systems - applicable principles); Manufacturer's Recommended PracticesCleaned and deburred pipe ends; Flux-free brazing for medical gases (N2 purged); Certified brazing personnel records; Visual inspection reports of brazed joints
5.0Pressure TestingNFPA 99: Health Care Facilities Code; ANSI/ASME B31.3: Process Piping; Client's Project SpecificationsTest pressure logs; Pressure test certificates; Leak detection reports (e.g., using soap solution or electronic leak detectors); System pressure holding records
6.0System Flushing & CleaningNFPA 99: Health Care Facilities Code; Manufacturer's Cleaning ProceduresFlushing logs detailing flow rates and duration; Visual inspection of flush water clarity; Records of particle count analysis (if specified)
7.0System Disinfection (if applicable)Client's infection control protocols; EPA-approved disinfectants; Manufacturer's disinfection guidelinesDisinfection logs; Certificate of disinfection; Bacteriological testing reports (if required)
8.0Final Inspection & HandoverNFPA 99: Health Care Facilities Code; Client's Quality Assurance Plan; Project SpecificationsPunch list report; Final inspection checklist; As-built drawings reflecting actual installation; Operation and Maintenance (O&M) Manuals; Warranty documentation

Key Phases of Work

  • Pre-installation Planning and Design Review
  • Material Procurement and Verification
  • Piping Fabrication and Assembly
  • Piping Installation and Support
  • Joint Preparation and Brazing/Soldering
  • Pressure Testing and Leak Detection
  • System Flushing and Cleaning
  • System Disinfection (if applicable)
  • Final Inspection and Documentation

Service Level Agreement For Medical-grade Copper Piping Installation Service

This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Medical-Grade Copper Piping Installation Service provided by [Your Company Name] (hereinafter referred to as "Provider") to [Client Company Name] (hereinafter referred to as "Client"). This SLA is an addendum to the Master Service Agreement (MSA) between the Provider and Client.

Service CategorySeverity LevelResponse Time TargetResolution Time Target (First Attempt)Escalation Procedure
Medical-Grade Copper Piping Installation & Related SupportCritical (System Failure / Contamination Risk)1 Hour4 Business HoursImmediate escalation to senior management. On-site technician dispatch within 2 hours. 24/7 availability.
Medical-Grade Copper Piping Installation & Related SupportHigh (Significant Performance Degradation / Potential Future Risk)2 Business Hours8 Business HoursEscalation to lead technician. Remote diagnosis and scheduled on-site visit within 4 business hours.
Medical-Grade Copper Piping Installation & Related SupportMedium (Minor Leak / Non-critical Functionality Impact)4 Business Hours24 Business HoursTroubleshooting by Level 1 support. Remote assistance and scheduling of on-site technician within 8 business hours.
Medical-Grade Copper Piping Installation & Related SupportLow (Cosmetic Issue / Consultation Request)8 Business Hours72 Business HoursTicket assignment to appropriate specialist. Remote support and scheduling of on-site visit based on availability within 48 business hours.

Definitions

  • Installation Service: Refers to the planning, procurement, installation, testing, and commissioning of medical-grade copper piping systems as per agreed-upon specifications and industry standards.
  • Response Time: The maximum time elapsed from when the Client reports an issue to the Provider until the Provider's support team acknowledges receipt of the issue and initiates diagnosis or action.
  • Resolution Time: The maximum time elapsed from when the Provider acknowledges an issue until the issue is resolved to the Client's satisfaction, as defined in the applicable service request.
  • Downtime: Any period during which the medical-grade copper piping system is unavailable for its intended use due to a failure or malfunction caused by the installation or materials provided by the Provider, excluding scheduled maintenance or Force Majeure events.
  • Scheduled Maintenance: Pre-planned and communicated periods of system unavailability for routine maintenance, upgrades, or inspections. These periods are excluded from Downtime calculations.
  • Force Majeure: Events beyond the reasonable control of the Provider, including but not limited to acts of God, natural disasters, war, terrorism, civil unrest, labor disputes, or governmental actions, which prevent the Provider from fulfilling its obligations under this SLA.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your Medical-Grade Copper Piping Installation Service in Tunisia project in Tunisia.

Speak to Sales