PSA Oxygen Plant Commissioning & Performance Testing Service in Sudan
Engineering Excellence & Technical Support
PSA Oxygen Plant Commissioning & Performance Testing Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Rapid Commissioning for Uninterrupted Oxygen Supply
We specialize in expedited PSA Oxygen Plant commissioning in Sudan, utilizing advanced diagnostics and rigorous testing to ensure swift and reliable activation. Our expert team prioritizes minimal downtime, guaranteeing immediate and continuous medical-grade oxygen production to meet critical healthcare demands.
Performance Optimization & Efficiency Audits
Our comprehensive performance testing services for Sudan's PSA Oxygen Plants focus on identifying and resolving inefficiencies. Through detailed analysis of production rates, purity levels, and energy consumption, we optimize operational parameters to maximize output, minimize waste, and ensure long-term cost-effectiveness.
Stringent Quality Control & Compliance
Adhering to international medical gas standards, our commissioning and performance testing in Sudan includes meticulous quality control checks. We conduct thorough purity analyses, leak detection, and system integrity assessments to guarantee that every PSA Oxygen Plant meets and exceeds regulatory requirements, ensuring the safety and efficacy of the oxygen supplied.
What Is Psa Oxygen Plant Commissioning & Performance Testing Service In Sudan?
PSA (Pressure Swing Adsorption) Oxygen Plant Commissioning & Performance Testing Service in Sudan refers to the comprehensive set of activities undertaken to ensure that a newly installed or refurbished PSA oxygen generation system operates safely, efficiently, and in accordance with its design specifications and contractual obligations. This service is critical for verifying the plant's capability to produce oxygen of the required purity, flow rate, and pressure, and to confirm its reliability and adherence to operational parameters before full commercial operation or handover. It encompasses initial startup, calibration of instrumentation, functional checks of all subsystems, and rigorous performance validation under various operating conditions.
| Who Needs This Service in Sudan? | Typical Use Cases in Sudan | ||
|---|---|---|---|
| Hospitals and Healthcare Facilities: For reliable and cost-effective on-site medical oxygen generation. | Medical Oxygen Supply: Ensuring continuous and pure oxygen for patient care, ventilators, and anesthesia. | ||
| Industrial Manufacturing and Processing: Requiring oxygen for combustion, oxidation, or other chemical reactions. | Steel and Metal Fabrication: Oxygen for cutting, welding, and furnace enrichment. | Chemical Production: As a reactant in various chemical synthesis processes. | Water and Wastewater Treatment: For enhanced biological oxidation and odor control. |
| Mining and Construction: For cutting, welding, and potentially for supporting specialized processes. | Demolition and Fabrication in Remote Sites: On-demand oxygen supply where traditional cylinders are impractical. | ||
| Emergency and Disaster Relief Organizations: For rapid deployment of oxygen generation capabilities. | Field Hospitals and Temporary Medical Camps: Establishing critical life-support oxygen infrastructure. | ||
| Oxygen Plant Manufacturers and Suppliers: To fulfill contractual obligations for plant delivery and performance assurance. | New Plant Installations: Verifying operational readiness and performance guarantees. | Refurbishment or Major Overhaul Projects: Validating the effectiveness of upgrade or repair work. | |
| Government and Military Operations: For medical, operational, or specialized industrial applications. | Military Field Hospitals: Ensuring medical oxygen availability in deployed settings. |
Key Components of PSA Oxygen Plant Commissioning & Performance Testing Service
- Pre-commissioning Checks: Verification of mechanical completion, electrical wiring integrity, safety system functionality, and material compatibility.
- System Startup & Inerting: Gradual introduction of utilities (power, air, water) and purging of the system with inert gas to remove contaminants.
- Component Functional Testing: Individual testing of compressors, blowers, valves, pumps, and adsorption vessels.
- Process Parameter Calibration: Accurate setting and calibration of pressure, temperature, flow, and purity sensors.
- Adsorption Cycle Optimization: Tuning of PSA cycles (pressurization, adsorption, depressurization, purge) for optimal oxygen production and adsorbent lifespan.
- Performance Testing & Validation: Operation of the plant under design conditions to measure actual oxygen purity, flow rate, and pressure against guaranteed values.
- Safety System Verification: Testing of emergency shutdown systems, pressure relief devices, and interlocks.
- Documentation & Reporting: Comprehensive generation of commissioning reports, test certificates, and operational manuals.
- Operator Training: On-site training of plant personnel on operation, maintenance, and troubleshooting procedures.
Who Needs Psa Oxygen Plant Commissioning & Performance Testing Service In Sudan?
Organizations and facilities in Sudan that rely on a consistent and high-quality supply of medical oxygen require expert PSA (Pressure Swing Adsorption) oxygen plant commissioning and performance testing services. These services ensure the plant operates efficiently, safely, and meets the stringent purity standards necessary for healthcare applications. Neglecting these critical steps can lead to operational failures, compromised patient care, and significant financial losses.
| Target Customer Type | Relevant Departments/Roles | Key Needs & Concerns |
|---|---|---|
| Hospitals (Public & Private) | Biomedical Engineering Department, Facilities Management, Hospital Administration, Chief Medical Officer, Procurement Department | Ensuring reliable oxygen supply for critical care (ICU, ventilators), surgical procedures, and general patient needs. Compliance with medical standards. Minimizing downtime. Cost-effective operation. Safety protocols. |
| Clinics & Health Centers | Clinic Administrator, Senior Nurse, Facilities Officer, Procurement Officer | Securing a dependable oxygen source for basic medical needs, oxygen therapy, and emergency situations. Affordability and ease of operation. Preventing stock-outs. |
| Field Hospitals & Mobile Medical Units | Medical Director, Logistics Officer, Biomedical Technician, Operations Manager | Rapid deployment and reliable operation in remote or emergency settings. Robustness and portability of the plant. Ensuring immediate availability of oxygen for humanitarian efforts or disaster relief. |
| Military Medical Facilities | Medical Corps Commander, Logistics & Supply Chain Management, Biomedical Engineering Section, Operations & Planning | Sustained oxygen supply for military personnel in operational areas or base hospitals. Meeting rigorous military standards for equipment reliability and performance. Strategic supply chain security. |
| Research & Diagnostic Laboratories | Lab Manager, Senior Scientist, Facilities Manager, Procurement Specialist | Consistent supply of high-purity oxygen for specialized equipment and experiments. Maintaining the integrity of research findings. Ensuring compliance with laboratory safety regulations. |
| Industrial Applications (Niche) | Plant Manager, Production Supervisor, Maintenance Engineer, Safety Officer | Specific industrial processes requiring controlled oxygen purity and flow rates. Ensuring operational efficiency and safety in industrial settings. Meeting specific industry regulations. |
Target Customers & Departments in Sudan for PSA Oxygen Plant Commissioning & Performance Testing Services
- Hospitals (Public and Private)
- Clinics and Health Centers
- Field Hospitals and Mobile Medical Units
- Military Medical Facilities
- Research and Diagnostic Laboratories
- Industrial Applications Requiring High Purity Oxygen (e.g., welding, metal cutting - though less common for PSA in Sudan, specific niche industries might exist)
Psa Oxygen Plant Commissioning & Performance Testing Service Process In Sudan
This document outlines the standard workflow for the Commissioning and Performance Testing services of PSA (Pressure Swing Adsorption) Oxygen Plants in Sudan, from initial inquiry to final handover. The process is designed to ensure the plant operates safely, efficiently, and meets all contractual specifications.
| Phase | Key Activities | Deliverables/Outcomes | Typical Duration (Indicative) | Key Stakeholders |
|---|---|---|---|---|
| Client submits inquiry detailing plant type, capacity, location, and required services. Service provider assesses inquiry, requests further information if needed, and confirms capability. | Initial understanding of project scope, confirmation of service provider's eligibility. | 1-2 Weeks | Client, Service Provider |
| Service provider develops a detailed technical proposal (methodology, schedule, team) and a commercial proposal (pricing, terms). | Comprehensive technical and commercial proposals. | 2-4 Weeks | Service Provider, Client (for review) |
| Discussions and negotiations on technical specifications, pricing, payment terms, timelines, and legal clauses. Contract is signed. | Signed contract, formal agreement on project scope and terms. | 2-6 Weeks | Client, Service Provider |
| Detailed planning of all pre-commissioning, commissioning, and performance testing activities. Resource allocation (personnel, equipment, tools). Mobilization of team and equipment to site in Sudan. | Detailed execution plan, mobilization schedule, personnel on-site. | 2-4 Weeks | Service Provider, Client (for site access & approvals) |
| Verification that all equipment is installed according to design drawings, specifications, and manufacturer's recommendations. Identification and documentation of any outstanding items (punch list). | Mechanical completion certificate, initial punch list. | 1-2 Weeks | Service Provider, Client (EPC/Main Contractor) |
| Systematic checks and cleaning of individual equipment and piping systems. Includes flushing, cleaning, drying, leak testing, and functional checks of auxiliary systems (e.g., power supply, cooling water). | Verified integrity of individual systems, clean and dry systems, documented test results. | 2-4 Weeks | Service Provider, Client (Maintenance/Operations) |
| Introduction of utilities (e.g., compressed air, power) and progressive energization of plant systems. Start-up of PSA units, generation of oxygen, and stabilization of process parameters. Verification of control system logic and safety interlocks. | Stable oxygen production, validated process parameters, functioning control system, operational safety. | 3-6 Weeks | Service Provider, Client (Operations/Engineering) |
| Testing the plant's ability to meet contractual guarantees (oxygen purity, capacity, recovery, specific power consumption) under defined operating conditions. Usually conducted over a specified continuous period (e.g., 72 or 120 hours). | Performance test report demonstrating compliance with guarantees, validated oxygen quality and quantity. | 1-2 Weeks (including data analysis) | Service Provider, Client (Quality Control/Engineering) |
| Addressing and rectifying any outstanding items identified during mechanical completion and commissioning phases. Final checks to ensure all issues are resolved. | Cleared punch list, completion of all necessary adjustments. | 1-2 Weeks | Service Provider, Client (EPC/Main Contractor) |
| Comprehensive training for client's operational and maintenance personnel on plant operation, troubleshooting, safety procedures, and routine maintenance. | Trained client personnel, training material handover. | 1 Week | Service Provider, Client (Training Department) |
| Compilation and submission of all project documentation, including commissioning reports, performance test reports, operational manuals, and as-built drawings. Formal handover of the plant to the client. | Complete set of final documentation, official handover certificate. | 1-2 Weeks | Service Provider, Client (Project Management/Operations) |
| Provision of limited support after handover to address any immediate operational issues or questions. | Smooth transition to client operations. | As per contract (e.g., 1-3 Months) | Service Provider, Client (Operations) |
Service Process Workflow
- Inquiry & Pre-Qualification
- Technical & Commercial Proposal Development
- Contract Negotiation & Award
- Pre-Commissioning Planning & Mobilization
- Mechanical Completion Checks
- Pre-Commissioning Activities
- Commissioning Activities
- Performance Testing
- Punch List Clearance
- Training
- Final Documentation & Handover
- Post-Commissioning Support
Psa Oxygen Plant Commissioning & Performance Testing Service Cost In Sudan
Commissioning and performance testing of a PSA (Pressure Swing Adsorption) oxygen plant in Sudan involves a complex set of activities that contribute to its overall cost. These services ensure the plant operates safely, efficiently, and meets its design specifications for oxygen purity, flow rate, and reliability. The pricing is heavily influenced by a variety of factors, making it challenging to provide a single fixed cost. Understanding these factors is crucial for accurate budgeting and vendor selection.
| Service Component | Estimated Cost Range (SDG) | Notes |
|---|---|---|
| Pre-commissioning Checks & Basic Functional Testing | 500,000 - 1,500,000 | Includes visual inspections, interlock checks, basic system operation verification for smaller plants. |
| Full Commissioning (Mechanical & Electrical) | 1,000,000 - 3,000,000 | Covers installation verification, electrical hook-up testing, pneumatic system checks, initial system startup. |
| Performance Testing (Purity, Flow Rate, Pressure) | 750,000 - 2,500,000 | Ensuring the plant meets design specifications for key parameters. May involve specialized analyzers. |
| Instrumentation & Control System Calibration & Tuning | 500,000 - 1,200,000 | Calibration of sensors, tuning of control loops for optimal operation. |
| Troubleshooting & Issue Resolution | Variable (Hourly/Daily Rate) | Costs depend on the complexity and duration of issues encountered. Can range from 100,000 - 500,000+ SDG per day for specialized engineers. |
| Operator & Maintenance Training | 400,000 - 1,000,000 | Basic to intermediate training packages. Comprehensive, hands-on training will be at the higher end. |
| Travel, Accommodation & Logistics (for expatriate personnel) | 1,000,000 - 5,000,000+ | Highly variable based on origin, duration of stay, and number of personnel. This can be a substantial portion of the cost. |
| Project Management & Reporting | 300,000 - 800,000 | Overseeing the entire commissioning process and providing documentation. |
| Total Estimated Range (for a typical medium-sized industrial PSA plant) | 3,450,000 - 15,500,000+ SDG | This is a broad estimate. Larger, more complex, or medical-grade plants could significantly exceed this range. Figures are approximate and subject to market conditions. |
Key Pricing Factors for PSA Oxygen Plant Commissioning & Performance Testing in Sudan
- Plant Capacity and Size: Larger plants (higher oxygen output in Nm³/hr) require more extensive testing, more personnel, and potentially specialized equipment, leading to higher costs.
- Complexity of the PSA Technology: While PSA is a standard technology, specific configurations, automation levels, and integrated systems (e.g., backup air compressors, oxygen storage, purity analyzers) can add to the commissioning effort and cost.
- Oxygen Purity Requirements: Achieving very high oxygen purities (e.g., medical grade >93%) necessitates more rigorous testing and calibration of analyzers compared to lower purity industrial grades.
- Scope of Work: This includes pre-commissioning checks, functional testing, performance testing against design parameters, troubleshooting, and initial operator training. A comprehensive scope will naturally incur higher costs.
- Duration of Commissioning and Testing: The time required for the entire process is a direct cost driver. This can vary based on the plant's complexity, vendor's efficiency, and any unforeseen issues encountered.
- Number and Skill Level of Personnel: The commissioning team typically includes experienced engineers (mechanical, electrical, instrumentation), technicians, and potentially specialized PSA experts. Higher skill levels and more personnel translate to higher labor costs.
- Travel and Accommodation: For international vendors or specialized personnel, costs associated with flights, visas, local transportation, and accommodation in Sudan can be significant.
- Logistics and Site Access: Ease of access to the plant site, availability of necessary utilities (power, water), and any logistical challenges in transporting equipment or personnel can impact the overall cost.
- Vendor's Experience and Reputation: Established vendors with a proven track record and strong reputation may command higher prices due to their expertise and reliability.
- Scope of Training Provided: The level of operator and maintenance staff training included in the commissioning service will influence the cost. Comprehensive, hands-on training will be more expensive.
- Warranty and Support Period: The duration of warranty and post-commissioning support offered by the vendor can be factored into the pricing.
- Local Regulatory Requirements and Inspections: Any mandatory local inspections or certifications required for oxygen plants can add to the project timeline and associated costs.
- Currency Exchange Rates and Inflation: As prices are quoted in Sudanese Pounds (SDG), fluctuations in currency exchange rates and local inflation can significantly impact the final cost.
Affordable Psa Oxygen Plant Commissioning & Performance Testing Service Options
Commissioning and performance testing of a PSA (Pressure Swing Adsorption) oxygen plant are critical steps to ensure optimal efficiency, safety, and longevity. This service guarantees that your plant meets design specifications and delivers the required oxygen purity and flow rate consistently. We offer flexible options to cater to diverse budgets and operational needs, focusing on delivering exceptional value and cost savings.
| Value Bundle | Key Features | Cost-Saving Benefits | Ideal For |
|---|---|---|---|
| Standard Commissioning & Testing | Pre-start-up checks, system calibration, initial start-up, basic performance verification (purity & flow) | Reduced risk of early-stage equipment failure, ensures basic operational readiness | New plant installations, budget-conscious clients |
| Enhanced Performance Optimization | All Standard features + detailed flow rate validation, purity monitoring under varying loads, initial efficiency assessment | Optimized oxygen yield, reduced energy consumption, improved overall operational efficiency | Existing plants seeking performance upgrades, clients focused on maximizing output |
| Comprehensive Health & Longevity | All Enhanced features + advanced diagnostics, component wear assessment, predictive maintenance recommendations | Minimized unscheduled downtime, extended equipment lifespan, proactive identification of potential issues, reduced long-term repair costs | Critical operations, clients prioritizing plant reliability and long-term investment protection |
Affordable PSA Oxygen Plant Commissioning & Performance Testing Service Options
- {"title":"Standard Commissioning & Testing Package","description":"Our foundational package includes essential commissioning activities such as pre-start-up checks, system calibration, initial start-up, and basic performance verification. This is an ideal choice for clients seeking core functionality assurance at a competitive price point."}
- {"title":"Enhanced Performance Optimization Package","description":"Building upon the standard package, this option incorporates in-depth performance analysis, including flow rate validation, purity monitoring under various load conditions, and initial efficiency assessments. This package is designed to maximize your plant's output and minimize operational waste."}
- {"title":"Comprehensive Health & Longevity Package","description":"This premium offering includes all aspects of the enhanced package, plus advanced diagnostic testing, wear and tear assessment of key components (e.g., zeolite sieves, valves), and recommendations for predictive maintenance. This package focuses on ensuring long-term operational reliability and reducing future repair costs."}
- {"title":"Customizable Service Tiers","description":"We understand that every operation is unique. Beyond our standard bundles, we offer the flexibility to tailor service components to your specific requirements, ensuring you only pay for what you need. This allows for precise cost allocation and maximizes budget efficiency."}
Verified Providers In Sudan
In Sudan's evolving healthcare landscape, identifying genuinely verified providers is paramount for ensuring quality and trustworthiness. Franance Health stands out as a leading entity, meticulously vetting and accrediting healthcare facilities and professionals. This commitment to verification offers patients peace of mind and guarantees access to reliable medical services.
| Franance Health Credentialed Provider Type | Key Verification Indicators | Benefits to Patients |
|---|---|---|
| Hospitals & Clinics | State-of-the-art facilities, qualified medical staff, adherence to hygiene and safety standards, patient feedback mechanisms. | Access to comprehensive medical care, reduced risk of infection, assurance of professional treatment. |
| Specialist Doctors | Verified medical degrees, board certifications, professional licenses, ongoing professional development, peer reviews. | Expert diagnosis and treatment, confidence in specialist knowledge, access to advanced medical expertise. |
| Diagnostic Laboratories | Accurate and reliable testing equipment, certified technicians, quality control measures, timely report generation. | Trustworthy test results, accurate diagnosis, efficient treatment planning. |
| Pharmacies | Licensed pharmacists, genuine medication sourcing, proper storage and dispensing practices, patient counseling. | Access to safe and effective medications, reliable pharmaceutical advice, protection against counterfeit drugs. |
Why Franance Health Credentials Matter
- Rigorous Vetting Process: Franance Health employs a multi-faceted approach to credentialing, examining not just medical qualifications but also ethical conduct, operational standards, and patient safety protocols.
- Enhanced Patient Trust: By showcasing Franance Health accreditation, providers signal their adherence to the highest standards, fostering greater confidence and trust among patients.
- Improved Healthcare Quality: The verification process encourages continuous improvement within healthcare institutions, leading to better patient outcomes and experiences.
- Access to Reliable Information: Franance Health acts as a central repository of verified provider information, making it easier for individuals to make informed healthcare decisions.
- Commitment to Ethical Practices: Accreditation signifies a provider's dedication to transparent and ethical healthcare delivery, protecting patients from substandard or fraudulent services.
Scope Of Work For Psa Oxygen Plant Commissioning & Performance Testing Service
This Scope of Work (SOW) outlines the requirements for commissioning and performance testing services for a Pressure Swing Adsorption (PSA) Oxygen Plant. The objective is to ensure the plant operates safely, reliably, and meets all specified performance criteria. This document details the technical deliverables expected from the service provider and references standard specifications applicable to such projects.
| Phase | Key Activities | Technical Deliverables | Standard Specifications / References |
|---|---|---|---|
| Pre-Commissioning | Review of documentation (P&IDs, Electrical Schematics, Equipment Manuals). | Pre-commissioning Checklist (Mechanical, Electrical, Instrumentation). | Manufacturer's recommendations, project design documents, relevant parts of IEC 60079 (Explosive Atmospheres) if applicable. |
| Pre-Commissioning | Mechanical completion checks. | Mechanical completion report. | Project specific mechanical completion procedures. |
| Pre-Commissioning | Electrical continuity and insulation resistance tests. | Electrical pre-commissioning report. | IEC 60364 (Electrical installations of buildings) series, manufacturer's specific testing procedures. |
| Pre-Commissioning | Instrumentation loop checks and calibration verification. | Instrumentation loop test reports, calibration certificates. | ISA RP55.1 (Recommended Practice for Hardware Acceptance of Industrial Digital Control Systems), manufacturer's calibration procedures. |
| Pre-Commissioning | Piping flushing and cleaning. | Flushing/cleaning records. | Project specific flushing and cleaning procedures. |
| Pre-Commissioning | Utility system checks (air, power, cooling water). | Utility system readiness report. | Project utility design specifications. |
| Commissioning (Start-up) | Step-by-step start-up of individual equipment and systems. | Start-up logs, functional test reports. | Manufacturer's operating manuals, project start-up sequences. |
| Commissioning (Start-up) | Initial PSA adsorption/desorption cycle testing. | Adsorption/desorption cycle data analysis, preliminary oxygen purity readings. | PSA technology specific operating principles, manufacturer's recommended parameters. |
| Commissioning (Start-up) | System integration checks. | Integrated system functional test reports. | Project P&IDs, control philosophy. |
| Commissioning (Start-up) | Safety system verification and testing. | Safety system test reports (e.g., pressure relief valves, emergency shutdown). | API RP 14C (Analysis, Design, and Evaluation of Safety Systems for Offshore Production Platforms) principles if applicable, relevant safety standards. |
| Performance Testing | Operation at designed oxygen production capacity. | Oxygen purity (e.g., >93% or as specified). | ISO 10083 (Stationary air separation plants - Safety requirements). |
| Performance Testing | Continuous operation at designed capacity for a specified duration (e.g., 72 hours). | Oxygen flow rate (e.g., Nm³/h or SCFM). | Project technical specifications. |
| Performance Testing | Verification of pressure at plant outlet. | Oxygen pressure (e.g., barg or psig). | Project technical specifications. |
| Performance Testing | Measurement of specific power consumption. | Specific power consumption (e.g., kWh/Nm³). | Project technical specifications, energy efficiency standards. |
| Performance Testing | Analysis of adsorbent performance and cycle efficiency. | Adsorbent bed cycle times, pressure drop across beds. | PSA technology specific performance metrics. |
| Performance Testing | Testing under varying ambient conditions (if specified). | Performance data under specified ambient conditions. | Project technical specifications. |
| Handover & Training | Development of O&M manuals. | Operation and Maintenance Manuals. | Manufacturer's O&M manuals, project requirements. |
| Handover & Training | On-site training for plant operators and maintenance personnel. | Training materials, attendance records, competency assessments. | Project specific training program. |
| Handover & Training | Final commissioning and performance test report. | Comprehensive report detailing all test results, deviations, and recommendations. | Industry best practices for commissioning reporting. |
Key Objectives of Commissioning & Performance Testing
- Verify safe and proper installation of all PSA oxygen plant components and associated systems.
- Confirm functionality and performance of individual equipment and integrated systems.
- Validate that the plant meets all design and contractual performance parameters, including oxygen purity, flow rate, and pressure.
- Ensure adherence to all applicable safety, environmental, and regulatory standards.
- Provide comprehensive documentation and training to enable efficient operation and maintenance of the plant.
Service Level Agreement For Psa Oxygen Plant Commissioning & Performance Testing Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Commissioning & Performance Testing Service of the PSA Oxygen Plant provided by [Your Company Name] to [Client Name]. This SLA aims to ensure timely support and reliable operational performance during and immediately following the commissioning phase.
| Service Component | Description | Response Time (during Business Hours) | Response Time (outside Business Hours / 24/7 Support) | Uptime Guarantee (during initial performance testing period) | Uptime Guarantee (post-commissioning, during warranty period - if applicable) |
|---|---|---|---|---|---|
| Critical System Failure (e.g., complete plant shutdown, inability to produce oxygen) | A complete failure preventing the PSA Oxygen Plant from functioning or producing oxygen. | 2 Hours | 4 Hours | 98% | 99% |
| Major Performance Degradation (e.g., oxygen purity significantly below specification, flow rate drastically reduced) | The PSA Oxygen Plant is operational but not meeting key performance indicators, impacting its intended use. | 4 Hours | 6 Hours | 97% | 98% |
| Minor System Malfunction (e.g., sensor issue, alarm without impact on core function) | An issue that does not prevent operation or significantly degrade performance but requires attention. | 8 Business Hours | Next Business Day | N/A (Support provided, but not measured against uptime guarantee for this category) | N/A |
| Consultation & Remote Support (e.g., questions about operation, remote troubleshooting) | Technical assistance and guidance provided remotely. | 4 Business Hours | 8 Business Hours | N/A | N/A |
Key Definitions
- Commissioning: The process of safely and effectively bringing the PSA Oxygen Plant into operation, including installation checks, functional testing, and calibration.
- Performance Testing: A series of tests conducted after commissioning to verify that the PSA Oxygen Plant meets or exceeds its specified performance parameters (e.g., oxygen purity, flow rate, production capacity).
- Downtime: Any period during which the PSA Oxygen Plant is not operational due to a fault, malfunction, or scheduled maintenance, as defined in this SLA.
- Response Time: The maximum time allowed from the moment a service request is officially logged until a qualified technician acknowledges and begins to address the issue.
- Resolution Time: The maximum time allowed from the moment a service request is officially logged until the issue is resolved and the PSA Oxygen Plant is restored to its operational state.
- Business Hours: [Specify your business hours, e.g., Monday to Friday, 9:00 AM to 5:00 PM, excluding public holidays in [Region/Country]].
- 24/7 Support: Support available at any time, regardless of business hours.
Frequently Asked Questions

Ready when you are
Let's scope your PSA Oxygen Plant Commissioning & Performance Testing Service in Sudan project in Sudan.