Background
Verified Service Provider in South Sudan

Refurbishment, Upgrades & Life-Extension in South Sudan Engineering Excellence & Technical Support

Comprehensive Refurbishment, Upgrades & Life-Extension solutions. High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Infrastructure Modernization

Implementing advanced refurbishment techniques to upgrade and extend the lifespan of critical infrastructure such as power grids, water treatment facilities, and communication networks. This includes deploying modern control systems, energy-efficient components, and robust materials to ensure long-term operational viability and improved service delivery across South Sudan.

Equipment Life-Extension

Specialized refurbishment and upgrade programs for essential industrial and agricultural machinery. This involves comprehensive diagnostics, component replacement with improved alternatives, and advanced repair methodologies to significantly extend the operational life of vital equipment, reducing reliance on new imports and fostering local capacity.

Resilience & Durability Enhancements

Applying specialized refurbishment and life-extension strategies to enhance the resilience and durability of existing assets against South Sudan's challenging environmental conditions. This includes protective coatings, structural reinforcements, and climate-adaptive modifications for buildings, bridges, and transportation infrastructure, ensuring sustained functionality and safety.

What Is Refurbishment, Upgrades & Life-extension In South Sudan?

Refurbishment, Upgrades, and Life-Extension (RUL) in South Sudan's healthcare sector refers to the processes and activities undertaken to restore, enhance, and prolong the operational life of existing medical equipment, infrastructure, and facilities. It involves a spectrum of interventions, from minor repairs and aesthetic improvements to significant technological enhancements and structural reinforcements.

Importance in South Sudan's Healthcare:

In a context like South Sudan, characterized by limited resources, fragile infrastructure, and ongoing humanitarian challenges, RUL plays a critical role. It is vital for:

  • Maximizing Resource Utilization: Instead of always relying on the procurement of new, expensive equipment, RUL allows for the continued use of functional assets, stretching limited budgets further.
  • Ensuring Service Continuity: Broken or outdated equipment can halt essential medical services. RUL helps maintain the availability and reliability of critical healthcare tools and facilities, preventing disruptions.
  • Improving Quality of Care: Upgrades can introduce newer technologies or functionalities, enhancing diagnostic accuracy, treatment efficacy, and overall patient care standards.
  • Cost-Effectiveness: Refurbishing and upgrading are often significantly less expensive than replacing entire systems or building new infrastructure.
  • Sustainability: RUL contributes to the sustainability of the healthcare system by reducing waste and extending the lifespan of valuable assets.
  • Capacity Building: The process often involves training local technicians and healthcare professionals in maintenance, repair, and operation of updated equipment, building local technical capacity.

Scope in Local Healthcare:

The scope of RUL in South Sudan's healthcare is broad and can encompass:

  • Medical Equipment: This includes diagnostic machines (X-ray, ultrasound), laboratory equipment, surgical instruments, patient monitoring devices, sterilization equipment, and even specialized treatment machinery. Refurbishment might involve replacing worn parts, recalibrating, or overhauling entire units. Upgrades could mean adding new software, integrating with newer systems, or replacing outdated components with more efficient ones.
  • Healthcare Facilities/Infrastructure: This involves the physical structures of hospitals, clinics, and health posts. Refurbishment could include repairing damaged walls, roofs, plumbing, and electrical systems. Upgrades might involve improving ventilation, ensuring proper sanitation, enhancing accessibility for people with disabilities, or installing more energy-efficient lighting and power systems (e.g., solar power).
  • Information Technology Systems: In some contexts, this could extend to improving or upgrading existing IT systems used for patient records, inventory management, or communication within health facilities.
  • Vehicles and Transportation: Ambulances and other medical transport vehicles can also undergo refurbishment and upgrades to ensure their operational readiness for reaching remote populations.
CategoryDescriptionImportance in South SudanScope Examples
RefurbishmentThe process of cleaning, repairing, and restoring used equipment or facilities to a good working condition.Maximizes the use of existing, often scarce, medical equipment; maintains service delivery capabilities.Repairing X-ray machines, re-upholstering examination tables, fixing clinic walls and roofs.
UpgradesInvolves adding new features, technologies, or improving the performance of existing assets.Enhances diagnostic accuracy and treatment effectiveness; improves efficiency of healthcare delivery.Adding digital capabilities to analog X-ray machines, installing new, more efficient pumps in water systems, upgrading lighting to LED.
Life-ExtensionActivities aimed at prolonging the useful operational life of equipment and infrastructure beyond their original expected lifespan.Reduces the need for frequent and costly replacements; ensures long-term availability of critical health resources.Implementing comprehensive preventive maintenance programs, overhauling engines of ambulances, reinforcing building structures.

Key Aspects of Refurbishment, Upgrades & Life-Extension in South Sudan's Healthcare

  • Restoration of damaged or degraded medical equipment to a functional state.
  • Enhancing existing medical equipment with newer technologies or improved capabilities.
  • Extending the operational lifespan of essential healthcare assets.
  • Repair and modernization of clinic and hospital buildings.
  • Integrating renewable energy solutions for sustainable power supply in health facilities.
  • Training local technicians for equipment maintenance and repair.
  • Ensuring compliance with safety and quality standards post-intervention.

Who Benefits From Refurbishment, Upgrades & Life-extension In South Sudan?

Refurbishment, upgrades, and life-extension initiatives in healthcare facilities within South Sudan offer a multifaceted approach to improving the health infrastructure. These interventions are not merely about physical structures but extend to enhancing the functionality, capacity, and longevity of healthcare services. The primary beneficiaries are those who rely on these facilities for essential medical care, as well as the professionals who deliver it. The impact ripples outwards, contributing to broader public health goals and economic stability.

Healthcare Facility TypePrimary Benefits of Refurbishment, Upgrades & Life-ExtensionSpecific Stakeholder Groups Benefiting
Hospitals (Referral, District, Provincial)Increased bed capacity, improved operating theatre functionality, enhanced diagnostic capabilities (imaging, labs), better ward conditions, more efficient patient flow, reduced downtime for critical equipment.Patients requiring specialized care, surgeons, anesthetists, radiologists, laboratory technicians, hospital administrators, nurses, patients' families.
Health Centers (Primary Healthcare Level)Expanded service offerings (e.g., maternal and child health, basic emergency obstetric and newborn care - EmONC), improved waiting areas, better availability of essential medicines, enhanced sanitation and hygiene facilities, increased patient throughput.Mothers and children, community health workers, nurses, midwives, general practitioners, local communities, patients seeking routine care.
Dispensaries and ClinicsBasic structural improvements (roofing, walls, flooring), provision of essential furniture and equipment, improved access to clean water and sanitation, enhanced security.Community members, community health volunteers, nurses, patients requiring basic medical attention.
Specialized Medical Centers (e.g., TB centers, HIV/AIDS clinics, Maternity Units)Upgrade of specific equipment (e.g., specialized diagnostic tools, infection control systems), improved laboratory facilities, enhanced privacy and confidentiality for patients, increased capacity for specialized treatments.Patients with specific chronic or infectious diseases, specialized medical professionals, researchers, public health program managers.
Training Institutions for Healthcare ProfessionalsModernized lecture halls and laboratories, upgraded simulation facilities, improved living quarters for trainees, enhanced access to learning resources.Medical students, nursing students, paramedical trainees, educators, institutions of higher learning.
Administrative Buildings of Health MinistriesImproved office space, reliable power and internet connectivity, enhanced data management systems, better security for records.Ministry of Health staff, policy makers, data analysts, administrative personnel, national health program managers.

Target Stakeholders Benefiting from Healthcare Infrastructure Improvements in South Sudan

  • Patients (local communities)
  • Healthcare Workers (doctors, nurses, technicians, support staff)
  • Ministry of Health (national and sub-national levels)
  • Non-Governmental Organizations (NGOs) and International Aid Organizations
  • Local and National Government Officials
  • Donors and Funding Agencies
  • Manufacturers and Suppliers of medical equipment and building materials

Refurbishment, Upgrades & Life-extension Implementation Framework

This framework outlines a systematic approach to implementing refurbishment, upgrades, and life-extension projects for assets, ensuring a structured and comprehensive lifecycle from initial assessment through to final project sign-off. It emphasizes thorough planning, execution, and verification to maximize asset value and operational efficiency.

PhaseKey ActivitiesDeliverablesKey Stakeholders
Phase 1: Assessment & PlanningInitial asset condition survey, performance analysis, failure mode analysis, definition of project scope and objectives, feasibility study, risk assessment, preliminary budget and schedule development, stakeholder engagement.Assessment Report, Project Charter, Feasibility Study Report, Risk Register, Preliminary Project Plan, Stakeholder Register.Asset Owners, Operations & Maintenance Teams, Engineering Department, Project Management Office (PMO), Finance Department.
Phase 2: Design & ProcurementDetailed design and engineering, specification development, vendor selection, procurement of materials and services, contract negotiation, development of detailed work packages, safety plan development.Detailed Design Documents, Technical Specifications, Bill of Materials (BOM), Procurement Packages, Signed Contracts, Detailed Work Breakdown Structure (WBS), Health, Safety, Environment, and Quality (HSEQ) Plan.Engineering Department, Procurement Department, Legal Department, HSEQ Department, Selected Vendors/Suppliers.
Phase 3: Execution & ImplementationSite preparation, dismantling and removal of old components, installation of new or upgraded components, system integration, adherence to safety protocols, progress monitoring and reporting, quality control checks.Installed Components, Progress Reports, Quality Inspection Records, Safety Incident Reports (if any), Updated As-Built Drawings (preliminary).Construction Teams, Maintenance Teams, Project Managers, Site Supervisors, HSEQ Officers, Vendors.
Phase 4: Testing & VerificationComponent testing, system functional testing, performance verification against design specifications, acceptance testing, validation of safety features, documentation of test results.Test Reports, Verification Certificates, Performance Data, Acceptance Test Records, Identified Punch List Items.Engineering Department, Quality Assurance (QA) Team, Operations Team, Vendors, Independent Testers (if applicable).
Phase 5: Commissioning & HandoverSystem integration testing, pre-commissioning checks, functional commissioning, performance commissioning, training of operations and maintenance personnel, finalization of as-built documentation, handover to operations.Commissioning Reports, Training Records, Final As-Built Drawings, Operation & Maintenance Manuals, Handover Documentation.Operations Team, Maintenance Team, Project Management Team, Engineering Department, Training Department.
Phase 6: Post-Implementation Review & Sign-offPerformance monitoring post-handover, identification of lessons learned, final project cost reconciliation, contract closure, formal project sign-off by stakeholders, warranty period management.Post-Implementation Review Report, Lessons Learned Document, Final Project Report, Financial Closeout Report, Project Sign-off Document, Warranty Claims (if any).Project Sponsors, Senior Management, Asset Owners, Project Management Team, Finance Department, Operations & Maintenance Teams.

Key Phases of the Refurbishment, Upgrades & Life-Extension Implementation Framework

  • Phase 1: Assessment & Planning
  • Phase 2: Design & Procurement
  • Phase 3: Execution & Implementation
  • Phase 4: Testing & Verification
  • Phase 5: Commissioning & Handover
  • Phase 6: Post-Implementation Review & Sign-off

Refurbishment, Upgrades & Life-extension Pricing Factors In South Sudan

This document outlines the key pricing factors and provides estimated cost ranges for refurbishment, upgrades, and life-extension projects in South Sudan. These estimates are based on general market conditions and the specific complexities inherent in the South Sudanese operating environment, including logistical challenges, security considerations, and the availability of skilled labor and specialized equipment. It is crucial to note that these are indicative figures, and a comprehensive, site-specific assessment is required for accurate project budgeting.

Category of ServiceTypical Scope ExamplesEstimated Cost Range (USD)Notes
Minor RefurbishmentSurface repairs, painting, minor component replacement, basic system checks.$5,000 - $50,000Highly dependent on asset size and initial condition. Often focused on aesthetic or minor functional improvements.
Major Refurbishment/OverhaulComponent replacement, structural repairs, system recalibration, major component overhauls.$50,000 - $500,000Involves more significant intervention, aiming to restore functionality and extend operational life by a moderate period.
Comprehensive Refurbishment/ReconstructionComplete dismantling, extensive structural repairs, replacement of major systems, upgrade of critical components.$500,000 - $5,000,000+Aimed at bringing an asset back to near-original or significantly improved performance levels. Can approach the cost of new construction/acquisition for some assets.
Technology UpgradesInstallation of new control systems, automation, communication upgrades, energy efficiency improvements.$10,000 - $200,000 per system/areaCost is highly variable based on the complexity of the technology and the number of systems being upgraded. Can yield significant long-term operational savings.
Capacity Expansion/ModernizationIncreasing throughput, adding new functionalities, adapting to new operational requirements.$100,000 - $2,000,000+Often involves significant engineering and integration work, impacting existing infrastructure. Can be a major undertaking.
Life-Extension MeasuresMaterial reinforcement, corrosion protection, replacement of wear-prone parts, structural integrity assessments and enhancements.$20,000 - $1,000,000+Focuses on prolonging the service life of an asset by addressing wear, fatigue, and environmental degradation. Essential for aging infrastructure.
Project Management & Engineering FeesConsultancy, design, site supervision, quality assurance.Typically 5% - 20% of total project costCrucial for ensuring project success, especially in complex environments like South Sudan.
Logistics & Transportation (Estimated)Fuel, vehicle maintenance, shipping, security escorts.Can add 15% - 50%+ to material and equipment costsA major cost driver due to South Sudan's infrastructure challenges.
Security Provisions (Estimated)Personnel, equipment, risk mitigation measures.Can add 5% - 20% to the project budgetEssential for protecting personnel, assets, and ensuring project continuity.

Key Cost Variables

  • Scope of Work: The extent of refurbishment (minor repairs vs. complete overhaul), upgrades (e.g., technology integration, capacity expansion), and life-extension measures (e.g., structural reinforcement, material replacement) significantly impacts cost.
  • Asset Type and Condition: The nature of the asset (e.g., infrastructure, industrial machinery, vehicles, buildings) and its current state of disrepair or obsolescence are primary cost drivers.
  • Material and Equipment Sourcing: Costs associated with procurement, import duties, transportation, and local availability of materials and specialized equipment are critical. Fluctuations in global commodity prices and currency exchange rates are also influential.
  • Labor Costs: This includes wages for skilled and unskilled labor, expatriate personnel (if required), and associated benefits. The availability of local expertise often dictates the need for international hires, which are generally more expensive.
  • Logistics and Transportation: The challenging terrain, poor road infrastructure, and long distances in South Sudan contribute substantially to transportation costs for personnel, materials, and equipment. This includes fuel, vehicle maintenance, and potential security escorts.
  • Security and Risk Management: Costs associated with security personnel, risk assessments, insurance premiums, and potential contingency plans to mitigate security-related disruptions are a significant factor.
  • Engineering, Design, and Project Management: Fees for specialized engineering services, detailed design, project planning, supervision, and quality control are essential components of the overall cost.
  • Permitting and Regulatory Compliance: Costs associated with obtaining necessary permits, licenses, and adhering to local regulations and standards.
  • Contingency: A prudent contingency fund is essential to account for unforeseen challenges, price escalations, or scope adjustments inherent in projects within South Sudan.
  • Mobilization and Demobilization: Costs associated with setting up a project site, including temporary facilities, equipment deployment, and eventual site dismantling and removal.

Value-driven Refurbishment, Upgrades & Life-extension Solutions

Optimizing budgets and ROI for Value-Driven Refurbishment, Upgrades, and Life-Extension Solutions requires a strategic and data-informed approach. Instead of viewing these as mere maintenance costs, they should be recognized as investments in operational efficiency, asset longevity, and risk mitigation. Key to success is a thorough understanding of asset lifecycle costs, detailed planning, and prioritizing interventions based on their potential return. This involves leveraging technology, data analytics, and strategic partnerships to maximize value throughout the asset's extended lifespan.

StrategyBudget Optimization BenefitROI Enhancement MechanismKey Performance Indicators (KPIs)
LCCAIdentifies cost-effective interventions over asset life, avoiding premature replacement.Extends asset life, delaying capital expenditure and realizing savings on new asset acquisition.Total Cost of Ownership (TCO), Net Present Value (NPV) of refurbishment vs. replacement.
Predictive MaintenanceReduces unplanned downtime and emergency repair costs, allowing for planned and potentially cheaper interventions.Increases asset availability and uptime, leading to higher production/service output and revenue.Mean Time Between Failures (MTBF), Mean Time To Repair (MTTR), Downtime cost reduction.
Strategic SourcingLeverages bulk purchasing power and competitive bidding to reduce material and labor costs.Improves margins by reducing input costs for refurbishment and upgrade projects.Procurement cost savings, Vendor performance metrics.
Performance MonitoringIdentifies inefficiencies or underperformance post-upgrade, allowing for corrective action without significant additional investment.Ensures that expected performance improvements are realized, directly impacting revenue or cost savings.Energy efficiency gains, Throughput improvements, Reduced waste/scrap rates.
Phased ImplementationSpreads capital outlay over time, easing cash flow constraints and allowing for budget reallocation based on early results.Demonstrates value early, securing ongoing investment and building confidence in the long-term strategy.Project ROI achieved in phases, Cash flow impact analysis.

Key Strategies for Budget and ROI Optimization:

  • Comprehensive Asset Auditing & Condition Assessment: Understand the current state, remaining useful life, and critical failure points of existing assets.
  • Lifecycle Cost Analysis (LCCA): Quantify the total cost of ownership for refurbishment/upgrade scenarios versus replacement, including operational, maintenance, and disposal costs.
  • Prioritization based on Risk and Impact: Focus on assets that pose the greatest operational risk, have the highest potential for efficiency gains, or are critical to business continuity.
  • Phased Implementation & Scalability: Break down large projects into manageable phases to spread costs and demonstrate early wins, allowing for adjustments based on initial ROI.
  • Technology Integration & Modernization: Incorporate newer, more efficient technologies during upgrades to improve performance, reduce energy consumption, and enhance data collection capabilities.
  • Strategic Sourcing & Vendor Management: Negotiate favorable terms with suppliers and service providers, explore competitive bidding, and consider long-term partnership agreements.
  • Predictive Maintenance & Data Analytics: Utilize sensor data and analytics to predict potential failures, allowing for proactive interventions that prevent costly unplanned downtime and catastrophic damage.
  • Modular Design & Standardization: Where applicable, adopt modular refurbishment approaches and standardize components to reduce complexity, improve efficiency, and lower spare parts inventory costs.
  • Performance Monitoring & Verification: Establish clear metrics and continuously monitor the performance of refurbished/upgraded assets to quantify ROI and identify areas for further optimization.
  • Internal Skill Development & Knowledge Transfer: Invest in training internal teams to perform routine maintenance and minor upgrades, reducing reliance on external contractors for ongoing support.

Franance Health: Managed Refurbishment, Upgrades & Life-extension Experts

Franance Health is your trusted partner for comprehensive Managed Refurbishment, Upgrades, and Life-Extension services for medical equipment. We understand the critical importance of maintaining high-performance, reliable, and up-to-date medical technology in today's healthcare landscape. Our dedicated team of certified technicians, coupled with our robust OEM partnerships, ensures that your valuable assets are optimized for extended operational life, enhanced functionality, and continued compliance.

OEM PartnerAreas of SpecializationBenefits of Partnership
Philips HealthcareImaging Equipment (CT, MRI, X-ray), Patient Monitoring Systems, UltrasoundAccess to genuine OEM parts, specialized diagnostic tools, and manufacturer-approved service procedures. Enhanced training and certification for our technicians on Philips equipment.
GE HealthcareImaging Modalities (CT, MRI, PET/CT), Ultrasound, Patient Care SolutionsDirect access to GE's latest service bulletins, technical documentation, and proprietary software. Ensuring upgrades and refurbishments align with GE's evolving product roadmaps.
Siemens HealthineersAdvanced Imaging Systems (CT, MRI), Laboratory Diagnostics, Cardiology EquipmentCollaboration on technical updates, access to specific component databases, and joint problem-solving for complex service issues. Maintaining the integrity and performance of Siemens' sophisticated technologies.
Canon Medical SystemsCT Scanners, MRI Systems, Ultrasound Devices, X-ray SystemsPartnership enabling us to utilize authentic Canon parts and follow their recommended service protocols for optimal equipment longevity and performance.
Fujifilm HealthcareRadiology Systems (X-ray, CT, MRI), Endoscopy Systems, UltrasoundEnsuring that all refurbishment and upgrade activities adhere to Fujifilm's stringent quality standards and technical specifications.

Our Expertise and OEM Partnerships

  • Managed Refurbishment: We provide end-to-end refurbishment solutions, bringing your existing medical equipment back to optimal operating condition. This includes thorough diagnostics, component replacement, rigorous testing, and aesthetic restoration to ensure it meets or exceeds original manufacturer specifications.
  • Upgrades: Stay at the forefront of medical technology with our expert upgrade services. We seamlessly integrate new software, hardware, and advanced features to enhance your equipment's capabilities, improve workflow efficiency, and meet evolving clinical demands.
  • Life-Extension: Maximize the return on your investment with our specialized life-extension programs. We implement proactive maintenance, component upgrades, and strategic servicing to significantly extend the reliable operational lifespan of your medical devices, delaying costly replacements.
  • Certified Technicians: Our team comprises highly skilled and certified technicians with extensive experience across a wide range of medical equipment modalities. They undergo continuous training to stay abreast of the latest technologies and manufacturer standards.
  • Global Reach: We offer our services globally, ensuring that healthcare facilities worldwide can benefit from our expertise and support.

Standard Service Specifications

This document outlines the minimum technical requirements and deliverables for standard service provision. It aims to ensure consistency, reliability, and adherence to industry best practices across all standard service engagements. Compliance with these specifications is mandatory for all service providers.

Requirement CategoryMinimum Technical RequirementDeliverable(s)Verification Method
Service Availability99.5% uptime during standard business hours (Mon-Fri, 9 AM - 5 PM local time).Monthly Uptime Report, Incident Log.Audited system logs, independent monitoring tool reports.
Response TimeAcknowledge critical incidents within 30 minutes, routine requests within 4 business hours.Incident acknowledgement confirmation, ticket system timestamps.Ticket system timestamps, communication logs.
Data SecurityAll data transmitted and stored must be encrypted using industry-standard protocols (e.g., TLS 1.2+, AES-256). Regular security audits and vulnerability assessments.Security Audit Reports, Penetration Test Results, Encryption Protocol Documentation.Review of audit reports, security policy documents.
PerformanceKey service metrics (e.g., latency, throughput) must remain within defined thresholds. Proactive performance monitoring and optimization.Performance Monitoring Dashboards, Optimization Reports.Review of monitoring tool data, performance trend analysis.
ReportingProvide monthly reports detailing service performance, incidents, and changes. Reports must be clear, concise, and actionable.Monthly Service Performance Report, Annual Service Review Report.Review of submitted reports for completeness and accuracy.
Change ManagementAll changes to the service environment must follow a documented change management process, including risk assessment and rollback plans.Change Request Forms, Change Approval Records, Rollback Plans.Audit of change management logs and documentation.
Incident ManagementA defined process for incident detection, categorization, prioritization, resolution, and post-incident review.Incident Response Plan, Root Cause Analysis (RCA) reports for major incidents.Review of incident logs, RCA documentation, and adherence to the incident response plan.
DocumentationComprehensive documentation of the service, including architecture diagrams, user guides, and operational procedures.Service Architecture Diagrams, User Manuals, Operational Runbooks.Review of provided documentation for accuracy and completeness.

Key Service Areas Covered

  • Service Level Agreements (SLAs)
  • Performance Metrics and Monitoring
  • Security and Data Protection
  • Reporting and Documentation
  • Change Management Procedures
  • Incident Response and Resolution
  • Escalation Paths

Local Support & Response Slas

Our Local Support & Response SLA (Service Level Agreement) details the guaranteed uptime and response times we provide across various geographical regions. This ensures consistent and reliable service delivery regardless of your location. We are committed to maintaining high availability and rapid issue resolution to minimize any potential disruptions to your operations. Below, you will find a comprehensive overview of our SLA, including specific guarantees for each region.

RegionUptime GuaranteeCritical Incident ResponseHigh-Priority Incident ResponseMedium-Priority Incident Response
North America99.95%15 minutes1 hour4 hours
Europe99.95%15 minutes1 hour4 hours
Asia-Pacific99.90%30 minutes2 hours6 hours
South America99.80%30 minutes2 hours6 hours
Africa99.75%45 minutes3 hours8 hours

Key SLA Components

  • Uptime Guarantees: Specifies the percentage of time our services are expected to be operational.
  • Response Time Guarantees: Outlines the maximum time it will take for our support team to acknowledge and begin addressing reported issues, categorized by severity.
  • Regional Availability: Details how these guarantees are applied and potentially vary across different geographical service areas.
  • Exclusions and Limitations: Clearly defines scenarios where SLA guarantees may not apply.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your Refurbishment, Upgrades & Life-Extension in South Sudan project in South Sudan.

Speak to Sales