
PSA Oxygen Plant Commissioning & Performance Testing Service in South Sudan
Engineering Excellence & Technical Support
PSA Oxygen Plant Commissioning & Performance Testing Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Rapid Deployment & Commissioning
Expert teams and pre-fabricated modules enable swift installation and activation of PSA oxygen plants, critical for immediate medical oxygen supply in South Sudan's challenging environment.
Optimized Performance & Purity
Rigorous performance testing ensures plants operate at peak efficiency, delivering medical-grade oxygen (93% ± 3%) consistently and reliably, meeting stringent international standards.
Localized Training & Sustainability
Comprehensive on-site training for local personnel ensures plant operators are skilled in maintenance and troubleshooting, fostering long-term operational sustainability and self-sufficiency.
What Is Psa Oxygen Plant Commissioning & Performance Testing Service In South Sudan?
PSA (Pressure Swing Adsorption) Oxygen Plant Commissioning & Performance Testing Service in South Sudan refers to the comprehensive technical service provided to ensure that an installed PSA oxygen generation plant operates according to its design specifications, achieves the intended oxygen purity and flow rate, and functions safely and reliably within the South Sudanese context. This service encompasses a series of rigorous checks, calibrations, and validations performed after the plant's installation and prior to its full operational handover.
| Who Needs the Service? | Typical Use Cases |
|---|---|
| Healthcare Facilities (Hospitals, Clinics): Essential for providing medical-grade oxygen to patients, particularly in remote or resource-constrained areas. | Medical Oxygen Supply: Ensuring a reliable and compliant on-site source of oxygen for respiratory therapy, anesthesia, and emergency medical care. |
| Industrial Operations: Sectors requiring high-purity oxygen for welding, cutting, combustion enhancement, or chemical processing. | Industrial Gas Supply: On-site generation of oxygen for manufacturing processes, metallurgy, and environmental applications. |
| Emergency Response Agencies & Humanitarian Organizations: For deployment in disaster relief operations, refugee camps, and conflict zones where access to reliable oxygen supply is critical. | Critical Care in Underserved Regions: Providing life-saving oxygen in areas with limited infrastructure or unreliable supply chains. |
| Plant Manufacturers/Installers: To ensure their product meets contractual obligations and performance standards before handover to the end-user. | Quality Assurance & Client Acceptance: Demonstrating that the installed PSA oxygen plant performs to specification and meets client requirements. |
| Regulatory Bodies (if applicable): For verification of compliance with national or international standards for medical device manufacturing or industrial safety. | Compliance and Certification: Adherence to relevant safety, purity, and operational standards mandated by local authorities or international guidelines. |
Service Involvement Breakdown:
- Pre-commissioning checks: Verification of installation completeness, mechanical integrity, electrical connections, and safety systems.
- Functional testing: Operation of individual plant components (compressors, dryers, adsorption vessels, valves, control systems) to confirm proper functioning.
- System integration testing: Assessment of how different components interact and perform as a cohesive unit.
- Performance validation: Measurement and verification of key output parameters, including oxygen purity (typically >90-95% for medical grade), flow rate (e.g., Nm³/hr), dew point, and pressure.
- Safety system verification: Testing of emergency shutdown procedures, pressure relief valves, oxygen leak detection, and hazardous area classification compliance.
- Control system calibration and programming: Ensuring accurate sensor readings, logical sequencing of operations, and user interface functionality.
- Documentation review and generation: Validation of vendor documentation, creation of test reports, operational manuals, and maintenance procedures.
- Operator training: Providing hands-on training to plant operators and maintenance personnel on system operation, troubleshooting, and routine maintenance.
- Troubleshooting and optimization: Identification and rectification of any anomalies or inefficiencies to achieve optimal performance.
Who Needs Psa Oxygen Plant Commissioning & Performance Testing Service In South Sudan?
Oxygen is a vital resource for healthcare, industrial processes, and emergency response. In South Sudan, a country with a growing healthcare sector and emerging industries, the reliable supply of medical and industrial oxygen is crucial. PSA (Pressure Swing Adsorption) oxygen plants offer a decentralized and efficient solution for on-site oxygen generation. However, the successful and safe operation of these plants hinges on expert commissioning and rigorous performance testing. This service ensures that the plant is installed correctly, operates to its full potential, meets all safety standards, and consistently produces oxygen of the required purity and quantity. Therefore, any entity in South Sudan that operates or plans to operate a PSA oxygen plant, or relies heavily on a consistent supply of oxygen from such a plant, is a potential client for commissioning and performance testing services.
| Customer Type | Relevant Departments/Users | Need for PSA Oxygen Plant Commissioning & Performance Testing |
|---|---|---|
| Hospitals and Healthcare Facilities | Medical Gas Department, Engineering & Maintenance, Biomedical Engineering, Infection Control, Clinical Staff (Surgeons, Anesthesiologists, Nurses) | Ensuring reliable supply of medical-grade oxygen for patient care (surgery, respiratory support, critical care), meeting stringent purity standards, maintaining patient safety, and complying with health regulations. Performance testing verifies capacity and purity for peak demand. |
| Mines and Extractive Industries | Operations Management, Maintenance & Reliability, Safety & Health Officers, Process Engineering | Providing oxygen for welding, cutting, and other industrial processes crucial for extraction and processing. Ensuring plant efficiency, safety during operation, and consistent supply to avoid production downtime. Performance testing confirms output for demanding industrial applications. |
| Manufacturing and Fabrication Companies | Production Management, Workshop Supervisors, Maintenance Teams, Quality Control | Utilizing oxygen for various fabrication and manufacturing processes. Commissioning ensures proper setup for optimal productivity. Performance testing verifies consistent oxygen output for quality assurance and efficient operation. |
| Welding and Metalworking Shops | Owner/Manager, Lead Fabricator/Welder, Maintenance Personnel | Essential for welding and cutting operations. Commissioning guarantees correct installation and initial setup for safe and effective use. Performance testing confirms the plant's ability to meet the fluctuating demands of a busy workshop. |
| Emergency and Disaster Relief Organizations | Logistics and Operations Managers, Medical Coordinators, Field Engineers | Deploying oxygen for rapid medical response in crisis situations. Commissioning and testing ensure that the plant is ready for immediate deployment and can reliably supply oxygen under challenging conditions. Performance verification is critical for life-saving applications. |
| Research and Educational Institutions | Laboratory Managers, Science Department Heads, Facilities Management | Using oxygen for scientific experiments, demonstrations, and specialized laboratory equipment. Commissioning ensures precise oxygen delivery for research accuracy. Performance testing validates the plant's ability to provide specific oxygen concentrations. |
| Government Ministries and Agencies | Ministry of Health (Procurement, Public Health), Ministry of Petroleum and Mining (Industrial Safety), Ministry of Infrastructure (Development Projects), National Disaster Management Authority | Overseeing public health infrastructure, industrial safety regulations, and emergency preparedness. They may commission or require performance testing for plants installed under their purview to ensure public safety and efficient resource allocation. |
Target Customers in South Sudan:
- Hospitals and Healthcare Facilities (Public & Private)
- Mines and Extractive Industries
- Manufacturing and Fabrication Companies
- Welding and Metalworking Shops
- Emergency and Disaster Relief Organizations
- Research and Educational Institutions
- Government Ministries and Agencies responsible for infrastructure and health.
Psa Oxygen Plant Commissioning & Performance Testing Service Process In South Sudan
This document outlines the comprehensive service process for commissioning and performance testing of PSA (Pressure Swing Adsorption) Oxygen Plants in South Sudan. The workflow is designed to ensure a systematic, efficient, and successful handover of the plant, meeting all specified performance criteria and safety standards. The process spans from initial client inquiry to final report generation and client sign-off, encompassing all critical stages of commissioning and testing.
| Stage | Description | Key Activities | Deliverables | Responsible Party |
|---|---|---|---|---|
| Client expresses interest in commissioning and performance testing services for their PSA Oxygen Plant in South Sudan. | Receive client inquiry, understand plant specifications, desired outcomes (e.g., purity, flow rate, uptime), and geographical location. Discuss preliminary project requirements. | Initial understanding of project scope and requirements. | Client & Service Provider |
| Based on the defined scope, a detailed proposal is prepared and submitted to the client. | Develop a technical proposal outlining methodology, scope of work, key personnel, timeline, safety protocols, and cost. Include any necessary site visit requirements. | Technical and Commercial Proposal. | Service Provider |
| Formal agreement is established between the client and the service provider. | Review and negotiate proposal terms, pricing, and contractual obligations. Finalize contract and issue purchase order. | Signed Contract/Purchase Order. | Client & Service Provider |
| Detailed planning and preparation for on-site activities. | Develop a detailed commissioning and testing plan, including schedules, resource allocation, safety plans (JSA, risk assessments), and logistics. Coordinate with client for site access, power, water, and any necessary permits. | Detailed Commissioning & Testing Plan, Site Access & Safety Plan. | Service Provider & Client |
| Ensuring all plant components are installed correctly and according to manufacturer specifications. | Visual inspection of all equipment (compressors, dryers, PSA skids, storage tanks, etc.). Verify piping, electrical, and instrumentation connections. Check for any physical damage or installation discrepancies. | Installation Verification Report. | Service Provider |
| Initial checks to ensure all systems are ready for power-up and operation. | Verify control system configuration, instrument calibration checks, valve operation, safety interlocks, and emergency shutdown systems. Perform continuity tests and insulation resistance tests on electrical components. | Pre-Functional Checklists, System Readiness Confirmation. | Service Provider |
| Testing individual systems and sub-systems to ensure they operate as designed. | Start-up of individual components (e.g., compressor, dryer). Test pneumatic and electric valve actuation. Verify sensor readings and control loop responses. Operate the PSA cycle in manual and automatic modes. | Functional Test Reports for each sub-system. | Service Provider |
| Verifying the plant's ability to meet specified oxygen purity, flow rate, and other performance parameters under various operating conditions. | Conduct tests at various load conditions. Measure oxygen purity, flow rate, pressure, and temperature using calibrated instruments. Monitor adsorption/desorption cycles. Record data systematically. Conduct tests over a defined period (e.g., 24-72 hours) to assess stability and uptime. | Performance Test Data, Oxygen Purity Certificates. | Service Provider |
| Identifying and resolving any issues encountered during testing and fine-tuning the plant for optimal performance. | Analyze test results. Identify root causes of any deviations from specifications. Implement corrective actions, adjust process parameters, and re-test as necessary. Optimize PSA cycle for maximum efficiency and product quality. | Troubleshooting Logs, Optimized Operating Parameters. | Service Provider |
| Providing comprehensive training to the client's operating and maintenance personnel. | Conduct classroom and hands-on training sessions covering plant operation, troubleshooting, routine maintenance, safety procedures, and emergency response. | Training Materials, Training Attendance Records. | Service Provider |
| Compiling all relevant documentation and reports for the client. | Prepare a comprehensive commissioning and performance testing report including all test data, analysis, findings, recommendations, and certificates. Compile O&M manuals, as-built drawings, and warranty information. | Final Commissioning & Performance Testing Report, O&M Manuals, As-Built Drawings. | Service Provider |
| Formal transfer of the commissioned and tested plant to the client. | Present the final report and documentation. Conduct a final walkthrough with the client. Obtain client acceptance and sign-off on the completion of services. | Client Acceptance Certificate, Final Project Closure. | Client & Service Provider |
PSA Oxygen Plant Commissioning & Performance Testing Service Workflow in South Sudan
- Initial Inquiry & Scope Definition
- Proposal Development & Submission
- Contract Negotiation & Award
- Pre-Commissioning Planning & Site Preparation
- Equipment Installation Verification
- Pre-Functional Checks
- Functional Testing
- Performance Testing
- Troubleshooting & Optimization
- Training
- Documentation & Reporting
- Final Handover & Sign-off
Psa Oxygen Plant Commissioning & Performance Testing Service Cost In South Sudan
Commissioning and performance testing of a PSA (Pressure Swing Adsorption) oxygen plant in South Sudan involves a complex interplay of factors influencing its cost. These costs are typically quoted in local currency, the South Sudanese Pound (SSP), though international components might be priced in USD and converted. Key pricing drivers include the plant's capacity, the level of complexity, the duration of the commissioning and testing phases, the expertise of the service provider, and logistical challenges specific to South Sudan.
Factors Influencing Cost:
- Plant Capacity (SCFH/Nm³/hr): Larger capacity plants naturally require more extensive testing and calibration, leading to higher costs.
- Technological Complexity: Advanced automation, specialized sensor integration, and proprietary technologies can increase the scope and expertise required, thus raising prices.
- Duration of Commissioning & Testing: This includes initial setup, functional checks, calibration, performance validation against guaranteed parameters, and troubleshooting. Longer durations equate to higher labor and resource costs.
- Service Provider Expertise & Reputation: Established international or experienced local providers with a proven track record will generally command higher fees due to their specialized knowledge, efficiency, and ability to mitigate risks.
- Travel & Accommodation: For expatriate engineers and technicians, costs associated with flights, visas, secure accommodation, and local transportation in South Sudan are significant contributors.
- Logistics & Site Access: South Sudan presents considerable logistical hurdles due to infrastructure limitations, security concerns, and remote locations. Getting personnel and equipment to the site can be costly and time-consuming.
- Consumables & Spare Parts: During testing, certain consumables (e.g., molecular sieve checks, filter replacements) and potentially minor spare parts might be required.
- Scope of Work: The contract's specifics, including whether it covers pre-commissioning checks, full functional testing, performance guarantees, operator training, and handover documentation, will directly impact the price.
- Contingency & Risk Management: Due to the challenging operating environment in South Sudan, service providers often incorporate a contingency factor to account for unforeseen delays, security issues, or technical challenges.
- Local Regulations & Taxes: Any applicable local taxes, duties, or regulatory compliance costs will also be factored in.
| Cost Component | Estimated Percentage of Total Cost (Indicative) | Notes |
|---|---|---|
| Service Provider Fees (Labor, Expertise) | 40-60% | This is the core cost, varying with provider reputation and duration. |
| Travel, Accommodation & Visas (Expatriate Staff) | 15-30% | Significant due to South Sudan's logistical challenges. |
| Logistics, Transportation & Site Access | 10-20% | Includes local transport, potential for specialized transport, and site preparation. |
| Consumables & Minor Spare Parts | 5-10% | Essential for testing and calibration. |
| Contingency & Risk Management | 10-15% | Crucial for mitigating risks in the operating environment. |
| Local Taxes & Duties | Variable | Depends on specific South Sudanese regulations. |
Typical Pricing Ranges (Indicative)
- Small to Medium Capacity Plants (e.g., < 100 Nm³/hr): Likely to range from SSP 20,000,000 to SSP 70,000,000.
- Medium to Large Capacity Plants (e.g., 100 - 500 Nm³/hr): Could range from SSP 70,000,000 to SSP 200,000,000.
- Very Large/Complex Plants (e.g., > 500 Nm³/hr or with extensive automation): Can exceed SSP 200,000,000, potentially reaching SSP 500,000,000 or more, depending on the specifics.
Affordable Psa Oxygen Plant Commissioning & Performance Testing Service Options
Our affordable PSA (Pressure Swing Adsorption) Oxygen Plant commissioning and performance testing services are designed to ensure your plant operates efficiently, reliably, and meets all regulatory requirements without breaking the bank. We offer flexible value bundles and implement strategic cost-saving measures to provide you with the best possible return on investment. Whether you need initial startup, routine checks, or troubleshooting, our experienced technicians are equipped to deliver top-notch service at competitive prices.
| Value Bundle | Included Services | Benefits | Estimated Cost Savings | Ideal For |
|---|---|---|---|---|
| Essential Startup Package | Initial Commissioning, Basic Performance Test, User Orientation | Ensures safe and correct initial operation, immediate issue identification, fundamental user knowledge. | 5-10% on initial setup vs. piecemeal services. | New plant installations or plants undergoing significant upgrades. |
| Performance Assurance Package | Routine Performance Testing (Quarterly), Basic Troubleshooting Support, Optimization Report | Proactive issue detection, improved operational efficiency, extended equipment lifespan, reduced downtime. | 10-15% on regular testing and minor troubleshooting. | Plants requiring consistent, high-level performance and reliability. |
| Comprehensive Reliability Package | Initial Commissioning, Routine Performance Testing (Bi-Annually), Advanced Troubleshooting, Predictive Maintenance Recommendations, Extended User Training | Maximized uptime, minimized operational costs, enhanced safety, skilled in-house operators, long-term plant health. | 15-20% on integrated services and long-term cost avoidance. | Critical operations, plants with high production demands, or those aiming for maximum operational efficiency. |
| Customized Solutions | Tailored to specific plant needs and operational cycles. Can include any combination of services. | Maximum flexibility, targeted solutions, cost-effectiveness for unique requirements. | Variable, based on scope; can achieve significant savings by avoiding unnecessary services. | Unique plant configurations, specific project timelines, or specialized operational challenges. |
Key Service Components & Value Bundles
- Initial Commissioning: Comprehensive startup procedures, including equipment checks, system calibration, and initial performance verification.
- Routine Performance Testing: Regular assessments to monitor oxygen purity, flow rate, and overall plant efficiency, identifying potential issues before they escalate.
- Troubleshooting & Optimization: In-depth analysis of any operational problems and implementation of solutions to improve performance and reduce energy consumption.
- Validation & Compliance: Ensuring your plant meets industry standards and regulatory mandates.
- User Training: Empowering your personnel with the knowledge to operate and maintain the plant effectively.
Verified Providers In South Sudan
In South Sudan, identifying reliable and credentialed healthcare providers is crucial for ensuring quality care. Franance Health stands out as a leading organization with a robust credentialing process that guarantees its network comprises highly qualified and ethical medical professionals. This commitment to verification ensures patients receive safe, effective, and patient-centered medical services.
| Credentialing Component | Franance Health's Standard | Why it's Important for Patients |
|---|---|---|
| Educational Background | Verification of degrees, diplomas, and certifications from accredited institutions. | Ensures providers have received foundational medical training from reputable sources. |
| Professional Licensing | Confirmation of valid and current medical licenses from relevant South Sudanese authorities. | Guarantees providers are legally permitted to practice medicine and meet regulatory requirements. |
| Clinical Experience | Thorough review of past work experience and areas of specialization. | Confirms practical application of knowledge and suitability for specific medical needs. |
| Peer Review and References | Collection of feedback from other healthcare professionals and employers. | Provides objective insights into a provider's performance, ethics, and collegiality. |
| Background Checks | Screening for any disciplinary actions, malpractice claims, or criminal history. | Safeguards patients against potential risks and ensures a commitment to ethical conduct. |
| Continuing Medical Education (CME) | Verification of ongoing professional development to stay abreast of advancements. | Demonstrates a commitment to lifelong learning and delivering up-to-date medical care. |
Why Franance Health Credentials Matter
- Rigorous Verification: Franance Health employs a comprehensive credentialing process that scrutinizes educational background, professional licenses, clinical experience, and adherence to ethical standards.
- Patient Safety Focus: Their credentialing prioritizes patient well-being, ensuring providers have the necessary skills and knowledge to deliver safe and effective care.
- Quality Assurance: By partnering with verified providers, Franance Health actively contributes to raising the overall standard of healthcare delivery in South Sudan.
- Trust and Reliability: Patients can have confidence that when they access healthcare through Franance Health, they are connecting with vetted and trustworthy medical professionals.
- Continuous Monitoring: The credentialing process is not a one-time event; Franance Health often includes provisions for ongoing monitoring and re-credentialing to maintain high standards.
Scope Of Work For Psa Oxygen Plant Commissioning & Performance Testing Service
This Scope of Work (SOW) outlines the services required for the commissioning and performance testing of a Pressure Swing Adsorption (PSA) Oxygen Plant. The objective is to ensure the plant operates safely, efficiently, and meets the specified performance criteria. This SOW covers all activities from pre-commissioning checks to final performance verification, including the provision of specified technical deliverables and adherence to relevant standard specifications.
| Phase | Activity | Description | Technical Deliverables | Standard Specifications (Examples) | |
|---|---|---|---|---|---|
| Pre-Commissioning | Mechanical Checks | Verification of all mechanical components, piping, valves, and instrumentation against design drawings and manufacturer specifications. Cleaning and flushing of systems. | Mechanical Completion Report, Punch List (identifying outstanding items) | ASME B31.3 (Process Piping), Manufacturer's Installation Manuals | |
| Pre-Commissioning | Electrical & Instrumentation (E&I) Checks | Verification of electrical connections, control panel wiring, instrument calibration, and safety interlocks. | E&I Completion Report, Instrument Calibration Certificates | IEC 60079 (Explosive Atmospheres), ISA Standards (e.g., ISA S5.1, ISA S75.02) | |
| Commissioning | System Start-up & Walkthrough | Controlled start-up of individual plant sections, verification of basic functionality, and initial operational checks. | Pre-functional Test Procedures & Reports | NFPA 70 (National Electrical Code) | |
| Commissioning | Initial Operation & Stabilization | Running the plant under various load conditions to achieve stable operation and monitor key parameters. | Initial Operational Data Logs, Preliminary Performance Report | API RP 521 (Pressure-relieving and Depressuring Systems) | |
| Performance Testing | Oxygen Purity & Flow Rate Testing | Measurement and verification of the produced oxygen purity (e.g., 93% +/- 2% by volume) and flow rate against design specifications under stable operating conditions. | Oxygen Purity Test Reports (using certified analyzers), Flow Rate Measurement Reports | ISO 27830 (Medical oxygen generating systems - Pressure swing adsorption) | Compressed Gas Association (CGA) Standards |
| Performance Testing | Adsorption Cycle Optimization | Fine-tuning of adsorption/desorption cycles to maximize efficiency and product quality. | Cycle Time Optimization Report | Internal Company Process Control Standards | |
| Performance Testing | Energy Consumption Testing | Measurement and verification of specific energy consumption (e.g., kWh/Nm³ of oxygen) against contractual guarantees. | Energy Consumption Report | ISO 50001 (Energy Management Systems) | |
| Performance Testing | Product Gas Quality & Contaminant Analysis | Analysis of the produced oxygen for potential contaminants (e.g., moisture, CO, CO2, NOx) to ensure it meets applicable standards. | Product Gas Analysis Certificates | USP (United States Pharmacopeia) for Medical Oxygen, ISO 8573 (Particulate, water, and oil contamination of compressed air) | |
| Performance Testing | Noise & Vibration Level Measurement | Measurement of noise and vibration levels to ensure compliance with environmental and safety regulations. | Noise & Vibration Measurement Report | ISO 1996 (Acoustics - Description, measurement and assessment of environmental noise) | |
| Documentation & Handover | Final Performance Test Report | Comprehensive report detailing all test procedures, results, deviations, and final performance validation. | Final Performance Test Report, As-Built Drawings, O&M Manuals, Training Material | Client-specific documentation requirements |
Key Objectives of the PSA Oxygen Plant Commissioning & Performance Testing Service
- Verify successful installation and mechanical completion of the PSA Oxygen Plant.
- Conduct pre-commissioning checks to ensure safety and system integrity.
- Execute commissioning activities to bring the plant into operational status.
- Perform comprehensive performance testing to validate adherence to design specifications and contractual guarantees.
- Identify and resolve any operational issues or deficiencies.
- Provide detailed documentation and technical deliverables as specified.
Service Level Agreement For Psa Oxygen Plant Commissioning & Performance Testing Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Commissioning & Performance Testing Service of the PSA Oxygen Plant provided by [Your Company Name] to [Client Name]. This SLA is an integral part of the overall contract and ensures a clear understanding of service expectations and commitments.
| Service Component | Response Time Guarantee (Business Hours) | Uptime Guarantee (During Testing Phase) |
|---|---|---|
| Initial Response to Critical Issues (Plant Malfunction/Failure during testing) | 2 hours | N/A (Focus on resolution) |
| Initial Response to Non-Critical Issues (Minor operational adjustments, information requests) | 4 business hours | N/A (Focus on resolution) |
| Start of Commissioning Activities (Upon site readiness and equipment delivery) | As per Project Schedule (refer to Main Contract) | N/A |
| Start of Performance Testing (Upon successful completion of commissioning) | As per Project Schedule (refer to Main Contract) | N/A |
| Downtime due to [Your Company Name]'s fault during Performance Testing | N/A | 98% uptime (excluding scheduled maintenance or client-induced issues) |
| Resolution of Critical Issues impacting Testing | Within 8 business hours (from initial response) | N/A (Focus on resolution) |
| Resolution of Non-Critical Issues impacting Testing | Within 24 business hours (from initial response) | N/A (Focus on resolution) |
| Provision of Test Reports | Within 5 business days of test completion | N/A |
Scope of Services
- On-site commissioning of the PSA Oxygen Plant.
- Performance testing to verify design parameters and operational efficiency.
- Troubleshooting and issue resolution during commissioning and testing phases.
- Provision of detailed reports on commissioning and performance test results.
Frequently Asked Questions

Ready when you are
Let's scope your PSA Oxygen Plant Commissioning & Performance Testing Service in South Sudan project in South Sudan.
Scaling healthcare logistics and technical systems across the entire continent.

