
Refurbishment, Upgrades & Life-Extension in Somalia
Engineering Excellence & Technical Support
Comprehensive Refurbishment, Upgrades & Life-Extension solutions. High-standard technical execution following OEM protocols and local regulatory frameworks.
Optimized Power Generation Reliability
We conduct comprehensive diagnostic assessments and implement targeted upgrades for Somalia's existing power generation assets, from diesel generators to small-scale hydro. Our focus is on enhancing fuel efficiency, reducing unscheduled downtime, and extending operational lifespan through component refurbishment and advanced control system integration, ensuring a more stable and cost-effective energy supply.
Modernized Electrical Grid Infrastructure
Our services involve the rehabilitation and modernization of key substations, transmission lines, and distribution networks across Somalia. This includes replacing aging equipment, implementing smart grid technologies for improved load management and fault detection, and reinforcing infrastructure against environmental challenges. The goal is to increase network capacity, reduce power losses, and improve the overall quality and reach of electricity distribution.
Sustainable Water Infrastructure Life Extension
We specialize in the refurbishment and life-extension of critical water infrastructure, including treatment plants, pumping stations, and distribution pipelines. Our technical approach focuses on leak detection and repair, pump efficiency upgrades, and the replacement of corroded or damaged pipe sections. This ensures a more reliable, hygienic, and sustainable supply of clean water, vital for public health and economic development in Somalia.
Select Your Service Track
What Is Refurbishment, Upgrades & Life-extension In Somalia?
In the context of Somalia, Refurbishment, Upgrades, and Life-Extension refer to a critical category of interventions focused on the maintenance, repair, and enhancement of existing healthcare infrastructure, medical equipment, and essential systems. This encompasses a range of activities aimed at restoring functionality, improving performance, and prolonging the operational lifespan of these vital assets, especially in a challenging and resource-constrained environment. The importance of this category is paramount, as it directly impacts the availability, quality, and accessibility of healthcare services for the Somali population.
| Category | Typical Interventions | Impact on Healthcare in Somalia |
|---|---|---|
| Refurbishment | Structural repairs, electrical/plumbing upgrades, sanitation improvements, painting, flooring replacement. | Restores functionality of clinics/hospitals, improves patient comfort and infection control, creates a safer working environment for staff. |
| Upgrades | Component replacement in medical devices (e.g., imaging machines, lab equipment), software updates, integration of new modules. | Enhances diagnostic accuracy, improves treatment outcomes, increases the range of services offered, boosts efficiency of medical professionals. |
| Life-Extension | Preventative maintenance schedules, routine servicing, calibration, timely replacement of consumables and worn parts. | Reduces unexpected breakdowns, minimizes downtime of critical equipment, lowers overall operational costs, ensures consistent availability of healthcare services. |
Key Components and Importance
- {"title":"Refurbishment:","description":"This involves the process of repairing and renovating existing healthcare facilities, such as hospitals, clinics, and health posts. It includes structural repairs, plumbing and electrical system overhauls, painting, and ensuring basic sanitation and hygiene standards are met. The goal is to create a safe, functional, and conducive environment for patient care and staff well-being."}
- {"title":"Upgrades:","description":"Upgrades focus on improving the performance and capabilities of existing medical equipment and technologies. This can involve replacing worn-out parts, installing newer components, updating software, or integrating complementary technologies. The aim is to enhance diagnostic accuracy, treatment efficacy, and overall operational efficiency of medical devices."}
- {"title":"Life-Extension:","description":"This refers to proactive measures taken to extend the useful life of healthcare assets. It includes regular preventative maintenance, comprehensive servicing, and timely replacement of consumable parts. By investing in life-extension strategies, the need for frequent and costly replacements of equipment and facilities is reduced, ensuring sustained service delivery."}
- {"title":"Importance in Somalia:","description":"Given the legacy of conflict and limited resources, many healthcare facilities and equipment in Somalia are aged, damaged, or obsolete. Refurbishment, upgrades, and life-extension are crucial for: \n\n* Maximizing Existing Resources: Instead of solely relying on new acquisitions, these interventions leverage existing assets, making them more cost-effective and sustainable. \n* Improving Service Delivery: Functional facilities and well-maintained equipment are fundamental to providing essential healthcare services, from primary care to specialized treatments. \n* Ensuring Patient Safety: Dilapidated structures and faulty equipment pose significant risks to patients and healthcare workers. Repairs and upgrades enhance safety. \n* Building Resilience: By extending the lifespan of infrastructure and equipment, Somalia can build a more resilient healthcare system capable of withstanding operational challenges. \n* Economic Viability: Investing in maintenance and repair is generally more economical than the constant procurement of new items, especially for a country with a strained budget."}
Who Benefits From Refurbishment, Upgrades & Life-extension In Somalia?
Refurbishment, upgrades, and life-extension initiatives in Somalia's healthcare sector offer a multi-faceted benefit to a range of stakeholders and healthcare facility types. These interventions aim to improve the functionality, safety, and longevity of existing medical infrastructure, ultimately leading to better patient care and a more robust health system.
| Stakeholder Group | Healthcare Facility Types Benefiting | Specific Benefits |
|---|---|---|
| Patients and Communities | Hospitals (District, Regional, Referral), Health Centers, Maternal and Child Health (MCH) Centers, Clinics, Mobile Clinics | Improved access to safe and functional healthcare services; reduced risk of infection due to better hygiene and infrastructure; enhanced patient comfort and dignity; increased availability of essential medical equipment and technologies; better outcomes for common and complex health issues; greater trust in the healthcare system. |
| Healthcare Professionals (Doctors, Nurses, Technicians, Support Staff) | Hospitals, Health Centers, MCH Centers, Clinics, Specialized Units (e.g., operating theaters, laboratories, diagnostic imaging) | Safer working environment; access to reliable and updated equipment; improved diagnostic and treatment capabilities; reduced stress and burnout due to better facilities; increased ability to provide quality care; opportunities for professional development through the use of new technologies. |
| Ministry of Health and Government Agencies | All levels of healthcare facilities managed by the government | Increased efficiency and effectiveness of the public health system; better utilization of existing resources; improved health indicators and public health outcomes; enhanced capacity for disaster preparedness and response; stronger oversight and management of healthcare infrastructure; demonstration of commitment to public welfare; potential for cost savings compared to building new facilities. |
| International Donors and NGOs | Hospitals, Health Centers, MCH Centers, Clinics, and project-specific facilities | More effective and sustainable use of development aid; extended lifespan of their investments in healthcare infrastructure; improved impact and reach of their programs; enhanced reputation and trust from beneficiary communities; ability to focus on advanced medical needs rather than basic infrastructure repairs; contribution to long-term stability and resilience. |
| Local Healthcare Facilities (as institutions) | Hospitals, Health Centers, MCH Centers, Clinics | Extended operational life and reduced need for frequent, costly repairs; improved energy efficiency and reduced utility costs; enhanced structural integrity and safety; greater capacity to house advanced medical equipment; improved overall operational efficiency; potential for increased patient throughput and service delivery. |
| Surrounding Communities | Proximity to any refurbished or upgraded healthcare facility | Increased availability of essential healthcare services locally; reduced travel time and costs for seeking medical attention; stimulation of local economy through employment during refurbishment and potential for increased patient numbers; improved community well-being and reduced health disparities. |
Target Stakeholders and Healthcare Facility Types Benefiting from Refurbishment, Upgrades, and Life-Extension in Somalia
- Patients and Communities
- Healthcare Professionals
- Ministry of Health and Government Agencies
- International Donors and NGOs
- Local Healthcare Facilities
- Surrounding Communities
Refurbishment, Upgrades & Life-extension Implementation Framework
This framework outlines a comprehensive, step-by-step lifecycle for implementing refurbishment, upgrade, and life-extension projects. It provides a structured approach to ensure successful project completion, from initial assessment and planning through to final sign-off and handover.
| Phase | Key Activities | Deliverables | Key Considerations |
|---|---|---|---|
| Phase 1: Assessment & Planning |
| Condition Report Project Scope Document Feasibility Report Business Case Risk Register Initial Budget & Schedule | Understanding current state, defining future needs, identifying constraints, securing buy-in, proactive risk management. |
| Phase 2: Design & Engineering |
| Detailed Design Drawings Technical Specifications Compliance Certificates Value Engineering Report | Translating requirements into actionable designs, ensuring adherence to standards, optimizing cost-effectiveness. |
| Phase 3: Procurement & Contracting |
| Procurement Plan Tender Documents Signed Contracts Purchase Orders | Selecting reliable partners, clear contract terms, efficient supply chain management. |
| Phase 4: Implementation & Execution |
| Site Access Permits Completed Work Packages Quality Inspection Records Progress Reports Change Orders | Safe execution, adherence to design, maintaining quality, timely communication, managing deviations. |
| Phase 5: Testing & Commissioning |
| Pre-commissioning Checklist Test Reports Integration Test Results UAT Sign-off | Verifying functionality, ensuring performance meets specifications, validating user requirements. |
| Phase 6: Handover & Sign-off |
| Final Inspection Report As-Built Drawings & O&M Manuals Training Records Project Acceptance Certificate Lessons Learned Report | Formal acceptance of completed work, ensuring maintainability, capturing knowledge for future projects. |
Refurbishment, Upgrades & Life-Extension Implementation Framework Lifecycle
- Phase 1: Assessment & Planning
- Phase 2: Design & Engineering
- Phase 3: Procurement & Contracting
- Phase 4: Implementation & Execution
- Phase 5: Testing & Commissioning
- Phase 6: Handover & Sign-off
Refurbishment, Upgrades & Life-extension Pricing Factors In Somalia
This document provides a detailed breakdown of pricing factors for refurbishment, upgrades, and life-extension projects in Somalia. These factors are crucial for estimating project costs, and due to the unique operating environment, can exhibit significant variability. This analysis aims to offer a structured understanding of these cost drivers.
| Cost Variable Category | Description | Estimated Range/Considerations (USD) | Notes |
|---|---|---|---|
| Asset Type & Complexity | Simple vs. complex machinery, basic infrastructure vs. advanced systems. | Highly variable. Simple repairs might be < $5,000. Complex overhauls/upgrades for critical infrastructure can exceed $500,000+ | A detailed technical assessment is crucial. |
| Scope of Work (SOW) | Minor repairs, routine maintenance, partial overhaul, full refurbishment, major upgrades, technology integration. | Highly variable. Directly proportional to the work involved. | Clear SOW prevents scope creep and cost overruns. |
| Spare Parts & Components | Cost of sourcing genuine, compatible, or custom-fabricated parts. | $100 - $50,000+ (depending on part criticality and availability) | Importation costs, lead times, and potential for counterfeits are major factors. |
| Specialized Expertise | Skilled local technicians, expatriate engineers, project managers. | $50 - $500+ per hour/day per person | Demand for specialized skills can drive up rates. |
| Geographic Location & Accessibility | Transportation costs to remote or high-risk areas. | Increases by 10-50% compared to accessible urban areas. | Road conditions and security dictate transport methods. |
| Security & Risk Mitigation | Security personnel, escort services, site hardening, insurance. | $100 - $1,000+ per day/week per project | Can be a significant portion of the budget in certain regions. |
| Logistics & Transportation (In-Country & International) | Freight, customs clearance, local haulage. | 5% - 25% of total project material costs | Challenging infrastructure can lead to higher costs and delays. |
| Import Duties, Taxes & Tariffs | Government levies on imported goods and services. | 5% - 30%+ of CIF value (highly dependent on specific goods and current regulations) | Can vary significantly and change without notice. |
| Labor Costs (Skilled & Unskilled) | Wages for local and expatriate workers. | Local unskilled: $5 - $15/day. Local skilled: $20 - $50/day. Expatriate: $150 - $500+/day. | Availability of skilled local labor is a key factor. |
| Project Management & Engineering | Planning, supervision, quality control, reporting. | 5% - 15% of total project cost | Essential for successful execution and risk management. |
| Contingency | Buffer for unforeseen issues. | 15% - 30%+ of total estimated cost | Absolutely critical in the Somali context. |
| Regulatory Compliance & Permitting | Fees for permits, licenses, and inspections. | $50 - $5,000+ (depending on the nature of the asset and permits required) | Can involve bureaucratic delays. |
| Quality Assurance & Testing | Non-destructive testing, performance validation, certification. | $500 - $10,000+ (depending on the asset and testing rigor) | Ensures asset reliability and safety. |
| Warranty & Guarantees | Contractor's risk premium for performance assurance. | Integrated into overall pricing, typically 5% - 10% uplift | Can be negotiable based on contractor's confidence and asset type. |
Key Cost Variables for Refurbishment, Upgrades & Life-Extension in Somalia
- Asset Type & Complexity: The nature of the asset (e.g., industrial machinery, infrastructure, vehicles, IT systems) and its complexity directly impacts the scope of work, required expertise, and specialized materials.
- Scope of Work (SOW): A clearly defined SOW is paramount. Minor repairs, full overhauls, technology upgrades, or structural enhancements will result in vastly different cost profiles.
- Age & Condition of Asset: Older assets in poor condition generally require more extensive work, leading to higher material and labor costs, and potentially unforeseen issues.
- Availability of Spare Parts & Components: Sourcing genuine and compatible parts in Somalia can be challenging and expensive. Importation costs, lead times, and the risk of counterfeit parts significantly influence pricing.
- Required Expertise & Specialized Skills: Projects may necessitate specialized engineers, technicians, or project managers with experience in specific asset types or technologies. Attracting and retaining such talent in Somalia can incur premiums.
- Geographic Location within Somalia: Accessibility of the project site impacts transportation costs for personnel, equipment, and materials. Security considerations in certain regions can also add to logistical expenses.
- Security & Risk Mitigation: Security personnel, escort services, and enhanced site security measures are often indispensable, adding a substantial layer to project budgets.
- Logistics & Transportation: In-country transportation can be costly and unreliable. Importation of specialized tools, equipment, and materials from international markets incurs customs duties, taxes, and freight charges.
- Import Duties, Taxes & Tariffs: Applicable government charges on imported goods and services can significantly affect the overall project cost.
- Labor Costs: While local labor may be more affordable, the availability of skilled local labor can be limited. Foreign labor will likely command higher wages and associated benefits.
- Project Management & Engineering: Effective project management and engineering oversight are critical for success. Costs are associated with planning, execution, monitoring, and reporting.
- Contingency & Unforeseen Expenses: Given the operational environment in Somalia, a significant contingency fund (often 15-30% or more) is prudent to account for unexpected challenges.
- Regulatory Compliance & Permitting: Obtaining necessary permits and ensuring compliance with local regulations can involve fees and administrative costs.
- Quality Assurance & Testing: Implementing robust QA/QC procedures and conducting thorough testing to ensure the refurbished asset meets performance standards adds to the cost.
- Warranty & Guarantees: The provision of warranties and guarantees by the contractor will be factored into the pricing, reflecting the risk undertaken.
- Currency Fluctuations & Exchange Rates: Fluctuations in the Somali Shilling (SOS) and major foreign currencies can impact the cost of imported goods and services.
Value-driven Refurbishment, Upgrades & Life-extension Solutions
Optimizing budgets and ROI for value-driven refurbishment, upgrades, and life-extension solutions requires a strategic approach that prioritizes long-term asset performance and financial viability. This involves a thorough understanding of asset criticality, potential for improvement, and a robust cost-benefit analysis. By focusing on high-impact initiatives, leveraging innovative technologies, and implementing rigorous project management, organizations can significantly enhance the lifespan and operational efficiency of their assets while minimizing capital expenditure.
| Strategy Area | Optimization Tactics | Potential ROI Impact | Budget Considerations |
|---|---|---|---|
| Asset Prioritization | Utilize criticality matrices, production impact analysis, and failure history to rank assets for refurbishment. | Higher ROI by focusing on assets with the greatest potential for increased revenue, reduced downtime, or extended service life. | Initial investment in data analysis and assessment tools. Reduced expenditure on lower-priority assets. |
| Condition Assessment & Predictive Maintenance | Employ NDT, IoT sensors, and AI for early detection of degradation and failure prediction. | Minimizes costly emergency repairs and unplanned downtime. Optimizes replacement/refurbishment timing. | Investment in sensing technology and data platforms. Reduced overall maintenance costs. |
| Phased Upgrades | Break down large projects into smaller, manageable phases, allowing for iterative improvements and learning. | Spreads capital outlay, allows for adjustments based on initial phase results, and delivers incremental ROI. | Controlled expenditure over time. Potential for increased cash flow management. |
| Standardization & Modularity | Utilize pre-designed refurbishment kits or modular upgrade components. | Reduces design and engineering costs, speeds up installation, and simplifies future maintenance. | Bulk purchasing discounts. Reduced labor and installation costs. |
| Data-Driven Insights | Analyze operational data to identify inefficiencies, energy waste, and performance gaps. | Identifies specific areas for upgrades that will yield the most significant operational and financial improvements. | Investment in data analytics software and skilled personnel. Potential for substantial operational cost savings. |
| Vendor & Procurement Management | Engage in competitive bidding, long-term contracts, and strategic partnerships. | Secures better pricing, quality, and service levels. Drives down procurement costs. | Dedicated procurement expertise. Potential for significant cost reductions through negotiation. |
| Energy Efficiency Focus | Prioritize upgrades that reduce energy consumption (e.g., motor upgrades, insulation, lighting). | Direct and immediate cost savings, coupled with environmental benefits and potential incentives. | Investment in efficient technologies. Rapid payback through reduced utility bills. |
| Technology Integration | Incorporate advanced controls, automation, or digital twins to enhance performance and monitor health. | Increases throughput, reduces manual labor, and provides real-time performance data for optimization. | Capital investment in new technologies. Long-term operational efficiency gains. |
| Performance Monitoring & KPIs | Define and track metrics like OEE, MTBF, MTTR, and cost per unit produced. | Quantifies the success of refurbishment initiatives and demonstrates tangible ROI to stakeholders. | Investment in monitoring systems and reporting tools. Justification for future investments. |
Key Strategies for Budget & ROI Optimization:
- Prioritize assets based on criticality and potential ROI.
- Conduct detailed condition assessments and predictive maintenance analyses.
- Develop a phased approach to upgrades, focusing on immediate needs and future scalability.
- Explore standardized refurbishment kits and modular upgrade components.
- Leverage data analytics to identify performance bottlenecks and areas for improvement.
- Benchmark against industry best practices and competitor strategies.
- Implement strong vendor management and competitive bidding processes.
- Focus on energy efficiency upgrades for immediate cost savings and sustainability benefits.
- Integrate new technologies that enhance functionality and reduce operational costs.
- Establish clear Key Performance Indicators (KPIs) for tracking project success and ROI.
Franance Health: Managed Refurbishment, Upgrades & Life-extension Experts
Franance Health is a leading provider of managed refurbishment, upgrades, and life-extension services for a wide range of medical equipment. We understand the critical role that reliable and up-to-date medical technology plays in patient care and operational efficiency. Our comprehensive solutions are designed to maximize the lifespan of your existing assets, reduce capital expenditure, and ensure compliance with the latest standards and technologies. Our expertise spans across various modalities, from diagnostic imaging and patient monitoring to surgical equipment and laboratory instruments. We pride ourselves on delivering tailored solutions that address your specific needs, backed by a team of highly skilled technicians and engineers, and robust OEM partnerships.
| OEM Partner | Service Expertise | Key Benefits of Partnership |
|---|---|---|
| Siemens Healthineers | Refurbishment & Upgrades for CT Scanners, MRI Machines, and Ultrasound Systems. Life-extension for imaging modalities. | Access to genuine OEM parts, advanced diagnostic tools, and manufacturer-approved upgrade kits. Ensures continued software support and firmware updates. |
| GE Healthcare | Managed refurbishment of X-ray, CT, MRI, and patient monitoring systems. Life-extension for critical care equipment. | Leveraging OEM technical documentation, specialized training programs, and access to proprietary service bulletins. Guarantees compliance with GE's evolving service standards. |
| Philips | Comprehensive refurbishment and upgrade services for imaging equipment (CT, MRI, X-ray) and patient care solutions (defibrillators, monitors). | Direct access to OEM technical specifications, calibration procedures, and recommended spare parts. Facilitates seamless integration of upgrades and ensures optimal system performance. |
| Canon Medical Systems | Expert refurbishment and life-extension programs for CT, MRI, and Ultrasound devices. Upgrade solutions for enhanced imaging capabilities. | Partnership ensures the use of authentic Canon parts and adherence to their stringent quality control measures. Provides access to OEM expertise for complex service challenges. |
| Hillrom | Managed refurbishment and upgrades for patient beds, vital signs monitors, and surgical equipment. | Collaboration allows for the use of OEM-certified parts and alignment with Hillrom's latest service protocols. Ensures continued functionality and safety of patient care devices. |
Our Credentials and OEM Partnerships
- Certified Technicians: Our engineering and technical staff undergo rigorous training and hold certifications from leading medical equipment manufacturers.
- Quality Management Systems: Franance Health adheres to strict quality management protocols, including ISO 13485 principles, ensuring consistent and reliable service delivery.
- Extensive Experience: Decades of combined experience in servicing and refurbishing medical devices across diverse healthcare settings.
- Global Reach: We serve clients across multiple continents, offering localized support and expertise.
- Customized Service Plans: Development of bespoke refurbishment, upgrade, and life-extension programs tailored to individual client requirements and budgets.
- Sustainability Focus: Our services promote environmental responsibility by extending the life of existing equipment, reducing waste and the need for new manufacturing.
Standard Service Specifications
This document outlines the standard service specifications, including minimum technical requirements and deliverables for all services provided. Adherence to these specifications ensures consistent quality, reliability, and interoperability across all offerings.
| Requirement Area | Minimum Technical Requirement | Deliverable |
|---|---|---|
| Service Level Agreements (SLAs) | Guaranteed uptime of 99.9% for critical services; response time for critical incidents not exceeding 1 hour. | Signed SLA document detailing uptime, response times, and escalation procedures. |
| Security Requirements | All data transmission must use industry-standard encryption (e.g., TLS 1.2+). Regular security audits and vulnerability assessments required. | Security compliance reports; documented security policies and procedures. |
| Performance Benchmarks | Average response time for standard user requests not exceeding 500ms. | Performance test reports demonstrating compliance with benchmarks. |
| Data Handling and Privacy | Compliance with relevant data protection regulations (e.g., GDPR, CCPA). Secure storage and anonymization of sensitive data. | Data privacy impact assessment (DPIA); data processing agreements (DPAs). |
| Reporting and Auditing | Monthly reports on service performance, availability, and incident resolution. Audit trails for all significant actions. | Monthly performance reports; audit logs upon request. |
| Integration Standards | Services must provide well-documented APIs adhering to RESTful principles or specified industry standards. | API documentation (OpenAPI/Swagger); example integration code. |
| Documentation Requirements | Comprehensive technical documentation, including installation, configuration, and user guides. Up-to-date knowledge base. | Complete set of technical documentation; accessible knowledge base. |
| Support and Maintenance | 24/7 support for critical issues. Scheduled maintenance windows with prior notification. | Support contact information; defined maintenance schedule and notification process. |
Key Areas Covered
- Service Level Agreements (SLAs)
- Security Requirements
- Performance Benchmarks
- Data Handling and Privacy
- Reporting and Auditing
- Integration Standards
- Documentation Requirements
- Support and Maintenance
Local Support & Response Slas
Our commitment to reliable service extends globally. We provide robust local support and response Service Level Agreements (SLAs) to ensure your operations run smoothly, no matter your location. This includes guaranteed uptime and prompt response times across all our supported regions. We understand the critical nature of your applications and strive to minimize any potential disruptions through proactive monitoring and swift issue resolution.
| Region | Uptime Guarantee | Response Time (Critical Incident) | Response Time (High Incident) | Response Time (Medium Incident) |
|---|---|---|---|---|
| North America | 99.99% | 15 minutes | 30 minutes | 2 hours |
| Europe | 99.99% | 15 minutes | 30 minutes | 2 hours |
| Asia-Pacific | 99.98% | 20 minutes | 40 minutes | 3 hours |
| South America | 99.97% | 25 minutes | 45 minutes | 4 hours |
| Middle East & Africa | 99.97% | 25 minutes | 45 minutes | 4 hours |
Key Features of Local Support & Response SLAs
- Regionalized Support Teams: Dedicated teams located in key regions provide localized expertise and understanding of regional nuances.
- 24/7/365 Availability: Our support is available around the clock to address urgent issues.
- Guaranteed Uptime: We offer strong uptime guarantees to ensure continuous service availability.
- Response Time Commitments: Clearly defined SLAs for response times based on issue severity.
- Proactive Monitoring: Continuous monitoring of your services to detect and address potential issues before they impact your operations.
- Multi-Lingual Support: Support available in multiple languages to cater to a diverse customer base.
Frequently Asked Questions

Ready when you are
Let's scope your Refurbishment, Upgrades & Life-Extension in Somalia project in Somalia.
Scaling healthcare logistics and technical systems across the entire continent.

