PSA Oxygen Plant Commissioning & Performance Testing Service in Sierra Leone
Engineering Excellence & Technical Support
PSA Oxygen Plant Commissioning & Performance Testing Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Integrated System Startup & Commissioning
Expertly managed end-to-end commissioning of PSA Oxygen Plants, ensuring seamless integration of all components, utilities, and control systems for immediate operational readiness and adherence to stringent safety protocols.
Comprehensive Performance Validation & Optimization
Conducted rigorous performance testing to validate oxygen purity, flow rates, and pressure against design specifications, identifying and implementing optimization strategies for enhanced efficiency and extended equipment lifespan.
Localized Expertise & Skill Transfer
Provided on-site technical support and hands-on training for local engineering and maintenance teams in Sierra Leone, empowering them with the knowledge and skills for ongoing plant operation, troubleshooting, and preventative maintenance.
What Is Psa Oxygen Plant Commissioning & Performance Testing Service In Sierra Leone?
PSA (Pressure Swing Adsorption) Oxygen Plant Commissioning & Performance Testing Service in Sierra Leone refers to a specialized engineering service ensuring that newly installed or existing PSA oxygen generation systems operate according to design specifications, achieve intended oxygen purity and flow rates, and are safe and reliable for continuous operation within the Sierra Leonean context. This service is crucial for the successful deployment and ongoing efficacy of on-site oxygen production facilities, particularly in regions where reliable medical-grade oxygen supply chains may be challenged. The commissioning phase focuses on verifying installation integrity, calibration of instrumentation, functional testing of all subsystems (air compression, filtration, PSA adsorption vessels, oxygen buffering, product gas analysis), and initial startup procedures. Performance testing, subsequently, quantifies the plant's actual output against guaranteed parameters, including oxygen purity (typically >93% for medical applications), flow rate, power consumption, and operational stability under various load conditions. It also includes validation of safety interlocks and emergency shutdown mechanisms.
| Who Needs the Service? | Typical Use Cases/Sectors in Sierra Leone |
|---|---|
| Hospitals and Medical Facilities (Public & Private) | Ensuring a consistent and reliable supply of medical-grade oxygen for patient care, critical during emergencies, surgeries, and for respiratory support (e.g., COVID-19 response). |
| Industrial Operations Requiring Oxygen | Applications such as welding, cutting, wastewater treatment, and certain chemical processes that rely on on-site oxygen generation for efficiency and cost-effectiveness. |
| Research and Development Institutions | Laboratories requiring purified oxygen for experimental setups and analytical instrumentation. |
| Mining and Extractive Industries | Potential use in specific processes or for safety-related applications requiring controlled atmospheric conditions. |
| NGOs and Humanitarian Organizations | Deploying or supporting health infrastructure in remote or underserved areas, necessitating self-sufficient oxygen generation. |
| Manufacturers and Installers of PSA Oxygen Plants | To validate their product's performance and ensure successful handover to end-users. |
| Government Health Ministries and Regulatory Bodies | To ensure compliance with safety and quality standards for medical oxygen provision. |
Key Components of PSA Oxygen Plant Commissioning & Performance Testing Service:
- Pre-commissioning Checks: Verification of mechanical and electrical installations, component integrity, and adherence to design documentation.
- System Startup & Functional Testing: Gradual introduction of utilities, initial system operation, and testing of individual subsystems (e.g., valve actuation, compressor operation, PSA cycle sequencing).
- Parameter Calibration: Ensuring accuracy of pressure, temperature, flow, and oxygen concentration sensors and controllers.
- Process Validation: Verifying the adsorption and desorption cycles, adsorbent bed performance, and product gas quality.
- Performance Guarantee Testing: Quantifying oxygen purity, flow rate, and yield under defined operating conditions.
- Safety System Verification: Testing of pressure relief devices, alarms, interlocks, and emergency shutdown procedures.
- Operational Training: Providing comprehensive training to plant operators and maintenance personnel.
- Documentation & Reporting: Generation of detailed commissioning reports, performance test results, and operational manuals.
Who Needs Psa Oxygen Plant Commissioning & Performance Testing Service In Sierra Leone?
In Sierra Leone, the need for expert PSA (Pressure Swing Adsorption) Oxygen Plant Commissioning & Performance Testing services is critical for ensuring reliable and efficient oxygen production. These services are indispensable for a variety of organizations that depend on a consistent supply of medical-grade oxygen, particularly in the healthcare sector and industries where oxygen is a vital component. Proper commissioning and performance testing guarantee that the oxygen plant operates at its optimal capacity, meets stringent quality standards, and adheres to safety regulations, thereby preventing operational failures and ensuring patient well-being.
| Customer Type | Key Departments/Roles | Reason for Needing Service | Impact of Failure |
|---|---|---|---|
| Hospitals and Healthcare Facilities | Intensive Care Units (ICUs), Operating Theaters, Respiratory Therapy Departments, Biomedical Engineering | Ensuring continuous and medical-grade oxygen supply for patient treatment, life support, and surgical procedures. | Patient morbidity and mortality, compromised surgical outcomes, inability to manage respiratory emergencies. |
| Government Health Ministries and Agencies | Public Health Infrastructure Department, Procurement and Logistics, Quality Assurance Units | Verifying the operational status, safety, and compliance of oxygen generation systems in public healthcare facilities. | Inefficient resource allocation, risks to public health, failure to meet national health standards. |
| NGOs and International Aid Organizations | Program Management, Technical Support Teams, Project Implementation Units | Confirming that donated or installed oxygen plants function as intended and meet the healthcare needs of the community. | Wasted resources, ineffective aid delivery, unmet humanitarian needs. |
| Industrial Users | Production Managers, Maintenance Supervisors, Quality Control Departments | Guaranteeing oxygen purity and flow rate for specific industrial applications (e.g., welding, cutting) to ensure product quality and operational efficiency. | Production delays, compromised product quality, safety hazards in industrial settings. |
| Oxygen Plant Manufacturers/Suppliers | Field Service Engineers, Project Managers, After-Sales Support Teams | Validating plant performance against specifications, fulfilling contractual obligations, and ensuring client satisfaction. | Customer dissatisfaction, warranty claims, damage to company reputation. |
| Facility Management and Maintenance Teams | Chief Engineer, Plant Operators, Maintenance Technicians | Ensuring reliable plant operation, performing routine checks, troubleshooting issues, and optimizing energy efficiency. | Unexpected plant downtime, increased maintenance costs, potential for unsafe operating conditions. |
Target Customers and Departments in Sierra Leone Requiring PSA Oxygen Plant Commissioning & Performance Testing Services
- {"title":"Hospitals and Healthcare Facilities","description":"These are the primary beneficiaries. A stable and pure oxygen supply is essential for patient care, especially in intensive care units (ICUs), operating theaters, and for patients with respiratory conditions. Malfunctioning oxygen plants can have life-threatening consequences."}
- {"title":"Government Health Ministries and Agencies","description":"Responsible for the oversight and regulation of healthcare infrastructure. They ensure that public health facilities have reliable oxygen supply systems and may commission independent testing services to verify the performance of installed plants."}
- {"title":"Non-Governmental Organizations (NGOs) and International Aid Organizations","description":"Many NGOs and aid organizations are involved in supporting Sierra Leone's healthcare system, often by donating or installing medical equipment, including oxygen plants. They require commissioning and testing to ensure the effectiveness of their aid."}
- {"title":"Industrial Users of Oxygen","description":"While healthcare is paramount, certain industries in Sierra Leone might utilize oxygen for processes like welding, metal fabrication, or potentially in specialized manufacturing. Ensuring the purity and flow rate of oxygen is crucial for these operations."}
- {"title":"Oxygen Plant Manufacturers and Suppliers","description":"Companies that manufacture or supply PSA oxygen plants in Sierra Leone will often contract commissioning and performance testing services as part of their product delivery and warranty obligations, ensuring their equipment meets client expectations and technical specifications."}
- {"title":"Facility Management and Maintenance Teams","description":"Internal teams responsible for the upkeep and operational integrity of healthcare facilities or industrial sites. They rely on these services for initial setup, troubleshooting, and routine performance verification."}
Psa Oxygen Plant Commissioning & Performance Testing Service Process In Sierra Leone
This document outlines the comprehensive workflow for the commissioning and performance testing of a PSA (Pressure Swing Adsorption) Oxygen Plant in Sierra Leone, from the initial customer inquiry through the successful execution and handover of services. The process is designed to ensure a smooth, efficient, and compliant operation of the oxygen generation system, meeting all specified performance criteria and regulatory requirements. Our approach prioritizes safety, quality, and client satisfaction throughout each stage.
| Stage | Key Activities | Deliverables/Outcomes | Responsible Party | Estimated Timeline (Indicative) |
|---|---|---|---|---|
| 1. Inquiry & Initial Consultation | Receive customer inquiry regarding PSA oxygen plant commissioning/testing. Conduct initial discussion to understand project scope, plant specifications, location, and client objectives. Gather preliminary plant documentation (manuals, drawings). | Understanding of client needs, initial project scope definition, confirmation of service feasibility. | Client, Service Provider | 1-3 Days |
| 2. Proposal & Contract Negotiation | Develop a detailed technical and commercial proposal outlining services, methodologies, timelines, resources, and pricing. Review proposal with the client, address any queries, and negotiate terms. Finalize and sign contract/agreement. | Detailed Service Proposal, Signed Contract/Agreement. | Service Provider, Client | 3-7 Days |
| 3. Pre-mobilization & Planning | Develop a detailed project execution plan (PEP), including safety plans, risk assessments, quality control procedures, and detailed schedules. Secure necessary permits and approvals for site access and operations in Sierra Leone. Arrange for personnel travel and accommodation. Procure required tools, equipment, and consumables. | Project Execution Plan (PEP), Safety Plans, Risk Assessments, Permit Applications, Mobilization Schedule, Equipment & Tooling List. | Service Provider | 5-15 Days |
| 4. Site Mobilization & Logistics | Transport personnel, equipment, and materials to the site in Sierra Leone. Establish site presence and set up temporary facilities as required. Conduct initial site safety induction for all personnel. | On-site presence of personnel and equipment, Site Safety Induction Completed. | Service Provider | 2-5 Days |
| 5. Pre-Commissioning Checks | Visual inspection of the PSA plant and associated equipment. Verification of electrical, pneumatic, and hydraulic connections. Leak testing of piping and vessels. Insulation resistance checks. Review of installation against design specifications. | Pre-Commissioning Checklist Completion, Identification and Rectification of Minor Issues. | Service Provider | 2-4 Days |
| 6. Commissioning | Gradual start-up of the PSA plant. Purging of systems. Testing of individual components (compressors, valves, adsorbents, control systems). Calibration of sensors and instruments. Initial operation at reduced capacity. Monitoring of key operating parameters (pressure, flow, temperature, purity). | Successful initial start-up, Functionality of all plant components verified, Initial operating parameters established. | Service Provider | 3-7 Days |
| 7. Performance Testing | Operation of the PSA plant at specified design conditions (e.g., flow rate, purity, pressure). Measurement and recording of key performance indicators (KPIs) as per the contract. Tests may include: Purity testing (e.g., O2 concentration), Flow rate verification, Pressure output verification, Energy consumption monitoring, Noise level monitoring (if specified). | Performance Test Reports (detailing achieved KPIs against specifications), Demonstration of plant meeting performance guarantees. | Service Provider | 3-5 Days |
| 8. Documentation & Handover | Compile all test data, reports, and logs. Prepare a comprehensive commissioning and performance testing report. Conduct a formal handover of the plant and all documentation to the client. Provide training to client's operational staff. | Final Commissioning & Performance Test Report, As-built drawings (if applicable), Training sessions for client personnel, Formal Handover Certificate. | Service Provider, Client | 2-4 Days |
| 9. Post-Execution Support | Provide post-handover support for a defined period (as per contract). Address any immediate operational issues or queries. Offer recommendations for ongoing maintenance and optimization. | Client satisfaction, Resolution of immediate post-handover issues, Recommendations for operation. | Service Provider | As per Contract (e.g., 1-4 Weeks) |
Service Workflow: PSA Oxygen Plant Commissioning & Performance Testing in Sierra Leone
- 1. Inquiry & Initial Consultation:
- 2. Proposal & Contract Negotiation:
- 3. Pre-mobilization & Planning:
- 4. Site Mobilization & Logistics:
- 5. Pre-Commissioning Checks:
- 6. Commissioning:
- 7. Performance Testing:
- 8. Documentation & Handover:
- 9. Post-Execution Support:
Psa Oxygen Plant Commissioning & Performance Testing Service Cost In Sierra Leone
Commissioning and performance testing of a PSA (Pressure Swing Adsorption) Oxygen Plant in Sierra Leone involves a series of critical steps to ensure the plant operates efficiently, safely, and meets the specified oxygen purity and production capacity. The cost of these services is influenced by several key factors, including the plant's size and complexity, the specific testing protocols required, the expertise of the commissioning team, and logistical considerations within Sierra Leone. It's important to note that precise cost ranges can fluctuate significantly based on the individual project's scope and the prevailing economic conditions in the country.
| Service Component | Estimated Cost Range (Sierra Leonean Leone - SLL) | Notes |
|---|---|---|
| Basic Commissioning & Initial Start-up (Small to Medium Plant) | 15,000,000 - 40,000,000 SLL | Covers standard pre-commissioning, functional checks, and initial operational testing. May not include extensive performance verification or operator training. |
| Comprehensive Commissioning & Performance Testing (Medium to Large Plant) | 40,000,000 - 120,000,000+ SLL | Includes detailed functional testing, system integration, extensive performance validation against specifications, environmental testing, and basic operator familiarization. Logistics costs within Sierra Leone are a significant component. |
| Specialized Performance Testing & Extended Operator Training | Additional 10,000,000 - 50,000,000+ SLL | For advanced performance validation, specific long-duration tests, or in-depth, hands-on operator training. This is often quoted separately based on specific needs. |
| Site Survey & Feasibility Assessment (Pre-Commissioning) | 5,000,000 - 15,000,000 SLL | If a preliminary site visit and assessment of existing conditions are required before formal commissioning begins. |
| Logistics & Per Diem (per engineer per day) | 500,000 - 1,500,000 SLL | This is highly variable based on location within Sierra Leone and prevailing rates. |
Key Pricing Factors for PSA Oxygen Plant Commissioning & Performance Testing in Sierra Leone:
- {"title":"Plant Size and Capacity (Nm³/hr or L/min):","description":"Larger plants with higher oxygen production capacities generally require more extensive testing, longer commissioning periods, and potentially a larger team, thus increasing costs."}
- {"title":"Complexity of the PSA System:","description":"Advanced features, multiple adsorption beds, sophisticated control systems, integration with medical gas pipelines, or specialized purification stages can add complexity and cost to the commissioning and testing process."}
- {"title":"Required Oxygen Purity Levels:","description":"Meeting stringent medical-grade oxygen purity standards (e.g., 93-95% with very low impurity levels) will necessitate more rigorous and precise testing procedures compared to industrial-grade oxygen."}
- {"title":"Scope of Commissioning Services:","description":"This includes pre-commissioning checks, functional tests of individual components, system integration testing, start-up procedures, performance verification, and operator training. A more comprehensive scope will naturally increase the cost."}
- {"title":"Performance Testing Protocols:","description":"The specific performance tests required (e.g., continuous operation tests, varying load tests, environmental condition tests) and the duration of these tests will impact the overall cost. International standards (like ISO) or specific client requirements will dictate these protocols."}
- {"title":"Expertise and Experience of the Commissioning Team:","description":"Engaging highly skilled and experienced engineers and technicians specializing in PSA technology and oxygen plants is crucial for effective commissioning. Their rates will reflect their expertise."}
- {"title":"Logistics and Travel within Sierra Leone:","description":"Costs associated with travel, accommodation, and per diems for the commissioning team within Sierra Leone, especially if the plant is located in remote areas, will be a significant factor."}
- {"title":"Local Import Duties and Taxes:","description":"Any specialized testing equipment or spare parts brought in for commissioning may be subject to import duties and taxes in Sierra Leone, adding to the overall expense."}
- {"title":"Duration of the Project:","description":"The overall time required for commissioning and performance testing directly influences labor costs and daily rates."}
- {"title":"Contractual Terms and Warranty Support:","description":"The service agreement may include post-commissioning support or warranty testing, which would be factored into the pricing."}
Affordable Psa Oxygen Plant Commissioning & Performance Testing Service Options
Ensuring your PSA Oxygen Plant operates at peak efficiency is crucial for reliable medical or industrial oxygen supply. Our affordable commissioning and performance testing services are designed to deliver exceptional value. We offer flexible solutions tailored to your budget, combining thorough diagnostics with cost-saving strategies to maximize your return on investment. Our expert team utilizes advanced testing methodologies to verify plant performance against design specifications, identify potential issues early, and provide actionable recommendations for optimization. We understand the financial pressures on organizations, which is why we've developed transparent pricing models and bundled service options that deliver comprehensive support without breaking the bank.
| Value Bundle | Key Inclusions | Cost-Saving Benefit | Ideal For |
|---|---|---|---|
| Basic Commissioning | Initial system startup, functional checks, basic performance verification, safety checks. | Ensures safe and functional operation, preventing costly early-stage failures. | New plant installations or plants undergoing minor upgrades. |
| Performance Optimization Bundle | Basic Commissioning + detailed analysis of oxygen purity, flow rate, pressure, energy consumption, and efficiency optimization recommendations. | Reduces energy costs, maximizes oxygen output, and extends equipment lifespan. | Plants requiring improved efficiency or experiencing sub-optimal performance. |
| Comprehensive Health Check | Performance Optimization Bundle + wear and tear assessment, component lifespan prediction, and detailed preventative maintenance plan. | Minimizes unscheduled downtime, reduces emergency repair costs, and ensures long-term reliability. | Existing plants looking to proactively manage maintenance and avoid unexpected breakdowns. |
| Remote Diagnostics Integration | Comprehensive Health Check + setup and validation of remote monitoring systems, including data logging and alert configuration. | Enables early detection of issues, allows for remote troubleshooting, and reduces the need for on-site visits. | Facilities seeking advanced, proactive operational support and reduced travel costs. |
Affordable PSA Oxygen Plant Commissioning & Performance Testing Service Options
- Standard Commissioning & Testing: Comprehensive checks and performance verification for baseline operational assurance.
- Optimized Performance Bundle: Includes standard services plus advanced tuning and efficiency analysis for enhanced output.
- Preventative Maintenance Integration: Combines commissioning with scheduled maintenance checks to minimize future downtime.
- Remote Monitoring Setup & Testing: Initial configuration and validation of remote diagnostic capabilities for proactive support.
- Troubleshooting & Rectification Package: Focused testing and issue resolution for plants experiencing performance deviations.
Verified Providers In Sierra Leone
Ensuring access to reliable and trustworthy healthcare providers is paramount. In Sierra Leone, Franance Health stands out as a premier choice due to its rigorous credentialing process and unwavering commitment to quality care. This document outlines the verification standards implemented by Franance Health and explains why these standards make them the optimal selection for your healthcare needs.
| Credentialing Aspect | Franance Health Standard | Why it Matters |
|---|---|---|
| Licensing and Certification | Mandatory verification of current and valid licenses/certifications from recognized bodies. | Ensures providers are legally qualified and meet minimum professional requirements. |
| Education and Training | Verification of degrees, diplomas, and specialized training from accredited institutions. | Guarantees a strong foundational knowledge and specialized expertise. |
| Experience Verification | Confirmation of previous work experience and roles held. | Assesses practical application of knowledge and ability to manage diverse patient cases. |
| Professional References | Contact with former supervisors and peers for insights into work ethic and collaboration. | Provides an objective view of a provider's professional character and teamwork. |
| Patient Feedback Integration | Incorporation of patient satisfaction surveys and testimonials into ongoing assessments. | Prioritizes patient-centered care and responsiveness to individual needs. |
| Continuing Professional Development (CPD) | Requirement for providers to demonstrate ongoing learning and skill enhancement. | Keeps practitioners up-to-date with the latest medical advancements and techniques. |
Franance Health Credentialing Process Highlights:
- Comprehensive Background Checks: Thorough verification of all professional licenses, certifications, and educational qualifications.
- Clinical Competency Assessments: Evaluation of practical skills and adherence to established medical best practices.
- Reputation and Reference Checks: Contacting previous employers, colleagues, and patients to gauge professional conduct and patient satisfaction.
- Ethical Conduct Review: Scrutiny of any past disciplinary actions or ethical violations.
- Ongoing Performance Monitoring: Regular reviews of provider performance, patient feedback, and continuing education compliance.
Scope Of Work For Psa Oxygen Plant Commissioning & Performance Testing Service
This Scope of Work (SOW) outlines the services required for the commissioning and performance testing of a Pressure Swing Adsorption (PSA) Oxygen Plant. The objective is to ensure the plant operates safely, efficiently, and meets all contractual performance guarantees. This document details the technical deliverables and references standard specifications that will govern the execution of these services.
| Parameter | Standard Specification Reference | Description |
|---|---|---|
| Oxygen Purity | ISO 6783 | Specifies the minimum acceptable purity of oxygen produced by the PSA plant. |
| Oxygen Flow Rate | Contractual Specification | Guaranteed continuous and peak oxygen output capacity as defined in the purchase agreement. |
| Nitrogen Content | ISO 6783 | Maximum allowable nitrogen concentration in the produced oxygen. |
| Dew Point | Contractual Specification / Industry Standard | Maximum permissible moisture content in the produced oxygen, critical for downstream applications. |
| Pressure | Contractual Specification | Delivery pressure of the produced oxygen. |
| Adsorbent Performance | Manufacturer Data Sheets / Contractual Guarantee | Performance characteristics of the molecular sieves or other adsorbents used in the PSA process. |
| Power Consumption | Contractual Specification | Maximum allowable specific energy consumption (e.g., kWh/Nm³ O₂) for the oxygen production. |
| Noise Levels | Local Environmental Regulations / Contractual Specification | Maximum permissible noise emission levels from the plant during operation. |
| Electrical Safety | IEC 60204-1 | General requirements for electrical equipment and systems to ensure safe operation. |
| Instrumentation and Control | ISA Standards (e.g., ISA-5.1, ISA-88) | Standards for instrumentation symbols, P&IDs, and batch control systems relevant to plant automation. |
| Piping and Pressure Vessels | ASME B31.3 / ASME Section VIII | Standards for process piping and pressure vessel design and fabrication. |
Technical Deliverables
- Commissioning Plan: A detailed plan outlining all commissioning activities, safety procedures, personnel roles and responsibilities, and a schedule.
- Pre-Commissioning Checklists: Comprehensive checklists for all major equipment and systems, including mechanical, electrical, instrumentation, and control systems.
- Functional Test Procedures: Detailed procedures for verifying the functionality of individual components and integrated systems.
- Performance Test Procedures: Clearly defined procedures for conducting all specified performance tests, including feedstock, product, and utility consumption.
- As-Built Drawings and Documentation: Updated drawings and documentation reflecting the final installed configuration of the PSA oxygen plant.
- Operating Manuals: Comprehensive manuals for plant operation, maintenance, and troubleshooting.
- Training Materials: Documentation and presentations used for operator and maintenance personnel training.
- Commissioning & Performance Test Report: A final report summarizing all commissioning activities, test results, deviations, and recommendations. This report will include data verification and analysis.
- Spare Parts List Recommendations: A recommended list of critical spare parts for routine maintenance and unforeseen failures.
- Safety Procedures and Risk Assessments: Documentation outlining all safety protocols and identified risks with mitigation strategies for commissioning and testing phases.
Service Level Agreement For Psa Oxygen Plant Commissioning & Performance Testing Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Commissioning and Performance Testing Service of your PSA Oxygen Plant. It ensures timely support and reliable operation during these critical phases.
| Service Component | Response Time Target (Business Hours) | Uptime Guarantee (%) | Notes |
|---|---|---|---|
| Initial Response to Critical Issue during Commissioning | 2 Hours | N/A | Applies during active commissioning hours (Mon-Fri, 8 AM - 6 PM). |
| Resolution of Critical Issue during Commissioning | 8 Business Hours (Target for initial diagnosis & plan) | N/A | Actual resolution time may vary based on issue complexity. |
| Initial Response to Critical Issue during Performance Testing | 1 Hour | N/A | Applies during the defined performance testing period. |
| Uptime Guarantee during Performance Testing Period | N/A | 98% | Applies to the scheduled performance testing duration (e.g., 72-hour continuous test). |
| Scheduled Maintenance Window | N/A | N/A | Agreed upon in advance with the client for any planned downtime. Downtime within scheduled maintenance is not counted against uptime guarantees. |
Key Service Level Objectives
- Response Time: The maximum allowable time from when a critical issue is reported to when our technical team begins active investigation and troubleshooting.
- Uptime Guarantee: The minimum percentage of time the PSA Oxygen Plant is expected to be operational and capable of producing oxygen within specified parameters, during the defined performance testing period.
- Definition of Critical Issue: An issue that directly prevents the plant from operating or producing oxygen, or significantly degrades the quality of the produced oxygen below acceptable standards.
Frequently Asked Questions

Ready when you are
Let's scope your PSA Oxygen Plant Commissioning & Performance Testing Service in Sierra Leone project in Sierra Leone.