Biomedical Staffing Augmentation Service in Nigeria - Price, Providers, Scope & SLA
Biomedical Staffing Augmentation Service is the strategic placement of certified biomedical engineers and technicians into your facility to supplement your in-house team, manage specific equipment, or execute entire maintenance projects. This service is essential for tertiary hospitals, large private clinics, diagnostic centres, and NGO-supported health facilities that face challenges with staff shortages, skill gaps for complex equipment like a Siemens Artis Q ceiling C-Arm, project backlogs, or the need to meet stringent donor reporting requirements. It directly solves the problem of having a multi-million Naira GE Healthcare Optima CT680 scanner sitting idle due to a lack of specialized, on-site expertise, ensuring you maximize patient throughput and return on investment. By embedding qualified personnel, you gain operational continuity, reduce equipment downtime, and free your core staff to focus on clinical duties.
Biomedical Staffing Augmentation Service price in Nigeria
Ad-hoc support for a single engineer costs between NGN 80,000 - NGN 250,000 per day, excluding travel and parts. Bundled Preventive Maintenance (PM) contracts for a cluster of equipment start from NGN 300,000 - NGN 1,500,000 monthly. A fully outsourced turnkey service for an entire department, like a radiology or pathology unit, can range from NGN 2,000,000 - NGN 10,000,000+ per month. Cost is driven by the equipment mix (servicing a Philips IntelliVue MP70 monitor is less complex than a CT scanner), travel logistics to remote states, the level of documentation required for donor agencies, urgency of the request, and whether parts and regulatory compliance (like NNRA filings) are included.
- Cost levers you control:
- Contract Duration: Commit to a 12-month or 24-month contract for preferential rates over short-term engagements.
- Service Windows: Opt for standard business hour support instead of 24/7 coverage if your operations allow.
- Batching Visits: Schedule PM for multiple devices on the same day or week to reduce travel costs.
- On-site Support: Provide accommodation and local transport for engineers on multi-day assignments in remote locations.
- First-Line Triage: Train your in-house staff to perform basic troubleshooting to reduce unnecessary call-outs.
Franance offers transparent, tiered pricing models that align with your budget and operational needs, ensuring no hidden costs.
cheapest Biomedical Staffing Augmentation Service in Nigeria
The cheapest ad-hoc service from an independent technician can cost as low as NGN 50,000 - NGN 100,000 per visit for basic troubleshooting, but this typically excludes travel, parts, formal documentation, and any performance guarantee. This price point often means you are engaging a freelancer who may lack the calibrated tools, professional indemnity insurance, and access to genuine OEM parts required for a compliant and reliable repair. The hidden costs manifest as extended downtime when the initial fix fails, potential damage to sensitive electronics from improper handling, and zero recourse if the equipment underperforms post-service.
- Checklist before accepting low quotes:
- Request their CAC Certificate of Incorporation (RC number).
- Ask for proof of professional indemnity and public liability insurance.
- Demand a reference from a hospital with similar equipment.
- Ask to see a sample service report; if it's a one-page invoice, be wary.
- Verify they own or have access to calibrated test equipment (e.g., a Fluke safety analyzer).
- Confirm if their quote includes a warranty on the labour provided.
Franance’s structured approach, even for single visits, guarantees documented work and accountability, protecting your asset's value.
affordable Biomedical Staffing Augmentation Service in Nigeria
An affordable, value-optimized service bundle typically costs between NGN 400,000 and NGN 2,000,000 per month, combining scheduled preventive maintenance with a set number of emergency call-outs and remote support. This model delivers affordability by creating efficiency. Instead of paying high ad-hoc rates for unpredictable failures, you get a planned service schedule. Scheduled routes allow the provider to service multiple facilities in one trip, drastically reducing the travel cost passed on to you. Remote triage via video call can resolve up to 30% of issues without a site visit, saving you both time and money.
- Bundle components for value:
- Scheduled PM Visits: Quarterly or bi-annual visits covering all agreed assets.
- Remote Technical Support: A block of hours per month for immediate phone or video support.
- Asset Inventory Management: Digital tagging and tracking of your equipment in a CMMS.
- Basic User Training: Annual refresher training for your clinical staff on proper equipment use.
- Monthly Performance Reports: A summary of uptime, issues resolved, and upcoming PMs.
Explore Franance’s customizable service bundles to find a plan that delivers maximum value for your budget.
Biomedical Staffing Augmentation Service contract cost in Nigeria (AMC vs CMC)
An Annual Maintenance Contract (AMC), covering only labour, typically costs 5-8% of the equipment's original value annually. A Comprehensive Maintenance Contract (CMC), covering labour and all non-consumable parts, costs significantly more, ranging from 10-18% of the equipment's value annually. The choice depends on your risk appetite and budget predictability. An AMC offers a lower upfront cost, but you bear the financial risk of expensive part failures, such as an X-ray tube replacement which can cost millions of Naira. A CMC provides complete peace of mind and a fixed annual budget, making it ideal for critical equipment and government or NGO procurement where budget variations are difficult to manage.
| Feature | Annual Maintenance Contract (AMC) | Comprehensive Maintenance Contract (CMC) |
|---|
| Cost | 5-8% of asset value | 10-18% of asset value |
| Labour | Included | Included |
| Spare Parts | Excluded (Client pays per part) | Included (All non-consumables) |
| Cash Flow | Unpredictable | Predictable (Fixed annual cost) |
| Uptime Guarantee | Basic response time SLA | High uptime guarantee (e.g., 98%) with penalties |
| Best For | Lower-cost, non-critical equipment | High-value, critical equipment (CT, MRI, ICU) |
Franance can model the total cost of ownership under both AMC and CMC scenarios to help you make an data-driven decision.
request Biomedical Staffing Augmentation Service quote in Nigeria (Franance)
Request a detailed, no-obligation quote from Franance today to see how our tailored staffing augmentation can improve your equipment uptime and operational efficiency.
where to get Biomedical Staffing Augmentation Service in Nigeria (providers)
You can find providers concentrated in major commercial hubs like Lagos, Abuja, and Port Harcourt, but reputable firms offer nationwide coverage. The selection process should start with a verification of the provider's corporate and technical credentials. Insist on due diligence beyond a simple quotation. Verify their CAC/RC registration to ensure they are a legitimate Nigerian entity. Ask for proof of OEM accreditation or training certificates for the specific equipment models in your facility. A provider servicing a Siemens Healthineers MRI must show evidence of training from Siemens. Franance simplifies this by pre-vetting all network engineers, verifying their certifications, and ensuring they are insured before they are ever assigned to your facility.
- Documents to insist on:
- Certificate of Incorporation from the Corporate Affairs Commission (CAC).
- Recent Tax Clearance Certificate (TCC).
- OEM Authorization Letter or valid Training Certificates for relevant engineers.
- Proof of Professional Indemnity and Public Liability Insurance.
- At least three verifiable references from similar healthcare facilities.
- A sample Scope of Work (SOW) and Service Level Agreement (SLA).
Franance provides a fully vetted and managed network of engineers, saving you the time and risk of due diligence.
Biomedical Staffing Augmentation Service providers in Nigeria — checklist
- Corporate Standing: Is the company registered with the CAC with a verifiable RC number?
- Tax Compliance: Can they provide a current Tax Clearance Certificate?
- Insurance: Do they hold valid Professional Indemnity and Public Liability insurance?
- OEM Certification: Can they show training certificates from manufacturers like GE, Philips, or Siemens for the specific models you own?
- Technical Competence: Do their engineers have demonstrable experience with your type of equipment?
- Test Equipment: Do they own and maintain calibrated test and measurement tools (e.g., patient simulators, electrical safety analyzers)?
- Spare Parts Access: Do they have a reliable supply chain for genuine OEM parts and hold local stock for common items?
- Nationwide Reach: Can they service your locations outside of Lagos, Abuja, or Port Harcourt?
- Documentation: Is their reporting professional, detailed, and provided in a timely manner?
- SLA: Do they offer a clear Service Level Agreement with defined response times and penalties?
- Regulatory Knowledge: Are they familiar with NNRA requirements for imaging equipment and SON standards?
- Digital Platform: Do they use a CMMS for asset management and provide a client portal for tracking work orders?
- References: Are their client references recent and relevant to your facility's needs?
verified Biomedical Staffing Augmentation Service provider in Nigeria (Franance)
Franance provides OEM-certified biomedical staffing augmentation across all 36 states from our hubs in Lagos, Abuja, Port Harcourt, and Kano, covering everything from basic patient monitors to complex MRI and CT systems. We operate as a single, accountable partner, managing a network of vetted specialists to deliver a consistent, high-quality service. Our model integrates multiple layers to ensure reliability and transparency, from the engineer on-site to the data on your dashboard.
- Franance delivery layers:
- Vetted Field Engineers: A nationwide network of OEM-trained and certified engineers.
- Remote Support Desk: An expert team for immediate troubleshooting and remote diagnostics.
- Centralized Parts Logistics: A managed supply chain for sourcing and delivering genuine spare parts.
- CMMS & Reporting Dashboard: A 24/7 client portal to track assets, view service history, and monitor KPIs.
- Dedicated Account Management: A single point of contact for all your service needs, escalations, and reporting.
- Financing & Flexible Payments: Options to spread the cost of contracts or major repairs.
best Biomedical Staffing Augmentation Service provider in Nigeria
The best providers are those with documented proof of OEM certification, a strong engineer-to-site ratio ensuring rapid deployment, and a digital reporting system that provides you with transparent performance data. Look beyond marketing claims and ask for evidence. The best firms have a deep portfolio of experience with your specific brands and models, whether it's Dräger anaesthesia machines or Roche diagnostic analyzers. They invest heavily in their engineers' continuous training and in modern, calibrated instrumentation. Their reporting is not just an invoice; it's a detailed analysis of work done, parts used, and performance verification results, all accessible via a digital platform.
- How to validate provider claims:
- Request Certificates: Ask for copies of the specific engineers' training certificates for your equipment.
- Demo the Dashboard: Request a live demonstration of their client portal or CMMS dashboard.
- Visit a Reference Site: Ask to speak with or visit a current client with a similar operational scale.
- Inspect Test Tools: During a site visit, ask the engineer to show you their calibrated test equipment and its calibration certificate.
- Review a Sample Report: Scrutinize a sample service report for detail, clarity, and actionable information.
Biomedical Staffing Augmentation Service scope of work in Nigeria (SOW)
A standard Scope of Work (SOW) includes a detailed asset list, specific maintenance tasks per device, agreed response times, clear deliverables like service reports and performance certificates, and a defined project timeline. The SOW is the most critical document in your service agreement. It must be granular and unambiguous. For a CT scanner, it should specify tasks like gantry cleaning, detector calibration, and X-ray tube performance tests. The process typically follows distinct phases, from initial assessment to final handover, ensuring nothing is missed.
- Non-negotiables in the SOW:
- Detailed Asset List: Every piece of equipment covered, including make, model, and serial number.
- Named Project Manager: A single point of contact responsible for the contract's execution.
- Clear Escalation Path: Defined contacts and timelines for resolving service issues.
- Penalty Clause: Financial or service credit penalties for failing to meet SLA targets.
- Parts Warranty: A clear statement on the warranty period for all supplied spare parts.
- Change Control Process: A formal process for adding or removing equipment from the contract.
how Biomedical Staffing Augmentation Service works in Nigeria (process & methodology)
The process begins with an on-site asset audit and tagging, followed by the creation of a tailored maintenance plan based on OEM recommendations and international standards like IEC 60601. Engineers then execute tasks using calibrated instruments, with all data captured digitally via a mobile application that syncs with a central CMMS. This methodology ensures that every action is standardized, traceable, and documented. For radiation-emitting equipment, the methodology must incorporate NNRA safety protocols. Pass/fail thresholds are not subjective; they are based on the manufacturer's precise specifications, ensuring your equipment performs exactly as intended.
- Methodology checklist:
- OEM Service Manuals: Work is based on the official service manual for each device.
- Calibrated Test Equipment: All test instruments have valid, traceable calibration certificates.
- Digital Data Capture: Service data is entered into a mobile app on-site, not on paper.
- Documented Pass/Fail Criteria: Clear, quantitative thresholds determine if a device passes inspection.
- Traceability: All parts used are recorded with serial numbers, linking them to the specific job.
Biomedical Staffing Augmentation Service SLA in Nigeria (response & uptime targets)
A typical multi-tiered Service Level Agreement (SLA) offers: Critical (e.g., ICU ventilator, theatre anaesthesia machine) response within 2-4 hours; Urgent (e.g., main laboratory analyzer, central sterile supply department autoclave) response within 8-12 hours; and Routine (e.g., ward patient monitor, ECG machine) response within 24-48 hours. The SLA must differentiate between "response time" (when the engineer contacts you or arrives) and "resolution time" (when the equipment is back in service). A strong SLA includes a commitment to a high uptime percentage (e.g., 98% for critical assets) and outlines clear penalty clauses, such as service credits, for failure to meet these targets.
- SLA clauses to include:
- Defined Response vs. Resolution Time: Clear definitions and time limits for both.
- Uptime Guarantee: A specific, measurable uptime percentage for critical equipment.
- Penalty for Misses: A clear description of service credits or financial penalties for SLA breaches.
- Remote Support Inclusion: Specifies that the response time clock starts from the moment remote triage begins.
- Hours of Coverage: Explicitly states 24/7/365 or standard business hours.
Biomedical Staffing Augmentation Service SLA in Nigeria (Franance)
Franance provides a transparent, tiered SLA with real-time performance tracking available 24/7 on your client dashboard.
Biomedical Staffing Augmentation Service documentation and certificates in Nigeria
You will receive a detailed digital service report for every intervention, a Certificate of Performance Verification after each PM, and an updated asset register, all accessible through a client portal. This documentation is your proof of compliance and due diligence. Service reports should be comprehensive, including the work performed, parts replaced (with serial numbers), engineer's findings, and performance test results. Certificates for electrical safety testing and calibration provide auditable proof that your equipment is safe for patient and staff use. For donor-funded projects, this level of documentation is non-negotiable for reporting and audits.
- Files auditors demand:
- Signed Service Reports: A complete history of all maintenance and repair activities.
- Calibration Certificates: Certificates for all test equipment used during service.
- PM Schedule Adherence Report: A report showing planned vs. actual PM completion dates.
- Asset Inventory List: An up-to-date list of all assets under contract, with their current status.
- Electrical Safety Test Records: A log of annual electrical safety tests for all patient-facing equipment.
Biomedical Staffing Augmentation Service compliance in Nigeria (NAFDAC, SON/SONCAP, NNRA, IEC/ISO)
Compliance involves ensuring your service provider has the necessary corporate registrations (CAC), that engineers are aware of equipment-specific rules from NAFDAC (for devices and their consumables), SON (for standards), and the Nigerian Nuclear Regulatory Authority (NNRA) for radiation-emitting devices, and that all work adheres to international standards like IEC/ISO. For instance, servicing any X-ray, CT, or mammography machine requires that the service company and its engineers hold a valid license from the NNRA. Imported spare parts must comply with SONCAP regulations. A professional provider will manage this compliance burden for you, ensuring all paperwork is correctly filed and all procedures meet regulatory scrutiny.
- Compliance actions per authority:
- NNRA: Verify your provider's license to service, install, and decommission ionizing radiation equipment.
- SON/SONCAP: Ensure imported parts are sourced through channels that comply with the Standards Organisation of Nigeria's conformity assessment program.
- NAFDAC: For diagnostic equipment, confirm that any reagents or consumables used are NAFDAC registered.
- IEC/ISO: Confirm that the provider's methodology for tasks like electrical safety testing is based on IEC 60601 and their quality management system is aligned with ISO 9001.
Biomedical Staffing Augmentation Service preventive maintenance checklist in Nigeria
A standard Preventive Maintenance (PM) schedule involves quarterly or bi-annual visits where engineers perform a series of checks, calibrations, and parts replacements according to the OEM service manual, with all tasks logged digitally. The goal of PM is to prevent failures before they happen. This includes replacing parts with a known lifespan (like batteries, filters, and seals), cleaning and lubricating mechanical components, and recalibrating sensors and outputs to ensure clinical accuracy. A digital log, accessible via your CMMS portal, provides a complete and auditable history of all PM activities for each asset.
- Core PM tasks:
- Visual Inspection: Check for physical damage, wear and tear, and loose connections.
- Functional Checks: Test all operational modes, alarms, and safety interlocks.
- Parts Replacement: Proactively replace life-limited components like batteries, filters, and O-rings.
- Calibration: Adjust and verify device outputs against a known standard using calibrated instruments.
- Electrical Safety Test: Perform mandatory electrical safety checks to ensure patient and operator safety.
- Cleaning: Internal and external cleaning to remove dust and contaminants that can cause overheating or component failure.
Biomedical Staffing Augmentation Service emergency repair in Nigeria
The emergency repair process starts with a call to a dedicated 24/7 hotline, followed by immediate remote triage within 30 minutes. If unresolved, an engineer is dispatched to arrive within the SLA window (e.g., 4 hours for critical equipment in Lagos or Abuja). The triage workflow is key to fast resolution. An expert on the phone can guide your on-site staff through basic checks, often resolving the issue or providing the dispatched engineer with critical information to bring the right tools and parts on the first visit. This "first visit fix" approach is a key metric of an efficient service provider.
- Emergency playbook:
- 24/7 Hotline: A single, dedicated number for reporting all emergencies.
- Defined Escalation Contacts: A clear list of who to contact at the provider if the issue is not being resolved.
- Remote Triage Protocol: A standardized process for remote diagnosis via phone or video.
- Pre-approved Budget: A pre-approved limit for common parts to speed up repairs without waiting for financial approval.
- Back-up Unit Strategy: A plan for deploying a loaner unit if a critical device has a long repair time.
Biomedical Staffing Augmentation Service spare parts and logistics in Nigeria
Availability of common spare parts is critical, with reputable providers holding local stock for high-failure items, resulting in a 24-48 hour lead time for delivery to your site. Specialized parts, such as a magnet for an MRI or a detector for a CT scanner, may take 2-4 weeks to import, factoring in international shipping and Nigerian customs clearance. It is crucial to insist on genuine OEM parts to ensure compatibility, performance, and safety. Using non-authentic parts can void your equipment's warranty and introduce significant clinical risk. A professional provider will manage the entire logistics chain, from sourcing to customs to final delivery.
- Spare parts controls:
- Insist on OEM Parts: The SOW should specify that only genuine, manufacturer-certified parts will be used.
- Request Warranty Documentation: Every major part should come with its own warranty certificate.
- Track Part Serial Numbers: Ensure the service report includes the serial numbers of both the old part removed and the new part installed.
- Agree on Lead Times: The SLA should define expected lead times for different categories of parts (local stock vs. international order).
- Verify Authenticity: Ask for proof of origin for critical components to avoid grey market or counterfeit parts.
Biomedical Staffing Augmentation Service training and handover in Nigeria
Training typically involves a 2-4 hour on-site session for clinical users and your in-house technicians after any major repair or new installation, covering proper operation, basic troubleshooting, and cleaning protocols. The handover is not complete until your team is confident in using the equipment. Training should be role-based: nurses and doctors learn the clinical application and user interface, while your technicians learn first-line maintenance checks and how to clearly articulate a fault when calling for support. This reduces user-error-related service calls and empowers your team.
- Training deliverables:
- User-Friendly Quick Guide: A laminated, one-page guide for quick reference, placed near the equipment.
- Signed Attendance Sheet: A record of all staff members who attended the training.
- Competency Checklist: A simple checklist to verify that users can perform key functions correctly.
- Contact for Follow-up Questions: The direct contact information of the trainer or support desk for future queries.
- Refresher Training Schedule: Agreement on an annual or bi-annual refresher session.
Biomedical Staffing Augmentation Service asset inventory and CMMS in Nigeria
A Computerized Maintenance Management System (CMMS) provides a real-time digital inventory of all your assets, tracking their maintenance history, status, and key performance indicators (KPIs) like uptime and Mean Time To Repair (MTTR). The process starts with a physical audit where every piece of equipment is tagged with a unique QR code or barcode. This tag is scanned by the engineer's mobile app during every service visit, automatically pulling up the asset's history and logging new activities. This gives you a powerful, transparent view of your entire equipment fleet from a single dashboard.
- CMMS data points:
- Unique Asset ID: The unique tag number for the device.
- Asset Details: Make, model, serial number, department, location.
- Lifecycle Data: Purchase date, warranty expiration date, end-of-service-life date.
- PM Schedule: The planned schedule and frequency for preventive maintenance.
- Complete Service History: A chronological log of every PM, repair, and inspection.
- Total Cost of Ownership (TCO): A running total of all maintenance and repair costs for the asset.
Biomedical Staffing Augmentation Service power audit and UPS/stabilizer sizing in Nigeria
A power audit is a 1-2 day on-site process where an engineer uses a power quality analyzer to measure voltage, frequency, sags, swells, and harmonics at the equipment's power source. The outcome is a detailed report that recommends the correct kVA rating and type of Uninterruptible Power Supply (UPS) and/or voltage stabilizer required to protect your sensitive medical equipment. Given the instability of the power grid in Nigeria, this is one of the most important proactive steps you can take. Over 50% of electronic board failures are directly attributable to poor power quality. A proper audit ensures you invest in the right protection, not just a generic solution.
- Power audit outcomes:
- Voltage/Frequency Stability Report: A log of power fluctuations over a 24-hour period.
- Recommended kVA Rating: A precise calculation for the required UPS and/or stabilizer capacity.
- Earthing Verification Report: Confirmation that the facility's electrical earthing is adequate and safe.
- Surge Protection Recommendations: A plan for installing surge protection devices at key points.
- Harmonics Analysis: A report on electrical "noise" that can damage sensitive components.
Biomedical Staffing Augmentation Service relocation and commissioning in Nigeria
The relocation process for a major system like a CT scanner or MRI takes 5-10 working days and involves professional dismantling, specialized packaging, insured transport, reinstallation, and full performance verification and commissioning at the new site. This is a highly specialized task. The process must follow strict OEM procedures to prevent damage. It includes a pre-move survey of the new site to ensure power, space, and environmental requirements are met. After reinstallation, the system undergoes a full battery of tests (Performance Qualification) to certify it is operating to the same standard as it was before the move.
- Relocation safeguards:
- Pre-Move Site Survey: A detailed check of the new location's readiness.
- Professional Crating and Transport: Use of specialized logistics partners with experience in moving sensitive medical devices.
- Transit Insurance: Comprehensive insurance covering the asset from the moment it is dismantled to final sign-off.
- Post-Move Performance Qualification (PQ): A full suite of tests to verify the equipment meets all OEM specifications.
- User Re-training: A refresher session for staff at the new location.
Biomedical Staffing Augmentation Service deinstallation and disposal in Nigeria
The deinstallation process is a 1-3 day activity that includes safe dismantling, data sanitization of patient information from hard drives, and documented disposal in compliance with local environmental (e.g., LASEPA in Lagos) and health regulations. For equipment containing hazardous materials, like lead in X-ray tubes or mercury in older devices, you must have a documented chain-of-custody to prove proper disposal. Data sanitization is critical to protect patient privacy and comply with data protection regulations. A professional provider will give you a certificate of data destruction as proof.
- Decommission essentials:
- Certificate of Data Destruction: A formal certificate confirming all patient data has been securely wiped.
- Hazardous Material Disposal Manifest: A document tracking the disposal of any hazardous components.
- Asset Removal Form: A signed document confirming the asset has been removed from your facility.
- Photographic Evidence: Photos documenting the key stages of the process for your records.
- Compliance with Local Agencies: Adherence to regulations from bodies like the Federal Ministry of Environment or state-level EPAs.
Biomedical Staffing Augmentation Service quality control and performance verification in Nigeria
Quality control is a scheduled process, typically quarterly or semi-annually, where specific performance parameters of a device are tested against OEM specifications using calibrated phantoms and test equipment to ensure it is operating accurately and safely. This goes beyond a basic functional check. For a diagnostic ultrasound, it involves using an ultrasound phantom to verify image uniformity and spatial accuracy. For a defibrillator, it means verifying that the delivered energy in joules matches the setting on the dial. The results are trended over time to predict potential failures before they impact clinical use.
- QC checkpoints:
- Diagnostic Accuracy: For imaging systems, checking parameters like CT number accuracy or spatial resolution.
- Output Consistency: For therapeutic devices, verifying energy delivery (defibrillators) or flow rates (infusion pumps).
- Alarm Function Verification: Testing that all critical alarms trigger at the correct thresholds.
- Image Quality Assessment: A qualitative and quantitative review of image quality against a baseline.
- Sensor Calibration: Verifying the accuracy of temperature, pressure, and other vital sign sensors.
Biomedical Staffing Augmentation Service electrical safety testing in Nigeria
Electrical safety testing is an annual requirement where an engineer uses a specialized safety analyzer to test parameters like earth continuity, insulation resistance, and leakage currents, as mandated by the international IEC 60601 standard. This is a fundamental safety requirement for any patient-connected device. The test ensures there is no risk of electric shock to patients or staff during normal use or in a fault condition. Upon successful completion, the device receives a "Tested for Electrical Safety" sticker with the test date and next due date, and a detailed report is uploaded to your CMMS.
- Electrical safety deliverables:
- Detailed Test Report: A digital report showing the measured values for each test parameter against the allowed limits.
- Pass/Fail Sticker: A durable sticker applied to the device as a clear visual indicator of its safety status.
- Updated Asset Safety Record: The CMMS is updated with the test results and next scheduled date.
- Recommendations for Failed Equipment: A clear action plan for any device that fails the test, which must be removed from service immediately.
Biomedical Staffing Augmentation Service KPIs and reporting in Nigeria
Key metrics tracked include equipment uptime percentage, Mean Time To Repair (MTTR), Mean Time Between Failures (MTBF), and SLA attainment rate. These are delivered in a monthly performance report and are accessible 24/7 via a real-time dashboard. These KPIs (Key Performance Indicators) transform maintenance from a cost centre into a measurable contributor to your hospital's operational efficiency. A low MTTR and high MTBF mean your equipment is reliable and your service provider is efficient. For a hospital director or donor, these metrics provide clear, objective evidence of the service's value.
- KPIs to review monthly:
- Uptime % for Critical Assets: The percentage of time your most critical equipment was available for use.
- Number of Open vs. Closed Work Orders: A measure of the service provider's workload and efficiency.
- First-Time Fix Rate: The percentage of repairs completed successfully on the first visit.
- Average Response Time: The average time taken to respond to service calls, measured against the SLA.
- Cost Per Asset Group: The total maintenance cost broken down by department or equipment type.
Biomedical Staffing Augmentation Service payment terms in Nigeria
Standard payment terms for contracts are quarterly or semi-annual payments in advance. For ad-hoc projects and major repairs, a 50-70% advance payment is common to cover mobilization and parts procurement, with the balance due upon job completion and your formal sign-off. For larger government or NGO contracts, a provider may be required to submit a performance bond from a reputable bank. Reputable providers like Franance can offer flexible payment structures, including financing options for significant contracts or unexpected, high-cost repairs, helping you manage your cash flow effectively.
- Finance clauses to agree:
- Billing Cycle: Clearly state if billing is monthly, quarterly, or semi-annually.
- Payment Due Date: The number of days from invoice receipt to payment due (e.g., Net 30).
- Currency of Payment: Specify NGN or USD, particularly if parts are imported.
- Policy for Out-of-Scope Work: A clear process and rate sheet for work not covered by the contract.
- Advance Payment Percentage: The agreed-upon percentage for project-based work.
Biomedical Staffing Augmentation Service near me in Nigeria (nationwide coverage)
Service is available nationwide, with the fastest response times in Lagos, Abuja, Port Harcourt, and Kano, where major providers have regional hubs and engineering teams. Service to other states and more remote locations is typically delivered through a hub-and-spoke model. Franance, for example, combines strategically located regional engineers for rapid emergency response with carefully planned, scheduled routes for preventive maintenance in other areas. This approach optimizes logistics, reduces costs, and ensures that even facilities in states like Borno, Sokoto, or Bayelsa receive consistent, professional support, all coordinated through a central helpdesk.
- Coverage highlights:
- 4-Hour Response: Available in major hubs like Lagos, Abuja, and Port Harcourt for critical equipment.
- 24-Hour Response: Standard for urgent issues in most state capitals.
- Scheduled PM Routes: Cost-effective, planned visits for routine maintenance in rural and remote areas.
- Nationwide Remote Support: Immediate remote diagnostic and troubleshooting support available to any location with a phone signal.