Background
Verified Service Provider in Senegal

Cleanroom Engineering (ISO 5-8) in Senegal Engineering Excellence & Technical Support

Cleanroom Engineering (ISO 5-8) solutions for Bioprocessing & Manufacturing. High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

ISO Class 5 Cleanroom Design & Validation

Expert design and validation of ISO Class 5 (Class 100) cleanroom facilities in Senegal, ensuring stringent particle control for sensitive pharmaceutical, biotech, and electronics manufacturing processes.

HEPA Filtration System Optimization

Implementation and optimization of high-efficiency particulate air (HEPA) filtration systems for ISO 6-8 cleanrooms, guaranteeing superior air purity and contamination prevention tailored to Senegalese industrial needs.

Cleanroom Environmental Monitoring & Compliance

Comprehensive environmental monitoring solutions (particle counts, air velocity, pressure differentials) and compliance consulting for ISO 5-8 cleanrooms in Senegal, ensuring regulatory adherence and operational integrity.

What Is Cleanroom Engineering (Iso 5-8) In Senegal?

Cleanroom engineering, particularly as it pertains to ISO 5-8 classifications, refers to the specialized design, construction, and maintenance of controlled environments that significantly minimize the presence of airborne particulates, microbial contamination, and other undesirable contaminants. These environments are critical for processes sensitive to contamination, where even microscopic particles can compromise product integrity, scientific accuracy, or patient safety. In Senegal, as globally, this discipline addresses the stringent requirements of industries where particulate control is paramount.

ISO 5-8 classification, based on the ISO 14644-1 standard, defines specific limits for the maximum number of particles of a given size per cubic meter of air. ISO 5 represents a higher level of cleanliness (fewer particles) than ISO 8. The engineering principles involve meticulous control over air filtration (HEPA/ULPA filters), airflow patterns (laminar, unidirectional, or turbulent), pressure differentials, material selection, surface finishes, gowning procedures, and environmental monitoring. The goal is to create and sustain an environment where the defined particulate levels are consistently maintained.

Who Needs Cleanroom Engineering (ISO 5-8) in Senegal?Typical Use Cases
Pharmaceutical and Biotechnology Companies: Manufacturing sterile injectables, active pharmaceutical ingredients (APIs), cell therapies, and conducting R&D.Sterile drug manufacturing, aseptic processing, cell culture, virology research, and quality control laboratories.
Medical Device Manufacturers: Producing implants, surgical instruments, diagnostic equipment, and other devices requiring a sterile or highly controlled manufacturing environment.Sterilization processes, assembly of sensitive medical components, and packaging of sterile devices.
Electronics and Semiconductor Industry: Fabricating microchips, assembling sensitive electronic components, and manufacturing high-precision optical devices.Photolithography, wafer fabrication, micro-assembly, and dust-sensitive electronic component manufacturing.
Research and Development Laboratories: Conducting advanced scientific research, particularly in fields requiring high purity and contamination control.Microbiology, molecular biology, advanced materials research, and sensitive chemical synthesis.
Food and Beverage Processing (High-Risk Applications): Producing infant formula, sterile dairy products, and other sensitive food items where microbial contamination poses significant health risks.Aseptic filling, infant formula production, and specialized food ingredient processing.
Aerospace and Defense: Manufacturing and assembling components for satellites, precision instruments, and sensitive defense systems.Optical component assembly, clean assembly of sensitive electronics, and material handling for critical components.

Key Aspects of Cleanroom Engineering (ISO 5-8) in Senegal

  • Design and Construction: Architecting and building cleanrooms to meet specific ISO classifications, incorporating appropriate HVAC systems, wall/ceiling/floor materials, and access control.
  • Filtration Systems: Implementation of High-Efficiency Particulate Air (HEPA) and Ultra-Low Penetration Air (ULPA) filters to remove sub-micron particles from the air.
  • Airflow Management: Establishing unidirectional (laminar or turbulent) airflow patterns to sweep contaminants away from critical areas and towards exhaust points.
  • Pressure Differentials: Maintaining positive or negative pressure gradients between cleanroom zones and adjacent areas to prevent the ingress or egress of contaminants.
  • Material and Surface Selection: Utilizing materials with low particle shedding properties, non-porous surfaces, and easy-to-clean finishes.
  • Gowning Procedures: Developing and enforcing strict protocols for personnel entering cleanrooms, including the use of specialized garments and personal protective equipment (PPE).
  • Environmental Monitoring: Continuous or periodic measurement and recording of particulate counts, temperature, humidity, and differential pressures to verify compliance with ISO standards.
  • Validation and Qualification: Conducting rigorous testing to ensure the cleanroom performs as designed and consistently meets its specified ISO classification.
  • Maintenance and Recertification: Ongoing upkeep of filtration systems, seals, and operational parameters, with regular recertification to maintain accredited cleanroom status.

Who Needs Cleanroom Engineering (Iso 5-8) In Senegal?

Cleanroom engineering, particularly for ISO 5 to ISO 8 classifications, is crucial for industries in Senegal requiring stringent control over airborne particulates to ensure product quality, safety, and regulatory compliance. These standards dictate the acceptable levels of contamination in a controlled environment, making them essential for specific sectors that cannot afford the risks associated with impurities. The demand for such advanced facilities is growing as Senegal aims to expand its high-value manufacturing and service sectors.

Customer TypeRelevant DepartmentsISO Classifications (Typical Focus)Key Needs/Applications
Pharmaceutical CompaniesManufacturing (Sterile Production), Quality Control, Research & DevelopmentISO 5 (Aseptic Filling), ISO 7 (Manufacturing), ISO 8 (Ancillary Areas)Sterile product manufacturing, API handling, vial filling, drug formulation.
Medical Device ManufacturersProduction (Assembly & Packaging), Quality Assurance, R&DISO 7 (Assembly), ISO 8 (Packaging & Storage)Sterile implant production, device assembly, clean packaging, biocompatible material handling.
Biotechnology FirmsCell Culture Labs, Fermentation, Genetic Engineering, Quality ControlISO 5 (Cell Culture), ISO 7 (Fermentation), ISO 8 (General Labs)Preventing contamination in sensitive biological cultures, ensuring reproducibility of experiments.
Food & Beverage Companies (Specialty)Production (Specialty/High-Risk), Quality ControlISO 7 (Critical Production Zones), ISO 8 (Packaging)Infant formula production, sterile food packaging, probiotic manufacturing.
Research Institutes & UniversitiesLife Sciences Departments, Medical Research Labs, Materials ScienceVaries based on research needs (e.g., ISO 7, ISO 8)Advanced research requiring controlled environments, developing new technologies.

Target Customers and Departments Requiring ISO 5-8 Cleanroom Engineering in Senegal:

  • {"title":"Pharmaceutical Manufacturing & Compounding","description":"Producing sterile injectables, oral medications, and compounded pharmaceuticals requires the highest levels of contamination control to prevent microbial contamination and ensure patient safety. This is a primary driver for cleanroom adoption."}
  • {"title":"Medical Device Manufacturing","description":"The production of implants, diagnostic equipment, surgical instruments, and other medical devices necessitates clean environments to prevent infections and ensure the functionality and longevity of the devices."}
  • {"title":"Biotechnology & Life Sciences Research","description":"Laboratories involved in genetic research, cell culture, protein production, and other sensitive biological processes need controlled environments to prevent cross-contamination and ensure the integrity of experimental results."}
  • {"title":"Food & Beverage Processing (Specialty/High-Risk)","description":"While general food processing may not require ISO 5-8, certain high-risk operations, such as infant formula production, sterile packaging of sensitive food products, or the manufacturing of probiotics, could benefit from or require these standards to ensure product safety and shelf-life."}
  • {"title":"Electronics Manufacturing (Precision Components)","description":"While Senegal's electronics manufacturing sector might be nascent, the production of highly sensitive micro-components, semiconductors, or specialized electronic assemblies can require cleanroom conditions to prevent dust and particle contamination that could lead to device failure."}
  • {"title":"Cosmetics & Personal Care Manufacturing (High-End/Sterile)","description":"The production of certain high-end or sterile cosmetic products, such as ophthalmic solutions or products requiring extended shelf-life without preservatives, may necessitate cleanroom environments."}
  • {"title":"Academic & Research Institutions","description":"Universities and research centers undertaking advanced scientific projects in medicine, biology, and materials science often require access to or the establishment of cleanroom facilities for their research endeavors."}

Cleanroom Engineering (Iso 5-8) Process In Senegal

This document outlines the typical workflow for Cleanroom Engineering services (ISO 5-8) in Senegal, from the initial client inquiry to the successful execution and handover of the project. The process is designed to be systematic and ensure all client requirements are met while adhering to international cleanroom standards.

PhaseKey ActivitiesDeliverablesKey Considerations (Senegal Context)
Phase 1: Inquiry and Initial ConsultationClient contacts the cleanroom engineering firm to express interest in services. Initial discussion of project scope, requirements (e.g., ISO class, application area), and timeline. Basic site information gathering.Initial project brief. Preliminary understanding of client needs.Establish communication channels (local representation if available). Understand local business practices and expectations.
Phase 2: Needs Assessment and Conceptual DesignDetailed site survey and assessment. In-depth discussion of operational processes, contamination control needs, and desired outcomes. Development of preliminary design concepts and layout options. Identification of critical parameters (airflow, temperature, humidity, pressure differentials, filtration).Site assessment report. Conceptual design drawings. Preliminary equipment list. Refined project scope.Accessibility of site for surveys. Availability of reliable utility services (power, water). Local availability of certain construction materials.
Phase 3: Detailed Design and ProposalDevelopment of detailed engineering drawings (P&IDs, HVAC schematics, electrical layouts, material specifications). Selection of specific materials, equipment, and filtration systems. Creation of a comprehensive technical proposal including scope of work, timeline, cost breakdown, and compliance with ISO standards. Risk assessment and mitigation strategies.Detailed engineering drawings. Bill of Materials (BOM). Comprehensive technical proposal and quotation. Project execution plan.Local regulatory requirements for construction and environmental impact. Import duties and lead times for specialized equipment. Availability of skilled local labor for specialized installation tasks.
Phase 4: Procurement and ManufacturingClient approval of the proposal and contract signing. Procurement of all specified materials and equipment. Manufacturing of custom cleanroom components and systems. Quality control checks during manufacturing.Purchase orders. Manufacturing progress reports. Factory Acceptance Tests (FAT) documentation.Supplier reliability and delivery schedules to Senegal. Customs clearance procedures and potential delays.
Phase 5: On-site Installation and ConstructionSite preparation and mobilization of the installation team. Construction of the cleanroom structure (walls, ceiling, flooring). Installation of HVAC systems, filtration units (HEPA/ULPA), lighting, and utilities. Installation of doors, windows, and pass-throughs. Integration of specialized equipment.Construction progress reports. Installation checklists. Photos and videos of installation milestones.Local labor availability and training needs. Logistics for transporting materials and equipment to the site. Coordination with local authorities and utility providers. Site safety protocols and compliance with local labor laws.
Phase 6: Commissioning and ValidationSystem testing and calibration (airflow, pressure, temperature, humidity). Air particulate counting and certification (ISO 5-8). Performance verification against design specifications. Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ).Commissioning reports. Cleanliness certification reports. IQ/OQ/PQ documentation.Availability of accredited third-party validation laboratories in or accessible from Senegal. Local environmental conditions during validation testing.
Phase 7: Training and HandoverTraining of client's personnel on cleanroom operation, maintenance, and contamination control procedures. Provision of comprehensive operation and maintenance manuals. Formal project handover and sign-off.Training materials. Operation and maintenance manuals. Project handover certificate.Language considerations for training materials and delivery. Client's technical capacity for understanding and implementing training.
Phase 8: Post-Installation Support and MaintenanceOngoing technical support. Scheduled preventive maintenance services. Troubleshooting and repair services. Periodic re-certification and recertification.Service agreements. Maintenance reports. Re-certification reports.Establishing remote support capabilities. Availability of spare parts and local service technicians. Long-term partnership development.

Cleanroom Engineering (ISO 5-8) Workflow in Senegal

  • Phase 1: Inquiry and Initial Consultation
  • Phase 2: Needs Assessment and Conceptual Design
  • Phase 3: Detailed Design and Proposal
  • Phase 4: Procurement and Manufacturing
  • Phase 5: On-site Installation and Construction
  • Phase 6: Commissioning and Validation
  • Phase 7: Training and Handover
  • Phase 8: Post-Installation Support and Maintenance

Cleanroom Engineering (Iso 5-8) Cost In Senegal

Cleanroom engineering projects in Senegal, specifically for ISO 5 to ISO 8 classifications, involve a complex interplay of factors that dictate the overall cost. These factors range from the specific ISO class required, the size and layout of the cleanroom, the materials and technologies employed, to the local labor costs, regulatory compliance, and the chosen contractor's expertise.

Key Pricing Factors:

  • ISO Classification: This is the most significant driver of cost. Higher ISO classes (e.g., ISO 5) demand more stringent air filtration (HEPA/ULPA filters), advanced air change rates, specialized materials, and meticulous construction techniques to achieve lower particle counts. This directly translates to higher equipment and material expenses.
  • Cleanroom Size and Layout: Larger cleanroom areas and more complex layouts (e.g., multiple interconnected rooms, airlocks, pass-throughs) naturally require more materials, labor, and sophisticated HVAC design, increasing the overall project cost.
  • Materials and Finishes: The choice of materials for walls, floors, ceilings, and doors significantly impacts cost. High-performance, non-shedding, and easily cleanable materials like stainless steel, specialized epoxy coatings, and hermetically sealed panels are more expensive but essential for maintaining cleanliness.
  • HVAC System Design and Equipment: The heart of a cleanroom is its HVAC system. This includes high-efficiency particulate air (HEPA) or ultra-low particulate air (ULPA) filters, fan filter units (FFUs), air handlers, ductwork, and precise temperature and humidity control systems. The complexity and capacity of the system directly influence pricing.
  • Ancillary Equipment and Services: This can include items like pass-throughs, gowning rooms, air showers, emergency power systems, data cabling, lighting, and specialized monitoring equipment, all of which add to the project's scope and cost.
  • Validation and Testing: Post-construction validation and certification are crucial to confirm the cleanroom meets the specified ISO standards. This involves rigorous testing of airflow, particle counts, pressure differentials, and often requires specialized third-party services, adding to the overall expense.
  • Labor Costs: Skilled labor is essential for cleanroom construction. While generally lower in Senegal compared to Western countries, the cost of specialized technicians, electricians, HVAC engineers, and construction workers trained in cleanroom protocols still constitutes a significant portion of the budget.
  • Project Management and Design: Professional design and project management are vital for ensuring the cleanroom meets all requirements. The fees associated with architects, engineers, and project managers contribute to the total cost.
  • Location and Site Conditions: The specific location within Senegal might have minor impacts on logistics and local material availability. Site preparation and any necessary modifications to existing infrastructure will also influence the cost.
  • Contractor Experience and Reputation: Highly experienced and reputable cleanroom construction companies, even in Senegal, may command higher prices due to their proven track record, expertise, and the assurance of quality they provide.

**Estimated Cost Ranges in Local Currency (XOF - West African CFA franc):

It's crucial to understand that these are ballpark estimates and can vary significantly. Obtaining detailed quotes from local and potentially international specialized contractors is essential for accurate budgeting. The following ranges are illustrative:

For ISO 8 (least stringent):

  • Small to Medium Cleanroom (e.g., 10-30 sqm): 10,000,000 XOF - 30,000,000 XOF
  • Larger/More Complex Installations: 30,000,000 XOF - 70,000,000 XOF

For ISO 7:

  • Small to Medium Cleanroom (e.g., 10-30 sqm): 20,000,000 XOF - 50,000,000 XOF
  • Larger/More Complex Installations: 50,000,000 XOF - 120,000,000 XOF

For ISO 6:

  • Small to Medium Cleanroom (e.g., 10-30 sqm): 30,000,000 XOF - 70,000,000 XOF
  • Larger/More Complex Installations: 70,000,000 XOF - 180,000,000 XOF

For ISO 5 (most stringent):

  • Small to Medium Cleanroom (e.g., 10-30 sqm): 50,000,000 XOF - 150,000,000 XOF
  • Larger/More Complex Installations: 150,000,000 XOF - 350,000,000+ XOF

Note: These figures are highly dependent on the specific requirements and the level of technological sophistication. For ISO 5, especially in pharmaceutical or semiconductor applications, costs can escalate significantly due to the need for ULPA filtration, advanced monitoring, and highly specialized materials and construction methods. It is advisable to consult with at least three specialized cleanroom engineering firms to gather competitive bids and understand the specific nuances of your project in Senegal.

ISO ClassEstimated Cost Range (XOF) - Small/Medium (10-30 sqm)Estimated Cost Range (XOF) - Larger/Complex
ISO 810,000,000 - 30,000,00030,000,000 - 70,000,000
ISO 720,000,000 - 50,000,00050,000,000 - 120,000,000
ISO 630,000,000 - 70,000,00070,000,000 - 180,000,000
ISO 550,000,000 - 150,000,000150,000,000 - 350,000,000+

Key Pricing Factors for Cleanroom Engineering (ISO 5-8) in Senegal

  • ISO Classification (5-8)
  • Cleanroom Size and Layout
  • Materials and Finishes
  • HVAC System Design and Equipment (HEPA/ULPA filters, FFUs)
  • Ancillary Equipment (Airlocks, Air Showers, etc.)
  • Validation and Testing Services
  • Skilled Labor Costs
  • Project Management and Design Fees
  • Location and Site Conditions
  • Contractor Experience and Reputation

Affordable Cleanroom Engineering (Iso 5-8) Options

Achieving ISO 5-8 cleanroom standards doesn't have to break the bank. Affordable cleanroom engineering focuses on smart design, efficient material selection, and streamlined processes to deliver cost-effective solutions without compromising critical environmental controls. This approach prioritizes functionality, compliance, and long-term operational savings, making cleanroom technology accessible to a wider range of industries and applications.

Cost-Saving StrategyDescriptionImpact on Cleanroom Performance (ISO 5-8)
Standardized Component SelectionUtilizing widely available, off-the-shelf components for walls, floors, ceilings, and HVAC systems. Reduces custom fabrication costs and lead times.High. Standardized components are often designed and tested for specific performance metrics, ensuring reliable filtration and air control when properly integrated.
Optimized Airflow DesignDesigning for efficient unidirectional or mixed airflow with minimal air leakage. Reduces the number of required air changes per hour (ACH) while maintaining contamination control.High. Proper airflow is fundamental to achieving ISO class. Optimized designs ensure consistent particle removal and prevent re-contamination.
Strategic Material ChoiceSelecting cost-effective yet compliant materials (e.g., durable, non-shedding composites, specific grades of PVC). Avoids over-specification for non-critical areas.Medium to High. Materials must be durable, easy to clean, and low-particulating. Choosing the right grade for each zone is crucial for long-term performance and cost.
Energy-Efficient HVAC IntegrationIncorporating energy-efficient fan filter units (FFUs) and HVAC systems. Reduces operational costs through lower power consumption.Medium. While not directly impacting particle counts, efficient systems contribute to sustainable operations and lower the total cost of ownership, making the overall cleanroom more affordable.
Modular Construction & PrefabricationMaximizes factory-based construction for quicker on-site assembly. Reduces on-site labor, waste, and disruption.High. Enables precise assembly and adherence to design specifications, crucial for consistent environmental control.
DIY Assembly Support & TrainingOffering comprehensive installation guides, virtual support, or on-site training for self-assembly. Empowers clients to reduce installation labor costs.Medium. Requires a certain level of technical proficiency from the client. Careful adherence to instructions is critical to ensure proper sealing and performance.
Phased Upgrade PathsDesigning the initial cleanroom with the possibility of future upgrades (e.g., adding more FFUs, upgrading filtration levels). Allows for initial lower investment.Medium. The initial phase must still meet the target ISO class, with future phases enhancing or maintaining that level.

Value Bundles for Affordable Cleanroom Engineering (ISO 5-8)

  • {"title":"Modular Cleanroom Systems","description":"Pre-fabricated, standardized modules that are easily assembled and reconfigured. Offers faster installation, lower labor costs, and flexibility for future expansion or relocation."}
  • {"title":"Softwall Cleanroom Solutions","description":"Utilizes flexible vinyl or plastic curtains for containment, often integrated with HEPA filtration. Ideal for less stringent requirements or as temporary clean zones, significantly reducing initial investment compared to hardwall structures."}
  • {"title":"Component-Based Kits","description":"Provides essential cleanroom components (e.g., fan filter units, HEPA filters, cleanroom panels, doors) as a package. Allows for DIY assembly or integration with existing structures, offering control over project scope and cost."}
  • {"title":"Hybrid Cleanroom Designs","description":"Combines hardwall construction for critical areas with softwall or modular elements for buffer zones or less sensitive spaces. Optimizes cost by applying higher-spec construction only where absolutely necessary."}
  • {"title":"Phased Implementation Packages","description":"Breaks down the cleanroom project into manageable stages. Allows businesses to invest incrementally, starting with essential functionality and adding features or expanding as budget allows."}

Verified Providers In Senegal

In Senegal's growing healthcare landscape, identifying reliable and accredited medical service providers is crucial for patients seeking quality care. Franance Health stands out as a premier organization, distinguished by its rigorous credentialing process and commitment to upholding the highest standards of medical excellence. This dedication to verification ensures that patients can trust the expertise and ethical practice of the providers affiliated with Franance Health.

Credential TypeFranance Health VerificationBenefit to Patients
Medical LicensureRigorously checked and validated.Guarantees that providers are legally authorized and qualified to practice medicine.
Specialty CertificationsConfirmed through recognized medical boards.Ensures providers possess specialized knowledge and skills for complex conditions.
Facility AccreditationCompliance with national and international standards.Indicates a safe, well-equipped, and efficiently managed healthcare environment.
Continuing EducationMandatory participation and documented evidence.Confirms providers are current with the latest medical research and techniques.
Patient Feedback MechanismsActive collection and analysis of patient reviews.Provides assurance of providers' commitment to patient satisfaction and continuous improvement.

Key Franance Health Credentials and Why They Matter

  • Accreditation by National Health Authorities: Franance Health ensures all its partner facilities and individual providers meet or exceed the stringent requirements set by Senegal's Ministry of Health and its regulatory bodies. This signifies compliance with national safety, quality, and operational standards.
  • International Quality Standards Alignment: Many Franance Health accredited providers adhere to international benchmarks for healthcare quality, such as ISO certifications or guidelines from organizations like the Joint Commission International. This demonstrates a commitment to global best practices in patient care and safety.
  • Verification of Medical Licenses and Certifications: Every healthcare professional affiliated with Franance Health undergoes a thorough check of their medical licenses, board certifications, and educational qualifications. This confirms their legitimate authorization to practice and their specialized expertise.
  • Continuous Professional Development: Franance Health encourages and often mandates ongoing training and education for its affiliated providers. This ensures they remain up-to-date with the latest medical advancements, technologies, and treatment protocols, offering patients the most current and effective care.
  • Patient Safety Protocols: Accreditation involves a deep dive into a provider's patient safety measures, including infection control, medication management, emergency preparedness, and patient rights. Franance Health's focus on these protocols minimizes risks and enhances the overall patient experience.
  • Ethical Practice and Patient Satisfaction: Franance Health assesses providers on their adherence to ethical medical practices, transparency, and patient-centered care. This includes mechanisms for feedback and resolution of patient concerns, contributing to higher satisfaction rates.
  • Specialized Expertise Validation: Beyond general medical practice, Franance Health verifies the specific expertise of providers in various specializations, ensuring patients are matched with the most competent professionals for their unique health needs.

Scope Of Work For Cleanroom Engineering (Iso 5-8)

This Scope of Work (SOW) outlines the requirements for cleanroom engineering services focused on achieving ISO 5 to ISO 8 classifications. It details the technical deliverables expected from the engineering team and the standard specifications that will govern the design, construction, and validation of the cleanroom facilities.

ISO ClassificationParticle Count Limit (particles per m³)Key Design ConsiderationsTypical Applications
ISO 5 (Class 100)≤ 3,520 (0.5 µm)High-efficiency HEPA/ULPA filtration, unidirectional airflow, stringent material controls, advanced gowning proceduresSemiconductor manufacturing (critical areas), pharmaceutical sterile filling, advanced biotech production
ISO 6 (Class 1,000)≤ 35,200 (0.5 µm)High-efficiency HEPA filtration, robust airflow management, careful material selectionPharmaceutical API manufacturing, certain medical device assembly, sensitive electronics manufacturing
ISO 7 (Class 10,000)≤ 352,000 (0.5 µm)HEPA filtration, effective air change rates, good construction practicesGeneral pharmaceutical manufacturing, medical device manufacturing, electronics assembly, biological containment (lower levels)
ISO 8 (Class 100,000)≤ 3,520,000 (0.5 µm)Standard HVAC with filtration, adequate air change rates, good housekeepingGeneral laboratory work, electronics assembly (less sensitive), packaging areas, general assembly

Technical Deliverables

  • Conceptual Design Report (including preliminary layouts, airflow strategies, and material selection)
  • Detailed Design Drawings (architectural, mechanical, electrical, plumbing, HEPA filtration systems)
  • Equipment Specifications (HVAC, filtration units, control systems, access control, interlocks)
  • Material and Finish Specifications (wall panels, flooring, ceilings, doors, windows)
  • Cleanroom Classification Strategy and Methodology Report
  • Commissioning Plan and Procedures
  • Validation Master Plan (VMP)
  • Installation Qualification (IQ) Protocols and Reports
  • Operational Qualification (OQ) Protocols and Reports
  • Performance Qualification (PQ) Protocols and Reports
  • As-Built Drawings and Documentation
  • Operations and Maintenance Manuals
  • Training Materials for Facility Personnel

Service Level Agreement For Cleanroom Engineering (Iso 5-8)

This Service Level Agreement (SLA) outlines the response times and uptime guarantees for Cleanroom Engineering services, specifically catering to ISO 5, ISO 6, ISO 7, and ISO 8 classified environments. This document aims to ensure the consistent operation and integrity of critical cleanroom facilities. All response times are measured from the moment a service request is formally logged and acknowledged by the Service Provider. Uptime guarantees are calculated on a monthly basis.

Service LevelISO ClassificationUptime Guarantee (Monthly)Response Time (Critical Failure)Response Time (Routine Issue)
GoldISO 599.95%1 hour4 business hours
SilverISO 599.90%2 hours8 business hours
GoldISO 699.90%2 hours4 business hours
SilverISO 699.85%3 hours8 business hours
GoldISO 799.80%3 hours4 business hours
SilverISO 799.70%4 hours8 business hours
GoldISO 899.70%4 hours4 business hours
SilverISO 899.60%6 hours8 business hours

Scope of Services

  • Preventative Maintenance (PM) of cleanroom systems (HVAC, filtration, monitoring, etc.)
  • Corrective Maintenance (CM) and emergency repairs for cleanroom equipment and systems
  • Validation and revalidation of cleanroom performance
  • Calibration of environmental monitoring equipment
  • On-site engineering support and troubleshooting
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your Cleanroom Engineering (ISO 5-8) in Senegal project in Senegal.

Speak to Sales