PSA Oxygen Plant Installation Service in Senegal Engineering Excellence & Technical Support

PSA Oxygen Plant Installation Service High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Expert Engineering & Site Assessment

Our seasoned engineers conduct meticulous site surveys and feasibility studies, ensuring optimal plant placement and integration with existing infrastructure for maximum efficiency and longevity in Senegal's diverse environmental conditions.

Precision Installation & Commissioning

We employ best-in-class installation methodologies and rigorous testing protocols to guarantee the safe, reliable, and high-performance operation of your PSA oxygen plant, adhering to international safety standards throughout the Senegal project lifecycle.

Local Expertise & Ongoing Support

Leveraging our deep understanding of local regulations and logistical challenges in Senegal, we provide comprehensive installation services alongside robust training and accessible after-sales support to ensure sustained plant operation and minimal downtime.

What Is Psa Oxygen Plant Installation Service In Senegal?

A PSA (Pressure Swing Adsorption) Oxygen Plant Installation Service in Senegal refers to the comprehensive process of designing, sourcing, deploying, commissioning, and providing ongoing support for on-site oxygen generation systems utilizing PSA technology within the Senegalese geographical and regulatory context. This service ensures reliable and cost-effective oxygen supply for various industrial, medical, and commercial applications by leveraging the principles of molecular sieving and pressure differentials to separate oxygen from atmospheric air.

Who Needs PSA Oxygen Plant Installation Service in Senegal?Typical Use Cases
Healthcare Facilities: Hospitals, clinics, and emergency medical centers requiring a consistent and medical-grade oxygen supply for patient respiration, anesthesia, and critical care.Industrial Manufacturing: Welding, cutting, smelting, and chemical processing industries that utilize oxygen for combustion enhancement, oxidation, and inerting purposes.
Mining Operations: Providing oxygen for blasting, fugitive dust suppression, and ventilation in underground mining environments.Water & Wastewater Treatment: Aeration of water bodies to improve dissolved oxygen levels and support biological treatment processes.
Fish Farming (Aquaculture): Supplying oxygen for dissolved oxygen management in fish ponds, enhancing fish growth and survival rates.Laboratory & Research Institutions: Generating high-purity oxygen for analytical equipment, experimental procedures, and specialized research applications.
Emergency Services & Disaster Relief: Rapid deployment of oxygen generation for immediate needs during natural disasters or large-scale emergencies.Remote or Underserved Areas: Establishing localized oxygen production where traditional supply chains are unreliable or uneconomical.

Key Components and Activities of PSA Oxygen Plant Installation Service:

  • Site Assessment & Feasibility Study: Evaluating the intended installation location for space, power availability, atmospheric conditions, and regulatory compliance.
  • System Design & Engineering: Tailoring the PSA system capacity, purity, flow rate, and ancillary equipment to meet specific operational requirements.
  • Equipment Procurement & Logistics: Sourcing high-quality PSA generators, compressors, purification systems, storage tanks, and other necessary components, and managing their transportation to Senegal.
  • Installation & Assembly: Professional assembly of the PSA plant components, including piping, electrical connections, and instrumentation, adhering to international and local standards.
  • Commissioning & Performance Testing: Rigorous testing of the installed system to verify oxygen purity, flow rates, pressure, and overall operational efficiency against design specifications.
  • Training & Handover: Providing comprehensive training to client personnel on system operation, routine maintenance, troubleshooting, and safety protocols.
  • After-Sales Support & Maintenance: Offering preventative maintenance plans, spare parts, technical assistance, and emergency repair services to ensure continuous and optimal plant performance.
  • Regulatory Compliance Assistance: Guiding clients through any necessary permits, certifications, and adherence to Senegalese industrial and medical gas regulations.

Who Needs Psa Oxygen Plant Installation Service In Senegal?

When considering the critical need for reliable oxygen supply, several key sectors and institutions in Senegal stand out as primary beneficiaries of PSA (Pressure Swing Adsorption) oxygen plant installation services. These facilities require a consistent and high-quality source of medical-grade oxygen to ensure patient care, support industrial processes, and maintain operational efficiency. The installation of a PSA oxygen plant offers a sustainable, cost-effective, and readily available solution for their oxygen demands.

Target Customer GroupKey Departments/Units InvolvedPrimary Need
Hospitals and Healthcare FacilitiesAnesthesia Department, Intensive Care Unit (ICU), Emergency Room, Respiratory Therapy, General WardsReliable and continuous supply of medical-grade oxygen for patient care and life support.
Government Health Ministries and AgenciesProcurement Department, Public Health Infrastructure Unit, National Health Security DirectorateStrategic acquisition and deployment of oxygen generation systems to improve national healthcare capacity and resilience.
Industrial Operations (Metal Fabrication, Manufacturing, Aquaculture)Operations Management, Maintenance Department, Production FloorProcess oxygen for welding, cutting, combustion, or aeration to enhance efficiency and product quality.
NGOs and International Aid OrganizationsProject Management, Logistics, Healthcare Program CoordinatorsImplementation of healthcare projects in underserved areas, ensuring access to essential medical oxygen.
Research and Educational InstitutionsLaboratory Management, Medical School Administration, Procurement OfficeOxygen for scientific experiments, medical training, and research activities.
Emergency Services and Disaster Management AgenciesOperations Command, Logistics and Supply, Training DivisionImmediate availability of oxygen for emergency response and patient stabilization in critical situations.

Target Customers for PSA Oxygen Plant Installation Services in Senegal

  • {"item":"Hospitals and Healthcare Facilities","description":"This is the most significant target group. All public and private hospitals, clinics, and specialized medical centers, from large tertiary hospitals in Dakar to smaller rural health posts, require a constant supply of medical oxygen for respiratory support, anesthesia, and various critical care applications. The ability to generate oxygen on-site eliminates the logistical challenges and costs associated with cylinder delivery and ensures uninterrupted supply during emergencies."}
  • {"item":"Government Health Ministries and Agencies","description":"National and regional health authorities responsible for public health infrastructure procurement and management are key stakeholders. They often drive large-scale projects to equip public hospitals and health centers with modern medical equipment, including oxygen generation systems, to improve healthcare accessibility and quality across the nation."}
  • {"item":"Industrial Operations","description":"While medical oxygen is a primary focus, certain industrial sectors also utilize oxygen for their processes. This includes: \n- Metal fabrication and welding (e.g., shipyards, construction companies).\n- Manufacturing plants that use oxygen for combustion or chemical processes.\n- Fish and aquaculture industries for water aeration.\n- Potential emerging industries requiring specialized gas supplies."}
  • {"item":"Mining and Resource Extraction Companies","description":"Companies operating in Senegal's mining sector may require oxygen for various applications, including safety equipment and certain processing stages."}
  • {"item":"Non-Governmental Organizations (NGOs) and International Aid Organizations","description":"Organizations involved in healthcare development, disaster relief, and humanitarian aid in Senegal often fund and implement projects that require reliable oxygen supplies for remote or underserved communities. They are crucial partners in expanding access to essential medical equipment."}
  • {"item":"Research and Educational Institutions","description":"Universities and research centers with medical or scientific departments may require oxygen for laboratory experiments, educational purposes, and medical training simulations."}
  • {"item":"Emergency Services and Disaster Management Agencies","description":"Organizations responsible for ambulance services, fire departments, and national disaster response efforts need readily available oxygen for pre-hospital care and emergency situations."}

Psa Oxygen Plant Installation Service Process In Senegal

This document outlines the comprehensive workflow for PSA (Pressure Swing Adsorption) Oxygen Plant Installation Services in Senegal, guiding clients from their initial inquiry to the successful execution and handover of the project. Our process is designed for clarity, efficiency, and optimal client collaboration.

PhaseKey ActivitiesClient InvolvementDeliverablesEstimated Timeline (Indicative)
  1. Inquiry and Initial Consultation
Client submits an inquiry detailing their oxygen requirements. Our team conducts an initial consultation to understand project scope, capacity needs, and any specific site considerations.Provide detailed oxygen requirements, desired capacity, and initial site information. Participate in consultation calls.Initial understanding of project scope, preliminary quotation (if applicable).1-3 Business Days
  1. Site Survey and Technical Assessment
Our engineers visit the proposed installation site in Senegal to conduct a thorough assessment of the physical space, power availability, ambient conditions, access routes, and safety regulations.Provide site access, relevant site plans, and answer technical queries from our team. Identify local contacts.Detailed site survey report, technical feasibility assessment, identification of any site-specific challenges.3-7 Business Days
  1. Proposal and Contract Finalization
Based on the inquiry and site survey, a comprehensive technical and commercial proposal is prepared. This includes detailed specifications, equipment list, installation plan, timeline, and cost. Negotiations and contract signing follow.Review and provide feedback on the proposal. Negotiate terms and conditions. Sign the contract.Formal proposal document, finalized contract agreement.7-14 Business Days
  1. Engineering and Design
Detailed engineering design for the PSA oxygen plant, including P&IDs, electrical schematics, structural drawings, and foundation design, tailored to the Senegal site conditions and local regulations.Approve engineering drawings and specifications.Approved engineering drawings, Bill of Materials (BOM).2-6 Weeks
  1. Procurement and Logistics
Sourcing and procurement of all necessary components and materials. Planning for international and local logistics to ensure timely delivery to Senegal.Facilitate any required local permits or clearances for incoming materials.Procured equipment and materials, logistics plan.4-12 Weeks (depending on lead times)
  1. Site Preparation and Civil Works
Preparation of the installation site, including foundation construction, utility hook-up points, and any necessary civil works as per the approved engineering design.Ensure site is cleared and ready for civil works. Provide access to utilities.Completed foundation, prepared site for equipment installation.2-5 Weeks
  1. Equipment Manufacturing and Pre-assembly
Manufacturing of the PSA oxygen plant modules. Off-site pre-assembly and factory testing of key components to minimize on-site installation time.N/A (internal process).Manufactured and pre-assembled PSA plant modules.8-20 Weeks
  1. Shipping and Customs Clearance
Packaging of the plant components and shipping to Senegal. Managing all customs procedures and import documentation.Assist with customs clearance by providing necessary documentation and local point of contact.Equipment arrives at port/site in Senegal.2-6 Weeks (shipping transit)
  1. On-site Installation and Erection
Our expert installation team arrives on-site to erect the PSA plant modules, connect piping, electrical systems, and integrate all components.Provide skilled labor (if required and agreed upon), site supervision, and ensure a safe working environment.Physically installed PSA oxygen plant.3-8 Weeks
  1. Pre-commissioning and Testing
Systematic checks and tests of all individual components and sub-systems to ensure correct installation and functionality before actual start-up.Observe testing procedures and provide any necessary local support.Pre-commissioning reports, individual component test results.1-2 Weeks
  1. Commissioning and Start-up
The plant is started up and operated under various load conditions to verify performance, oxygen purity, flow rate, and overall system stability.Observe commissioning process, participate in performance verification.Commissioning reports, performance validation certificates, stable oxygen production.1-2 Weeks
  1. Training and Handover
Comprehensive training is provided to the client's operational and maintenance staff on the safe and efficient operation, troubleshooting, and routine maintenance of the PSA oxygen plant. Formal handover of the plant and documentation.Nominate personnel for training, actively participate in training sessions, formally accept the plant.Trained personnel, O&M manuals, spare parts list, warranty certificates, official handover document.3-5 Business Days
  1. Post-Installation Support and Maintenance
Ongoing technical support, remote monitoring, preventative maintenance services, and spare parts supply to ensure long-term optimal performance of the PSA oxygen plant.Engage in service agreements, report any issues promptly, order spare parts as needed.Ongoing plant operation, service reports, technical assistance.Ongoing

PSA Oxygen Plant Installation Service Process in Senegal

  • Phase 1: Inquiry and Initial Consultation
  • Phase 2: Site Survey and Technical Assessment
  • Phase 3: Proposal and Contract Finalization
  • Phase 4: Engineering and Design
  • Phase 5: Procurement and Logistics
  • Phase 6: Site Preparation and Civil Works
  • Phase 7: Equipment Manufacturing and Pre-assembly
  • Phase 8: Shipping and Customs Clearance
  • Phase 9: On-site Installation and Erection
  • Phase 10: Pre-commissioning and Testing
  • Phase 11: Commissioning and Start-up
  • Phase 12: Training and Handover
  • Phase 13: Post-Installation Support and Maintenance

Psa Oxygen Plant Installation Service Cost In Senegal

Installing a PSA (Pressure Swing Adsorption) oxygen plant in Senegal involves a range of costs influenced by several key factors. These factors determine the overall investment, from initial equipment purchase to final commissioning. Understanding these elements is crucial for accurate budgeting and project planning. The pricing will be in local currency, the West African CFA franc (XOF).

Plant Capacity (Nm³/h)Estimated Price Range (XOF)

Key Pricing Factors for PSA Oxygen Plant Installation in Senegal:

  • {"title":"Plant Capacity (Nm³/h)","description":"The most significant driver of cost is the desired oxygen output capacity, measured in Normal cubic meters per hour (Nm³/h). Larger capacity plants require more sophisticated and larger components, leading to higher equipment and installation expenses."}
  • {"title":"Purity Requirements","description":"The required purity of the generated oxygen (e.g., 93%, 95%, or higher for medical applications) impacts the complexity and cost of the PSA system. Higher purity often necessitates more adsorbent material and advanced control systems."}
  • {"title":"Technology Provider and Brand","description":"Different manufacturers offer varying levels of quality, reliability, and after-sales support, which are reflected in their pricing. Well-established international brands may come with a premium."}
  • {"title":"Automation and Control Systems","description":"The level of automation, from basic manual controls to fully integrated PLC (Programmable Logic Controller) systems with remote monitoring, will affect the overall cost. Higher automation generally leads to increased efficiency and reduced labor needs but at a higher upfront price."}
  • {"title":"Ancillary Equipment","description":"This includes essential components like air compressors, dryers (refrigerated or desiccant), air receivers, oxygen receivers, filters, and potential booster pumps. The specifications and brands of this equipment will add to the total cost."}
  • {"title":"Site Preparation and Civil Works","description":"Costs associated with preparing the installation site, including foundation work, building enclosures, electrical connections, and potential civil engineering for safety features, will vary depending on existing infrastructure and site conditions."}
  • {"title":"Logistics and Transportation","description":"Shipping the plant components to Senegal, import duties, taxes, and local transportation to the installation site are significant cost considerations."}
  • {"title":"Installation and Commissioning Labor","description":"The cost of skilled labor for assembling the plant, connecting utilities, testing, and commissioning the system will vary based on local labor rates and the complexity of the installation. This often includes the involvement of specialized engineers from the manufacturer."}
  • {"title":"Training","description":"Training for local personnel on the operation and maintenance of the PSA oxygen plant is usually included in the installation service cost or as a separate but necessary expense."}
  • {"title":"Warranty and After-Sales Support","description":"The duration and scope of the warranty, as well as ongoing technical support and spare parts availability, can influence the initial investment. Some packages may include initial spare parts."}

Affordable Psa Oxygen Plant Installation Service Options

Installing a PSA (Pressure Swing Adsorption) oxygen plant is a significant investment for healthcare facilities and industries. This guide explores affordable service options, focusing on value bundles and cost-saving strategies to make this essential technology accessible. We aim to empower you with knowledge to make informed decisions and optimize your budget without compromising on quality or reliability.

Value Bundle ComponentDescriptionCost-Saving Benefit
Standard Installation PackageIncludes basic plant setup, initial testing, and essential operational training for one to two staff members.Entry-level affordability, covers core installation needs.
Comprehensive Installation & Training BundleEncompasses standard installation, extended operational and basic maintenance training for multiple staff, and initial spare parts kit.Reduces future training costs, minimizes downtime through better in-house maintenance, proactive problem-solving.
Full-Service Lifecycle PackageIncludes installation, comprehensive training, extended warranty, annual preventive maintenance visits for a set period, and priority technical support.Predictable maintenance costs, maximized plant lifespan, significantly reduced risk of costly breakdowns, streamlined support.
Modular Plant InstallationInstallation of a pre-fabricated, modular PSA unit that requires minimal on-site construction and assembly.Faster installation time, reduced labor costs, less site disruption, easier relocation if needed.
Refurbished Plant InstallationInstallation of a professionally refurbished PSA oxygen plant that has undergone rigorous testing and certification.Significant upfront cost savings compared to new units, environmentally friendly option.

Key Considerations for Affordable PSA Oxygen Plant Installation

  • Understanding Your Oxygen Needs: Accurately assessing daily oxygen consumption is crucial for selecting the right plant capacity, avoiding overspending on an oversized unit or facing shortages with an undersized one.
  • Choosing the Right Plant Technology: While PSA is standard, variations exist. Understanding the nuances of different PSA configurations can lead to cost efficiencies.
  • Importance of a Reliable Supplier: Partnering with a reputable supplier offering comprehensive services, including installation, training, and ongoing maintenance, is vital for long-term cost savings.
  • Exploring Refurbished or Modular Options: For budget-conscious buyers, considering certified refurbished plants or modular designs can offer significant upfront cost reductions.
  • Financing and Leasing Options: Investigate available financing schemes or leasing agreements that can spread the cost over time, making it more manageable.
  • Local vs. International Suppliers: Evaluating the pros and cons of local installation services versus those offered by international manufacturers, considering shipping, travel, and support costs.
  • Training and Skill Development: Investing in adequate training for your in-house staff to handle basic operations and maintenance can reduce reliance on external technicians.
  • Energy Efficiency of the Plant: Newer, more energy-efficient PSA models, while potentially having a higher initial cost, can yield substantial savings on electricity bills over their lifespan.
  • Long-Term Maintenance Contracts: Negotiating a comprehensive, cost-effective long-term maintenance contract can prevent unexpected breakdowns and costly emergency repairs.
  • Scalability and Future-Proofing: Opting for a plant that can be scaled up or modified in the future can prevent the need for a complete replacement as your needs grow.

Verified Providers In Senegal

Navigating the healthcare landscape in Senegal can be challenging, especially when seeking trustworthy and qualified providers. This is where understanding the significance of verified credentials becomes paramount. Franance Health stands out as a beacon of reliability, offering a network of healthcare professionals whose qualifications have undergone rigorous scrutiny. Their commitment to verification ensures that patients receive care from practitioners who are not only experienced but also adhere to the highest standards of ethical and professional practice. Choosing Franance Health means opting for peace of mind, knowing you are in capable and legitimate hands.

Provider TypeTypical Verified CredentialsFranance Health Assurance
PhysiciansMedical Doctor (MD) degree, specialty board certifications, valid medical license from the Ministry of HealthConfirmation of MD, board certification validity, and active/unrestricted medical license.
NursesNursing diploma or degree, registration with the National Council of Nurses and Midwives, relevant certificationsVerification of nursing qualification, registration status, and specialized certifications.
Specialists (e.g., Cardiologists, Dermatologists)MD degree with postgraduate specialization in their field, often international fellowships or advanced trainingValidation of specialist training, degrees from recognized institutions, and proof of practice in their specialty.
PharmacistsPharmacy degree, license from the Order of Pharmacists of SenegalConfirmation of pharmacy degree and current registration with the professional order.
Therapists (e.g., Physiotherapists)Relevant degree in their therapy field, registration with relevant professional bodiesVerification of academic qualifications and professional registration.

Why Franance Health Credentials Matter:

  • Rigorous Verification Process: Franance Health doesn't just take credentials at face value. They employ a thorough vetting process to confirm the authenticity and validity of each healthcare provider's qualifications, licenses, and certifications.
  • Commitment to Quality Care: By ensuring providers meet stringent requirements, Franance Health guarantees a baseline of competence and expertise, directly translating to higher quality patient care.
  • Enhanced Patient Safety: Verified credentials minimize the risk of encountering unqualified or fraudulent practitioners, thereby enhancing patient safety and well-being.
  • Trust and Transparency: The verification process fosters trust between patients and providers, creating a transparent healthcare ecosystem where patients can make informed decisions.
  • Access to Specialized Expertise: Franance Health's network often includes specialists whose verified credentials assure patients of their advanced training and experience in specific medical fields.
  • Adherence to Ethical Standards: Beyond technical qualifications, Franance Health often looks for providers who demonstrate a commitment to ethical medical practices and patient-centered care.

Scope Of Work For Psa Oxygen Plant Installation Service

This Scope of Work (SOW) outlines the requirements for the installation service of a Pressure Swing Adsorption (PSA) Oxygen Plant. It details the technical deliverables, standard specifications, and responsibilities of the service provider to ensure a successful and compliant installation.

Technical DeliverableDescriptionStandard Specification/ReferenceAcceptance Criteria
Site Survey ReportDetailed assessment of the installation site, including accessibility, foundation requirements, utility availability, and potential hazards.Pre-defined site survey checklist, local building codes, environmental regulations.Report submitted and approved by the client prior to commencement of work.
Foundation Design and ConstructionDesign and construction of concrete foundations for the PSA oxygen plant skids, air receivers, and auxiliary equipment.Geotechnical survey report, structural engineering design standards (e.g., ACI 318), seismic considerations.Foundation dimensions, strength, and levelness verified against design specifications.
Skid Mounted Equipment InstallationRigging, lifting, and precise placement of PSA oxygen generator skids, compressor skids, and other pre-assembled units onto foundations.Manufacturer's installation manual, rigging best practices, safety regulations (e.g., OSHA).Equipment positioned accurately, plumb, and level as per manufacturer's drawings.
Piping Systems InstallationInstallation of all process piping, utility piping (compressed air, nitrogen, oxygen), and vent piping, including material sourcing, welding, and pressure testing.Relevant ASME, ASTM, and ANSI standards for materials and fabrication, client's piping and instrumentation diagrams (P&IDs).Piping integrity verified through hydrostatic/pneumatic testing, leak detection, and visual inspection. Welds meet quality standards.
Electrical Installation and WiringInstallation of main power supply, motor control centers (MCCs), local control panels, cabling, grounding, and lighting systems.NEC (National Electrical Code) or local equivalent, manufacturer's electrical schematics, project electrical design specifications.All electrical components properly installed, wired, grounded, and tested for continuity and insulation resistance.
Instrumentation and Control System InstallationInstallation of all sensors, transmitters, control valves, analyzers, and integration with the plant's Distributed Control System (DCS) or PLC.Manufacturer's instrumentation manuals, ISA standards (e.g., ISA RP75.06 for valve sizing), project control philosophy.Instrumentation calibrated, loop-checked, and functioning as per design intent and P&IDs.
Pre-Commissioning and System FlushingThorough cleaning of all piping systems, flushing with appropriate media to remove debris, and verification of system integrity.Manufacturer's recommendations, project cleaning and flushing procedures.System free from foreign material, flushing media analysis satisfactory, pressure holding capacity confirmed.
Commissioning and Start-upGradual start-up of the PSA oxygen plant, including air compressor, molecular sieve beds, and oxygen product withdrawal, ensuring stable operation.Manufacturer's commissioning procedures, project start-up sequence.Oxygen production meeting design purity, flow rate, and pressure specifications. All systems operating within normal parameters.
Performance TestingTesting of the PSA oxygen plant under various operating conditions to verify performance against guaranteed parameters.Manufacturer's performance test procedures, client's acceptance test criteria.Guaranteed oxygen purity, flow rate, and energy consumption met or exceeded. Plant stability demonstrated over defined period.
Operator Training ManualComprehensive documentation covering plant operation, troubleshooting, maintenance, and safety procedures.Manufacturer's operating manual, project-specific operational guidelines.Manual is clear, accurate, and covers all aspects of plant operation.
As-Built DrawingsUpdated drawings reflecting the final installed configuration of mechanical, electrical, and instrumentation systems.Project drawing standards, mark-ups from site installation.Accurate representation of installed equipment and systems.
Final Handover Documentation PackageCollection of all relevant documents, including manuals, test reports, certificates, and warranties, for official project handover.Client's project documentation requirements.Complete and organized documentation package approved by the client.

Key Phases of PSA Oxygen Plant Installation

  • Site Preparation and Civil Works
  • Equipment Delivery and Unloading
  • Mechanical Installation
  • Electrical Installation
  • Piping and Instrumentation Installation
  • System Testing and Commissioning
  • Operator Training
  • Documentation and Handover

Service Level Agreement For Psa Oxygen Plant Installation Service

This Service Level Agreement (SLA) outlines the terms and conditions for the installation service of a PSA Oxygen Plant provided by [Your Company Name] (hereinafter referred to as "Provider") to [Client Company Name] (hereinafter referred to as "Client"). This SLA specifies the response times for critical issues and the uptime guarantees for the installed plant once commissioned.

Issue CategoryDefinitionProvider Response Time (during business hours)Provider Resolution Time (target, excluding parts availability and Client access)Uptime Guarantee (Post-Commissioning)
Critical IssueComplete halt in oxygen production, immediate safety/operational risk.2 Hours8 Business HoursN/A (during installation/commissioning phase)
Major IssueReduced oxygen production capacity/quality, but operational.4 Business Hours24 Business HoursN/A (during installation/commissioning phase)
Minor IssueNon-critical malfunction, no significant impact on production.8 Business Hours48 Business HoursN/A (during installation/commissioning phase)
Operational StatusPSA Oxygen Plant operating as per specifications after commissioning.N/AN/A98% (excluding scheduled maintenance)

Key Definitions

  • Installation Period: The timeframe agreed upon for the physical installation and initial testing of the PSA Oxygen Plant.
  • Commissioning: The formal process of bringing the PSA Oxygen Plant into full operational status, including performance verification and handover to the Client.
  • Critical Issue: A failure or malfunction of the PSA Oxygen Plant that significantly impacts or completely halts oxygen production, posing an immediate risk to patient safety or critical operational processes.
  • Major Issue: A significant malfunction of the PSA Oxygen Plant that reduces oxygen production capacity or quality, but does not completely halt operations.
  • Minor Issue: A non-critical malfunction or operational inefficiency of the PSA Oxygen Plant that does not significantly impact oxygen production.
  • Response Time: The maximum time allowed for the Provider to acknowledge a reported issue and initiate troubleshooting or dispatch a technician.
  • Resolution Time: The maximum time allowed for the Provider to resolve a reported issue, restoring the PSA Oxygen Plant to its agreed-upon operational status.
  • Uptime Guarantee: The percentage of time the PSA Oxygen Plant is expected to be operational and performing within its specified parameters after successful commissioning.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your PSA Oxygen Plant Installation Service in Senegal project in Senegal.

Speak to Sales