
Radiology Room Design & Shielding Calculation in Senegal
Engineering Excellence & Technical Support
Turnkey room planning, shielding drawings and approvals for imaging suites. High-standard technical execution following OEM protocols and local regulatory frameworks.
Optimized Radiation Shielding for Diagnostic Imaging Centers
Engineered precise lead shielding calculations for X-ray rooms, CT scanners, and fluoroscopy suites in Senegal, ensuring compliance with national radiation safety standards and minimizing dose to staff and patients while maximizing diagnostic image quality.
Workflow-Centric Radiology Room Layouts
Designed functional and efficient radiology room layouts in Senegal, prioritizing patient throughput, staff ergonomics, and infection control. Integrated consideration for equipment placement, patient access, and observation areas for enhanced operational efficiency.
Site-Specific Shielding Analysis for Diverse Senegalese Healthcare Facilities
Conducted comprehensive site-specific radiation shielding analyses for a range of healthcare facilities across Senegal, from major hospitals to smaller clinics. Accounted for varying building materials, occupancy factors, and equipment types to deliver cost-effective and compliant shielding solutions.
What Is Radiology Room Design & Shielding Calculation In Senegal?
Radiology room design and shielding calculation in Senegal is a specialized engineering service focused on the planning, layout, and structural protection of diagnostic imaging facilities. This service ensures that radiation-exposed personnel, patients, and the general public are adequately protected from ionizing radiation emitted by medical imaging equipment, such as X-ray machines, CT scanners, and mammography units. The core of this service involves the precise determination of shielding materials and thicknesses required for walls, floors, ceilings, doors, and windows to attenuate radiation to permissible dose limits as defined by national and international radiation protection standards. This process integrates architectural considerations with radiation physics to create a safe, functional, and compliant imaging environment.
| Who Needs This Service? | Typical Use Cases | ||||
|---|---|---|---|---|---|
| Medical Institutions: Hospitals, clinics, diagnostic imaging centers, private practices in Senegal that are installing or upgrading radiology departments. | Radiologists and Technologists: To ensure their work environment meets safety standards and minimizes their radiation exposure. | Healthcare Facility Developers and Owners: For new construction projects or renovations involving medical imaging facilities. | Regulatory Bodies: For compliance verification and licensing of radiology facilities. | Equipment Manufacturers and Installers: To ensure their installations meet all safety and regulatory requirements. | |
| New Radiology Department Construction: Designing and shielding entire departments with multiple imaging modalities. | Installation of New X-ray, CT, or Mammography Equipment: Calculating shielding for specific rooms housing new devices. | Renovation or Expansion of Existing Radiology Facilities: Re-evaluating and updating shielding requirements for modified spaces. | Relocation of Radiology Equipment: Ensuring the new location is adequately shielded. | Establishing Interventional Radiology Suites: Requiring specialized shielding due to higher radiation doses and longer exposure times. | Veterinary Radiology Facilities: Though standards may differ, shielding is still essential. |
Key Components of Radiology Room Design & Shielding Calculation:
- Site Assessment and Requirements Gathering: Evaluating the proposed location, existing structures, and specific imaging modalities to be installed.
- Radiation Source Characterization: Identifying the type, energy, and workload of each radiation-producing equipment.
- Shielding Material Selection: Determining appropriate materials (e.g., lead, concrete, baryte concrete) based on radiation type and energy.
- Dose Limit Interpretation: Applying regulatory limits for occupational, public, and patient doses.
- Shielding Equation Application: Utilizing established physics formulas (e.g., NCRP Report No. 147, ICRP Publication 105) to calculate required shielding thicknesses.
- Layout and Workflow Optimization: Designing room dimensions, equipment placement, and patient/staff traffic flow for efficiency and safety.
- Integration with Architectural Plans: Collaborating with architects and contractors to ensure seamless incorporation of shielding into building construction.
- Quality Assurance and Verification: Providing documentation for regulatory compliance and potentially on-site verification of shielding effectiveness.
Who Needs Radiology Room Design & Shielding Calculation In Senegal?
Designing and calculating shielding for radiology rooms in Senegal is crucial for a range of healthcare facilities and professionals dedicated to providing safe and effective diagnostic imaging services. The primary goal is to protect both patients and medical staff from unnecessary radiation exposure while ensuring the integrity of diagnostic imaging equipment. This specialized service caters to institutions that are either establishing new radiology departments or upgrading existing ones to meet modern safety standards and regulatory requirements.
| Department/Facility Type | Primary Need | Specific Imaging Modalities |
|---|---|---|
| Public Hospitals | Ensuring radiation safety compliance for a high volume of patients, training new staff. | X-ray, CT, Fluoroscopy, Mammography, Ultrasound, basic Nuclear Medicine. |
| Private Hospitals & Clinics | Optimizing patient throughput, investing in advanced imaging technology, maintaining high service standards, and radiation safety. | X-ray, CT, MRI, Fluoroscopy, Mammography, Ultrasound, Interventional Radiology, potentially PET-CT. |
| Diagnostic Imaging Centers | Providing specialized imaging services efficiently and safely, attracting referrals through advanced technology and safety certifications. | CT, MRI, Digital X-ray, Mammography, Ultrasound, Bone Densitometry. |
| University Teaching Hospitals | Combines patient care with training and research; requires robust shielding for complex procedures and research protocols. | All standard modalities plus advanced CT/MRI for research, potentially Angiography suites. |
| Government Health Agencies | Regulatory oversight, policy development, ensuring national radiation safety standards are met across all facilities. | N/A (Focus on regulatory compliance of other facilities). |
| Veterinary Clinics | Safe imaging for animals, protecting veterinary staff. | X-ray, Ultrasound, potentially CT. |
Target Customers and Departments in Senegal
- Hospitals (Public and Private): These are the largest consumers, encompassing general hospitals, university teaching hospitals, and specialized medical centers. They require radiology services for a wide spectrum of patient needs, from emergency diagnostics to long-term treatment monitoring.
- Diagnostic Imaging Centers: Standalone facilities dedicated to providing radiology services to a broad patient base, often on referral from various clinics and hospitals.
- Clinics with Imaging Capabilities: Smaller healthcare providers that may offer basic X-ray or ultrasound services and are looking to expand or improve their imaging safety protocols.
- Government Health Ministries and Agencies: Responsible for setting and enforcing radiation safety regulations, they may require expertise for new facility approvals, inspections, and national guidelines.
- Radiology Departments: The core beneficiaries within any healthcare institution. This includes services utilizing X-ray, CT scanners, MRI (though not directly radiation shielding, room design is critical), fluoroscopy, mammography, and interventional radiology.
- Nuclear Medicine Departments: While not always considered traditional radiology, these departments deal with radioactive isotopes and require specialized room design and shielding for patient treatment and diagnostic procedures.
- Veterinary Hospitals and Clinics: Increasingly, veterinary practices are investing in advanced imaging equipment, necessitating appropriate room design and shielding for animal patients and staff.
- Research Institutions and Universities: Facilities conducting research involving medical imaging or radiation science, requiring compliant and safe laboratory and imaging environments.
Radiology Room Design & Shielding Calculation Process In Senegal
This document outlines the comprehensive process for designing radiology rooms and calculating shielding requirements, specifically tailored to the context of Senegal. It covers the workflow from the initial client inquiry to the final execution and commissioning of the facility. The process emphasizes adherence to international best practices and local regulations (where applicable) to ensure radiation safety and optimal diagnostic imaging performance.
| Phase | Key Activities | Key Considerations (Senegal Context) | Deliverables | Responsible Parties |
|---|---|---|---|---|
| Initial consultation with the client (hospital, clinic). Understanding the scope of services, intended modalities (X-ray, CT, MRI, etc.), patient volume, and budget. Gathering architectural plans, if available. | Local healthcare infrastructure, availability of skilled personnel, regulatory compliance requirements, potential for future expansion. | Project brief, preliminary scope of work, understanding of client needs. | Client (Hospital/Clinic), Project Manager, Sales/Consulting Team |
| On-site visit to evaluate the proposed location. Assessing structural integrity, power supply, ventilation, existing utilities, accessibility, and potential for radiation leakage. Collaborating with the client's architect/engineer. | Building materials commonly used in Senegal, local climate considerations (temperature, humidity), accessibility for large equipment delivery. | Site assessment report, preliminary architectural integration recommendations. | Project Manager, Architect/Engineer (Client's), Radiation Protection Specialist |
| Determining the required shielding (lead, concrete, etc.) for walls, floors, ceilings, and doors based on the selected imaging equipment, workload, occupancy factors, and relevant dose limits (international standards like ICRP are primary, local regulations secondary). | Availability and cost of shielding materials (lead sheeting, concrete). Expertise in local construction methods for integrating shielding. Understanding potential for seismic activity affecting structural integrity of shielding. | Detailed shielding design report, material specifications, shielding thickness calculations. | Radiation Protection Specialist, Medical Physicist, Structural Engineer |
| Selecting appropriate imaging equipment based on clinical needs and budget. Developing detailed room layouts, including positioning of the X-ray tube, detector, patient table, control console, and patient/staff areas. Ensuring ergonomic workflow. | Availability of specific equipment models and after-sales service in Senegal. Power and cooling requirements of equipment. | Equipment list, room layout drawings, workflow diagrams. | Radiologist/Clinician, Medical Physicist, Equipment Supplier, Project Manager |
| Producing comprehensive technical drawings, including architectural plans, electrical schematics, mechanical drawings, and radiation shielding details. Developing a detailed project execution plan. | Clarity and detail to ensure accurate interpretation by local construction teams. Documentation in commonly understood formats. | Final architectural and engineering drawings, construction specifications, project schedule. | Architect/Engineer, Radiation Protection Specialist, Project Manager |
| Sourcing and procuring all necessary materials, including shielding materials, construction supplies, and imaging equipment. Managing logistics for delivery to the site in Senegal. | Reliability of local suppliers, import regulations and customs clearance, transportation infrastructure within Senegal. | Procurement plan, ordered materials and equipment. | Procurement Department, Project Manager, Logistics Coordinator |
| Executing the construction and installation of the radiology room according to the approved drawings and specifications. This includes structural work, installation of shielding, electrical and mechanical systems, and the imaging equipment. | Availability of skilled construction labor in Senegal. Supervision to ensure quality and adherence to shielding specifications. Coordination with local authorities for permits. | Physically constructed radiology room, installed equipment. | Construction Contractors, Equipment Installers, Project Manager, Site Supervisors |
| Conducting rigorous quality control checks throughout the construction and installation process. This includes verification of shielding integrity, radiation leakage tests, electrical safety tests, and equipment performance checks. | Independent verification of shielding effectiveness. Ensuring equipment functions optimally under local environmental conditions. | Quality control reports, test results, radiation surveys. | Radiation Protection Specialist, Medical Physicist, Quality Control Team, Client Representative |
| Final commissioning of the radiology room and equipment. This involves a comprehensive review of all systems, a final radiation safety assessment, and training of the client's personnel on equipment operation and safety procedures. Formal handover to the client. | Ensuring operational readiness and user competency. Providing ongoing support mechanisms. | Commissioning report, final radiation safety certificate, user training records, project completion certificate. | Project Manager, Medical Physicist, Radiation Protection Specialist, Equipment Supplier, Client |
Radiology Room Design & Shielding Calculation Process in Senegal: Workflow
- Inquiry & Requirements Gathering
- Site Assessment & Architectural Integration
- Radiation Protection Design (Shielding Calculations)
- Equipment Specification & Layout
- Technical Drawings & Documentation
- Procurement & Material Sourcing
- Construction & Installation
- Quality Control & Testing
- Commissioning & Final Handover
Radiology Room Design & Shielding Calculation Cost In Senegal
Designing and shielding a radiology room in Senegal involves several key considerations that influence the overall cost. These include the complexity of the room, the type and energy of the radiation-producing equipment, the chosen shielding materials, local labor rates, and regulatory compliance. The cost is typically presented in local currency, the West African CFA franc (XOF).
Pricing Factors:
- Room Size and Layout: Larger rooms and more intricate layouts require more materials and labor for construction and shielding.
- Equipment Type and Energy: Different radiological modalities (X-ray, CT, MRI, PET, etc.) emit radiation at varying energies and intensities, dictating the required thickness and type of shielding. Higher energy equipment necessitates more robust shielding.
- Shielding Materials: Common materials include lead, concrete, and sometimes specialized baryte plaster. The cost of these materials, their availability in Senegal, and the labor required for installation are significant factors.
- Labor Costs: Skilled labor for architectural design, construction, and specialized radiation shielding installation will vary based on local market rates.
- Architectural and Engineering Fees: Professional services for design, planning, and ensuring compliance with national and international safety standards.
- Regulatory Compliance and Certification: Costs associated with obtaining permits, inspections, and certifications from relevant Senegalese health and nuclear regulatory bodies.
- Ventilation and HVAC Systems: Radiology rooms often require specialized ventilation to manage heat generated by equipment and maintain a sterile environment, adding to the cost.
- Electrical and Data Cabling: Robust electrical infrastructure and data connectivity for medical imaging equipment are essential.
- Project Management: The cost of overseeing the entire project from conception to completion.
Cost Ranges (Estimates in XOF):
It's crucial to note that these are estimates and actual costs can vary significantly. Obtaining quotes from local contractors and consultants is highly recommended.
Small to Medium X-ray Room (e.g., general radiography, dental):
- Design & Planning: 300,000 - 1,000,000 XOF
- Shielding Materials (Lead lining, concrete): 700,000 - 2,500,000 XOF
- Labor (Construction & Shielding Installation): 500,000 - 1,500,000 XOF
- Regulatory Fees & Certification: 200,000 - 500,000 XOF
- Total Estimated Range: 1,700,000 - 5,500,000 XOF
CT Scan Room:
- Design & Planning: 500,000 - 1,800,000 XOF
- Shielding Materials (Thicker concrete, lead considerations): 1,500,000 - 5,000,000 XOF
- Labor (Construction & Shielding Installation): 1,000,000 - 3,000,000 XOF
- Regulatory Fees & Certification: 400,000 - 1,000,000 XOF
- Total Estimated Range: 3,400,000 - 10,800,000 XOF
MRI Room (Note: MRI shielding is primarily for RF, not radiation, but structural requirements are significant):
- Design & Planning (RF shielding expertise needed): 800,000 - 3,000,000 XOF
- RF Shielding Materials (Copper, specialized panels): 3,000,000 - 10,000,000+ XOF
- Structural Reinforcement & Labor: 1,500,000 - 5,000,000 XOF
- Regulatory Fees & Certification: 300,000 - 800,000 XOF
- Total Estimated Range: 5,600,000 - 18,800,000+ XOF
Important Considerations for Senegal:
- Import Duties: Imported shielding materials (like lead sheeting) may incur significant import duties and taxes, increasing the overall cost.
- Local Expertise: While international standards are followed, relying on local architects and construction firms with experience in healthcare facilities is crucial for cost-effectiveness and timely completion.
- Negotiation: Prices for materials and labor can often be negotiated, especially for larger projects.
- Phased Approach: For budget-constrained projects, a phased approach to room development might be considered.
It is essential to consult with qualified professionals in Senegal for accurate and project-specific cost estimations.
| Room Type/Equipment | Estimated Design & Planning (XOF) | Estimated Shielding Materials (XOF) | Estimated Labor (Construction & Installation) (XOF) | Estimated Regulatory Fees & Certification (XOF) | Total Estimated Range (XOF) |
|---|---|---|---|---|---|
| Small/Medium X-ray Room | 300,000 - 1,000,000 | 700,000 - 2,500,000 | 500,000 - 1,500,000 | 200,000 - 500,000 | 1,700,000 - 5,500,000 |
| CT Scan Room | 500,000 - 1,800,000 | 1,500,000 - 5,000,000 | 1,000,000 - 3,000,000 | 400,000 - 1,000,000 | 3,400,000 - 10,800,000 |
| MRI Room (RF Shielding Focus) | 800,000 - 3,000,000 | 3,000,000 - 10,000,000+ | 1,500,000 - 5,000,000 | 300,000 - 800,000 | 5,600,000 - 18,800,000+ |
Key Factors Influencing Radiology Room Design & Shielding Costs in Senegal
- Room Size and Layout
- Equipment Type and Radiation Energy
- Shielding Material Selection (Lead, Concrete, Baryte Plaster)
- Local Labor Rates and Availability
- Architectural and Engineering Design Fees
- Regulatory Compliance and Certification Expenses
- Ventilation and HVAC System Requirements
- Electrical and Data Infrastructure
- Project Management Overhead
- Import Duties on Specialized Materials
Affordable Radiology Room Design & Shielding Calculation Options
Designing and outfitting a radiology room involves significant investment, particularly concerning radiation shielding and specialized equipment. However, with strategic planning and smart choices, substantial cost savings can be achieved without compromising safety or diagnostic efficacy. This guide explores affordable radiology room design principles, crucial shielding calculation options, the benefits of value bundles, and practical cost-saving strategies.
| Shielding Calculation Option | Description | Cost Implication (Relative) |
|---|---|---|
| Standard Lead Shielding | Traditional, highly effective, but can be expensive and heavy. Requires precise calculations based on workload, distance, and occupancy factors. | High |
| Lead-Lined Drywall | Pre-fabricated panels with lead sheeting integrated into drywall. Easier and faster installation than separate lead sheets, but can be more costly per square foot. | Medium-High |
| Baryte Plaster (High-Density Concrete) | A dense concrete mix containing barium sulfate. Effective for certain radiation types and can be a cost-effective alternative to lead in some applications, especially for larger areas. | Medium |
| Concrete Block Walls | Thickened concrete block walls can provide significant shielding. Requires careful structural consideration and can be less precise than lead-based methods for specific attenuation requirements. | Medium-Low |
| Computational Modeling (e.g., Monte Carlo) | Advanced software-based simulation. Highly accurate, allows for optimization of shielding thickness and material. Can be cost-effective by preventing over-shielding and enabling the use of less material. | Low (after initial software/expertise investment) |
| Vendor-Provided Shielding Design | Often bundled with equipment purchase. Can be convenient but may not always be the most cost-optimized solution if not independently reviewed. | Variable (often included in bundle cost) |
Key Considerations for Affordable Radiology Room Design & Shielding
- {"title":"Smart Layout & Space Optimization","description":"Minimize the overall footprint. Efficiently arrange equipment, control areas, and patient waiting spaces to reduce construction and shielding material requirements. Consider multi-purpose areas where feasible."}
- {"title":"Shielding Material Selection","description":"Lead is the traditional standard, but explore alternatives or complementary materials like concrete, drywall with lead-lined inserts, or specialized baryte plaster. The choice depends on the type and energy of radiation and required attenuation levels."}
- {"title":"Shielding Calculation Strategies","description":"Accurate calculations are paramount for safety and cost-effectiveness. Over-shielding is expensive and unnecessary. Utilize qualified medical physicists and consider different calculation methodologies to determine precise shielding needs."}
- {"title":"Value Bundles & Package Deals","description":"Many vendors offer integrated packages that include equipment, installation, and sometimes even initial shielding design consultation. These bundles can lead to significant discounts and streamlined procurement."}
- {"title":"Phased Development & Future-Proofing","description":"If budget is a major constraint, consider a phased approach. Design the room with future expansion or equipment upgrades in mind, allowing for easier retrofitting later and avoiding costly structural changes down the line."}
- {"title":"Equipment Sourcing & Refurbishment","description":"Explore options for certified refurbished equipment. This can provide significant savings on expensive imaging modalities while still meeting diagnostic standards. Ensure thorough inspection and warranty."}
- {"title":"Energy Efficiency & Longevity","description":"Invest in energy-efficient lighting and HVAC systems for long-term operational cost savings. Choose durable, low-maintenance materials for the room finishes."}
Verified Providers In Senegal
Finding healthcare providers in Senegal who are both qualified and trustworthy is paramount. Franance Health stands out as a leading platform for verified healthcare professionals, offering a transparent and reliable way to connect with the best medical expertise in the country. Their rigorous credentialing process ensures that all listed providers meet high standards of education, experience, and ethical practice, providing patients with the peace of mind they deserve.
| Benefit of Choosing Verified Providers (via Franance Health) | Impact on Patient Experience |
|---|---|
| Access to Qualified Specialists | Ensures receiving care from professionals with the right expertise for specific medical needs. |
| Reduced Risk of Medical Errors | Minimizes the likelihood of encountering unqualified or improperly trained individuals. |
| Increased Confidence in Treatment | Builds trust in the healthcare system and the prescribed treatment plans. |
| Efficient Healthcare Navigation | Simplifies the process of finding the right doctor or facility. |
| Peace of Mind | Provides reassurance that you are in safe and capable hands. |
Why Franance Health Credentials Matter:
- Rigorous Verification: Franance Health employs a multi-faceted verification process that includes checking medical licenses, educational qualifications, professional certifications, and references.
- Experience Validation: They go beyond basic credentials to assess the practical experience and specialization of each healthcare provider.
- Commitment to Quality: By prioritizing verified professionals, Franance Health upholds a commitment to delivering high-quality healthcare services.
- Patient Safety: The platform's focus on verification significantly enhances patient safety by reducing the risk of encountering unqualified practitioners.
- Transparency and Trust: Franance Health fosters trust by offering a transparent view of provider credentials, empowering patients to make informed decisions.
Scope Of Work For Radiology Room Design & Shielding Calculation
This Scope of Work (SOW) outlines the requirements for the design of a radiology room, including radiation shielding calculations, to ensure compliance with all applicable safety standards and regulations. The project aims to create a functional, safe, and efficient environment for diagnostic imaging procedures.
| Phase | Activity | Key Considerations | Standard Specifications/Guidelines |
|---|---|---|---|
| Design & Planning | Room Layout and Equipment Placement | Patient flow, operator safety, equipment size, service access, infection control. | Architectural best practices, accessibility standards (ADA/local equivalents). |
| Design & Planning | Radiation Shielding Calculations | X-ray tube potential (kVp), workload (mA-min/week), distance, occupancy factor, beam direction, primary/secondary barriers. | NCRP Report No. 147, ICRP Publication 143, local radiation safety regulations. |
| Design & Planning | Shielding Material Specification | Lead equivalence, density, fire rating, structural integrity. | ASTM standards for lead sheeting, concrete specifications, manufacturer data. |
| Design & Planning | Electrical & Mechanical Systems | Power requirements for imaging equipment, UPS, ventilation rates, air changes per hour (ACH), temperature/humidity control. | NFPA 70 (NEC), ASHRAE standards, local building codes. |
| Design & Planning | Lighting Design | Illumination levels for diagnostic tasks, ambient lighting, dimmable options, color rendering index (CRI). | IES Lighting Handbook, healthcare facility design guidelines. |
| Design & Planning | Acoustic Design | Sound transmission class (STC) for walls and doors, background noise levels. | ASTM E90, local building codes for noise control. |
| Documentation | Compliance Report | Summarize calculations, material specifications, and adherence to regulations. | Regulatory body requirements, licensing documentation. |
| Implementation | Material Procurement | Quality control of shielding materials, timely delivery. | Manufacturer certifications, material testing reports. |
| Implementation | Construction & Installation | Proper installation of shielding, verification of lead continuity, quality assurance checks. | Contractor's adherence to design drawings and specifications. |
| Implementation | Post-Installation Verification | Radiation surveys to confirm shielding effectiveness, final inspections. | Radiation safety officer (RSO) protocols, regulatory inspection requirements. |
Key Deliverables and Standard Specifications
- Detailed architectural drawings for the radiology room layout, including equipment placement, patient access, and control booth.
- Comprehensive radiation shielding calculations for all walls, doors, windows, and viewing areas, based on intended equipment, workload, and occupancy factors.
- Specification of shielding materials (e.g., lead, concrete) and their required thicknesses.
- Electrical and mechanical system design integration, considering the specific needs of radiology equipment and safety requirements.
- HVAC design for optimal temperature and humidity control to protect equipment and ensure patient comfort.
- Lighting design for both general illumination and task-specific lighting within the radiology suite.
- Acoustic design to minimize noise transmission into and out of the radiology room.
- Compliance documentation, demonstrating adherence to relevant national and international radiation safety standards (e.g., NCRP, ICRP, local regulatory bodies).
- Bill of Quantities (BOQ) for all materials and components specified in the design.
- Construction administration and site supervision during the implementation phase.
Service Level Agreement For Radiology Room Design & Shielding Calculation
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Radiology Room Design & Shielding Calculation service. It defines the expected performance levels and recourse in the event of service degradation.
| Service Component | Response Time (Business Hours) | Uptime Guarantee | Downtime Notification & Resolution |
|---|---|---|---|
| Initial Design Consultation Request Acknowledgment | 4 Business Hours | N/A (Service Initiation) | N/A |
| Delivery of Preliminary Design Concepts | 5 Business Days (following receipt of all required information) | N/A (Project Milestone) | N/A |
| Shielding Calculation Request Acknowledgment | 4 Business Hours | N/A (Service Initiation) | N/A |
| Delivery of Draft Shielding Calculations & Report | 7 Business Days (following receipt of all required information) | N/A (Project Milestone) | N/A |
| Response to Design/Calculation Clarification Requests | 8 Business Hours | 99.5% Availability of Communication Channels (Email, Phone, Portal) | Scheduled maintenance announced 24 hours in advance. Unscheduled downtime requires notification within 2 business hours and resolution target within 8 business hours. |
| Review and Incorporation of Client Feedback (Minor Revisions) | 3 Business Days (per revision cycle) | 99.5% Availability of Communication Channels | Scheduled maintenance announced 24 hours in advance. Unscheduled downtime requires notification within 2 business hours and resolution target within 8 business hours. |
| Availability of Design/Calculation Documentation Portal (if applicable) | N/A | 99.9% Uptime | Scheduled maintenance announced 24 hours in advance. Unscheduled downtime requires notification within 2 business hours and resolution target within 4 business hours. |
Service Scope
- Design consultation and schematic development for radiology rooms, including equipment placement and workflow optimization.
- Comprehensive shielding calculations based on provided room parameters, equipment specifications, and regulatory requirements (e.g., NCRP, ICRP).
- Production of detailed shielding reports, including material specifications and thickness recommendations.
- Review and revision of designs and calculations based on client feedback and minor scope adjustments.
- Technical support during the design and construction phases related to the provided documentation.
Frequently Asked Questions

Ready when you are
Let's scope your Radiology Room Design & Shielding Calculation in Senegal project in Senegal.
Scaling healthcare logistics and technical systems across the entire continent.

