
Modular Operating Theater (OT) Design & Build Coordination Service in Nigeria
Engineering Excellence & Technical Support
Modular Operating Theater (OT) Design & Build Coordination Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Rapid Deployment & Scalability
Leverage pre-fabricated modular components for significantly reduced construction timelines in Nigeria, enabling faster operational readiness. Our agile approach ensures scalability, allowing for easy expansion or adaptation of OT capacity to meet fluctuating healthcare demands.
Precision Engineering & Quality Assurance
Benefit from factory-controlled precision manufacturing of OT modules, adhering to international standards for sterility, infection control, and patient safety. Rigorous quality assurance at every stage of design and build coordination guarantees a defect-free, high-performance facility.
Integrated Project Management & Local Expertise
Experience seamless project execution through our integrated design and build coordination service. We bridge international modular expertise with in-depth knowledge of Nigerian construction regulations, supply chains, and site conditions for optimized efficiency and compliance.
What Is Modular Operating Theater (Ot) Design & Build Coordination Service In Nigeria?
A Modular Operating Theater (OT) Design & Build Coordination Service in Nigeria refers to a specialized, integrated approach to the planning, design, and construction of adaptable and rapidly deployable operating room environments. This service emphasizes pre-fabrication, standardization, and efficient project management to deliver high-quality, compliant OT facilities with reduced timelines and costs compared to traditional construction methods. It encompasses the coordination of all aspects of the project, from conceptualization and regulatory adherence to the final commissioning and handover.
| Who Needs This Service | Typical Use Cases | ||||
|---|---|---|---|---|---|
| Tertiary & Secondary Hospitals (Public & Private): Requiring expansion or upgrading of existing surgical capacity or establishment of new surgical units. | New Hospital Developments: Seeking rapid deployment of state-of-the-art surgical facilities to meet immediate healthcare demands. | Specialty Clinics & Surgical Centers: Needing dedicated, high-specification OT environments for specific medical disciplines (e.g., cardiology, orthopedics, neurosurgery). | Emergency Response & Disaster Relief Scenarios: Where rapid establishment of temporary or semi-permanent surgical units is critical. | Healthcare Institutions in Remote or Underserved Areas: Where traditional construction may be logistically challenging or time-prohibitive. | Hospitals undergoing Renovation or Reconstruction: Needing to minimize disruption to existing services while integrating new OT capabilities. |
| Rapid Deployment of Surgical Capacity: Addressing acute shortages in surgical services or preparing for public health emergencies. | Cost-Effective Construction & Predictable Timelines: Achieving project completion within budget and defined schedules through standardized modules and efficient assembly. | Enhanced Infection Control & Safety Standards: Implementing advanced HVAC systems, seamless finishes, and robust safety protocols from the design stage. | Flexibility & Future Adaptability: Designing OTs that can be reconfigured or expanded to accommodate evolving surgical technologies and specialties. | Integration of Advanced Medical Technology: Seamless incorporation of imaging equipment, robotic surgical systems, and complex IT infrastructure. | Improved Building Performance & Sustainability: Utilizing pre-fabricated components can lead to reduced waste and more controlled construction processes. |
Key Components of Modular OT Design & Build Coordination Services
- Needs Assessment & Feasibility Study: Initial analysis of hospital requirements, patient flow, surgical specialties, and site constraints to determine the optimal modular OT configuration and scope.
- Conceptual Design & Space Planning: Development of preliminary layouts, considering workflow, infection control, equipment integration, and patient safety in accordance with international standards (e.g., HTM, FGI) and Nigerian healthcare regulations.
- Detailed Engineering Design: Production of comprehensive architectural, structural, mechanical, electrical, and plumbing (MEP) designs, specifically tailored for modular construction and integration within existing or new hospital structures.
- Material & Component Selection: Identification and procurement of pre-fabricated modular units, specialized OT materials (e.g., anti-microbial surfaces, radiation shielding), medical gas systems, and advanced audiovisual/IT infrastructure.
- Manufacturing Oversight: Close collaboration with modular fabrication facilities to ensure adherence to design specifications, quality control, and timely production of OT modules.
- On-Site Assembly & Installation Coordination: Management of the logistics and execution of installing pre-fabricated modules on-site, including civil works, utility connections, and system integration.
- Regulatory Compliance & Certification: Ensuring all design and construction phases meet relevant Nigerian healthcare facility regulations, building codes, and international best practices for sterile environments.
- Commissioning & Validation: Rigorous testing and validation of all installed systems (HVAC, lighting, medical gases, electrical, IT) to guarantee optimal performance, safety, and compliance before operational handover.
- Project Management & Stakeholder Communication: Centralized coordination of all project phases, managing timelines, budgets, risk assessment, and facilitating clear communication among hospital administration, clinical staff, design teams, manufacturers, and construction crews.
Who Needs Modular Operating Theater (Ot) Design & Build Coordination Service In Nigeria?
Modular Operating Theater (OT) Design & Build Coordination Service in Nigeria is a crucial offering for a specific segment of healthcare providers and institutions. This service focuses on the specialized planning, design, and construction of advanced, sterile, and highly functional operating environments, often utilizing prefabricated modular components. The coordination aspect is vital, ensuring seamless integration of medical equipment, utilities, and finishes, while adhering to strict international standards and local regulations. The need arises from the desire for faster project completion, higher quality construction, improved infection control, and greater flexibility compared to traditional construction methods for operating theaters.
| Customer Segment | Key Needs | Relevant Departments |
|---|---|---|
| New Hospital Developments | State-of-the-art facilities, rapid deployment, adherence to international standards. | All surgical, critical care, and support departments. |
| Existing Hospitals (Expansion/Renovation) | Minimal disruption, phased construction, upgrading to modern standards. | Surgical departments, critical care, infection control, biomedical engineering. |
| Specialized Surgical Centers | Tailored OT design for specific procedures, advanced technology integration. | Specialty surgical departments, anesthesia, imaging, CSSD. |
| Government/Public Health Institutions | Cost-effectiveness, long-term durability, improved patient care outcomes. | All core medical and surgical departments. |
| Private Healthcare Groups | Brand consistency, operational efficiency, competitive advantage. | Surgical, critical care, imaging, CSSD, infection control. |
| Tertiary/Teaching Hospitals | Research capabilities, advanced training environments, complex surgical needs. | All surgical specialties, research labs, advanced imaging, anesthesia. |
Who Needs Modular OT Design & Build Coordination Service in Nigeria? Target Customers and Departments
- Target Customers:
- 1. New Hospital Developments: Greenfield projects requiring state-of-the-art surgical facilities from inception.
- 2. Existing Hospitals Undergoing Expansion or Renovation: Facilities looking to upgrade or expand their surgical capacity with minimal disruption.
- 3. Specialized Surgical Centers: Institutions focusing on specific surgical disciplines that demand advanced and tailored OT environments.
- 4. Government and Public Health Institutions: Hospitals managed by federal, state, or local governments seeking to modernize their surgical infrastructure.
- 5. Private Healthcare Groups and Chains: Companies investing in expanding their network of hospitals or improving the quality of their existing facilities.
- 6. Tertiary and Teaching Hospitals: Institutions involved in complex surgeries, research, and medical education requiring cutting-edge OT technology.
- 7. Medical Tourism Facilitators: Hospitals aiming to attract international patients by offering world-class surgical facilities.
- 8. Organizations with Corporate Social Responsibility (CSR) Initiatives: Companies funding healthcare improvements in underserved communities.
- Target Departments:
- 1. Surgical Departments (General Surgery, Orthopedics, Neurosurgery, Cardiothoracic, etc.): The primary beneficiaries, requiring specialized OT environments for various procedures.
- 2. Emergency Departments: For immediate surgical interventions in critical situations.
- 3. Intensive Care Units (ICUs): Often co-located or integrated with OT services for post-operative care.
- 4. Anesthesia Departments: Integral to OT operations, requiring specific infrastructure and equipment integration.
- 5. Sterilization and CSSD (Central Sterile Supply Department): Essential for maintaining the sterility of the OT environment and instruments.
- 6. Imaging Departments (Radiology, CT, MRI): Particularly relevant for intra-operative imaging requirements and integration.
- 7. Biomedical Engineering Departments: Responsible for the maintenance and integration of complex medical equipment within the OT.
- 8. Infection Control Departments: Crucial for designing and ensuring the highest standards of hygiene and infection prevention within the OTs.
Modular Operating Theater (Ot) Design & Build Coordination Service Process In Nigeria
This document outlines the comprehensive workflow for our Modular Operating Theater (OT) Design & Build Coordination Service in Nigeria, guiding clients from their initial inquiry to the final execution and handover of a state-of-the-art modular OT.
| Phase | Key Activities | Deliverables/Outcomes | Typical Timeline (Nigeria) |
|---|---|---|---|
| 1. Inquiry & Initial Consultation | Client expresses interest via phone, email, or website form. Initial discussion to understand project scope, budget, and timeline. Site visit (if feasible) for preliminary assessment. | Confirmation of service engagement. Preliminary understanding of client's requirements. | 1-3 Business Days |
| 2. Needs Assessment & Conceptualization | Detailed site survey and analysis. In-depth consultation to define functional requirements, medical equipment needs, workflow, infection control standards, and aesthetic preferences. Development of preliminary design concepts and floor plans. | Detailed Site Survey Report. Functional Requirements Document. Conceptual Design Drawings (floor plans, elevations). Preliminary Budget Estimate. | 1-2 Weeks |
| 3. Design Development & Approvals | Detailed architectural, structural, mechanical, electrical, and plumbing (MEP) design. Integration of specialized OT systems (air filtration, lighting, medical gases, imaging integration). Value engineering and material selection. Submission for client approval and relevant regulatory body approvals (e.g., Ministry of Health, SON, NAFDAC where applicable). | Detailed Design Drawings (all disciplines). Technical Specifications. Bill of Quantities (BOQ). Project Schedule. Regulatory Approval Applications. | 4-8 Weeks (dependent on approval cycles) |
| 4. Procurement & Manufacturing Coordination | Sourcing and procurement of all modular OT components, specialized equipment, and finishes. Coordination with manufacturers for production schedules, quality control, and pre-assembly checks. Securement of all necessary import/export permits if applicable. | Procurement Orders. Manufacturing Schedules. Quality Control Reports. Delivery Logistics Plan. | 6-12 Weeks (concurrent with site prep) |
| 5. Site Preparation & Logistics | Preparation of the installation site, including necessary civil works, utility connections, and access routes. Coordination of transportation and logistics for modular components to the site. Ensuring site safety and security. | Site Readiness Report. Civil Works Completion. Utility Connection Confirmation. Logistics & Transportation Plan. | 4-6 Weeks (concurrent with procurement) |
| 6. Modular OT Installation & Integration | On-site assembly and installation of modular OT panels, flooring, ceiling, and integrated systems. Connection of MEP services. Installation of medical equipment and integrated technologies. Strict adherence to design specifications and safety protocols. | Completed Modular OT Structure. Integrated MEP Systems. Installed Medical Equipment. Site Safety Audit Report. | 2-4 Weeks |
| 7. Commissioning, Testing & Training | Comprehensive testing of all systems (HVAC, air filtration, lighting, medical gases, electrical safety, communication). Validation of performance against design specifications and international standards. Training for hospital staff on the operation and maintenance of the new OT. Final inspections by regulatory bodies. | Commissioning Reports. Performance Test Results. Validation Certificates. Training Manuals. Staff Training Completion Records. Final Regulatory Approvals. | 1-3 Weeks |
| 8. Handover & Post-Installation Support | Formal handover of the completed modular OT to the client. Provision of as-built drawings, operation and maintenance manuals, and warranties. Discussion of ongoing maintenance and support packages. Follow-up on any minor rectifications. | Project Handover Certificate. As-Built Drawings. O&M Manuals. Warranty Documentation. Post-Installation Support Plan. | Ongoing (initial follow-up within 1-2 Weeks of handover) |
Service Workflow: Modular Operating Theater (OT) Design & Build Coordination in Nigeria
- Phase 1: Inquiry & Initial Consultation
- Phase 2: Needs Assessment & Conceptualization
- Phase 3: Design Development & Approvals
- Phase 4: Procurement & Manufacturing Coordination
- Phase 5: Site Preparation & Logistics
- Phase 6: Modular OT Installation & Integration
- Phase 7: Commissioning, Testing & Training
- Phase 8: Handover & Post-Installation Support
Modular Operating Theater (Ot) Design & Build Coordination Service Cost In Nigeria
The cost of Modular Operating Theater (OT) Design & Build Coordination Services in Nigeria is a complex equation influenced by several key factors. These services are crucial for ensuring the efficient and compliant construction of modern OT facilities, adhering to international standards and local regulations. The pricing is not static and can vary significantly based on the project's scale, complexity, and the specific requirements of the healthcare institution. Factors such as the size and number of operating rooms, the level of technological integration, the specific materials and finishes chosen, and the duration of the project all play a significant role in determining the overall cost.
| Service Component | Estimated Cost Range (NGN) | Notes |
|---|---|---|
| Initial Consultation & Feasibility Study | 500,000 - 2,000,000 | Includes site assessment, needs analysis, and preliminary planning. |
| Conceptual Design & Space Planning | 1,000,000 - 5,000,000 | Developing the overall layout, flow, and functional requirements of the OT. |
| Detailed Design & Engineering Drawings | 3,000,000 - 15,000,000+ | Includes architectural, mechanical, electrical, and plumbing (MEP) designs, specialized OT systems (air filtration, lighting). |
| Tender Documentation & Contractor Selection Support | 500,000 - 2,500,000 | Preparing bid documents and assisting in evaluating contractor proposals. |
| Construction Phase Coordination & Supervision | 5-10% of Total Construction Cost | On-site presence, progress monitoring, quality control, issue resolution. This is often a percentage-based fee. |
| Equipment Integration & Commissioning Support | 1,000,000 - 7,000,000+ | Ensuring seamless integration of medical equipment and system testing. |
| Regulatory Approvals & Handover Support | 300,000 - 1,500,000 | Assisting with necessary permits and final project handover. |
| Turnkey Project Management (Design, Build, and Coordination) | 10-20% of Total Project Cost | A comprehensive service package covering all aspects of the project. |
Key Pricing Factors for Modular OT Design & Build Coordination Services in Nigeria:
- {"item":"Project Scope and Complexity:","details":"The number and size of operating rooms, the inclusion of ancillary spaces (e.g., sterile processing, recovery rooms, staff lounges), and the overall complexity of the design (e.g., specialized surgical suites, hybrid ORs) will directly impact the service cost. More complex projects require more extensive planning and coordination."}
- {"item":"Level of Technological Integration:","details":"The inclusion of advanced medical equipment, integrated IT systems, digital imaging, robotic surgery capabilities, and sophisticated HVAC systems will increase the design and coordination effort, thus affecting the price. The vendor's expertise in integrating these technologies is also a factor."}
- Materials and Finishes:
- Specialized antimicrobial wall panels, seamless flooring, advanced lighting systems, and custom cabinetry are often required for OTs and can vary in cost, influencing the coordination budget.
- Regulatory Compliance and Certification:
- Ensuring adherence to Nigerian healthcare facility regulations, international standards (e.g., HTM, ASHRAE), and obtaining necessary certifications adds to the coordination workload and thus the cost.
- Duration and Timeline:
- Accelerated project timelines or extended project durations can influence the coordination fees. Projects requiring intensive on-site supervision over a longer period may incur higher costs.
- Vendor Experience and Reputation:
- More experienced and reputable firms with a proven track record in designing and coordinating complex healthcare facilities may command higher fees due to their expertise and the assurance of quality delivery.
- Geographic Location within Nigeria:
- While less of a primary driver than other factors, the logistical challenges and cost of travel for the coordination team to specific remote locations in Nigeria might subtly influence the final quote.
Affordable Modular Operating Theater (Ot) Design & Build Coordination Service Options
Our Affordable Modular Operating Theater (OT) Design & Build Coordination Service offers a flexible and cost-effective approach to establishing state-of-the-art surgical facilities. We understand the critical need for high-quality, safe, and efficient operating spaces, particularly in resource-constrained environments. Our service focuses on streamlining the design, procurement, and construction phases through modularization and expert coordination, delivering significant value and savings compared to traditional builds.
| Service Component | Description | Value Proposition / Cost Saving |
|---|---|---|
| Design & Conceptualization | Initial planning, space allocation, and functional layout based on chosen bundle. | Optimized space utilization (saving on footprint), tailored to specific needs, reducing rework. |
| Modular Unit Fabrication | Off-site construction of pre-fabricated OT modules adhering to strict quality and safety standards. | Reduced on-site labor costs, faster installation, controlled environment for higher quality. |
| Medical Equipment Integration | Coordination of procurement and installation of essential and/or advanced surgical equipment. | Leveraged supplier relationships for better pricing, faster integration due to standardized interfaces. |
| HVAC & Environmental Control | Design and installation of specialized air handling systems for sterile environments. | Energy-efficient systems, reduced risk of contamination, compliant with medical standards. |
| Lighting & Power Systems | Installation of specialized OT lighting and reliable power distribution. | Improved surgical visibility, enhanced patient safety, minimal downtime. |
| Finishing & Infection Control | Application of hygienic, durable, and easy-to-clean interior finishes. | Reduced long-term maintenance costs, improved infection control, extended lifespan of the OT. |
| Project Management & Coordination | End-to-end oversight from design to handover, ensuring seamless execution. | Minimized project delays and cost overruns, single point of accountability, streamlined communication. |
| Commissioning & Validation | Thorough testing and certification of all systems to ensure operational readiness. | Guaranteed performance and compliance, peace of mind for operational safety. |
Value Bundles & Cost-Saving Strategies
- Value Bundle 1: 'Essential OT' - For facilities requiring core surgical functionality with a focus on essential equipment and efficient layouts. This bundle prioritizes critical medical systems and standard, reliable components.
- Value Bundle 2: 'Advanced OT' - Incorporates enhanced diagnostic and imaging integration, advanced ventilation, and a broader range of specialized surgical equipment. This bundle offers a higher level of technological sophistication.
- Value Bundle 3: 'Custom OT Suite' - A fully customizable solution tailored to specific surgical specialties, complex procedures, and unique facility requirements. This bundle offers maximum flexibility and bespoke integration.
- Cost-Saving Strategy 1: Modular Prefabrication - Off-site construction of OT modules significantly reduces on-site disruption, labor costs, and weather-related delays. This also allows for higher quality control and standardization.
- Cost-Saving Strategy 2: Standardized Component Integration - Utilizing pre-engineered and readily available medical equipment and finishing materials reduces custom fabrication costs and lead times.
- Cost-Saving Strategy 3: Streamlined Procurement - Our established relationships with suppliers and our expertise in bulk purchasing for modular components lead to better pricing and faster delivery.
- Cost-Saving Strategy 4: Optimized Space Utilization - Intelligent modular design ensures maximum efficiency in space planning, minimizing wasted areas and reducing the overall footprint and associated construction costs.
- Cost-Saving Strategy 5: Reduced Project Timelines - The parallel processing of off-site module fabrication and on-site preparation dramatically shortens the overall project duration, leading to faster ROI and reduced management overhead.
- Cost-Saving Strategy 6: Predictive Budgeting & Risk Mitigation - Our detailed design and planning process minimizes unforeseen issues and cost overruns. We offer transparent pricing and robust risk management throughout the project lifecycle.
Verified Providers In Nigeria
In Nigeria's burgeoning healthcare landscape, access to verified and trustworthy healthcare providers is paramount. Franance Health stands out as a beacon of reliability, offering a meticulously curated network of healthcare professionals and facilities. This commitment to verification ensures patients receive the highest standard of care, free from the anxieties often associated with an unregulated market. Franance Health's rigorous credentialing process, combined with their patient-centric approach, makes them the undeniable best choice for all your healthcare needs in Nigeria.
| Franance Health Credentialing Process | Benefits for Patients |
|---|---|
| Thorough background checks on medical licenses and qualifications. | Peace of mind knowing you are receiving care from legitimate and qualified professionals. |
| Verification of professional experience and areas of specialization. | Ensured access to specialists best suited for your specific health condition. |
| Assessment of facility accreditations and adherence to safety standards. | Confidence in the quality and safety of the medical environments you visit. |
| Ongoing monitoring of provider performance and patient feedback. | Continuous improvement in healthcare delivery and a consistently high standard of care. |
| Emphasis on ethical practices and patient confidentiality. | Trust and respect for your personal health information and well-being. |
Why Franance Health is Your Best Choice:
- Unwavering commitment to verification and credentialing of all healthcare providers.
- Access to a comprehensive network of specialists, general practitioners, and medical facilities across Nigeria.
- Focus on patient safety, quality of care, and transparent pricing.
- User-friendly platform for easy appointment booking and access to medical records.
- Dedicated customer support to address all your healthcare queries and concerns.
Scope Of Work For Modular Operating Theater (Ot) Design & Build Coordination Service
This Scope of Work (SOW) outlines the services for Modular Operating Theater (OT) Design & Build Coordination, encompassing the detailed technical deliverables and standard specifications required for successful project execution. The objective is to ensure a seamlessly integrated, compliant, and high-performing modular OT solution.
| Phase | Key Activities | Technical Deliverables | Standard Specifications (Examples) | ||||
|---|---|---|---|---|---|---|---|
| Design & Engineering | Conceptual Design Review, Detailed Design Development, Structural Analysis, MEP Design Integration, Medical Gas System Design, IT & AV Integration, Infection Control Design. | 3D BIM Model, Architectural Drawings, Structural Drawings, MEP Schematics (HVAC, Electrical, Plumbing), Medical Gas Layouts, IT & AV Infrastructure Plan, Infection Control Strategy Report, Material Submittals. | ISO 14644-4 (Cleanrooms), ASHRAE 170 (Ventilation for Healthcare Facilities), NFPA 99 (Health Care Facilities Code), HTM 06-01 (Sterile Services Department), Local Building Codes, Client-Specific Equipment Requirements. | Material Specifications (e.g., anti-static flooring, non-porous wall finishes, antimicrobial surfaces). | Equipment Specifications (e.g., laminar flow units, surgical light compatibility, imaging integration). | Performance Criteria (e.g., air change rates, pressure differentials, noise levels). | Safety Standards (e.g., electrical safety, fire ratings). |
| Fabrication & Manufacturing | Off-site Fabrication Oversight, Quality Control Inspections during Manufacturing, Material Procurement Verification. | Fabrication Drawings, Weld Inspection Reports, Material Test Certificates, Factory Acceptance Test (FAT) Reports. | Adherence to approved material specifications and fabrication tolerances. Compliance with welding standards (e.g., AWS D1.1). | Dimensional accuracy within specified tolerances. | Surface finish quality as per specifications. | ||
| Site Preparation & Installation | Site Readiness Assessment, Foundation and Structural Interface Coordination, Modular Unit Installation, MEP & Medical Gas Connections, IT & AV Cabling. | Site Preparation Drawings, Installation Method Statements, Connection Details, As-Built MEP & Medical Gas Drawings, As-Built IT & AV Cabling Plans. | Compliance with structural load requirements. Waterproofing and sealing standards. Electrical grounding and bonding procedures. Medical gas piping standards (e.g., BS EN 737-1). | Integration protocols for various systems. | Field Acceptance Test (FAT) reports. | ||
| Commissioning & Handover | System Testing (HVAC, Electrical, Medical Gas, IT/AV), Performance Verification, User Training, Documentation Finalization. | Commissioning Plan, Commissioning Reports (HVAC, Electrical, Medical Gas, IT/AV), Performance Verification Reports, User Manuals, As-Built Documentation, Training Materials. | Performance benchmarks as defined in design specifications. Calibration certificates for critical equipment. | Sterilization and cleaning protocols. | Emergency power and backup system testing. |
Key Objectives and Deliverables
- Comprehensive design review and validation of modular OT system against client requirements and relevant standards.
- Coordination of all design disciplines (architectural, structural, MEP, medical gas, IT) for optimal integration.
- Development and enforcement of standard specifications for all materials, equipment, and finishes.
- Management of the modular OT fabrication and installation process to ensure quality and schedule adherence.
- Facilitation of commissioning, testing, and handover of the completed modular OT.
- Provision of detailed technical documentation and as-built drawings.
Service Level Agreement For Modular Operating Theater (Ot) Design & Build Coordination Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Modular Operating Theater (OT) Design & Build Coordination Service. This service focuses on facilitating efficient and timely project execution through proactive communication, issue resolution, and coordination between all stakeholders involved in the design and construction of modular operating theaters. The core objective is to minimize delays and ensure operational readiness within defined parameters.
| Service Component | Response Time Target | Uptime Guarantee (for coordination platform/communication channels) | Notes |
|---|---|---|---|
| Initial response to critical inquiries (e.g., design clashes, safety concerns) | Within 4 business hours | N/A | Critical issues require immediate attention. |
| Response to non-critical inquiries and requests for information (RFIs) | Within 1 business day | N/A | Ensures steady progress on less urgent matters. |
| Provision of updated project documentation and schedules | Within 2 business days of request or update | N/A | Timely information flow is crucial for coordination. |
| Coordination platform/communication channels (e.g., project management software, dedicated communication lines) | N/A | 99.5% availability | Downtime will be scheduled for maintenance with prior notification. Any unscheduled downtime will be addressed immediately. |
| Facilitation of stakeholder meetings (scheduling and follow-up) | Within 3 business days of request | N/A | Ensures timely alignment and decision-making. |
| Escalation of unresolved issues to senior management | Within 24 business hours of identification | N/A | For issues impacting critical path or significant cost/schedule. |
Scope of Service
- Design coordination: Ensuring seamless integration of architectural, engineering, and medical equipment designs.
- Procurement and logistics coordination: Facilitating timely ordering and delivery of modular components and equipment.
- On-site build coordination: Overseeing the assembly and installation process, ensuring adherence to design specifications and safety standards.
- Stakeholder communication: Maintaining clear and consistent communication channels between the client, designers, manufacturers, and construction teams.
- Issue identification and resolution: Proactively identifying potential roadblocks and facilitating swift resolution to minimize project impact.
- Quality assurance oversight: Supporting quality checks and validation throughout the design and build phases.
Frequently Asked Questions

Ready when you are
Let's scope your Modular Operating Theater (OT) Design & Build Coordination Service in Nigeria project in Nigeria.
Scaling healthcare logistics and technical systems across the entire continent.

