PSA Oxygen Plant Commissioning & Performance Testing Service in Niger
Engineering Excellence & Technical Support
PSA Oxygen Plant Commissioning & Performance Testing Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Optimized Oxygen Purity & Flow Rate
Successfully commissioned PSA oxygen plants in Niger, achieving guaranteed oxygen purity levels exceeding 93% and delivering consistent, reliable flow rates to meet critical medical and industrial demands. Our performance testing ensures peak efficiency from day one.
Robust System Integration & Site Adaptation
Expertly integrated and commissioned PSA oxygen generation systems tailored to Niger's unique environmental conditions and logistical challenges. Our rigorous testing verifies seamless operation across diverse site requirements and existing infrastructure.
Validated Performance & Safety Compliance
Conducted comprehensive performance testing and validation for PSA oxygen plants in Niger, adhering to international safety standards and ensuring optimal operational parameters. Our meticulous process guarantees reliability and long-term, safe oxygen supply.
What Is Psa Oxygen Plant Commissioning & Performance Testing Service In Niger?
PSA (Pressure Swing Adsorption) oxygen plant commissioning and performance testing service in Niger refers to the systematic process of verifying and validating the operational readiness, safety, and designed performance of a PSA oxygen generation unit installed within the country. This service ensures that the plant meets all specified technical parameters, safety standards, and regulatory requirements before being handed over for full operational use. It encompasses a series of integrated activities that confirm the system's ability to reliably produce oxygen at the required purity, flow rate, and pressure, while operating efficiently and safely within the Nigerien context. This typically involves pre-commissioning checks, functional tests, performance verification under simulated or actual load conditions, and comprehensive documentation.
| Who Needs This Service? | Typical Use Cases in Niger |
|---|---|
| Operators and owners of new PSA oxygen plants in Niger. | Medical facilities (hospitals, clinics) requiring reliable on-site oxygen generation for patient care, particularly in remote areas where supply chain reliability is a concern. |
| Companies undertaking plant expansions or modifications involving PSA oxygen units. | Industrial sectors (e.g., welding and cutting, chemical processing, water treatment) that utilize oxygen for their operations and require consistent, high-purity supply. |
| Regulatory bodies or third-party certifiers involved in the approval of industrial installations. | Mining operations that may use oxygen for smelting or other processing activities. |
| Engineering, Procurement, and Construction (EPC) contractors responsible for delivering operational plants. | Emergency response services and disaster relief operations that may deploy mobile PSA oxygen units for critical needs. |
| Maintenance and service providers responsible for ensuring the ongoing operational integrity of existing plants. | Research and development facilities requiring specific oxygen concentrations or volumes for experimental purposes. |
Key Components of PSA Oxygen Plant Commissioning & Performance Testing Service in Niger:
- Pre-commissioning Inspections: Verification of physical installation, electrical connections, piping integrity, and safety features according to design specifications and local regulations.
- System Integrity Checks: Leak testing of pneumatic and gas lines, pressure relief valve calibration, and functionality checks of control systems and instrumentation.
- Functional Testing: Activation and validation of individual components (compressors, dryers, valves, adsorbent beds) and subsystems (e.g., control logic, interlocks).
- Performance Verification: Measurement and validation of key performance indicators (KPIs) such as oxygen purity (e.g., >90% or >95%), production capacity (Nm³/hr), outlet pressure, dew point, and energy consumption against design guarantees.
- Safety Audits: Ensuring compliance with all relevant safety protocols, including emergency shutdown procedures, fire prevention measures, and hazardous area classifications, as per Nigerien industrial safety standards.
- Environmental Compliance: Assessment of emissions and waste management practices in accordance with any applicable environmental regulations in Niger.
- Operator Training and Familiarization: Providing hands-on training to plant operators and maintenance personnel on system operation, troubleshooting, and routine maintenance procedures.
- Documentation and Reporting: Generation of comprehensive commissioning reports, performance test certificates, as-built drawings, and operational manuals.
Who Needs Psa Oxygen Plant Commissioning & Performance Testing Service In Niger?
Companies and organizations operating in Niger that rely on a consistent and high-quality supply of medical or industrial oxygen need expert PSA (Pressure Swing Adsorption) Oxygen Plant Commissioning & Performance Testing Services. These services are crucial for ensuring that oxygen plants are installed correctly, operate efficiently, meet safety standards, and deliver oxygen at the required purity and flow rates. This is particularly important in sectors where reliable oxygen is critical for patient health or industrial processes.
| Target Customer Category | Key Departments Involved | Specific Needs Addressed by Services |
|---|---|---|
| Healthcare Facilities | Biomedical Engineering, Facilities Management, Anesthesiology, Intensive Care Units (ICUs), Pharmacy | Ensuring medical-grade oxygen purity, reliable supply for patient life support, compliance with health regulations, optimizing plant uptime, safety of oxygen delivery systems. |
| Industrial Gas Suppliers | Operations Management, Engineering, Quality Control, Maintenance, Production | Verifying production efficiency, confirming oxygen purity and flow rates meet specifications, ensuring operational safety, validating plant performance against design parameters, troubleshooting issues. |
| Mining and Metallurgy | Operations, Maintenance, Safety Officers, Production Engineering | Confirming oxygen quality for process efficiency, ensuring safe handling and storage of oxygen, validating plant reliability for continuous operations, meeting environmental and safety compliance. |
| Oil and Gas Sector | Maintenance & Reliability, Safety, Operations, On-site Medical Services | Ensuring oxygen availability for specialized applications, validating safety protocols, guaranteeing reliability for remote operations, supporting on-site medical requirements. |
| Manufacturing and Fabrication | Production Management, Maintenance, Quality Assurance, Health & Safety | Optimizing oxygen supply for welding and cutting processes, ensuring consistent oxygen quality for product integrity, verifying safety of oxygen handling and equipment. |
| Emergency Services & Disaster Relief | Logistics, Operations, Medical Support Teams | Rapid assessment and validation of temporary oxygen supply solutions, ensuring immediate availability and reliability during crisis situations. |
| Government & Public Health Agencies | Health Ministry (Procurement, Planning, Operations), Disaster Management Authority | Verifying national oxygen plant infrastructure, ensuring compliance with national standards, validating performance of public health oxygen sources, strategic resource management. |
| NGOs & International Aid | Program Management, Logistics, Health Program Coordinators | Commissioning oxygen plants for new or existing healthcare projects, validating the performance of donated or installed equipment, ensuring sustainable oxygen supply for development initiatives. |
Target Customers and Departments in Niger Requiring PSA Oxygen Plant Commissioning & Performance Testing Services
- {"title":"Healthcare Facilities","description":"Hospitals, clinics, and specialized medical centers that use oxygen for patient care, respiratory therapies, and critical life support."}
- {"title":"Industrial Gas Suppliers","description":"Companies that produce and distribute industrial gases, including oxygen, to various sectors. They need to ensure their production facilities are optimized and compliant."}
- {"title":"Mining and Metallurgy Operations","description":"Industries that utilize oxygen in processes like smelting, welding, and cutting, requiring a reliable and pure oxygen supply for efficiency and safety."}
- {"title":"Oil and Gas Sector","description":"Companies involved in exploration, production, and refining that may use oxygen in various on-site processes or for emergency medical needs."}
- {"title":"Manufacturing and Fabrication","description":"Businesses involved in metal fabrication, welding, and other industrial processes where oxygen is a key component."}
- {"title":"Emergency Services and Disaster Relief Organizations","description":"Organizations that may operate temporary medical facilities or require rapid deployment of oxygen supply during emergencies."}
- {"title":"Government and Public Health Agencies","description":"Entities responsible for public health infrastructure, managing national oxygen reserves, and ensuring the availability of medical oxygen."}
- {"title":"NGOs and International Aid Organizations","description":"Organizations involved in humanitarian efforts, particularly those focused on healthcare delivery and infrastructure development in remote or underserved areas."}
Psa Oxygen Plant Commissioning & Performance Testing Service Process In Niger
This document outlines the standard workflow for commissioning and performance testing of Pressure Swing Adsorption (PSA) Oxygen Plants in Niger. The process begins with an initial inquiry and concludes with the successful handover of the plant, ensuring it meets all specified performance criteria and operates reliably. Emphasis is placed on adherence to safety protocols, regulatory compliance, and client satisfaction throughout each stage.
| Stage | Description | Key Activities | Deliverables | Key Considerations (Niger Context) |
|---|---|---|---|---|
| Inquiry & Pre-qualification | Initial contact from client expressing interest in commissioning and performance testing services. | Receive and review client's request, understand plant specifications, location, and desired scope of work. Assess client's technical capabilities and financial standing. | Acknowledgement of inquiry, preliminary information gathering. | Understand local regulations regarding oxygen production and industrial operations. Identify any specific safety requirements prevalent in Niger. |
| Technical Proposal & Quotation | Developing a detailed proposal outlining the proposed approach, methodology, timeline, and cost. | Conducting a preliminary site visit (if possible/necessary). Developing a detailed technical solution, including scope of services, testing procedures, and risk assessment. Preparing a comprehensive cost quotation. | Technical proposal, detailed quotation, project schedule outline. | Sourcing local resources and understanding import/export regulations for specialized equipment or personnel. Factoring in logistical challenges and potential delays. |
| Contract Negotiation & Award | Formalizing the agreement between the service provider and the client. | Negotiating terms and conditions, payment schedules, scope of work, and responsibilities. Finalizing the contract. | Signed contract, agreed payment milestones. | Ensuring contract compliance with Nigerien labor laws and business practices. Understanding local dispute resolution mechanisms. |
| Project Planning & Mobilization | Detailed planning of all activities and deployment of resources to the site. | Developing a detailed project execution plan, including safety plans, quality assurance plans, and resource allocation. Obtaining necessary permits and visas. Mobilizing personnel, tools, and equipment to Niger. | Project execution plan, safety plan, quality plan, approved permits. | Navigating customs and import procedures for equipment. Arranging secure transportation and accommodation for personnel. Establishing communication channels with local authorities. |
| Pre-commissioning (Mechanical & Electrical) | Ensuring all plant components are installed correctly and functional before introducing process gases. | Performing mechanical checks (piping, valves, pumps, compressors, vessels). Performing electrical checks (wiring, motor controls, instrumentation, power supply). Performing integrity tests (hydrostatic, pneumatic). | Pre-commissioning checklists, installation verification reports, integrity test reports. | Ensuring availability of qualified local technicians for support. Verifying compatibility of electrical systems with local power grids. Adhering to specific safety standards for hazardous areas. |
| Commissioning (Functional & Process) | Bringing the plant online and verifying its ability to produce oxygen according to design parameters. | Introducing process gases (air). Step-by-step startup of PSA cycles. Verifying adsorption and desorption cycles. Adjusting operating parameters (pressure, temperature, flow rates). Testing safety interlocks and emergency shutdown systems. | Commissioning reports, operational parameter logs, functional test results. | Ensuring availability of necessary utilities (power, cooling water). Monitoring and managing potential environmental impacts. Implementing strict safety protocols for handling compressed gases. |
| Performance Testing | Quantitatively verifying that the plant meets all specified performance criteria. | Conducting tests to measure oxygen purity, production capacity, energy consumption, and product dew point under various operating conditions. Verifying adherence to ISO standards or client-specific requirements. Analyzing test data and generating performance reports. | Performance test reports, data analysis, certificate of performance. | Ensuring accurate calibration of testing equipment. Documenting all test results meticulously for legal and operational purposes. Engaging with local quality control agencies if required. |
| Training & Handover | Ensuring the client's personnel are capable of operating and maintaining the plant. | Conducting theoretical and practical training sessions on plant operation, maintenance, troubleshooting, and safety procedures. Providing comprehensive operating manuals and maintenance guides. Formal handover of the plant and all documentation. | Training records, operation & maintenance manuals, handover certificates. | Tailoring training materials to the client's technical background. Providing training in a language understood by the client's personnel. Ensuring availability of spare parts information. |
| Post-Commissioning Support | Providing ongoing support to the client after the initial handover. | Troubleshooting any initial operational issues. Providing remote or on-site support for any minor adjustments or unforeseen problems. Offering recommendations for optimization. | Support logs, incident reports, recommendations for improvement. | Establishing a clear communication protocol for ongoing support. Understanding potential challenges in accessing spare parts or specialized expertise remotely. |
| Project Closure | Finalizing all project activities and administrative tasks. | Completing final invoicing. Obtaining client sign-off on all deliverables. Archiving project documentation. Conducting a lessons learned session. | Final project report, final invoice, client satisfaction survey. | Ensuring all contractual obligations are met and all local administrative requirements for project closure are fulfilled. Respecting local business closure protocols. |
PSA Oxygen Plant Commissioning & Performance Testing Service Process in Niger - Workflow Stages
- Inquiry & Pre-qualification
- Technical Proposal & Quotation
- Contract Negotiation & Award
- Project Planning & Mobilization
- Pre-commissioning (Mechanical & Electrical)
- Commissioning (Functional & Process)
- Performance Testing
- Training & Handover
- Post-Commissioning Support
- Project Closure
Psa Oxygen Plant Commissioning & Performance Testing Service Cost In Niger
The cost of commissioning and performance testing services for a PSA (Pressure Swing Adsorption) oxygen plant in Niger is a complex calculation influenced by several key factors. These factors dictate the overall price, making it difficult to provide a single definitive figure. Understanding these elements is crucial for accurate budgeting and vendor selection. Factors affecting cost include the size and capacity of the oxygen plant (measured in Nm³/hr), the complexity of the plant's design and auxiliary systems, the geographical location within Niger (influencing logistics and accessibility), the required testing protocols and standards (e.g., ISO, specific client requirements), the duration of the commissioning and testing phases, and the experience and reputation of the service provider. Additional considerations include travel and accommodation expenses for the technical team, any specialized equipment or consumables needed for testing, and potential site-specific challenges like extreme weather conditions or limited infrastructure.
| Plant Capacity (Nm³/hr) | Estimated Service Cost Range (XOF - Central African CFA franc) | Notes |
|---|---|---|
| Up to 5 Nm³/hr (Small Scale) | 1,500,000 - 4,000,000 XOF | Includes basic commissioning, functional testing, and initial performance validation. May be more towards the higher end for remote locations or complex systems. |
| 5 - 20 Nm³/hr (Medium Scale) | 3,000,000 - 8,000,000 XOF | More in-depth performance testing, extended duration, and potentially more complex troubleshooting. Logistical costs become more significant. |
| 20 - 50 Nm³/hr (Large Scale) | 6,000,000 - 15,000,000 XOF | Comprehensive testing, including reliability runs, multiple product purity tests, and detailed documentation. Higher potential for extended site presence. |
| Over 50 Nm³/hr (Very Large Scale/Industrial) | 10,000,000+ XOF | Customized proposals based on specific project scope, plant integration, and stringent performance guarantees. Significant logistical and personnel costs. |
Key Pricing Factors for PSA Oxygen Plant Commissioning & Performance Testing in Niger
- Plant Capacity/Size (Nm³/hr): Larger plants naturally require more extensive testing and longer commissioning periods.
- Plant Complexity: Advanced features, multiple production lines, or integration with other systems increase complexity and cost.
- Geographical Location within Niger: Remote locations incur higher logistical costs (transport, accommodation, per diems).
- Testing Protocols & Standards: Adherence to international or specific client-mandated standards can influence the scope and duration of testing.
- Duration of Commissioning & Testing: The overall time spent on-site by the technical team is a direct cost driver.
- Service Provider's Experience & Reputation: Highly experienced and reputable firms often command higher fees, reflecting their expertise and reliability.
- Travel & Accommodation: Costs associated with flights, local transport, and lodging for the commissioning team.
- Specialized Equipment & Consumables: Requirement for specific testing instruments or materials not readily available on-site.
- Site-Specific Challenges: Environmental conditions (heat, dust), infrastructure limitations, and local labor availability can impact costs.
Affordable Psa Oxygen Plant Commissioning & Performance Testing Service Options
Securing affordable and reliable commissioning and performance testing for your PSA Oxygen Plant is crucial for its optimal operation and longevity. This service ensures your plant meets design specifications, operates efficiently, and delivers the purity and volume of oxygen required for your specific application. We offer flexible service options, including value bundles and strategic cost-saving measures, to cater to diverse project needs and budgets.
| Service Package | Inclusions | Target Audience | Estimated Cost Savings Strategy |
|---|---|---|---|
| Basic Commissioning & Testing | Essential functional and performance tests, safety system validation, and basic reporting. | Smaller scale plants, projects with strict budget constraints, or clients with in-house technical expertise. | Focus on core testing requirements, minimizing optional add-ons. Standardized testing protocols for efficiency. |
| Standard Commissioning & Testing Bundle | Includes Basic Package plus comprehensive performance analysis, troubleshooting assistance, and basic operator guidance. | Medium to large-scale plants, clients seeking a balance of thoroughness and cost-effectiveness. | Bundling services reduces individual service costs. Early engagement for streamlined planning and execution. |
| Premium Commissioning & Performance Assurance | Includes Standard Bundle plus advanced performance optimization, detailed root cause analysis for any deviations, and extended operator training. | Critical applications, high-volume production plants, clients requiring maximum uptime and guaranteed performance. | Proactive identification of potential issues reduces costly downtime later. Package discounts for comprehensive coverage. |
| On-Demand & Targeted Testing | Specific tests or troubleshooting assistance as needed, outside of full commissioning. | Existing plant owners requiring periodic checks, troubleshooting specific issues, or validation after modifications. | Pay only for the services required. Avoids unnecessary costs associated with full commissioning packages. |
Key Service Components:
- Pre-commissioning Checks: Verification of installed equipment, piping, electrical connections, and safety systems against design documentation.
- Functional Testing: Individual component and system testing to ensure proper operation and responsiveness.
- Performance Testing: Measuring key parameters such as oxygen purity, flow rate, pressure, and power consumption under various operating conditions.
- Safety System Validation: Rigorous testing of all safety interlocks, alarms, and emergency shutdown procedures.
- Documentation and Reporting: Comprehensive reports detailing test results, deviations, and recommendations for optimization.
- Operator Training (Optional): Basic training on plant operation, monitoring, and troubleshooting.
Verified Providers In Niger
In Niger, ensuring access to reliable and qualified healthcare providers is paramount. Franance Health stands out as a leading entity in credentialing and verifying healthcare professionals, offering a robust system that benefits both patients and practitioners. This verification process is not merely a formality; it's a critical step towards guaranteeing patient safety, enhancing the quality of care, and fostering trust within the healthcare ecosystem. By rigorously assessing the qualifications, experience, and ethical standing of medical professionals, Franance Health ensures that only the most competent and trustworthy individuals are listed and recognized within their network. This commitment to excellence translates directly into better health outcomes for individuals seeking medical attention in Niger, making Franance Health credentials a definitive mark of quality and reliability.
| Credential Aspect | Franance Health Verification Process | Benefit to Patients | Benefit to Providers |
|---|---|---|---|
| Education and Training | Verification of degrees, diplomas, and specialized training from accredited institutions. | Assurance of theoretical knowledge and foundational skills. | Recognition of academic achievements and specialized expertise. |
| Licensure and Registration | Confirmation of valid and current licenses to practice in Niger. | Confirmation that the provider is legally authorized to practice medicine. | Validation of professional standing and compliance with regulatory requirements. |
| Work Experience | Thorough review of professional history, including previous roles and durations. | Evidence of practical application of skills and experience in real-world settings. | Demonstration of practical competence and career progression. |
| Professional References | Contacting and evaluating references from peers, supervisors, or employers. | Insight into the provider's professional conduct and performance. | Opportunity to showcase positive professional relationships and performance. |
| Ethical Standing | Checks for any disciplinary actions, malpractice claims, or criminal records. | Protection against unethical practices and malfeasance. | Certification of good character and commitment to ethical practice. |
| Continuing Professional Development (CPD) | Verification of participation in ongoing training and education programs. | Ensures providers are up-to-date with the latest medical advancements. | Acknowledgement of commitment to lifelong learning and skill enhancement. |
Why Franance Health Credentials Represent the Best Choice:
- Unwavering Commitment to Patient Safety: Franance Health's stringent verification protocols are designed to identify and eliminate unqualified or fraudulent practitioners, directly safeguarding patient well-being.
- Ensuring High-Quality Care: By validating the expertise and experience of healthcare providers, Franance Health promotes access to top-tier medical services, leading to improved health outcomes.
- Building Trust and Transparency: The credentialing process fosters transparency, allowing patients to make informed decisions about their healthcare providers with confidence.
- Promoting Professional Accountability: Franance Health's recognition encourages providers to maintain high ethical standards and continuous professional development.
- Facilitating Access to Competent Professionals: Patients can easily identify and connect with verified healthcare professionals, streamlining the process of receiving necessary medical attention.
- Upholding International Standards: Franance Health's verification methods often align with global best practices in healthcare credentialing, ensuring a high level of integrity.
Scope Of Work For Psa Oxygen Plant Commissioning & Performance Testing Service
This Scope of Work (SOW) outlines the services required for the commissioning and performance testing of a Pressure Swing Adsorption (PSA) Oxygen Plant. The objective is to ensure the plant operates safely, reliably, and meets all specified performance criteria. This document details the technical deliverables, standard specifications, and testing methodologies to be employed.
| Activity | Description | Key Deliverables | Relevant Standard Specification |
|---|---|---|---|
| Pre-Commissioning Checks | Verification of installed equipment, piping, and structural integrity. Cleaning of vessels and lines. Lubrication of rotating equipment. Review of vendor manuals and drawings. | Mechanical Completion Certificate, Cleaning Certificates, Lubrication Records, Vendor Documentation Review Report | Client's Construction Standards, Vendor Specifications, Relevant ASME/API codes |
| Mechanical Completion Verification | Detailed inspection of all mechanical components, ensuring correct installation, alignment, and adherence to design specifications. Pressure testing of piping and vessels. | Mechanical Completion Report, Pressure Test Reports, Alignment Records | Client's Mechanical Completion Guidelines, ASME B31.3 (Process Piping), ASME Section VIII (Pressure Vessels) |
| Electrical & Instrumentation Checks | Verification of all electrical connections, power distribution, motor rotations, grounding, and instrumentation calibration. Functional testing of control loops and safety interlocks. | Electrical & Instrumentation Completion Report, Calibration Certificates, Loop Check Reports, Safety Interlock Test Reports | Client's Electrical & Instrumentation Standards, IEC 60079 (Explosive Atmospheres), ISA Standards |
| Pre-Start-up Safety Review (PSSR) | A systematic review to ensure all safety procedures, emergency response plans, and operational protocols are in place before initial start-up. | PSSR Report, Safety Procedure Review Document, Emergency Response Plan | Client's Safety Management System, OSHA Standards, HAZOP Study Recommendations |
| Initial Start-up & System Stabilization | Controlled start-up of the PSA unit, gradual pressurization, and stabilization of process parameters (adsorption, regeneration cycles). Verification of basic system functionality. | Start-up Log, Process Parameter Trending Reports, Initial System Stability Report | Vendor's Start-up Manual, Client's Operating Procedures |
| Performance Testing | Testing the PSA Oxygen Plant under various operating conditions to verify its capacity, purity, recovery rate, and energy consumption against design specifications. Includes steady-state testing. | Performance Test Report (including O2 Purity, Capacity, Recovery, Specific Energy Consumption), Test Data Sheets, Analysis Certificates | Client's Performance Guarantees, ISO 8573-1 (Compressed air - Part 1: Contaminants and purity classes), Relevant ASTM Standards for Gas Analysis |
| Acceptance & Handover | Formal review of all test results and documentation. Addressing any punch list items. Training of client personnel and final handover of the operational plant and documentation. | Final Acceptance Certificate, As-Built Drawings, Operations & Maintenance Manuals, Training Records | Client's Project Acceptance Criteria, Vendor's O&M Manual Guidelines |
Key Stages of Commissioning and Performance Testing
- Pre-Commissioning Checks
- Mechanical Completion Verification
- Electrical & Instrumentation Checks
- Pre-Start-up Safety Review (PSSR)
- Initial Start-up & System Stabilization
- Performance Testing
- Acceptance & Handover
Service Level Agreement For Psa Oxygen Plant Commissioning & Performance Testing Service
This Service Level Agreement (SLA) outlines the terms and conditions governing the commissioning and performance testing services provided by [Your Company Name] for your PSA Oxygen Plant, located at [Plant Location]. It details the expected response times for critical issues and the uptime guarantees for the plant during and after the commissioning and testing phases.
| Service Category | Response Time Guarantee (Business Hours) | Uptime Guarantee (During Testing Period) | Notes |
|---|---|---|---|
| Critical Issue (Plant Inoperable/Safety Hazard) | Within 2 hours of notification | N/A (Focus on immediate resolution) | Definition of 'Critical Issue' to be mutually agreed upon. Includes major equipment failure impacting safety or production. |
| High Priority Issue (Significant Performance Degradation) | Within 4 business hours of notification | 98% uptime during scheduled testing windows | Definition of 'High Priority Issue' to be mutually agreed upon. Includes issues affecting oxygen purity or flow significantly below specifications. |
| Medium Priority Issue (Minor Performance Deviation/Non-Critical Functionality) | Within 8 business hours of notification | 99% uptime during scheduled testing windows | Definition of 'Medium Priority Issue' to be mutually agreed upon. Includes issues with auxiliary systems or minor deviations within acceptable tolerances. |
| Low Priority Issue (Cosmetic/Documentation) | Within 24 business hours of notification | N/A (Not directly impacting operational uptime) | Issues that do not affect the core functionality or performance of the oxygen plant. |
| Post-Commissioning (During Warranty Period - Critical Issue) | Within 4 business hours of notification | 95% uptime (averaged over a month) | Applies to issues identified and reported within the agreed warranty period post-commissioning. |
| Post-Commissioning (During Warranty Period - Non-Critical Issue) | Within 16 business hours of notification | N/A (Focus on scheduled maintenance/resolution) | Applies to issues identified and reported within the agreed warranty period post-commissioning. |
Scope of Services
- Commissioning Services: Includes the initial setup, calibration, functional testing, and system integration of the PSA Oxygen Plant.
- Performance Testing: Encompasses a series of tests to verify the plant's ability to meet specified oxygen purity, flow rate, and pressure parameters under various operating conditions.
- On-site Support: Provision of qualified technicians and engineers during the agreed-upon commissioning and testing periods.
- Documentation: Delivery of detailed commissioning reports, performance test results, and operational manuals.
Frequently Asked Questions

Ready when you are
Let's scope your PSA Oxygen Plant Commissioning & Performance Testing Service in Niger project in Niger.