
PSA Oxygen Plant Installation Service in Namibia
Engineering Excellence & Technical Support
PSA Oxygen Plant Installation Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Expert Oxygen Plant Installation & Commissioning
Leveraging Namibia's unique climate and logistical challenges, our certified engineers provide seamless installation and rigorous commissioning of state-of-the-art PSA oxygen plants, ensuring reliable, on-demand medical-grade oxygen supply for healthcare facilities nationwide.
Robust Logistics & Site Preparation
We specialize in overcoming Namibia's vast distances. Our comprehensive service includes meticulous planning for transport, site survey, and preparation, guaranteeing efficient and safe delivery and installation of your PSA oxygen plant, even in remote locations.
Local Compliance & Long-Term Support
Navigating Namibian regulations with expertise, our installations adhere to all local standards. Beyond commissioning, we offer comprehensive training and proactive maintenance packages, ensuring the sustained optimal performance and longevity of your PSA oxygen plant investment.
What Is Psa Oxygen Plant Installation Service In Namibia?
PSA (Pressure Swing Adsorption) Oxygen Plant Installation Service in Namibia refers to the comprehensive process of designing, fabricating, supplying, installing, commissioning, and providing ongoing support for on-site oxygen generation systems utilizing PSA technology. These plants extract oxygen from ambient air by selectively adsorbing nitrogen and other impurities under pressure, followed by desorbing them at reduced pressure. The service encompasses all technical and logistical aspects necessary to bring a functional PSA oxygen plant into operation within Namibia's industrial and medical sectors.
| Who Needs PSA Oxygen Plant Installation Service? | Typical Use Cases |
|---|---|
| Medical Facilities: Hospitals, clinics, and healthcare centers requiring a reliable and continuous supply of medical-grade oxygen for patient care, especially in remote or underserved areas of Namibia. | Industrial Applications: Metal fabrication (welding, cutting), glass manufacturing, wastewater treatment, aquaculture, and chemical processes that utilize oxygen as a reactant or for enrichment. |
| Mining & Mineral Processing: Oxygen enrichment for combustion processes, froth flotation, and certain extraction techniques. | Emergency Services: Providing on-site oxygen generation for disaster relief efforts or temporary medical facilities. |
| Research & Development Laboratories: Requiring high-purity oxygen for specialized experimental setups. | Remote Operations: Oil and gas exploration or other industries operating in geographically isolated regions where a stable oxygen supply is critical. |
Key Components of PSA Oxygen Plant Installation Service:
- Site Assessment & Feasibility Study: Evaluating the client's oxygen demand, site conditions (space, power availability, environmental factors), and logistical considerations.
- System Design & Engineering: Tailoring the PSA oxygen plant to meet specific purity, flow rate, and pressure requirements, including selecting appropriate adsorbent materials, compressors, and control systems.
- Fabrication & Procurement: Manufacturing or sourcing all necessary components, including air compressors, dryers, filters, PSA adsorber vessels, buffer tanks, and control instrumentation.
- On-site Installation & Assembly: Erecting the plant, connecting all piping, electrical wiring, and control systems according to engineering specifications.
- Commissioning & Performance Testing: System startup, functional checks, calibration of instruments, and performance validation to ensure the plant meets design specifications for oxygen purity, flow, and reliability.
- Operator Training: Educating site personnel on the operation, maintenance, and troubleshooting of the PSA oxygen plant.
- Documentation & Certification: Providing comprehensive technical manuals, schematics, and any required local certifications.
- After-Sales Support & Maintenance: Offering ongoing technical assistance, spare parts, and scheduled maintenance services to ensure optimal plant performance and longevity.
Who Needs Psa Oxygen Plant Installation Service In Namibia?
In Namibia, organizations requiring reliable and on-site oxygen supply are prime candidates for PSA (Pressure Swing Adsorption) oxygen plant installation services. These plants offer a cost-effective and independent solution for generating medical-grade oxygen, eliminating the logistical challenges and expenses associated with traditional cylinder delivery.
| Target Customer Segment | Key Departments/Applications |
|---|---|
| Healthcare Facilities | Intensive Care Units (ICUs), Operating Theaters, Emergency Rooms, General Wards, Respiratory Therapy, Anesthesia |
| Mining Operations | Welding, Cutting, Smelting, Material Processing, Safety Applications |
| Industrial Manufacturing | Welding, Fabrication, Metal Cutting, Chemical Processes, Heat Treatment |
| Research & Development | Laboratory Gas Supply, Analytical Instrumentation, Controlled Atmosphere Experiments |
| Emergency Services/Disaster Relief | Mobile Oxygen Units, Field Hospitals, Life Support |
| Veterinary Services | Anesthesia, Respiratory Support, Post-operative Care |
| Aviation/Aerospace | Maintenance, Testing (if applicable) |
| Water Treatment | Oxidation Processes, Aeration |
| Food & Beverage | Modified Atmosphere Packaging (MAP) |
Target Customers and Departments for PSA Oxygen Plant Installation in Namibia:
- Healthcare Facilities: Hospitals, clinics, and specialized medical centers are the primary beneficiaries. Ensuring a continuous and ample supply of medical oxygen is critical for patient care, especially in critical care units, operating theaters, and for patients with respiratory conditions.
- Mining Operations: The mining industry in Namibia often requires oxygen for various applications, including welding, cutting, and certain chemical processes. On-site PSA plants provide a consistent and readily available oxygen source, improving operational efficiency and safety.
- Industrial Manufacturing: Businesses involved in welding, fabrication, metal cutting, and other industrial processes that utilize oxygen can benefit from the independence and cost savings of a PSA plant. This is particularly relevant for larger operations with high oxygen consumption.
- Research and Development Institutions: Universities and research facilities that conduct experiments requiring a controlled oxygen atmosphere or for analytical purposes can utilize PSA technology.
- Emergency Services and Disaster Relief: Organizations responsible for emergency response and disaster management can deploy mobile or fixed PSA units to provide vital oxygen support in remote or disaster-stricken areas.
- Veterinary Clinics and Animal Hospitals: Similar to human healthcare, animal care facilities require oxygen for anesthesia, respiratory support, and post-operative care for animals.
- Aviation and Aerospace (if applicable): While less common in Namibia, any facilities involved in aviation maintenance or training that require oxygen for specific applications would be potential clients.
- Water Treatment Facilities: Certain water purification processes may involve the use of oxygen. PSA plants can offer an efficient on-site solution.
- Food and Beverage Industry: In some specific food processing applications, oxygen can be used for Modified Atmosphere Packaging (MAP) to extend shelf life. While not a primary driver, it's a potential niche.
Psa Oxygen Plant Installation Service Process In Namibia
This document outlines the comprehensive workflow for PSA Oxygen Plant Installation Services in Namibia, covering the entire process from initial client inquiry to final project execution and handover. Our aim is to provide a transparent and efficient service, ensuring our clients receive a high-quality, reliable oxygen supply.
| Phase | Key Activities | Deliverables/Outcomes |
|---|---|---|
| Inquiry & Consultation | Client inquiry, information gathering, initial consultation, needs assessment. | Understanding of client requirements, preliminary project scope. |
| Site Survey & Proposal | Site survey, data analysis, design, proposal preparation, negotiation. | Detailed technical proposal, cost estimate, project timeline, signed contract. |
| Contract, Procurement & Logistics | Contract signing, advance payment, equipment procurement, shipping, site preparation. | Ordered and delivered equipment, prepared installation site. |
| Installation & Commissioning | Equipment delivery, mechanical/electrical installation, pre-commissioning, system commissioning, performance validation. | Fully installed and operational PSA oxygen plant, verified performance. |
| Training & Handover | Operator/maintenance training, documentation, formal handover, final payment, warranty commencement. | Trained client personnel, complete project documentation, operational plant with warranty. |
PSA Oxygen Plant Installation Service Process in Namibia
- {"steps":[{"name":"Client Inquiry","details":"Client contacts us via phone, email, or our website, expressing interest in PSA oxygen plant solutions."},{"name":"Information Gathering","details":"We gather preliminary information about the client's requirements, including desired oxygen purity, flow rate, daily consumption, intended application (e.g., medical, industrial), available space, and power supply."},{"name":"Initial Consultation & Needs Assessment","details":"A consultation is scheduled, either virtually or in-person, to delve deeper into the client's specific needs, discuss potential PSA technology options, and understand any site-specific constraints or preferences. This phase helps us determine the feasibility and preliminary scope of the project."}],"title":"Phase 1: Inquiry and Initial Consultation","description":"The process begins with an initial inquiry from a potential client in Namibia interested in PSA oxygen plant installation."}
- {"steps":[{"name":"Site Survey","details":"Our technical team visits the client's site in Namibia to conduct a thorough survey. This includes assessing the installation location, measuring dimensions, checking structural integrity, evaluating access for equipment delivery, confirming utility connections (power, water, compressed air if applicable), and identifying any potential installation challenges."},{"name":"Data Analysis and Design","details":"Upon returning from the site survey, the collected data is analyzed. Our engineering team develops preliminary plant design concepts and selects the most appropriate PSA technology and equipment based on the client's requirements and site conditions."},{"name":"Detailed Proposal Preparation","details":"A comprehensive proposal is prepared, which includes a detailed technical specification of the proposed PSA oxygen plant, estimated oxygen output, required utilities, a site preparation plan, a project timeline, a breakdown of costs (equipment, installation, commissioning, training), warranty information, and payment terms."},{"name":"Proposal Presentation and Negotiation","details":"The detailed proposal is presented to the client. We engage in discussions to address any questions, clarify technical details, and negotiate terms to reach a mutually agreeable contract."}],"title":"Phase 2: Site Survey and Detailed Proposal","description":"Following the initial consultation, a comprehensive site assessment is conducted to gather all necessary data for designing and quoting the installation."}
- {"steps":[{"name":"Contract Signing and Advance Payment","details":"The formal installation service agreement is signed by both parties. An advance payment is typically required to initiate procurement and project commencement."},{"name":"Equipment Procurement","details":"We procure the necessary PSA oxygen plant components, ancillary equipment, and materials from our reputable suppliers. This includes ensuring compliance with Namibian import regulations and standards."},{"name":"Logistics and Shipping","details":"Arrangements are made for the transportation of equipment and materials from the manufacturing/supplier location to the client's site in Namibia. This involves managing customs clearance, shipping, and local transportation."},{"name":"Site Preparation by Client","details":"Based on the site preparation plan provided in the proposal, the client undertakes necessary civil works, electrical connections, and other preparatory measures at the installation site."}],"title":"Phase 3: Contract, Procurement, and Logistics","description":"Once the proposal is accepted and the contract is signed, the procurement and logistical arrangements commence."}
- {"steps":[{"name":"Equipment Delivery and Unloading","details":"All procured equipment and materials are delivered to the client's site. Our team supervises the safe unloading and placement of components."},{"name":"Mechanical and Electrical Installation","details":"Our experienced technicians and engineers perform the physical installation of the PSA oxygen generator, air preparation units, storage systems, piping, electrical wiring, and control systems according to the approved design and blueprints."},{"name":"Pre-Commissioning Checks","details":"Before energizing the system, thorough pre-commissioning checks are conducted. This includes verifying all connections, inspecting for any damage during transit, and ensuring all safety devices are in place."},{"name":"System Commissioning","details":"The plant is progressively powered up and tested. This involves functional testing of all components, pressure testing, leak detection, and initial operation to achieve the specified oxygen purity and flow rate. Adjustments and fine-tuning are made as necessary."},{"name":"Performance Verification and Validation","details":"The plant's performance is rigorously tested and validated against the contract specifications. Oxygen purity, flow rate, and pressure are measured and documented. This may involve independent testing if required by the client or regulatory bodies."}],"title":"Phase 4: Installation and Commissioning","description":"This is the core phase where the PSA oxygen plant is physically installed and brought online."}
- {"steps":[{"name":"Operator and Maintenance Training","details":"Comprehensive training is provided to the client's designated personnel on the operation, routine maintenance, troubleshooting, and safety procedures for the PSA oxygen plant. Training materials and manuals are provided."},{"name":"Documentation and Handover","details":"All relevant documentation, including user manuals, maintenance logs, test certificates, warranty documents, and as-built drawings, are compiled and handed over to the client. A formal handover meeting is conducted to confirm project completion and client satisfaction."},{"name":"Final Payment and Warranty Commencement","details":"Upon successful handover and client acceptance, the final payment is processed. The warranty period for the installed system commences at this stage."},{"name":"Post-Installation Support and Monitoring","details":"We offer ongoing support and can arrange for periodic maintenance and performance monitoring services as per the service agreement, ensuring the long-term reliability and efficiency of the oxygen plant."}],"title":"Phase 5: Training and Handover","description":"The final stages involve ensuring the client's personnel are trained to operate and maintain the plant, followed by formal project handover."}
Psa Oxygen Plant Installation Service Cost In Namibia
Installing a PSA (Pressure Swing Adsorption) oxygen plant in Namibia involves a range of costs influenced by several critical factors. These include the plant's capacity (measured in Nm³/hr or L/min), the purity level of the oxygen required (typically 90-95%), the level of automation and features, the chosen manufacturer, transportation and logistics to the installation site in Namibia, site preparation requirements, installation labor, commissioning and testing, and any necessary ongoing maintenance agreements. Local economic conditions, import duties, and currency fluctuations also play a significant role. For smaller, self-contained units, costs might be on the lower end, while larger, custom-designed systems with advanced controls will naturally command higher prices. It is crucial to obtain detailed quotes from reputable suppliers who have experience with installations in Namibia to get an accurate cost estimation.
| Plant Capacity Range (Nm³/hr) | Estimated Cost Range (NAD) |
|---|---|
| < 1 | 150,000 - 300,000 |
| 1 - 5 | 300,000 - 750,000 |
| 5 - 10 | 750,000 - 1,500,000 |
10 | 1,500,000+ (highly variable) |
Key Pricing Factors for PSA Oxygen Plant Installation in Namibia
- Plant Capacity (Nm³/hr or L/min): Higher capacity plants are generally more expensive.
- Oxygen Purity Level: Achieving higher purity oxygen often requires more sophisticated technology and thus higher costs.
- Level of Automation and Features: Advanced control systems, remote monitoring, and integrated safety features increase the price.
- Manufacturer Reputation and Origin: Well-established brands, especially those with international certifications, may have higher upfront costs but often offer better reliability and support.
- Transportation and Logistics: Shipping the plant components to Namibia, including potential customs duties and import taxes, adds to the overall cost.
- Site Preparation: Depending on the existing infrastructure, costs for foundations, power supply, and pipework can vary.
- Installation Labor: The cost of skilled technicians for assembly, connection, and initial setup.
- Commissioning and Testing: Ensuring the plant operates according to specifications and meets safety standards.
- Warranty and After-Sales Support: The length and scope of warranty, as well as the availability of local technical support.
- Ongoing Maintenance Contracts: Optional but recommended for ensuring long-term operational efficiency and reducing downtime.
Affordable Psa Oxygen Plant Installation Service Options
Setting up a Pressure Swing Adsorption (PSA) oxygen plant is a crucial investment for various industries, including healthcare, welding, and chemical processing. Ensuring this setup is both effective and budget-friendly requires understanding available service options, value bundles, and strategic cost-saving measures. This guide explores how to achieve affordable PSA oxygen plant installation without compromising on quality or long-term performance.
| Value Bundle | Description | Included Services | Cost-Saving Benefits |
|---|---|---|---|
| Standard Installation Package | Basic setup and commissioning of a pre-selected PSA unit. | Site preparation guidance, equipment delivery, physical installation, basic operational training, and initial system test. | Predictable upfront cost, streamlined process, reduced risk of installation errors. |
| Comprehensive Turnkey Solution | End-to-end service from consultation to a fully operational plant. | In-depth consultation, site assessment, custom plant design, procurement, installation, commissioning, advanced operator training, and initial spare parts kit. | Minimizes client management effort, optimized design for efficiency, potential for bulk purchasing discounts on equipment and components. |
| Modular & Scalable Installation | Installation of a base unit with provisions for future expansion. | Installation of a core PSA unit with considerations for future module addition. Includes initial setup and a roadmap for scalability. | Lower initial investment, ability to adapt to growing demand, phased capital expenditure, avoids over-provisioning. |
| Retrofitting & Upgrade Services | Enhancing existing PSA systems for improved efficiency or capacity. | Assessment of existing plant, component upgrades (e.g., adsorbent material, control systems), performance testing, and recommissioning. | Extends the life of existing assets, improved energy efficiency leading to lower operational costs, avoids full replacement cost. |
Key Components of Affordable PSA Oxygen Plant Installation
- Understanding PSA Technology: Familiarize yourself with how PSA plants work to make informed decisions.
- Site Assessment and Planning: Proper initial planning can prevent costly future modifications.
- Equipment Selection: Choosing the right capacity and brand impacts upfront and operational costs.
- Installation Expertise: Hiring experienced professionals ensures efficiency and safety.
- Maintenance and Support: Long-term service contracts can offer cost predictability.
- Regulatory Compliance: Adhering to standards avoids fines and rework.
Verified Providers In Namibia
In Namibia's evolving healthcare landscape, ensuring you receive care from verified and reputable providers is paramount. Franance Health stands out as a leader, committed to upholding the highest standards of medical practice and patient well-being. This commitment is reflected in their stringent credentialing process, which meticulously vets all affiliated healthcare professionals and institutions. By choosing Franance Health, you are opting for a network of practitioners who have demonstrated exceptional expertise, ethical conduct, and a dedication to delivering superior healthcare services. Their credentialing process goes beyond basic qualifications, encompassing a thorough review of experience, patient satisfaction, and adherence to best practices, making them the definitive choice for trusted healthcare in Namibia.
| Credentialing Component | Franance Health's Standard | Benefit to Patients |
|---|---|---|
| Medical License Verification | Mandatory and continuously monitored with the Namibian Medical Council. | Ensures providers are legally qualified to practice. |
| Professional Education & Training | Thorough review of degrees, certifications, and postgraduate qualifications. | Confirms in-depth knowledge and specialized skills. |
| Clinical Experience Assessment | Evaluation of years in practice and specific experience in relevant fields. | Guarantees practical application of expertise. |
| Peer Review & Reputation | Internal and external reviews by experienced medical professionals. | Validates the provider's standing and competence within the medical community. |
| Disciplinary Record Check | Comprehensive checks for any past or current malpractice claims or disciplinary actions. | Protects patients from potentially compromised care. |
| Continuing Professional Development (CPD) | Verification of ongoing learning and adherence to current medical advancements. | Ensures providers are up-to-date with the latest treatments and technologies. |
Why Franance Health is the Superior Choice for Verified Providers in Namibia:
- Rigorous Credentialing Process: Franance Health employs a multi-faceted vetting system that scrutinizes the qualifications, experience, and track record of every provider.
- Commitment to Excellence: Only providers who consistently demonstrate a high level of medical expertise and patient care are accepted into the Franance Health network.
- Ethical Practice Assurance: All Franance Health providers adhere to strict ethical guidelines and professional codes of conduct.
- Patient-Centric Approach: The credentialing process includes a review of patient feedback and satisfaction, ensuring providers prioritize the patient experience.
- Access to Top-Tier Professionals: Franance Health provides access to some of Namibia's most skilled and trusted healthcare professionals across various specialties.
- Peace of Mind: Choosing a Franance Health verified provider offers the assurance of receiving safe, effective, and high-quality medical care.
Scope Of Work For Psa Oxygen Plant Installation Service
This Scope of Work (SOW) outlines the requirements for the installation of a Pressure Swing Adsorption (PSA) Oxygen Plant. It details the technical deliverables expected from the service provider and the standard specifications that must be adhered to throughout the project. The goal is to ensure a safe, efficient, and compliant installation of the PSA oxygen generation system.
| Deliverable | Description | Standard Specifications / Requirements |
|---|---|---|
| Detailed Installation Plan | A comprehensive plan outlining all installation activities, timelines, resource allocation, safety procedures, and quality control measures. | Must include Gantt charts, risk assessment, and communication protocols. Approved by client prior to commencement. |
| Site Preparation Report | Documentation of all site preparation activities, including civil works, foundation readiness, and utility availability. | Compliance with local building codes and client-specific site requirements. Includes photographic evidence and sign-offs. |
| Equipment Receiving and Inspection Report | Confirmation of successful delivery of all PSA plant components and ancillaries, along with an inspection report detailing any damages or discrepancies. | Includes detailed inventory check against packing lists and visual inspection reports. All damages must be immediately reported. |
| Installed PSA Oxygen Plant | The fully assembled and interconnected PSA oxygen generation system, including air compressors, adsorber vessels, control panel, oxygen buffer tank, and associated piping and electrical connections. | All installations must adhere to manufacturer's installation manuals and relevant industry standards (e.g., ASME, ISO, NFPA). All connections must be leak-tested and certified. |
| Piping and Electrical Installation | All interconnecting piping for air, oxygen, nitrogen, and process gases, along with all electrical wiring, control systems, and power connections. | Piping materials to be as per approved P&IDs and specifications. Electrical wiring to comply with IEC standards and local electrical codes. All welds to be inspected and tested. |
| Control System Integration | Successful integration and configuration of the PSA plant's PLC/DCS control system with plant-wide SCADA or BMS if applicable. | All control logic and setpoints to be verified against design documents. Communication protocols and network connectivity to be confirmed. |
| Pre-Commissioning Report | A report detailing all checks and tests performed before introducing process gases, including electrical continuity, insulation resistance, function tests of individual components, and flushing/cleaning of systems. | Includes detailed checklists and sign-offs for each tested item. Hydrostatic or pneumatic testing of pressure vessels and piping. |
| Commissioning Report | A comprehensive report documenting the successful startup of the PSA oxygen plant, including the generation of oxygen at the specified purity, flow rate, and pressure. | Demonstrates compliance with guaranteed performance parameters. Includes trend logs and data from performance tests. |
| Performance Test Certificates | Certificates confirming the PSA oxygen plant's performance against specified parameters (purity, flow, pressure, dew point, etc.) under various operating conditions. | Tests conducted according to agreed-upon protocols, witnessed by client representatives. Readings calibrated and traceable. |
| As-Built Drawings | Updated drawings reflecting the actual installed configuration of the PSA oxygen plant, including piping, electrical, and instrumentation details. | Must be accurate and to scale, reflecting any deviations from the original design. Approved by client. |
| Operation and Maintenance (O&M) Manuals | Complete O&M manuals for the installed PSA oxygen plant, including troubleshooting guides, spare parts lists, and preventive maintenance schedules. | Provided in both hard and soft copy, in the agreed language. Includes manufacturer's documentation. |
| Training Materials and Records | Comprehensive training materials and attendance records for client personnel on the operation, maintenance, and safety procedures for the PSA oxygen plant. | Training sessions conducted by qualified personnel. Materials to be clear, concise, and relevant to the installed system. |
| Final Handover Certificate | A formal document signed by both parties signifying the successful completion of the installation and handover of the PSA oxygen plant. | Confirms that all contractual obligations have been met. |
Key Project Phases and Deliverables
- Phase 1: Planning and Design Review
- Phase 2: Site Preparation and Civil Works
- Phase 3: Equipment Delivery and Warehousing
- Phase 4: Installation and Erection
- Phase 5: Pre-Commissioning and Testing
- Phase 6: Commissioning and Performance Verification
- Phase 7: Training and Handover
Service Level Agreement For Psa Oxygen Plant Installation Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the installation services provided by [Your Company Name] for PSA (Pressure Swing Adsorption) Oxygen Plants. This SLA is effective from the date of project commencement until the final handover of the installed PSA Oxygen Plant.
| Service Area | Response Time Target (Business Hours) | Resolution Time Target (Business Hours) | Uptime Guarantee |
|---|---|---|---|
| Critical System Failure (e.g., complete plant shutdown, inability to produce oxygen) | 1 Hour | 4-8 Hours (depending on complexity and parts availability) | 98% |
| Major Component Malfunction (e.g., compressor issues, dryer failure) | 2 Hours | 8-12 Hours (depending on complexity and parts availability) | 98.5% |
| Minor Component Issue (e.g., sensor malfunction, minor leak, control system anomaly) | 4 Business Hours | 24 Business Hours | 99% |
| Performance Degradation (e.g., reduced oxygen purity below agreed specifications) | 8 Business Hours | 48 Business Hours | 99% |
| Installation Support & Consultation (e.g., questions regarding installation procedures, clarifications) | 24 Business Hours | N/A (support provided as needed) | N/A |
| Scheduled Maintenance | N/A | As per agreed schedule | N/A |
Key Performance Indicators (KPIs)
- Response Time: The time taken by [Your Company Name] to acknowledge and begin addressing a reported issue or request.
- Resolution Time: The time taken by [Your Company Name] to fully resolve a reported issue or complete a requested task.
- Uptime Guarantee: The percentage of time the PSA Oxygen Plant is expected to be operational and capable of producing oxygen, excluding scheduled maintenance.
- Availability: The state of being operational and accessible when needed.
Frequently Asked Questions

Ready when you are
Let's scope your PSA Oxygen Plant Installation Service in Namibia project in Namibia.
Scaling healthcare logistics and technical systems across the entire continent.

