Background
Verified Service Provider in Mozambique

Isolation Transformer Setup Service (OT/ICU) in Mozambique Engineering Excellence & Technical Support

Isolation Transformer Setup Service (OT/ICU) High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Precision Voltage Stability

Ensures unwavering power quality for critical OT/ICU equipment in Mozambique, mitigating voltage fluctuations that can compromise patient safety and device functionality through advanced isolation transformer configurations.

Enhanced Electrical Safety & Grounding

Implements robust grounding systems and advanced isolation techniques specifically tailored for the medical environment in Mozambique, drastically reducing leakage currents and preventing electrical hazards for patients and staff in OT/ICU settings.

Reliable Power Continuity Solutions

Designs and installs redundant isolation transformer setups for OT/ICU units in Mozambique, guaranteeing uninterrupted power supply during grid disturbances or maintenance, vital for life-support systems and critical procedures.

What Is Isolation Transformer Setup Service (Ot/icu) In Mozambique?

The Isolation Transformer Setup Service (OT/ICU) in Mozambique refers to the specialized provision of installing, configuring, and commissioning isolation transformer systems within Operating Theatres (OT) and Intensive Care Units (ICU) of healthcare facilities. These systems are critical for patient safety, ensuring a low-impedance path to ground for medical electrical equipment, thereby minimizing the risk of electric shock and electrical fires. The service encompasses a comprehensive approach to deploying these safety-critical electrical infrastructure components.

Who Needs It?Typical Use Cases
Hospitals and Healthcare Facilities: All facilities in Mozambique that operate or plan to operate Operating Theatres (OT) and Intensive Care Units (ICU) are mandated to have medically isolated power systems.New Construction/Renovation of OTs/ICUs: Essential for ensuring that newly built or renovated surgical suites and critical care areas meet stringent safety requirements from the outset.Existing Facilities Requiring Upgrade: Facilities with outdated or non-compliant electrical systems in their OTs/ICUs, which pose significant patient safety risks, require this service for modernization.Medical Equipment Manufacturers and Suppliers: When supplying new or complex medical devices that require specific power isolation for safe operation in critical care environments.Government Health Ministries and Regulatory Bodies: Responsible for enforcing safety standards in healthcare infrastructure and may require evidence of compliance.Surgical Procedures: To power a wide array of sensitive medical devices such as anesthetic machines, surgical lights, electrosurgical units, ventilators, patient monitors, and infusion pumps, all of which require a stable and safe power source.Intensive Patient Monitoring: For the continuous operation of life-support systems and monitoring equipment in ICUs where the reliability and safety of electrical power are paramount for patient survival.Minimizing Electrocution Risk: The primary use case is to provide a highly reliable and safe power distribution system that significantly reduces the likelihood of electric shock to patients and healthcare professionals, especially in environments where patients are susceptible to current flow.Preventing Fires: By controlling leakage currents, isolation transformers help prevent the ignition of flammable anesthetic gases or other combustible materials within the OT.Ensuring Equipment Longevity: A stable and well-grounded power supply can contribute to the extended operational life of expensive medical equipment.

Key Components of the Service:

  • Site Assessment and Design: Evaluating the existing electrical infrastructure of the OT/ICU, determining optimal placement of isolation transformers, and designing the grounding and bonding scheme in compliance with relevant national and international standards (e.g., IEC 60364-7-710).
  • Procurement and Supply: Sourcing and providing high-quality, medical-grade isolation transformers, associated distribution boards, protective devices (e.g., residual current devices with high sensitivity), and cabling.
  • Installation and Wiring: Expert installation of isolation transformers, primary and secondary power distribution, and the creation of dedicated medical IT (isolated transformer) systems. This includes precise wiring of all circuits within the OT/ICU to the isolation transformer.
  • Grounding and Bonding: Establishing a robust and effective grounding and equipotential bonding system to ensure that all conductive parts are at the same potential, minimizing stray currents.
  • Monitoring and Alarm Systems: Installation and integration of medical electrical equipment monitoring systems (e.g., insulation monitoring devices - IMDs) that provide real-time alerts for insulation faults or abnormal leakage currents.
  • Commissioning and Testing: Thorough testing and verification of the entire isolation transformer system, including insulation resistance tests, leakage current measurements, earth continuity tests, and functional testing of alarm systems, to ensure compliance with safety standards and operational readiness.
  • Documentation and Training: Providing comprehensive documentation of the installed system, including schematics, test reports, and user manuals. Training for facility biomedical engineers and maintenance staff on system operation, monitoring, and basic troubleshooting.

Who Needs Isolation Transformer Setup Service (Ot/icu) In Mozambique?

This service is crucial for healthcare facilities in Mozambique, particularly for departments requiring a stable and safe electrical supply for critical medical equipment. Isolation transformers prevent the flow of direct current and are vital in preventing electric shock to both patients and medical staff, especially in environments where medical devices are directly connected to patients.

Customer TypeExample Facilities/OrganizationsPrimary Need for Isolation Transformer Setup Service
Public HospitalsCentral Hospitals, Provincial Hospitals, District HospitalsInfrastructure upgrade, patient safety compliance, modernization
Private Hospitals & ClinicsCity Clinics, Specialized Private HospitalsHigh-quality patient care, risk mitigation, competitive advantage
NGOs & Humanitarian AidMedical Missions, Mobile Clinics, Field HospitalsEstablishing safe medical environments in challenging locations, emergency response
Government Health AgenciesMinistry of Health Departments (e.g., Infrastructure, Standards)Setting national healthcare standards, facilitating equipment safety, infrastructure planning
Medical Equipment SuppliersCompanies installing life support, monitoring, and surgical equipmentEnsuring successful and safe installation of their products

Target Customers and Departments for Isolation Transformer Setup Service (OT/ICU) in Mozambique:

  • Primary Target Customers:
  • {"item":"Hospitals (Public and Private): All sizes of hospitals, from large national referral hospitals to smaller district and private clinics, will benefit from this service.","sublist":["Government-funded hospitals aiming to upgrade their infrastructure for patient safety and compliance.","Private healthcare providers seeking to offer high-quality, safe, and reliable medical services."]}
  • {"item":"Specialized Medical Centers: Facilities focusing on critical care and surgical procedures.","sublist":["Maternity hospitals and units","Pediatric hospitals and intensive care units"]}
  • {"item":"Non-Governmental Organizations (NGOs) and Humanitarian Aid Organizations: Groups involved in establishing or improving healthcare infrastructure in underserved areas.","sublist":["Organizations running field hospitals or mobile clinics.","NGOs focused on maternal and child health initiatives."]}
  • {"item":"Government Health Ministries and Agencies: Responsible for national healthcare standards and infrastructure development.","sublist":["Departments overseeing hospital maintenance and upgrades.","Agencies involved in procurement of medical equipment and infrastructure."]}
  • {"item":"Medical Equipment Suppliers and Installers: Companies that provide and install medical equipment requiring stable power.","sublist":["Partnerships to ensure their installed equipment functions safely and reliably."]}
  • {"item":"Construction and Engineering Firms specializing in Healthcare Facilities: Companies involved in building or renovating hospitals and clinics.","sublist":["Ensuring new constructions meet electrical safety standards."]}
  • Key Departments Requiring Isolation Transformer Setup:
  • {"item":"Operating Theatres (OT) / Surgical Wards: Absolutely critical due to the proximity of equipment to patients and the need for uninterrupted power during procedures.","sublist":["General Surgery","Cardiothoracic Surgery","Neurosurgery","Orthopedic Surgery","Gynecological Surgery","Ophthalmology"]}
  • {"item":"Intensive Care Units (ICU) / Critical Care Units (CCU): Where patients are on life support and connected to multiple medical devices, requiring the highest level of electrical safety.","sublist":["Medical ICU","Surgical ICU","Cardiac ICU (CICU)","Neonatal ICU (NICU)","Pediatric ICU (PICU)"]}
  • {"item":"Emergency Departments (ED) / Accident & Emergency (A&E): Often deal with critical patients requiring immediate intervention and life support.","sublist":["Trauma bays","Resuscitation areas"]}
  • {"item":"Dialysis Centers: Patients undergoing dialysis are directly connected to machines, making electrical safety paramount.","sublist":[]}
  • {"item":"Anesthesia Departments: Where anesthesia machines and monitoring equipment are used.","sublist":[]}
  • {"item":"Post-Anesthesia Care Units (PACU) / Recovery Rooms: Patients are monitored closely after surgery.","sublist":[]}
  • {"item":"Labor and Delivery Wards (especially High-Risk Units): Where critical monitoring and resuscitation equipment may be used.","sublist":[]}
  • {"item":"Diagnostic Imaging Departments (e.g., MRI, CT Scan Suites): While not directly patient-connected in the same way as OT/ICU, these often have sensitive equipment where stable and isolated power is beneficial.","sublist":[]}

Isolation Transformer Setup Service (Ot/icu) Process In Mozambique

This document outlines the standard workflow for an Isolation Transformer Setup Service specifically for Operating Theatres (OT) and Intensive Care Units (ICU) within Mozambique. It details the process from the initial client inquiry to the successful execution and handover of the installed isolation transformer system.

PhaseKey ActivitiesResponsible PartyKey Deliverables/OutcomesNotes for Mozambique Context
Phase 1: Inquiry & Requirements GatheringClient submits an inquiry for OT/ICU isolation transformer setup. Detailed discussion of client's specific needs (e.g., transformer capacity, redundancy requirements, existing electrical infrastructure, specific medical equipment to be powered). Clarification of regulatory standards and hospital policies.Client (Hospital/Clinic Management) Service Provider (Technical Sales/Engineers)Understanding of client's technical and functional requirements. Initial project scope definition.Importance of understanding local power grid stability and voltage fluctuations. Familiarity with Mozambican health facility standards and regulations is crucial.
Phase 2: Site Survey & AssessmentOn-site visit to the OT/ICU locations. Assessment of available space for transformer installation and associated equipment. Evaluation of existing electrical panels, wiring, and earthing systems. Identification of potential installation challenges and necessary modifications. Measurement of existing power loads.Service Provider (Field Engineers/Technicians)Detailed site assessment report. Identification of site-specific requirements and potential risks. Confirmation of technical feasibility.Accessibility to OT/ICU during operational hours can be a constraint. Coordination with hospital administration for necessary access is vital. Understanding of local building codes and safety regulations.
Phase 3: Proposal & QuotationDevelopment of a comprehensive technical proposal based on gathered requirements and site assessment. Detailed scope of work, including transformer selection, auxiliary equipment, installation, testing, and commissioning. Cost breakdown and quotation, including materials, labor, and contingency. Timeline for project execution.Service Provider (Technical Sales/Project Managers)Formal proposal document. Detailed quotation with price breakdown. Project timeline.Ensure quotations are clear and transparent, considering import duties and taxes if applicable to specialized equipment. Offer multiple options if budget is a concern.
Phase 4: Contracting & AgreementClient reviews and approves the proposal and quotation. Negotiation of terms and conditions. Signing of the contract/service agreement. Advance payment/mobilization advance may be required.Client (Legal/Procurement Department) Service Provider (Management/Legal Department)Signed contract/service agreement. Formal commencement of the project.Standard Mozambican contract law should be adhered to. Local legal counsel review may be advisable for significant projects.
Phase 5: Procurement & LogisticsOrdering of the isolation transformer and all necessary auxiliary components (e.g., circuit breakers, surge protectors, monitoring systems, cabling). Arrangement of shipping, customs clearance, and local transportation to the site. Quality control checks upon delivery.Service Provider (Procurement Team/Logistics Department)Procured and delivered equipment. Completed import and customs procedures. Equipment ready for installation.Lead times for specialized medical electrical equipment can be long. Proactive procurement is essential. Navigating customs regulations and potential delays in Mozambique requires experience and patience.
Phase 6: Installation & CablingPreparation of the installation site (e.g., mounting space, cable routes). Installation of the isolation transformer and associated control panels. Wiring and connection of the transformer to the existing electrical distribution system. Installation of grounding and earthing systems. Adherence to strict electrical safety standards and hospital protocols.Service Provider (Qualified Electricians/Technicians)Physically installed isolation transformer system. Completed electrical connections and grounding. Safe and functional wiring.Work may need to be scheduled during off-peak hours or planned shutdowns to minimize disruption to patient care. Strict adherence to IEC 60364 standards for medical installations and local electrical codes is paramount.
Phase 7: Testing & CommissioningPre-commissioning checks (visual inspection, continuity tests). Functional testing of the isolation transformer and its protection mechanisms. Load testing to verify capacity and performance. Insulation resistance tests. Verification of alarm systems and monitoring functions. Testing of emergency power transfer if integrated.Service Provider (Commissioning Engineers/Technicians) Client (Clinical/Biomedical Engineering Representatives)Comprehensive test reports. Certified operational isolation transformer system. Confirmation of system performance against specifications.Involve hospital's biomedical engineering department in testing and validation. Ensure all test equipment is calibrated. Document all test results meticulously for compliance and future reference.
Phase 8: Training & HandoverTraining for the hospital's maintenance and technical staff on the operation and basic troubleshooting of the isolation transformer system. Provision of user manuals, schematics, and maintenance guidelines. Formal handover of the completed installation and associated documentation.Service Provider (Project Manager/Technical Trainers) Client (Maintenance/Biomedical Staff)Trained personnel. Complete documentation package. Formal acceptance of the installed system.Training materials should ideally be available in Portuguese. Ensure sufficient time for questions and practical demonstrations. Confirm understanding of critical safety procedures.
Phase 9: Post-Installation SupportProvision of warranty period support. Scheduled preventive maintenance visits as per agreement. On-call technical support for troubleshooting and emergency repairs. Supply of spare parts if needed.Service Provider (Technical Support Team/Service Department)Ongoing operational reliability of the system. Client satisfaction and continued safety.Establish clear communication channels for support requests. Understand local availability of spare parts for the specific transformer model.

Isolation Transformer Setup Service (OT/ICU) Workflow in Mozambique

  • Inquiry & Requirements Gathering
  • Site Survey & Assessment
  • Proposal & Quotation
  • Contracting & Agreement
  • Procurement & Logistics
  • Installation & Cabling
  • Testing & Commissioning
  • Training & Handover
  • Post-Installation Support

Isolation Transformer Setup Service (Ot/icu) Cost In Mozambique

The cost of an Isolation Transformer Setup Service for Operating Theatres (OT) and Intensive Care Units (ICU) in Mozambique can vary significantly. This specialized service involves the installation and configuration of isolation transformers, crucial for patient safety by preventing the flow of leakage current to ground. The pricing is influenced by several factors, including the complexity of the installation, the size and type of transformer, the accessibility of the location, and the expertise of the service provider.

Service ComponentEstimated Cost Range (MZN)Notes
Isolation Transformer Unit (per unit, ~5-10kVA)50,000 - 150,000+Price varies greatly by brand, capacity, and features.
Installation Labor (per day/technician)5,000 - 15,000+Reflects expertise in medical electrical installations.
Ancillary Materials (wiring, conduits, breakers, etc.)10,000 - 50,000+Depends on the scale and complexity of the wiring.
Testing and Certification8,000 - 25,000+Essential for ensuring safety and compliance.
Project Management/Supervision15,000 - 40,000+For larger or more complex installations.
Total Estimated Setup Cost (per OT/ICU module, excluding transformer itself)75,000 - 250,000+ MZNThis is a broad estimate and can be significantly higher for complex projects.

Key Pricing Factors for OT/ICU Isolation Transformer Setup in Mozambique:

  • Transformer Capacity (kVA): Larger transformers required for high-demand OT/ICU environments will naturally incur higher costs.
  • Number of Isolation Transformers: Hospitals with multiple OTs and ICUs will require more units, increasing the overall service fee.
  • Installation Complexity: This includes factors like the distance from the main power source, the need for new electrical conduits, wiring, and integration with existing hospital power distribution systems.
  • Site Accessibility: Remote locations or challenging building structures can increase labor and logistical costs.
  • Brand and Quality of Transformer: High-quality, reputable brands often come with a higher initial cost.
  • Ancillary Equipment: Costs may include surge protectors, monitoring systems, and specialized enclosures for the transformers.
  • Testing and Certification: Thorough testing and certification are essential for medical environments, and these services add to the overall price.
  • Labor and Expertise: The skill level and experience of the electricians and technicians performing the installation are critical and reflected in the pricing. Specialized knowledge in medical electrical systems is often required.
  • Permits and Regulatory Approvals: Depending on local regulations, permits may be required, adding to the administrative cost.
  • Warranty and Maintenance Packages: Some providers may offer extended warranties or maintenance contracts, which can be bundled into the setup cost or offered separately.

Affordable Isolation Transformer Setup Service (Ot/icu) Options

Establishing an isolation transformer setup is crucial for critical care environments like Operating Theaters (OT) and Intensive Care Units (ICU) to ensure patient safety by preventing electrical shock hazards. This service encompasses the installation, testing, and commissioning of isolation transformers, which provide galvanic isolation between the patient and the main power supply. We offer flexible options to meet diverse budgetary and technical needs.

Cost-Saving StrategyDescriptionBenefit
Bundled Service PackagesOpting for our pre-defined value bundles that include installation, testing, and basic monitoring.Reduces individual service costs and ensures a comprehensive solution.
Off-Peak Installation SchedulingScheduling installations during non-peak hours or weekends when hospital operations are less intensive.Minimizes potential disruption costs and may offer lower labor rates.
Standardized Component SelectionUtilizing commonly available and certified standard components rather than custom-built solutions where appropriate.Lower material costs and quicker procurement times.
Phased ImplementationFor larger facilities, implementing the isolation transformer setup in phases for different departments or wings.Spreads the initial capital expenditure and allows for learning and optimization during the rollout.
Long-Term Maintenance ContractsNegotiating a long-term maintenance contract alongside the installation.Often includes discounted rates for ongoing service and proactive maintenance, preventing costly emergency repairs.
Energy-Efficient Transformer OptionsSelecting isolation transformers with higher efficiency ratings.Reduces long-term energy consumption costs, though initial investment might be slightly higher.

Value Bundles for OT/ICU Isolation Transformer Setup

  • {"title":"Basic Isolation Setup","description":"Includes a standard isolation transformer, basic wiring, and functional testing. Ideal for facilities with existing infrastructure and minimal additional requirements."}
  • {"title":"Standard Isolation Package","description":"Combines the basic setup with enhanced monitoring capabilities (e.g., ground fault detection), a dedicated circuit breaker, and initial calibration. Suitable for most standard OT/ICU configurations."}
  • {"title":"Premium Integrated Solution","description":"A comprehensive package featuring high-capacity isolation transformers, advanced remote monitoring and alarm systems, surge protection, and seamless integration with existing building management systems. Designed for state-of-the-art facilities demanding maximum safety and control."}
  • {"title":"Retrofit & Upgrade Service","description":"Specialized service for existing facilities looking to upgrade their current isolation transformer setup or replace outdated units. Focuses on minimizing disruption to ongoing operations."}

Verified Providers In Mozambique

In Mozambique, navigating the healthcare landscape requires trust and reliability. Finding verified providers is paramount for ensuring quality care. Franance Health stands out as a premier organization committed to connecting individuals and businesses with exceptional healthcare services. Their rigorous credentialing process and dedication to patient well-being make them the best choice for your healthcare needs in Mozambique.

Franance Health AdvantageBenefit to YouExample of Credential Verification
Rigorous Provider VettingAssurance of high-quality medical care and ethical practice.Verification of medical licenses, board certifications, and professional accreditations.
Comprehensive NetworkEasy access to a wide range of specialists and facilities throughout Mozambique.Partnerships with reputable hospitals, clinics, and individual practitioners.
Focus on Patient ExperienceEnsures a positive and supportive healthcare journey.Provider feedback mechanisms and patient satisfaction surveys.
Simplified Healthcare NavigationReduces the burden of searching for reliable healthcare providers.Online platform with searchable provider profiles and direct booking options.
Building Trust in HealthcareEmpowers you to make informed decisions about your health.Display of verified provider credentials and qualifications on their platform.

Why Franance Health is the Best Choice:

  • Unwavering Commitment to Quality: Franance Health prioritizes a stringent vetting process for all their affiliated providers, ensuring they meet the highest standards of medical expertise and ethical practice.
  • Extensive Network of Verified Professionals: They have cultivated a comprehensive network of doctors, specialists, and healthcare facilities across Mozambique, all meticulously verified for their credentials and licenses.
  • Patient-Centric Approach: Franance Health places the patient at the forefront, focusing on accessible, affordable, and compassionate healthcare delivery.
  • Streamlined Access to Care: Their platform simplifies the process of finding and booking appointments with trusted healthcare professionals, saving you time and reducing stress.
  • Transparency and Trust: By providing verified credentials, Franance Health fosters transparency and builds trust between patients and providers.

Scope Of Work For Isolation Transformer Setup Service (Ot/icu)

This Scope of Work (SOW) outlines the services required for the setup, configuration, and testing of Isolation Transformers specifically designed for Operating Theatre (OT) and Intensive Care Unit (ICU) environments. The objective is to ensure the safe and reliable operation of electrical equipment by providing galvanic isolation, mitigating electrical hazards, and meeting stringent medical facility standards.

SectionDescriptionTechnical DeliverablesStandard Specifications
  1. Site Assessment and Planning
Initial evaluation of the OT/ICU electrical infrastructure, power requirements, and physical space for transformer installation. Development of a detailed installation plan.Site survey report, power load analysis, installation plan, cable routing diagrams, and Bill of Materials (BOM).IEC 60364-7-710 (Electrical installations of buildings - Part 7-710: Requirements for special installations and locations - Medical locations), local electrical codes, facility-specific safety guidelines.
  1. Isolation Transformer Procurement and Delivery
Sourcing and delivery of isolation transformers, associated enclosures, and necessary accessories as per approved specifications.Procured isolation transformers, mounting hardware, and all specified accessories delivered to the site in good condition.Compliance with medical grade isolation transformer standards (e.g., IEC 61558-2-15), appropriate KVA rating for the load, low leakage current ratings, and UL/CE certifications.
  1. Installation and Wiring
Mounting of the isolation transformer, connecting primary and secondary windings, implementing proper grounding and bonding, and ensuring all wiring adheres to safety standards.Professionally installed and securely mounted isolation transformer, correctly wired primary and secondary circuits, robust grounding and bonding system, cable management.IEC 60364-7-710, NEC (National Electrical Code) or equivalent, manufacturer's installation guidelines, color-coded wiring for safety.
  1. Protection and Monitoring
Installation of surge protection devices, overcurrent protection (circuit breakers/fuses), and residual current devices (RCDs) as required. Setup of any specified monitoring systems for transformer performance.Installed surge protection, appropriate circuit breakers/fuses, functional RCDs, operational monitoring systems (if applicable).IEC 61643 (Surge protective devices), IEC 60947 (Low-voltage switchgear and controlgear), RCD sensitivity as per IEC 60364-7-710 (typically ≤ 10mA for ICU/OT circuits).
  1. Commissioning and Testing
Pre-commissioning checks, energization, and comprehensive testing to verify voltage regulation, insulation resistance, leakage current, impedance, and fault conditions.Test reports detailing insulation resistance, leakage current measurements (primary-to-ground, secondary-to-ground, primary-to-secondary), voltage regulation under load, impedance measurements, and operational checks.IEC 61558-2-15, IEC 60364-7-710, facility-specific acceptance criteria, manufacturer's test specifications.
  1. Documentation and Training
Provision of all relevant documentation, including single-line diagrams, test reports, operation and maintenance manuals. Training for facility biomedical and electrical engineering staff on the system's operation and basic troubleshooting.As-built drawings, commissioning test reports, operation and maintenance manuals, training session records, trained personnel.Clear, concise, and accurate documentation; training materials aligned with the installed system and facility protocols.

Key Objectives

  • To install and commission isolation transformers compliant with relevant medical electrical equipment safety standards.
  • To ensure proper grounding and bonding of the isolation transformer system.
  • To perform comprehensive testing and validation to confirm performance and safety.
  • To provide necessary documentation and training for facility personnel.
  • To minimize disruption to OT/ICU operations during the setup process.

Service Level Agreement For Isolation Transformer Setup Service (Ot/icu)

This Service Level Agreement (SLA) outlines the guaranteed response times and uptime for the Isolation Transformer Setup Service specifically for Operating Room (OT) and Intensive Care Unit (ICU) environments. This service is critical for maintaining a safe and compliant medical facility.

Service EventSeverity LevelResponse Time Guarantee (from notification)Resolution Time TargetUptime Guarantee (for installed systems)
New Installation/ReplacementStandard24 Business Hours5 Business Days99.9%
New Installation/ReplacementPriority (Scheduled downtime)12 Business Hours3 Business Days99.9%
Troubleshooting/RepairCritical (System Failure impacting patient care)4 Business Hours8 Business HoursN/A (Focus on immediate restoration)
Troubleshooting/RepairHigh (System Malfunction, potential impact)8 Business Hours2 Business Days99.9%
Troubleshooting/RepairMedium (Minor issue, no immediate patient risk)24 Business Hours5 Business Days99.9%

Scope of Service

  • On-site installation and configuration of new isolation transformer units.
  • Replacement of existing isolation transformer units.
  • Initial testing and validation of isolation transformer functionality and compliance.
  • Troubleshooting and repair of isolation transformer systems.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your Isolation Transformer Setup Service (OT/ICU) in Mozambique project in Mozambique.

Speak to Sales