
PSA Oxygen Plant Installation Service in Libya
Engineering Excellence & Technical Support
PSA Oxygen Plant Installation Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Advanced Oxygen Purity Control
Our PSA oxygen plant installations in Libya utilize state-of-the-art Pressure Swing Adsorption technology, ensuring consistently high oxygen purity (90-95%+) for critical applications, meeting stringent international standards.
Robust Design for Harsh Environments
Engineered to withstand Libya's demanding climatic conditions, our PSA oxygen plants feature durable construction and specialized components, guaranteeing reliable and long-term operation with minimal downtime.
Energy-Efficient & Cost-Effective Solutions
We deliver PSA oxygen plant installations that are optimized for energy efficiency, significantly reducing operational costs and providing a sustainable, cost-effective oxygen supply for medical, industrial, and commercial needs in Libya.
What Is Psa Oxygen Plant Installation Service In Libya?
PSA Oxygen Plant Installation Service in Libya refers to the comprehensive process of designing, engineering, procuring, constructing, commissioning, and providing ongoing support for Pressure Swing Adsorption (PSA) oxygen generation systems within the Libyan market. This service encompasses all technical and logistical aspects required to establish a functional and reliable on-site oxygen production facility. PSA technology utilizes adsorbent materials, typically molecular sieves, to selectively adsorb nitrogen from compressed air, thereby producing a high-purity oxygen stream. The installation service ensures that these complex systems are integrated effectively into existing industrial or medical infrastructure, meeting specific operational demands and adhering to local regulatory standards.
| Need For Service | Primary Beneficiaries | Typical Use Cases |
|---|---|---|
| On-site, cost-effective, and reliable oxygen supply for continuous operations. | Industries with significant oxygen consumption and a desire to reduce reliance on external suppliers. | Medical Sector: Hospitals, clinics, and emergency response units requiring medical-grade oxygen for patient respiration and life support. |
| Independence from volatile supply chains and fluctuating market prices for oxygen cylinders or liquid oxygen. | Organizations seeking control over their oxygen production and inventory management. | Industrial Processes: Metal fabrication (welding, cutting), chemical synthesis, glass manufacturing, and pulp and paper production. |
| Meeting stringent purity requirements for specialized applications. | Facilities requiring oxygen with specific purity levels to optimize their processes or products. | Environmental Applications: Wastewater treatment (aeration) and aquaculture (water enrichment). |
| Enhanced safety and reduced handling risks associated with traditional oxygen supply methods. | Operations that prioritize safety and wish to minimize the logistical complexities of handling compressed gas cylinders or cryogenic liquids. | Space & Aviation: Although less common in Libya, PSA systems are used for on-board oxygen generation. |
| Emergency preparedness and resilience against disruptions. | Organizations that require a continuous and secure oxygen source, especially in remote or challenging locations. | Research & Development: Laboratories requiring controlled oxygen atmospheres for experiments. |
Key Components of PSA Oxygen Plant Installation Service in Libya
- Feasibility Studies & Site Assessment: Evaluating project viability, identifying optimal plant location, and assessing existing infrastructure and utility availability (power, compressed air, etc.).
- System Design & Engineering: Detailed design of the PSA unit, air preparation systems (compressors, dryers, filters), storage vessels, piping, and control systems, tailored to meet specific purity, flow rate, and pressure requirements.
- Equipment Procurement & Logistics: Sourcing and supplying all necessary components, including PSA adsorbers, air compressors, dryers, filters, oxygen analyzers, storage tanks, and instrumentation, and managing their transportation to the Libyan site.
- Civil Works & Structural Installation: Preparation of the installation site, including foundation laying, building erection (if required), and ensuring structural integrity for the plant and associated equipment.
- Mechanical & Electrical Installation: Rigorous installation of all mechanical components (piping, valves, pumps, adsorbers) and electrical systems (power distribution, control panels, instrumentation wiring).
- Piping & Instrumentation Diagram (P&ID) Integration: Ensuring seamless integration of the oxygen plant with existing site P&IDs and utility networks.
- Pre-commissioning & Commissioning: Thorough system checks, functional testing of individual components, and integrated system commissioning to verify performance against design specifications, including oxygen purity, flow, and stability.
- Start-up & Performance Verification: Initial plant start-up, operational adjustments, and comprehensive performance testing under actual operating conditions.
- Training & Handover: Providing comprehensive training to client personnel on plant operation, maintenance, troubleshooting, and safety procedures.
- Documentation & As-Built Drawings: Supplying detailed operational manuals, maintenance guides, safety protocols, and accurate as-built engineering drawings.
- Warranty & After-Sales Support: Offering warranty periods and ongoing technical support, spare parts supply, and routine maintenance services.
- Regulatory Compliance: Ensuring adherence to all relevant Libyan safety, environmental, and industrial standards and regulations.
Who Needs Psa Oxygen Plant Installation Service In Libya?
Libya's healthcare infrastructure, while undergoing development, faces a critical need for reliable and advanced medical oxygen supply. PSA (Pressure Swing Adsorption) oxygen plants offer a decentralized, cost-effective, and sustainable solution for generating medical-grade oxygen on-site. This technology is particularly crucial in remote areas, disaster-prone regions, and expanding healthcare facilities where consistent and high-quality oxygen is essential for patient care. Installing and maintaining these plants requires specialized expertise, making dedicated installation service providers indispensable.
| Target Customer Category | Specific Departments/Users | Key Needs Addressed by PSA Oxygen Plants |
|---|---|---|
| Hospitals (Government and Private) | Intensive Care Units (ICU), Emergency Rooms (ER), Operating Theaters, Respiratory Therapy Departments, General Wards | Continuous and on-demand oxygen supply for critical care, surgical procedures, respiratory support, and general patient needs. Reduced reliance on external suppliers, improved cost-efficiency, and enhanced patient safety. |
| Clinics and Medical Centers | Outpatient Services, Minor Surgery Units, Diagnostic Labs | Reliable oxygen for routine medical procedures, stabilization of patients before transfer, and basic respiratory treatments. Accessible oxygen in facilities outside major urban centers. |
| Field Hospitals and Emergency Response Units | Temporary medical facilities, disaster relief operations | Rapid deployment and self-sufficiency of oxygen generation in remote or crisis situations. Essential for life support in challenging environments. |
| Rehabilitation Centers | Pulmonary Rehabilitation Programs | Supplemental oxygen for patients undergoing rehabilitation for chronic respiratory conditions. |
| Research and Development Facilities (Medical Focus) | Biomedical research labs | Controlled oxygen environments for specific experiments and cell culture applications. |
| Government Health Ministries and Agencies | National healthcare planning, public health initiatives | Ensuring widespread access to essential medical oxygen, capacity building, and managing national medical gas supplies. |
| Non-Governmental Organizations (NGOs) involved in healthcare | Humanitarian aid projects, healthcare delivery in underserved areas | Providing life-saving oxygen in regions with limited infrastructure and resources, supporting their medical missions. |
Target Customers and Departments in Libya Requiring PSA Oxygen Plant Installation Service:
- Hospitals (Government and Private)
- Clinics and Medical Centers
- Field Hospitals and Emergency Response Units
- Rehabilitation Centers
- Research and Development Facilities (Medical Focus)
- Government Health Ministries and Agencies
- Non-Governmental Organizations (NGOs) involved in healthcare
Psa Oxygen Plant Installation Service Process In Libya
This document outlines the comprehensive workflow for PSA (Pressure Swing Adsorption) Oxygen Plant installation services in Libya, from initial inquiry to project completion. The process is designed to ensure efficient, safe, and high-quality installation, meeting the specific requirements of clients in Libya.
| Phase | Step | Description | Key Activities | Deliverables/Outcomes |
|---|---|---|---|---|
| 1: Inquiry & Pre-Qualification | 1.1: Initial Inquiry | Client expresses interest in PSA oxygen plant installation services. | Receive and acknowledge client inquiry, understand basic project needs (capacity, application). | Acknowledged inquiry, preliminary project scope identified. |
| 1: Inquiry & Pre-Qualification | 1.2: Requirements Gathering | Detailed understanding of client's specific needs and site conditions in Libya. | Conduct site visits (if feasible), hold detailed discussions, gather technical specifications, power availability, site layout, safety regulations. | Comprehensive technical and site assessment report. |
| 1: Inquiry & Pre-Qualification | 1.3: Pre-Qualification & Capability Assessment | Assessing the service provider's suitability and experience for the Libyan market. | Review of company credentials, past project experience in similar environments, certifications, safety records, local regulatory compliance understanding. | Approved pre-qualification status, confidence in provider's capabilities. |
| 2: Proposal Development & Contract Negotiation | 2.1: Technical Proposal | Detailed technical solution and installation plan tailored to the client's requirements. | Design of the PSA oxygen plant, equipment selection, plant layout, system integration plan, scope of work, project timeline, resource allocation. | Detailed Technical Proposal document. |
| 2: Proposal Development & Contract Negotiation | 2.2: Commercial Proposal | Costing and pricing of the installation services. | Quotation for equipment supply (if applicable), installation labor, supervision, logistics, project management, contingency planning, payment terms. | Commercial Proposal and Financial Offer. |
| 2: Proposal Development & Contract Negotiation | 2.3: Contract Negotiation | Finalizing the terms and conditions of the service agreement. | Discussion and agreement on scope, price, timeline, payment milestones, warranties, responsibilities, dispute resolution, Libyan contract law adherence. | Signed and executed Service Contract. |
| 3: Pre-Installation & Logistics | 3.1: Project Planning & Mobilization | Detailed project execution plan and mobilization of resources. | Development of detailed project schedule, resource plan (personnel, equipment), procurement of materials, obtaining necessary permits and approvals in Libya. | Approved Project Execution Plan, Mobilization Plan, and Permitting Strategy. |
| 3: Pre-Installation & Logistics | 3.2: Equipment Procurement & Shipping | Sourcing and delivery of the PSA oxygen plant components to Libya. | Manufacturing or sourcing of plant components, quality control, packaging, customs clearance procedures, transportation to the designated site in Libya. | Delivered PSA plant equipment and associated materials at the project site. |
| 3: Pre-Installation & Logistics | 3.3: Site Preparation | Ensuring the installation site is ready for construction. | Site clearing, leveling, foundation preparation, provision of utilities (power, water, drainage), establishment of temporary site facilities (offices, storage). | Site ready for commencement of installation activities. |
| 4: On-site Installation & Commissioning | 4.1: Equipment Installation | Physical installation of the PSA oxygen plant components at the site. | Unloading and positioning of equipment, assembly of skids, piping, electrical connections, instrumentation installation, structural erection. | Physically installed PSA oxygen plant system. |
| 4: On-site Installation & Commissioning | 4.2: Pre-Commissioning Checks | Verification of all installed components before energization. | Mechanical completion checks, flushing and cleaning of pipelines, insulation checks, electrical continuity tests, instrument calibration. | Successful pre-commissioning reports. |
| 4: On-site Installation & Commissioning | 4.3: Commissioning & Start-up | Energizing the system and performing initial operational tests. | System pressurization, initial start-up, performance tuning, verification of oxygen purity, flow rate, and pressure. | Functional PSA oxygen plant system operating within specified parameters. |
| 4: On-site Installation & Commissioning | 4.4: Performance Testing & Acceptance | Demonstrating the plant's performance against agreed specifications. | Conducting detailed performance tests, validating all operational parameters, client witnessing and formal acceptance of the installed plant. | Signed Performance Acceptance Certificate. |
| 5: Post-Installation & Project Closure | 5.1: Training | Ensuring the client's personnel are competent to operate and maintain the plant. | Theoretical and practical training on plant operation, maintenance procedures, troubleshooting, safety protocols for local staff. | Trained client operational and maintenance staff. |
| 5: Post-Installation & Project Closure | 5.2: As-Built Documentation | Providing comprehensive documentation of the final installed system. | Providing updated engineering drawings, equipment manuals, maintenance logs, test reports, spare parts list. | Complete As-Built Documentation package. |
| 5: Post-Installation & Project Closure | 5.3: Warranty & Handover | Formal handover of the plant and initiation of warranty period. | Final project close-out meeting, formal handover of keys and documentation, commencement of warranty period. | Completed project, plant operational, warranty initiated. |
| 5: Post-Installation & Project Closure | 5.4: Post-Project Support | Ongoing support after project completion. | Providing technical support, spare parts management, potential for ongoing maintenance contracts, addressing any warranty claims. | Satisfied client, ongoing operational reliability. |
PSA Oxygen Plant Installation Service Process in Libya: Workflow Overview
- Phase 1: Inquiry & Pre-Qualification
- Phase 2: Proposal Development & Contract Negotiation
- Phase 3: Pre-Installation & Logistics
- Phase 4: On-site Installation & Commissioning
- Phase 5: Post-Installation & Project Closure
Psa Oxygen Plant Installation Service Cost In Libya
The cost of installing a PSA (Pressure Swing Adsorption) oxygen plant in Libya can vary significantly due to several factors. These include the plant's capacity (measured in Nm³/h or m³/h), the level of purity required for the oxygen, the specific technology and manufacturer chosen, the complexity of the site installation, and associated logistics like transportation and permits. Generally, the Libyan market may see pricing influenced by the availability of skilled labor, local import duties, and the prevailing economic conditions.
| Plant Capacity (Nm³/h) | Estimated Price Range (Libyan Dinar - LYD) |
|---|---|
| Small (e.g., 1-10 Nm³/h) | LYD 50,000 - LYD 150,000+ |
| Medium (e.g., 10-50 Nm³/h) | LYD 150,000 - LYD 500,000+ |
| Large (e.g., 50+ Nm³/h) | LYD 500,000+ (Potentially millions) |
Key Pricing Factors for PSA Oxygen Plant Installation in Libya
- Plant Capacity (Nm³/h): Larger capacity plants will naturally incur higher capital and installation costs.
- Oxygen Purity Requirements (%): Higher purity oxygen (e.g., medical grade) often requires more advanced filtration and monitoring systems, increasing costs.
- Technology and Manufacturer Reputation: Different manufacturers offer varying levels of quality, efficiency, and after-sales support, impacting price.
- Site Complexity and Preparation: The existing infrastructure at the installation site, the need for foundation work, and accessibility can influence labor and material costs.
- Ancillary Equipment: This includes air compressors, dryers, storage tanks, and piping, all of which add to the overall project cost.
- Logistics and Transportation: Shipping costs to Libya, customs duties, and local transportation of equipment are significant factors.
- Labor Costs: The availability and cost of skilled engineers, technicians, and general labor in Libya will directly affect installation expenses.
- Permits and Regulatory Compliance: Obtaining necessary permits and ensuring compliance with Libyan regulations can incur fees and delays.
- After-Sales Support and Training: The cost may include commissioning, operator training, and warranty services.
- Geographic Location within Libya: Remote locations might have higher transportation and logistical costs.
Affordable Psa Oxygen Plant Installation Service Options
Setting up a Pressure Swing Adsorption (PSA) oxygen plant is a crucial investment for many industries and healthcare facilities. Finding an affordable installation service doesn't mean compromising on quality or efficiency. This guide explores value-driven installation options and effective cost-saving strategies for PSA oxygen plant projects.
| Cost-Saving Strategy | Description | Potential Savings Indicator |
|---|---|---|
| Off-Peak Installation Scheduling | Negotiate lower installation rates by scheduling during the provider's less busy periods (e.g., weekdays, non-holiday seasons). | $$ |
| Bulk Purchasing of Ancillary Equipment | If the installation provider offers related equipment (e.g., air dryers, compressors), inquire about discounts for bundled purchases with the PSA plant. | $ |
| Leverage In-House Expertise | Utilize your own qualified technicians for tasks like site preparation, utility connections, or initial operator training, reducing the need for external labor. | $$$ |
| Long-Term Maintenance Contracts | While an upfront cost, well-structured long-term maintenance contracts can often include discounted installation services or offer better rates on future repairs and parts. | $ |
| Phased Installation Approach | For larger projects, breaking down the installation into phases might allow for better budget management and leverage lower costs for certain components or services at different times. | $$ |
| Compare Multiple Quotes | Obtain detailed quotes from at least three reputable PSA plant installation service providers to identify competitive pricing and understand variations in service inclusions. | $$$ |
| Negotiate Payment Terms | Discuss flexible payment schedules or early payment discounts with the installation provider to manage cash flow effectively. | $ |
Understanding Value Bundles in PSA Oxygen Plant Installation
- {"title":"Basic Installation Package","description":"This typically includes the core setup of the PSA unit, connection to existing utilities (power, compressed air), and initial system testing. It's ideal for clients with in-house technical teams who can manage post-installation operations and maintenance."}
- {"title":"Standard Installation & Commissioning","description":"Beyond basic installation, this bundle includes full system commissioning, performance testing, and basic operator training. This is a popular choice for organizations seeking a turnkey solution for the initial setup phase."}
- {"title":"Comprehensive Installation & Training Package","description":"This top-tier bundle encompasses everything in the standard package, plus extended training for maintenance personnel, on-site support for an initial operational period, and comprehensive documentation. It offers the highest level of assurance and preparedness for long-term operation."}
- {"title":"Customizable Value Bundles","description":"Reputable providers often allow clients to tailor packages by adding or removing specific services like extended warranties, spare parts kits, remote monitoring setup, or advanced maintenance training, ensuring you only pay for what you need."}
Verified Providers In Libya
In Libya's evolving healthcare landscape, identifying verified providers is crucial for ensuring quality and trustworthy medical services. Franance Health stands out as a beacon of reliability, backed by rigorous credentialing processes and a commitment to excellence. Their verified providers offer a level of assurance that is paramount for individuals seeking the best possible care.
| Provider Type | Key Credentials Verified | Franance Health Assurance |
|---|---|---|
| Doctors/Specialists | Medical Licenses, Board Certifications, Educational Degrees, Professional Experience, Reputational Checks | Ensures highly qualified and experienced practitioners with validated expertise. |
| Hospitals/Clinics | Accreditation Status, Regulatory Compliance, Quality Improvement Initiatives, Staff Qualifications, Patient Safety Protocols | Confirms facilities meet high standards of care, safety, and operational efficiency. |
| Diagnostic Centers | Equipment Calibration and Maintenance, Technician Certifications, Quality Control Measures, Compliance with Health Regulations | Guarantees accurate and reliable diagnostic services through well-maintained equipment and certified personnel. |
| Pharmacy Services | Pharmacy Licenses, Pharmacist Credentials, Drug Sourcing and Storage Protocols, Dispensing Accuracy | Ensures safe and legitimate access to medications handled by qualified pharmacists. |
Why Franance Health Providers are the Best Choice:
- Unwavering Commitment to Quality: Franance Health enforces stringent qualification standards for all its affiliated medical professionals and facilities.
- Rigorous Vetting Process: Each provider undergoes thorough background checks, verification of licenses, certifications, and a comprehensive review of their professional history.
- Patient-Centric Approach: Verified Franance Health providers prioritize patient well-being, offering compassionate care and clear communication.
- Access to Specialized Expertise: The network includes a diverse range of specialists, ensuring that patients can find the right expertise for their specific medical needs.
- Adherence to International Standards: Franance Health promotes alignment with internationally recognized best practices in healthcare delivery.
- Transparent and Accountable: The credentialing process fosters transparency, giving patients confidence in the competence and integrity of the providers they choose.
Scope Of Work For Psa Oxygen Plant Installation Service
This Scope of Work (SOW) outlines the services required for the installation of a Pressure Swing Adsorption (PSA) Oxygen Plant. It details the technical deliverables, standard specifications, and key activities to ensure a successful and compliant installation.
| Deliverable Category | Specific Technical Deliverables | Standard Specifications / Requirements |
|---|---|---|
| Project Management | Project Execution Plan (PEP) | Detailed project schedule, resource allocation, risk management plan, communication plan, quality assurance plan. |
| Project Management | Progress Reports | Weekly/Bi-weekly reports detailing progress, milestones achieved, challenges, and upcoming activities. |
| Site Preparation | Foundation Design and Layout | Adherence to civil engineering standards, soil bearing capacity, seismic considerations. Approved by client/consultant. |
| Site Preparation | Concrete Foundations | Poured-in-place concrete foundations meeting specified compressive strength and dimensions. Relevant building codes and standards (e.g., ACI). |
| Site Preparation | Cable Trays and Conduits | Installation of appropriate cable trays and conduits for electrical and instrumentation wiring, following electrical safety standards (e.g., NEC, IEC). |
| Equipment Handling | Delivery Manifest and Condition Report | Detailed inventory of delivered items, inspection reports for any damage during transit. |
| Equipment Handling | Lifting and Rigging Plan | Safe and efficient plan for unloading and positioning of plant components, adhering to industry best practices and safety regulations. |
| Installation | Skid Mounting and Alignment | Precise mounting and alignment of PSA skid components (adsorbers, compressors, piping, etc.) as per manufacturer's drawings and tolerances. |
| Installation | Vessel Erection | Safe and secure erection of compressed air receivers, oxygen buffer vessels, and other static equipment, meeting pressure vessel codes (e.g., ASME Section VIII). |
| Piping | Piping Material Specification (PMS) | Adherence to specified materials (e.g., stainless steel, carbon steel), schedules, and joint types (welding, flanged). |
| Piping | Welding Procedures and Qualifications | All welding to be performed by certified welders, following approved Welding Procedure Specifications (WPS) and Procedure Qualification Records (PQR). |
| Piping | Hydrostatic/Pneumatic Testing Records | Testing of all piping systems to specified pressure and duration, documented with pressure charts and leak test reports. |
| Electrical | Cable Laying and Termination | Installation of power and control cables, adhering to electrical codes and manufacturer specifications. Proper glanding and termination. |
| Electrical | Electrical Panel Installation and Wiring | Installation and wiring of MCCs, junction boxes, and local control panels, adhering to electrical safety standards and schematics. |
| Instrumentation | Instrument Installation and Calibration | Installation of pressure transmitters, temperature sensors, flow meters, oxygen analyzers, etc., followed by calibration against traceable standards. |
| Instrumentation | Control System Wiring and Loop Checking | Wiring of all instrumentation to the PLC/DCS system. Thorough loop checking to verify signal integrity and functionality. |
| Pre-Commissioning | Pre-commissioning Checklists | Comprehensive checklists for mechanical, electrical, and instrumentation checks prior to energization. |
| Pre-Commissioning | Piping Blowdown/Flushing Records | Cleaning of all piping systems to remove debris, documented with flushing reports. |
| Pre-Commissioning | Electrical System Energization Report | Documentation of successful energization of all electrical systems with insulation resistance tests. |
| Commissioning | Plant Startup and Operation Records | Detailed logs of plant startup sequence, operational parameters, and any anomalies observed. |
| Commissioning | Performance Test Procedure (PTP) | Approved PTP outlining tests to verify oxygen purity, flow rate, power consumption, and other performance metrics. |
| Commissioning | Performance Test Report | Comprehensive report of the results of performance tests, comparing actual performance against guaranteed specifications. |
| Training | Operator Training Manual | User-friendly manual covering plant operation, maintenance, troubleshooting, and safety procedures. |
| Training | Training Session Records | Documentation of training sessions conducted for client personnel, including attendance and topics covered. |
| Documentation | As-Built Drawings (P&IDs, Electrical Schematics, GA Drawings) | Updated drawings reflecting the actual installed configuration of the plant, approved by client. |
| Documentation | Operation and Maintenance Manuals | Complete manuals for all major equipment supplied with the PSA plant. |
| Documentation | Certificates of Compliance and Test Reports | All relevant material certificates, welding inspection reports, hydrostatic test certificates, calibration certificates, etc. |
Key Areas of Focus
- Project Management and Planning
- Site Preparation and Civil Works
- Equipment Delivery and Unloading
- Installation and Erection of PSA Oxygen Plant Components
- Piping and Electrical Connections
- Instrumentation and Control System Installation
- Pre-Commissioning and Testing
- Commissioning and Performance Verification
- Training and Handover
- Documentation and As-Built Drawings
Service Level Agreement For Psa Oxygen Plant Installation Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the installation services provided for the PSA Oxygen Plant. This SLA is an addendum to the Master Service Agreement (MSA) between [Your Company Name] and [Client Company Name].
| Service Type | Response Time Target (During Service Hours) | Response Time Target (Outside Service Hours - Emergency Only) | Resolution Time Target (Estimated) | Uptime Guarantee (Post-Installation) |
|---|---|---|---|---|
| Emergency Support | 1 hour | 2 hours | 4-8 business hours | N/A (covered by warranty/maintenance agreement) |
| Urgent Support | 2 business hours | N/A | 8-16 business hours | N/A (covered by warranty/maintenance agreement) |
| Standard Support | 4 business hours | N/A | 24-48 business hours | N/A (covered by warranty/maintenance agreement) |
Definitions
- Service Hours: Standard business hours, Monday to Friday, 8:00 AM to 5:00 PM [Client's Time Zone], excluding public holidays.
- Emergency Support: Support required for critical failures that prevent the oxygen plant from operating, posing an immediate safety or operational risk.
- Urgent Support: Support required for non-critical issues that significantly impact plant performance or lead to minor operational disruptions.
- Standard Support: Support for general inquiries, minor configuration adjustments, or non-critical troubleshooting.
- Installation: The complete process of setting up and commissioning the PSA Oxygen Plant at the client's specified location as per the agreed-upon project scope.
- Downtime: Any period during which the PSA Oxygen Plant is unavailable for operation due to issues related to the installation process or its immediate aftermath (within the warranty period). Planned maintenance, client-induced issues, or force majeure events are excluded.
- Response Time: The maximum time allowed for [Your Company Name] to acknowledge a reported issue and initiate troubleshooting steps.
- Resolution Time: The maximum time allowed for [Your Company Name] to resolve a reported issue to restore full functionality.
Frequently Asked Questions

Ready when you are
Let's scope your PSA Oxygen Plant Installation Service in Libya project in Libya.
Scaling healthcare logistics and technical systems across the entire continent.

