PSA Oxygen Plant Commissioning & Performance Testing Service in Libya
Engineering Excellence & Technical Support
PSA Oxygen Plant Commissioning & Performance Testing Service High-standard technical execution following OEM protocols and local regulatory frameworks.
ISO 8573-1 Compliant Purity Verification
Rigorous on-site testing using calibrated analyzers to ensure oxygen purity meets or exceeds ISO 8573-1 standards, guaranteeing critical medical and industrial application readiness.
Optimized Production & Efficiency Tuning
Performance analysis and fine-tuning of PSA oxygen generation systems to maximize output, minimize energy consumption, and achieve optimal operational efficiency under Libyan environmental conditions.
Integrated System Commissioning & Startup
Comprehensive pre-commissioning checks, functional tests, and safe startup procedures for PSA oxygen plants, ensuring seamless integration with existing site infrastructure and immediate operational readiness.
What Is Psa Oxygen Plant Commissioning & Performance Testing Service In Libya?
PSA (Pressure Swing Adsorption) Oxygen Plant Commissioning & Performance Testing Service in Libya refers to the comprehensive suite of technical activities undertaken to verify, calibrate, and validate the operational integrity and output capacity of PSA oxygen generation systems installed within the Libyan industrial landscape. This service ensures that the installed equipment meets design specifications, safety standards, and end-user performance requirements before and during its operational life. The commissioning phase focuses on bringing the plant from an installation state to a fully operational one, encompassing system checks, functional tests, and initial parameter adjustments. Performance testing, conversely, involves a rigorous evaluation of the plant's ability to consistently deliver oxygen at the specified purity, flow rate, and pressure under simulated and actual operating conditions, often benchmarked against contractual guarantees.
| Stakeholder Group | Need for Service | Typical Use Cases |
|---|---|---|
| Project Developers & EPC Contractors | To fulfill contractual obligations, ensure project completion, and hand over a fully functional and certified asset to the client. | New plant installations, modular skids, retrofits, and expansions. Verification of system performance against vendor guarantees and project specifications. |
| End-Users (Industrial Facilities) | To guarantee the reliable supply of medical or industrial-grade oxygen, optimize operational efficiency, ensure compliance with safety regulations, and maximize return on investment. | Hospitals (medical oxygen), metallurgy (steelmaking, welding), chemical processing, glass manufacturing, wastewater treatment, aquaculture, and specialized industrial applications requiring on-site oxygen generation. |
| Regulatory Bodies & Insurers | To confirm adherence to national and international safety standards, environmental regulations, and to validate operational parameters for insurance purposes. | Verification of safety systems, emission compliance (if applicable), and operational reliability for compliance audits and risk assessment. |
| Oxygen Plant Manufacturers/Suppliers | To validate their product performance, support client acceptance, and provide a comprehensive service package. | Factory Acceptance Tests (FAT) followed by Site Acceptance Tests (SAT), troubleshooting during warranty periods, and post-installation support. |
Key Components of PSA Oxygen Plant Commissioning & Performance Testing Service:
- Pre-Commissioning Checks: Verification of mechanical completion, electrical connections, instrumentation wiring, safety interlocks, and utility availability (power, compressed air, cooling water).
- Functional System Tests: Step-by-step activation and testing of individual plant subsystems, including air dryers, compressors, PSA adsorber beds, oxygen buffer tanks, and control systems.
- Control System Calibration & Verification: Ensuring accurate readings and responses from sensors (pressure, flow, temperature, oxygen purity), actuators, and the Programmable Logic Controller (PLC) or Distributed Control System (DCS).
- Initial Start-up & Stabilization: Controlled start-up sequence, bed regeneration cycle validation, and achieving stable operating parameters.
- Performance Guarantee Testing (PGT): Operation at specified ambient conditions and production rates to measure actual oxygen purity, flow, pressure, and power consumption against contractual targets.
- Efficiency & Yield Analysis: Calculation of adsorbent efficiency, cycle times, and oxygen yield under various operating loads.
- Safety System Validation: Testing of emergency shutdown procedures, pressure relief devices, and hazardous area classifications.
- Documentation & Reporting: Generation of detailed commissioning reports, performance test certificates, operational manuals, and as-built drawings.
- Operator Training: On-site training for plant operators and maintenance personnel on system operation, troubleshooting, and routine maintenance procedures.
Who Needs Psa Oxygen Plant Commissioning & Performance Testing Service In Libya?
The commissioning and performance testing of Pressure Swing Adsorption (PSA) oxygen plants are critical for ensuring their optimal operation, safety, and efficiency. In Libya, several sectors and organizations would significantly benefit from specialized PSA oxygen plant commissioning and performance testing services. These services are essential for a wide range of applications, from life-saving medical oxygen to industrial processes.
| Customer Type | Key Departments/Units Involved | Primary Need for Services |
|---|---|---|
| Hospitals & Clinics | Anesthesiology, Intensive Care Units (ICU), Respiratory Therapy, Biomedical Engineering | Patient safety, ensuring medical-grade oxygen purity and supply continuity, regulatory compliance. |
| Oil & Gas Companies (Upstream, Midstream, Downstream) | Maintenance & Operations, Process Engineering, Safety Departments, Fabrication Yards | Operational efficiency, process integrity, safety compliance for welding, cutting, and chemical processes. |
| Manufacturing Plants (Metal Fabrication, Chemical, Glass, etc.) | Production Management, Engineering, Quality Control | Consistent oxygen supply for production processes, product quality, energy efficiency. |
| Municipal Water & Wastewater Authorities | Operations, Environmental Compliance, Engineering | Effective water treatment processes, meeting environmental discharge standards, reliability of oxygen supply. |
| Emergency Response & Disaster Management Agencies | Logistics, Medical Support Units, Operations | Rapid deployment readiness, reliable oxygen supply for critical medical interventions during emergencies. |
| Ministry of Health | Healthcare Infrastructure Development, Public Health Services | Ensuring quality and availability of medical oxygen across public healthcare facilities, national health preparedness. |
| Ministry of Industry and Mines | Industrial Development, Safety Standards | Supporting industrial growth by ensuring reliable oxygen supply for various manufacturing sectors, adherence to industrial safety regulations. |
Target Customers and Departments in Libya Requiring PSA Oxygen Plant Commissioning & Performance Testing Services
- {"title":"Healthcare Sector","description":"Reliable and pure oxygen is a non-negotiable requirement for hospitals and medical facilities. PSA oxygen plants are increasingly being adopted for on-site oxygen generation, reducing reliance on external suppliers and ensuring continuous availability. Commissioning and testing are vital for patient safety and treatment efficacy."}
- {"title":"Oil and Gas Industry","description":"Libya's prominent oil and gas sector utilizes oxygen in various processes, including welding, cutting, and specialized downstream applications. Ensuring the consistent purity and flow rate of oxygen from PSA plants is crucial for operational efficiency and safety in exploration, production, and refining operations."}
- {"title":"Industrial Manufacturing","description":"Various manufacturing industries, such as metal fabrication, chemical production, and glass manufacturing, often require oxygen for their processes. Commissioning and performance testing guarantee that PSA plants meet the specific quality and quantity demands of these industrial operations."}
- {"title":"Water Treatment Facilities","description":"Oxygen is used in advanced wastewater treatment processes, such as advanced oxidation and aerobic digestion. Ensuring the reliable performance of PSA oxygen plants is key to maintaining effective water purification and environmental protection standards."}
- {"title":"Emergency and Disaster Relief Organizations","description":"In times of crisis or natural disaster, the rapid deployment and reliable operation of medical oxygen systems are paramount. Organizations involved in emergency response would benefit from ensuring their PSA oxygen generation equipment is fully operational and tested."}
- {"title":"Government and Public Service Agencies","description":"Various government bodies responsible for public health infrastructure, industrial development, and environmental management may oversee or operate PSA oxygen plants. Ensuring compliance with national standards and optimal performance is a key responsibility."}
- {"title":"Aerospace and Aviation Industry","description":"While a smaller sector in Libya, any operations requiring aviation fuel production, maintenance, or specialized atmospheric control would necessitate reliable oxygen sources, potentially from PSA technology."}
Psa Oxygen Plant Commissioning & Performance Testing Service Process In Libya
This document outlines the comprehensive workflow for PSA Oxygen Plant Commissioning & Performance Testing Services in Libya, from initial inquiry to final execution and reporting. Our process is designed to ensure efficient, safe, and compliant operation of your PSA oxygen generation system, meeting all contractual and regulatory requirements.
| Phase | Activity | Description | Key Deliverables/Outcomes | Libyan Context Considerations |
|---|---|---|---|---|
| Phase 1: Inquiry & Proposal | Initial Inquiry | Client expresses interest in commissioning and/or performance testing services for their PSA oxygen plant. | Understanding of client's needs and plant specifications. | Initial contact via email, phone, or through a local representative. Understanding of specific project location and potential site access challenges. |
| Information Gathering | Gathering detailed information about the PSA plant (make, model, capacity, age), existing documentation, and specific service requirements. | Technical data sheet, plant schematics, P&IDs, previous maintenance records. | Language barriers, need for clear and concise technical documentation in English or Arabic. Verification of vendor and equipment certifications. | |
| Site Assessment (Remote/Preliminary) | Initial assessment of site conditions, logistical requirements, and safety considerations based on provided information. | Preliminary risk assessment, understanding of local infrastructure. | Understanding of political stability, security situation, and accessibility of the site. Need for local security clearances and permits. | |
| Proposal Development | Developing a detailed proposal outlining scope of work, methodology, timelines, required resources, pricing, and terms & conditions. | Comprehensive technical and commercial proposal. | Compliance with Libyan procurement regulations. Inclusion of local content requirements if applicable. Clarity on payment terms and currency. | |
| Phase 2: Pre-Mobilization & Planning | Contract Finalization | Negotiation and signing of the service contract. | Signed contract, clear understanding of obligations. | Legal review of contract terms by Libyan legal counsel. Adherence to Libyan contract law. |
| Mobilization Planning | Detailed planning for personnel, equipment, and material mobilization to Libya. | Mobilization schedule, personnel Roster, equipment list, visa applications, travel arrangements. | Securing necessary visas for expatriate personnel. Coordinating with local logistics providers for transportation within Libya. Obtaining necessary permits for equipment entry. | |
| Site Access & Permits | Obtaining all necessary site access permits, work permits, and any other regulatory approvals required by Libyan authorities. | Site entry permits, work permits, safety permits. | Extensive coordination with client's local representatives and relevant Libyan government bodies. Understanding of local customs and working hours. Compliance with environmental regulations. | |
| Pre-commissioning Checks | Reviewing plant documentation, ensuring all pre-commissioning checks as per manufacturer's recommendations are completed by the client. | Confirmation of pre-commissioning completion by client. | Clear communication channels with client's on-site team to ensure readiness. | |
| Phase 3: On-Site Execution: Commissioning | Arrival & Site Inductions | Mobilized team arrives on-site, undergoes site safety induction, and familiarizes with the plant and surrounding environment. | Completion of site inductions, understanding of site-specific safety procedures. | Adherence to client's site-specific safety protocols and Libyan HSE regulations. Understanding of local emergency procedures. |
| Pre-Commissioning Verification | Verifying mechanical completion, electrical connections, instrumentation calibration, and safety system checks. | Mechanical and electrical integrity checks, instrument calibration reports. | Ensuring all checks are performed in accordance with international standards and manufacturer guidelines. | |
| System Energization & Start-up | Energizing plant systems, initiating initial start-up sequences, and monitoring system behavior under no-load conditions. | Successful initial start-up, stable system parameters. | Careful monitoring and control during start-up, considering potential power fluctuations. | |
| Functional Testing | Performing functional tests on all plant components and subsystems (e.g., adsorption vessels, valves, compressors, PSA cycle). | Successful operation of all components as per design. | Systematic testing to identify and rectify any initial faults or deviations. | |
| Control System Configuration & Tuning | Configuring and fine-tuning the plant's control system for optimal operation. | Optimized control parameters, stable operation. | Ensuring the control system is robust and responsive to changing conditions. | |
| Phase 4: On-Site Execution: Performance Testing | Preparation for Performance Tests | Ensuring the plant is stable and operating within nominal parameters, preparing test equipment and calibration. | Stable plant operation, calibrated test equipment. | Verifying availability of accurate and calibrated measurement devices (flow meters, pressure gauges, analyzers). |
| Performance Test Execution | Conducting tests to verify the plant's ability to produce oxygen at the specified purity, capacity, and pressure under various operating conditions. | Collection of performance test data (oxygen purity, flow rate, pressure, power consumption). | Testing at various load points to simulate real-world operational scenarios. Ensuring sufficient data is collected for statistical analysis. | |
| Data Analysis & Validation | Analyzing collected data to determine if the plant meets the guaranteed performance parameters. | Performance test results, comparison against guarantees. | Ensuring the analysis is conducted objectively and in accordance with agreed-upon test procedures. | |
| Troubleshooting & Optimization (if required) | If performance guarantees are not met, identifying root causes and implementing corrective actions for optimization. | Root cause analysis, implemented corrective actions, re-testing (if necessary). | Collaborative troubleshooting with client's engineers to ensure long-term improvements. | |
| Phase 5: Reporting & Handover | Draft Report Preparation | Compiling all commissioning and performance test data, observations, and findings into a draft report. | Draft commissioning and performance test report. | Clear and concise report structure, with accurate data presentation. |
| Client Review & Approval | Submitting the draft report to the client for review and obtaining their formal approval. | Client feedback, signed-off final report. | Allowing adequate time for client review, considering potential communication delays. | |
| Final Report & Documentation | Issuing the final, approved report along with all relevant documentation, including test certificates and recommendations. | Final approved report, test certificates, O&M manual updates (if applicable). | Providing a comprehensive handover package that is easily understood and usable by the client's team. | |
| Handover Meeting | Conducting a formal handover meeting to discuss the report, findings, and any outstanding issues or recommendations. | Successful handover, client's understanding of report and recommendations. | Ensuring key client personnel are present to receive the handover. | |
| Phase 6: Post-Execution Support | Recommendations Implementation | Assisting the client in implementing any recommended corrective actions or optimizations. | Successful implementation of recommendations. | Providing remote or on-site support as per contractual agreement. |
| Warranty Support (if applicable) | Providing support during the warranty period for any defects or issues that may arise. | Resolution of warranty claims. | Clear communication channels for reporting and resolving warranty issues. | |
| Follow-up & Training (Optional) | Offering follow-up technical support or additional training for the client's operational staff. | Enhanced operational competency for client's staff. | Tailoring training programs to the specific needs of the Libyan operational team. |
PSA Oxygen Plant Commissioning & Performance Testing Service Process in Libya
- Phase 1: Inquiry & Proposal
- Phase 2: Pre-Mobilization & Planning
- Phase 3: On-Site Execution: Commissioning
- Phase 4: On-Site Execution: Performance Testing
- Phase 5: Reporting & Handover
- Phase 6: Post-Execution Support
Psa Oxygen Plant Commissioning & Performance Testing Service Cost In Libya
Commissioning and performance testing of a PSA (Pressure Swing Adsorption) oxygen plant in Libya involves a complex set of services essential for ensuring the plant operates safely, efficiently, and meets specified output requirements. The cost of these services is influenced by several key factors, leading to a broad range of pricing in Libyan Dinar (LYD). Understanding these factors is crucial for accurate budgeting and vendor selection.
| Plant Capacity (Nm³/hr) | Estimated Cost Range (LYD) | Notes |
|---|---|---|
| 1 - 5 | 20,000 - 50,000 | Smaller, simpler units, basic commissioning. |
| 5 - 20 | 40,000 - 120,000 | Standard industrial units, comprehensive testing. |
| 20 - 50 | 100,000 - 300,000 | Larger capacity, complex controls, detailed performance validation. |
50 | 250,000+ | Very large or highly specialized plants, extensive testing protocols, potentially multi-week engagements. |
Key Pricing Factors for PSA Oxygen Plant Commissioning & Performance Testing in Libya:
- {"title":"Plant Capacity and Complexity","description":"Larger capacity plants (measured in Nm³/hr or SCFM) and those with more sophisticated control systems, multiple PSA beds, or integrated purification/drying stages will naturally incur higher commissioning and testing costs due to the increased scope of work, specialized equipment, and expert personnel required."}
- {"title":"Scope of Services","description":"The specific services included in the contract significantly impact cost. This can range from basic pre-commissioning checks and start-up assistance to comprehensive performance testing against contractual guarantees, vibrascope analysis, noise level measurements, and integrated safety system validation. Extended warranty periods or remote monitoring setup will also add to the price."}
- {"title":"Vendor Experience and Reputation","description":"Established vendors with a proven track record in the region and demonstrated expertise in PSA technology typically command higher fees. Their experience often translates to faster, more efficient execution and a higher likelihood of successful commissioning, reducing potential project delays and associated costs."}
- {"title":"Location and Accessibility","description":"The remoteness of the plant site within Libya can increase logistical costs, including travel, accommodation, and transportation of specialized testing equipment and personnel. Sites with challenging security or infrastructure may also incur additional expenses."}
- {"title":"Duration of Commissioning and Testing","description":"The planned timeline for commissioning and performance testing directly affects labor costs. Extended durations due to site readiness issues, equipment delivery delays, or complex troubleshooting will increase the overall service cost."}
- {"title":"Required Documentation and Reporting","description":"The level of detail and format required for commissioning reports, performance test reports, and handover documentation can influence costs. Comprehensive, certified documentation often requires more time and resources from the service provider."}
- {"title":"Third-Party Inspections and Certifications","description":"If independent third-party inspections or specific certifications are mandated, these will add to the project's service cost. The fees for these external bodies are separate but are often managed by the commissioning service provider."}
- {"title":"Local Content Requirements and Regulations","description":"Libyan regulations might stipulate certain local content requirements for service provision, which could influence the cost if local teams need extensive training or if there are specific import/export restrictions on personnel or equipment."}
- {"title":"Language and Technical Expertise","description":"The need for personnel fluent in both English and Arabic, along with highly specialized technical skills for PSA systems, can impact the availability and cost of qualified engineers and technicians."}
Affordable Psa Oxygen Plant Commissioning & Performance Testing Service Options
Our Affordable PSA Oxygen Plant Commissioning & Performance Testing Service Options are designed to provide comprehensive and cost-effective solutions for ensuring your PSA oxygen plant operates at peak efficiency and meets all required standards. We understand the critical role your oxygen generation system plays, and our services are tailored to deliver maximum value without compromising quality. We offer flexible value bundles and implement smart cost-saving strategies to make essential commissioning and testing accessible and economically viable for your operation.
| Value Bundle Option | Core Services Included | Target Application | Key Cost-Saving Benefit | Estimated Price Range (Illustrative) |
|---|---|---|---|---|
| Essentials Package | Basic Commissioning (Pre-start checks, system startup verification), Standard Performance Testing (Purity, flow rate checks) | New installations, small-scale plants, routine re-validation | Focuses on core functionality, reducing scope for lower cost | $X,XXX - $XX,XXX |
| Standard Package | Full Commissioning (All checks, calibration, parameter tuning), Comprehensive Performance Testing (Purity, flow, pressure, dew point, gas composition), Initial Operator Briefing | Mid-sized plants, initial operational setup, planned maintenance | Balances thoroughness with cost-effectiveness for typical operational needs | $XX,XXX - $XXX,XXX |
| Premium Package | Extended Commissioning (Deep diagnostics, advanced optimization), Full Performance Testing (All standard tests + advanced analytics, endurance testing), In-depth Operator Training, 3-Month Post-Commissioning Support | Large-scale plants, critical applications, pre-certification testing, complex configurations | Proactive optimization and extended support prevent future costly issues | $XXX,XXX - $XXXX,XXX |
| Custom Bundle | Tailored to specific client needs and plant requirements. | Unique or highly specialized applications, specific compliance mandates | Pay only for the services you truly need, eliminating unnecessary costs | Custom Quote |
Key Service Components & Value Propositions
- Comprehensive Commissioning: Ensures proper installation, calibration, and initial setup for optimal performance and safety.
- Rigorous Performance Testing: Validates oxygen purity, flow rate, pressure, and other critical parameters against design specifications.
- Troubleshooting & Optimization: Identifies and resolves any operational issues to maximize efficiency and minimize downtime.
- Safety Compliance Verification: Confirms adherence to all relevant safety regulations and industry best practices.
- Operator Training: Empowers your team with the knowledge to operate and maintain the plant effectively.
- Detailed Reporting: Provides clear, actionable reports on commissioning and testing results, including recommendations.
Verified Providers In Libya
In Libya's evolving healthcare landscape, identifying and trusting healthcare providers is paramount. Verified providers offer a crucial layer of assurance, ensuring quality, ethical practices, and competence. Franance Health stands out as a leading force in this regard, meticulously vetting and credentialing healthcare professionals and institutions. Their rigorous process ensures that all Franance Health-affiliated providers meet the highest standards, making them the most reliable choice for patients seeking excellent medical care in Libya.
| Feature | Franance Health Advantage | Impact for Patients |
|---|---|---|
| Credentialing Process | Multi-stage vetting, including verification of licenses, qualifications, and experience. Continuous performance monitoring. | Guaranteed access to qualified and competent medical professionals. |
| Quality Standards | Adherence to international best practices and local healthcare regulations. Emphasis on patient outcomes and satisfaction. | Higher likelihood of receiving effective and appropriate medical treatment. |
| Ethical Conduct | Strict adherence to a code of ethics, ensuring patient privacy, informed consent, and non-discriminatory care. | Peace of mind knowing that your health is in trustworthy and respectful hands. |
| Network Breadth | A comprehensive network of hospitals, clinics, and individual practitioners covering various medical specialties. | Convenient access to a wide range of healthcare services without compromising on quality. |
| Patient Trust | Building a reputation for reliability and excellence through consistent delivery of superior healthcare. | Reduced anxiety and uncertainty when seeking medical attention. |
Why Franance Health is the Top Choice for Verified Providers in Libya
- Unwavering commitment to quality assurance and patient safety.
- Rigorous credentialing process for all affiliated healthcare professionals and facilities.
- Focus on ethical medical practices and patient-centered care.
- Extensive network of specialists and general practitioners across Libya.
- Streamlined access to pre-vetted, high-quality healthcare services.
- Building trust and confidence in the Libyan healthcare sector.
Scope Of Work For Psa Oxygen Plant Commissioning & Performance Testing Service
This Scope of Work (SOW) outlines the services required for the commissioning and performance testing of a Pressure Swing Adsorption (PSA) Oxygen Plant. The objective is to ensure the plant operates safely, reliably, and meets all specified performance parameters. The services include pre-commissioning checks, functional testing, performance testing, and final handover documentation.
| Phase/Activity | Description | Key Deliverables | Applicable Standards/Specifications |
|---|---|---|---|
| Pre-commissioning Activities | Verification of mechanical completion, electrical wiring, instrumentation, safety systems, and utility connections. Inert gas purging and leak testing of the system. | Pre-commissioning Checklist, Punch List | Client's Engineering Specifications, Relevant ASME/API codes, Manufacturer's Manuals |
| Functional Testing | Testing of individual components (compressors, adsorber vessels, valves, control systems) and integrated system functions. Verification of start-up, shutdown, and emergency shutdown procedures. | Functional Test Reports, Alarm & Interlock Verification Report | Client's Control Philosophy, ISA Standards (e.g., ISA 5.1, ISA 84) |
| Performance Testing | Demonstration of the PSA Oxygen Plant's ability to consistently produce oxygen at the specified purity, flow rate, and pressure under normal operating conditions. This includes stabilization periods and multiple test runs. | Performance Test Report (including O2 Purity, Flow Rate, Pressure, Specific Power Consumption), Test Data Sheets | Client's Performance Specifications, ISO 10083, CGA G-4.3 |
| Documentation & Handover | Compilation and submission of all commissioning reports, test results, operating manuals, maintenance procedures, and as-built drawings. Training for client's operation and maintenance personnel. | Final Commissioning Report, As-Built Drawings, O&M Manuals, Training Certificate | Client's Documentation Requirements, Manufacturer's Data Books |
| Safety & Quality Assurance | Adherence to all site safety regulations and client's quality procedures throughout the commissioning process. Hazard identification and risk assessment. | Safety Plan, Risk Assessment Reports, QA/QC Records | Client's HSE Policies, ISO 9001 |
Scope of Work - PSA Oxygen Plant Commissioning & Performance Testing
- Pre-commissioning Activities
- Functional Testing
- Performance Testing
- Documentation & Handover
- Safety & Quality Assurance
Service Level Agreement For Psa Oxygen Plant Commissioning & Performance Testing Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Commissioning & Performance Testing Service of your PSA Oxygen Plant. This agreement ensures timely support and reliable performance during the critical phases of your plant's operational readiness.
| Service Component | Response Time (Critical Issue) | Response Time (Non-Critical Issue) | Uptime Guarantee (During Testing) |
|---|---|---|---|
| Plant Commissioning Support | 1 Hour (On-site or Remote) | 4 Business Hours (Remote) | N/A (Focus on successful commissioning) |
| Performance Testing Support | 30 Minutes (On-site or Remote) | 2 Business Hours (Remote) | 98% (During scheduled testing windows) |
| Troubleshooting & Issue Resolution | 1 Hour (On-site or Remote) | 4 Business Hours (Remote) | N/A (Focus on resolution speed) |
| Remote Monitoring & Diagnostics | 1 Business Hour | 8 Business Hours | N/A (Continuous monitoring) |
Scope of Service
- Commissioning of the PSA Oxygen Plant as per agreed specifications.
- Conducting performance testing to verify output, purity, and efficiency.
- Troubleshooting and issue resolution during the commissioning and testing phases.
- On-site technical support during the agreed service period.
Frequently Asked Questions

Ready when you are
Let's scope your PSA Oxygen Plant Commissioning & Performance Testing Service in Libya project in Libya.