
Operating Theatre Turnkey Build in Libya
Engineering Excellence & Technical Support
Complete OR design, equipment integration and commissioning High-standard technical execution following OEM protocols and local regulatory frameworks.
Advanced Modular Operating Theatre Design
Our turnkey solutions incorporate state-of-the-art modular operating theatre designs, optimized for airflow, infection control, and ergonomic workflow. This includes integrated laminar airflow systems, HEPA filtration, and seamless, non-porous surfaces to ensure the highest standards of sterility and patient safety.
Redundant Power & Medical Gas Systems
We engineer robust and redundant power supply systems, including UPS and backup generators, coupled with reliable medical gas pipelines (Oxygen, Nitrous Oxide, Vacuum, Air). This ensures uninterrupted operation of critical equipment and life support systems, even during power outages, vital for continuous patient care in Libya's diverse environmental conditions.
Integrated A/V and Imaging Technology
Our turnkey builds seamlessly integrate advanced audio-visual systems for training and remote consultation, alongside state-of-the-art medical imaging and diagnostic equipment. This includes fully wired infrastructure for PACS, endoscopic cameras, and surgical displays, facilitating modern surgical techniques and knowledge transfer.
What Is Operating Theatre Turnkey Build In Libya?
An Operating Theatre Turnkey Build in Libya refers to the comprehensive, end-to-end process of designing, constructing, equipping, and commissioning a fully functional operating theatre suite. This service encapsulates all project phases, from initial conceptualization and architectural design through to final handover, ensuring the facility is ready for immediate clinical use. The 'turnkey' aspect signifies that the client receives a complete, operational unit with minimal further involvement required. This typically includes the physical construction of the theatre space, integration of advanced medical gas systems, specialized ventilation and air filtration (HVAC), robust electrical infrastructure with backup power, specialized lighting, sterile environments, infection control measures, and the procurement and installation of all surgical equipment, imaging modalities, and ancillary support systems. The service is provided by specialized contracting firms possessing expertise in healthcare infrastructure and medical technology. The goal is to deliver a compliant, safe, and efficient surgical environment tailored to specific clinical needs and international standards within the Libyan healthcare landscape.
| Who Needs It? | Typical Use Cases | |
|---|---|---|
| Hospitals and Healthcare Facilities (Public and Private) seeking to upgrade or establish new surgical capabilities. | Establishment of new general surgical theatres. | Development of specialized surgical suites (e.g., orthopedic, cardiac, neurosurgery, laparoscopic). |
| Government Health Ministries and Agencies responsible for public healthcare infrastructure development and modernization. | Expansion of existing hospital infrastructure to meet increased patient demand. | Replacement of outdated or non-compliant operating theatre facilities. |
| International Aid Organizations and NGOs involved in rebuilding or enhancing healthcare systems in post-conflict or developing regions. | Setting up temporary or permanent surgical facilities in remote or underserved areas. | Creation of advanced trauma and emergency surgical centers. |
| Private Investors and Healthcare Developers entering the Libyan market. | Construction of state-of-the-art surgical centers for elective procedures. |
Key Components of an Operating Theatre Turnkey Build:
- Architectural Design and Planning
- Civil Works and Construction
- Medical Gas Pipeline Systems (MGPS) Installation
- Advanced HVAC and Air Filtration Systems
- Electrical Infrastructure and Uninterruptible Power Supplies (UPS)
- Specialized Surgical Lighting and Illumination Systems
- Laminar Airflow and Infection Control Measures
- Sterile Processing and Decontamination Areas
- Surgical Equipment Procurement and Installation (e.g., surgical tables, C-arms, anesthesia machines)
- Diagnostic Imaging Integration (e.g., X-ray, CT scanners)
- IT and Communication Systems Integration
- Commissioning, Validation, and Training
Who Needs Operating Theatre Turnkey Build In Libya?
A turnkey build for an operating theatre in Libya presents a comprehensive solution for healthcare facilities requiring rapid and complete establishment of modern surgical suites. This service encompasses everything from initial design and architectural planning to construction, installation of specialized medical equipment, and final commissioning. The demand arises from a need for upgraded, safe, and efficient surgical environments, particularly in a region undergoing reconstruction and development, or where existing infrastructure is outdated.
| Target Department | Key Needs Addressed by Turnkey Build |
|---|---|
| Surgical Departments (General Surgery, Orthopedics, Urology, etc.) | Creation of sterile, well-equipped environments with advanced surgical lighting, tables, imaging integration, and anesthesia workstations. |
| Cardiothoracic Surgery | Provision of highly specialized operating rooms with dedicated equipment for open-heart procedures, advanced monitoring, and life support. |
| Neurosurgery | Requirements for specialized operating microscopes, neuronavigation systems, high-resolution imaging, and radiation protection. |
| Gynecology and Obstetrics | Development of operating theaters suitable for cesarean sections, gynecological procedures, and potential obstetric emergencies. |
| Ophthalmology | Installation of specialized surgical microscopes, phacoemulsification machines, and precise lighting for delicate eye surgeries. |
| Ear, Nose, and Throat (ENT) | Equipping theaters with specialized instruments, endoscopes, and microsurgical tools for complex ENT procedures. |
| Anesthesia Departments | Integration of modern anesthesia machines, patient monitors, and gas supply systems for safe and efficient anesthetic delivery. |
| Sterilization and Central Sterile Supply Departments (CSSD) | Ensuring seamless integration and appropriate space for the entire sterilization workflow, which is critical for operating theatre safety. |
| Intensive Care Units (ICUs) / Recovery Rooms | While not directly the operating theatre, a turnkey build often considers the proximity and integration with post-operative care facilities, requiring similar levels of environmental control and essential equipment. |
Target Customers for Operating Theatre Turnkey Build in Libya
- Government Hospitals: Public healthcare institutions undergoing modernization or expansion projects.
- Private Hospitals and Clinics: New or existing private healthcare providers aiming to enhance their surgical capabilities and attract patients.
- Specialized Medical Centers: Facilities focusing on specific surgical disciplines (e.g., cardiac, orthopedic, neurosurgery) that require state-of-the-art operating rooms.
- Reconstruction and Development Projects: Organizations and governmental bodies involved in rebuilding or establishing new healthcare infrastructure in post-conflict or developing areas.
- Military Hospitals: Healthcare facilities serving armed forces personnel that require high-standard surgical capabilities.
- International Aid Organizations: Entities working on improving healthcare access and quality in Libya, often funding or overseeing infrastructure projects.
Operating Theatre Turnkey Build Process In Libya
The turnkey operating theatre build process in Libya involves a structured workflow from initial client inquiry to final project handover. This process is designed to ensure all aspects of the operating theatre's construction and equipping are managed efficiently, adhering to international standards and local regulations. It typically encompasses planning, design, procurement, construction, installation, commissioning, and training.
| Phase | Key Activities | Deliverables |
|---|---|---|
| Inquiry & Consultation | Client meets with provider, discusses needs, budget, timeline. | Initial project scope, preliminary budget estimate. |
| Feasibility & Site Assessment | Site survey, structural, utility, and regulatory checks. | Feasibility report, site assessment findings. |
| Conceptual Design | Develop initial layouts and space plans. | Conceptual design drawings, 3D visualizations. |
| Detailed Design | Architectural, MEP, and equipment specifications. | Full set of detailed construction drawings, technical specifications. |
| Approvals & Permitting | Submit designs to Libyan authorities, obtain permits. | Approved building permits. |
| Procurement | Source and order all materials and equipment. | Procurement orders, supplier contracts. |
| Construction | Civil works, building shell, finishes. | Completed theatre structure and finishes. |
| MEP & Medical Gas Installation | Install HVAC, electrical, plumbing, medical gas lines. | Installed MEP systems, medical gas pipelines. |
| Equipment Installation | Install surgical lights, tables, imaging, etc. | Installed and connected medical equipment. |
| Testing & Commissioning | System checks, performance validation, environmental tests. | Commissioning reports, test certificates. |
| Training & Handover | Train staff, formal project handover. | Training manuals, handover documentation, keys. |
| Post-Handover Support | Maintenance, troubleshooting, warranty. | Service agreements, ongoing support. |
Operating Theatre Turnkey Build Process: Workflow Stages
- Inquiry & Initial Consultation: The process begins with a potential client (hospital, clinic, government health agency) expressing interest. This stage involves understanding the client's needs, scope of project, budget, and timeline.
- Feasibility Study & Site Assessment: A detailed assessment of the proposed site is conducted. This includes evaluating structural integrity, access, utility availability (power, water, HVAC, medical gases), and compliance with local building codes and healthcare regulations.
- Conceptual Design & Space Planning: Based on the inquiry and feasibility study, initial conceptual designs and floor plans are developed. This phase focuses on optimizing workflow, patient flow, staff movement, and equipment placement to meet specific surgical specialties.
- Detailed Design & Engineering: Once the conceptual design is approved, detailed architectural, mechanical, electrical, and plumbing (MEP) drawings are created. This includes specifications for finishes, lighting, acoustics, ventilation (HVAC), medical gas systems, and power distribution, all in line with international standards like HTM and local Libyan requirements.
- Regulatory Approvals & Permitting: The detailed designs are submitted to relevant Libyan authorities for approval and necessary building permits. This can be a time-consuming phase requiring close liaison with local bodies.
- Procurement & Supply Chain Management: Procurement of all materials, equipment (surgical lights, tables, booms, anesthesia machines, imaging devices, sterilization equipment, etc.), and specialized systems is initiated. This involves selecting reputable suppliers and ensuring timely delivery to the site.
- Construction & Civil Works: The physical construction of the operating theatre shell begins. This includes structural work, partitioning, flooring, wall finishes (anti-bacterial, seamless), ceiling installation, and integration of specialized infrastructure.
- MEP & Medical Gas Installation: The mechanical, electrical, and plumbing systems are installed. This critical phase includes the installation and testing of medical gas pipelines, HVAC systems with HEPA filtration for air purity, specialized lighting, and electrical systems designed for medical environments.
- Equipment Installation & Integration: All procured medical equipment is installed, calibrated, and integrated into the theatre's infrastructure. This requires coordination with various equipment manufacturers and specialized technicians.
- Testing, Commissioning & Validation: Rigorous testing is performed on all installed systems and equipment. This includes environmental testing (air changes, pressure differentials), electrical safety checks, medical gas purity and flow tests, and functional validation of all equipment to ensure it meets specifications and operational requirements.
- Training & Handover: Comprehensive training is provided to the hospital's medical and technical staff on the operation and maintenance of the newly installed equipment and systems. Upon successful completion of all tests and training, the project is formally handed over to the client.
- Post-Handover Support & Maintenance: Ongoing support, maintenance, and warranty services are typically offered to ensure the continued optimal performance of the operating theatre facilities.
Operating Theatre Turnkey Build Cost In Libya
The cost of a turnkey operating theatre build in Libya can fluctuate significantly due to a variety of factors. These include the size and complexity of the operating theatre, the quality and specifications of the medical equipment, the chosen construction materials, and the prevailing economic conditions and import duties in Libya. Furthermore, the specific requirements for infection control, specialized ventilation (HVAC) systems, and advanced imaging integration will heavily influence the overall price. The expertise and reputation of the contracting company, as well as the duration of the project, also play a crucial role in determining the final cost. It's essential to obtain detailed quotes from multiple experienced contractors specializing in healthcare infrastructure in Libya to get accurate pricing.
| Category | Estimated Price Range (LYD) | Notes |
|---|---|---|
| Basic Operating Theatre (Small, Standard Equipment) | 300,000 - 750,000 | Assumes a smaller footprint, standard surgical equipment, and less complex HVAC. Primarily for general surgery. |
| Intermediate Operating Theatre (Medium Size, Advanced Equipment) | 750,000 - 1,500,000 | Larger space, higher-grade equipment (e.g., advanced anesthesia machines, integrated displays), and more robust infection control measures. |
| Advanced/Specialized Operating Theatre (Large, High-End Equipment) | 1,500,000 - 3,000,000+ | Includes specialized features for cardiac, neurosurgery, or other complex procedures. May involve robotic surgery integration, advanced imaging, and highly specialized HVAC systems. Costs can escalate significantly. |
| Medical Equipment Only (per theatre, mid-range) | 150,000 - 500,000 | This is a highly variable component. Price depends on the specific types and brands of essential surgical equipment. |
| HVAC and Infection Control Systems (per theatre) | 100,000 - 400,000 | Crucial for sterile environments; prices depend on airflow rates, filtration levels, and integration complexity. |
| Construction and Finishing Materials (per theatre) | 50,000 - 200,000 | Reflects the cost of specialized wall panels, flooring, and other sterile-environment compliant materials. |
Key Pricing Factors for Operating Theatre Turnkey Builds in Libya:
- Size and Square Footage of the Operating Theatre
- Complexity of the Surgical Suites (e.g., number of theatres, scrub areas, sterile corridors)
- Quality and Brand of Medical Equipment (e.g., surgical lights, tables, anesthesia machines, monitors)
- Specifications of HVAC and Air Filtration Systems (critical for infection control)
- Finishing Materials (e.g., wall cladding, flooring, ceiling tiles – often specialized for sterile environments)
- Integration of Medical Gas Systems (oxygen, vacuum, medical air)
- Electrical Infrastructure and Backup Power (UPS, generators)
- Specialized Lighting and Communication Systems
- Architectural and Engineering Design Fees
- Permitting and Regulatory Compliance Costs
- Logistics and Import Duties for Imported Equipment and Materials
- Labor Costs (skilled and unskilled construction and installation teams)
- Contractor's Overhead and Profit Margin
- Project Management and Supervision Fees
- Contingency for unforeseen issues or changes in scope
Affordable Operating Theatre Turnkey Build Options
Building an operating theatre is a significant investment, and for many healthcare facilities, affordability is a key concern. This guide explores affordable operating theatre turnkey build options, focusing on value bundles and cost-saving strategies to help you achieve your goals without compromising essential quality and functionality. A turnkey solution simplifies the process by providing a complete, ready-to-use operating theatre, often including design, construction, equipment, and installation, all managed by a single provider.
| Cost-Saving Strategy | Description | Potential Impact |
|---|---|---|
| Phased Construction/Equipment Procurement | Instead of a full turnkey build, consider building the core infrastructure first and then phasing in equipment over time as budget allows. This allows for immediate use of the space while deferring major capital expenditure. | Reduces initial capital outlay, allows for adoption of newer technologies as they emerge. |
| Standardized Equipment Selection | Opt for widely used, reliable, and standard medical equipment rather than highly specialized or proprietary systems where possible. This can lead to better pricing, easier maintenance, and wider availability of consumables. | Lower equipment purchase costs, reduced maintenance expenses, easier spare parts sourcing. |
| Modular Construction Techniques | Utilizing prefabricated modules for certain components (e.g., wall panels, equipment booms) can speed up construction and reduce on-site labor costs and disruption. | Faster build times, reduced on-site labor, improved quality control. |
| Negotiate Bulk Purchasing | If procuring multiple theatres or significant equipment, negotiate bulk discounts with suppliers. A good turnkey provider can leverage their relationships for better pricing. | Significant savings on equipment and materials. |
| Energy-Efficient Design & Equipment | Invest in energy-efficient lighting (LEDs), HVAC systems, and medical equipment. While initial costs might be slightly higher, long-term operational savings on utilities are substantial. | Lower utility bills, reduced environmental impact. |
| Careful Space Planning & Workflow Optimization | Efficient layout design minimizes wasted space and improves staff workflow, potentially reducing the overall footprint needed and the amount of equipment required. | Reduced construction costs, improved operational efficiency, potentially fewer equipment needs. |
| Explore Refurbished or Demo Equipment | For non-critical or less frequently used equipment, consider high-quality refurbished or demonstration units from reputable suppliers. Ensure they come with warranties. | Significant cost reduction on specific equipment items. |
| Long-Term Maintenance Contracts | While an upfront cost, a comprehensive maintenance contract with the turnkey provider can often be more cost-effective than ad-hoc repairs and can include preventative maintenance, minimizing unexpected breakdowns. | Predictable maintenance costs, extended equipment lifespan, reduced downtime. |
Key Value Bundles in Turnkey Operating Theatre Builds
- {"title":"Standard Package","description":"Often the most budget-friendly, this bundle typically includes essential infrastructure, basic medical gases, standard lighting, and a set of core surgical equipment. It's suitable for facilities with well-defined needs and the capacity to procure some items separately or upgrade later."}
- {"title":"Enhanced Package","description":"This bundle offers a step up in functionality and comfort. It might include advanced HVAC systems for better air quality control, integrated audiovisual systems for training and collaboration, a wider range of surgical instruments, and more specialized lighting options."}
- {"title":"Premium Package","description":"Designed for specialized procedures or high-volume settings, this package integrates the latest technology, cutting-edge imaging systems, robotic surgery readiness, sophisticated patient monitoring, and premium finishes for enhanced sterility and ergonomics. While the most expensive, it offers the highest level of operational efficiency."}
- {"title":"Customizable Bundle","description":"Many providers offer flexibility by allowing you to tailor a package to your specific requirements, selecting components and services from different tiers. This is ideal for facilities with unique needs or those looking to optimize costs by cherry-picking features."}
Verified Providers In Libya
In the complex landscape of healthcare access in Libya, identifying trustworthy and skilled medical providers is paramount. Franance Health stands out as a premier organization dedicated to connecting individuals with a network of verified healthcare professionals. Their rigorous credentialing process ensures that every provider on their platform meets the highest standards of expertise, ethics, and patient care, making them the best choice for your medical needs in Libya.
| Credential Area | Franance Health Verification Standard | Benefit to Patients |
|---|---|---|
| Medical Licensing & Registration | Confirmed with official Libyan medical councils and relevant authorities. | Ensures providers are legally qualified to practice medicine. |
| Educational Qualifications & Diplomas | Verified from reputable medical institutions, including degrees, certifications, and specialized training. | Guarantees a strong foundation of medical knowledge and expertise. |
| Professional Experience & Track Record | Thorough review of past practice, including patient feedback where available and professional references. | Confirms practical competence and a history of effective patient care. |
| Specialty Certifications | Validation of all specialized board certifications and accreditations. | Ensures access to highly skilled specialists for specific medical needs. |
| Ethical Conduct & Professional Standards | Assessment of adherence to medical ethics, including a review of any disciplinary actions. | Provides peace of mind knowing you are in the care of trustworthy professionals. |
Why Franance Health Providers are the Best Choice:
- Rigorous Verification Process: Franance Health employs a multi-faceted verification system that goes beyond basic licensing. This includes extensive background checks, verification of qualifications and specialties, and assessment of practical experience.
- Commitment to Excellence: Only providers demonstrating a consistent track record of successful patient outcomes and ethical practice are included in the Franance Health network.
- Specialized Expertise: Access a wide range of medical specialists, from general practitioners to highly specialized surgeons, ensuring you find the right care for any condition.
- Patient-Centric Approach: Franance Health providers are committed to patient-centered care, prioritizing communication, empathy, and personalized treatment plans.
- Streamlined Access to Care: Franance Health simplifies the process of finding and booking appointments with qualified doctors, saving you time and reducing stress.
Scope Of Work For Operating Theatre Turnkey Build
This document outlines the Scope of Work (SOW) for a turnkey operating theatre (OT) build project. It details the technical deliverables and standard specifications required to ensure a fully functional, state-of-the-art operating theatre facility. The SOW covers all phases from design and engineering to construction, installation, commissioning, and handover.
| Category | Standard Specification / Requirement | Notes |
|---|---|---|
| Room Design & Layout | Adherence to international standards (e.g., ISO, HTM, FGI) | Optimized for workflow, patient safety, and infection control. |
| Air Quality & HVAC | Laminar flow systems with HEPA filtration (ISO Class 5 or better in surgical field). | Positive pressure differential (typically +15 Pa) relative to adjacent areas. |
| Infection Control | Seamless, non-porous, and easily cleanable surfaces (walls, floors, ceilings). | Antimicrobial properties for key surfaces. |
| Lighting | High-intensity, shadowless surgical luminaires with adjustable color temperature and brightness. | Adequate ambient and task lighting. |
| Medical Gas Pipeline System (MGPS) | Compliance with relevant national and international standards (e.g., BS 7373, NFPA 99). | Color-coded outlets for O2, medical air, vacuum, N2O, etc. |
| Electrical Systems | Redundant power supply with Automatic Transfer Switch (ATS) and Uninterruptible Power Supply (UPS). | Medical isolation transformers for patient safety. |
| Flooring | Antistatic, seamless, and slip-resistant flooring. | Durable and chemically resistant. |
| Doors | Automatic sliding or swing doors with hermetic sealing capabilities. | Lead lining for radiation protection if required. |
| Wall Panels | Smooth, non-porous, and impact-resistant wall cladding. | Integration of service panels for medical gases, electricity, and data. |
| Pendants & Booms | Configurable medical equipment pendants for easy access to gases, power, and data. | Integrated lighting and ergonomic design. |
| Noise Levels | Maximized sound insulation to minimize noise disruption. | Target < 40 dB within the OT. |
| Safety Features | Emergency stop buttons, fire detection and suppression systems, grounding systems. | Compliance with all relevant safety regulations. |
| IT & AV Integration | High-speed network connectivity, integrated displays, video conferencing capabilities. | User-friendly interfaces for system control. |
Key Project Phases and Deliverables
- Phase 1: Design & Engineering
- Conceptual Design Drawings
- Detailed Architectural Drawings
- Structural Engineering Drawings
- MEP (Mechanical, Electrical, Plumbing) Design
- HVAC System Design (including laminar flow, air filtration, pressure differentials)
- Medical Gas Pipeline System (MGPS) Design
- Electrical System Design (including emergency power, UPS, lighting)
- IT & Communication Infrastructure Design
- Audio-Visual (AV) System Design
- Infection Control & Sterilization Design Integration
- Safety and Fire Protection System Design
- Regulatory Compliance Documentation
- Bill of Quantities (BOQ) and Specifications
- Phase 2: Procurement & Manufacturing
- Sourcing of all materials and equipment
- Manufacturing of specialized OT components (e.g., OT doors, wall panels)
- Quality control and inspection of procured items
- Phase 3: Construction & Installation
- Civil works (shell construction, internal partitions, flooring)
- MEP installation (ductwork, piping, wiring)
- HVAC system installation and commissioning
- MGPS installation and testing
- Electrical system installation and testing
- Installation of specialized OT equipment (OT lights, tables, pendants)
- IT & Communication infrastructure installation
- AV system installation
- Finishes (wall cladding, ceiling, flooring)
- Installation of safety and fire protection systems
- Phase 4: Commissioning & Testing
- Functional testing of all installed systems (HVAC, electrical, MGPS, AV)
- Performance testing to meet specified standards
- Sterilization and infection control validation
- Integration testing of all systems
- User Acceptance Testing (UAT)
- Phase 5: Training & Handover
- Comprehensive training for end-users and maintenance staff
- As-built drawings and documentation
- Operation and Maintenance (O&M) manuals
- Warranty and support agreements
- Final project handover and sign-off
Service Level Agreement For Operating Theatre Turnkey Build
This Service Level Agreement (SLA) outlines the guaranteed response times and uptime for the operating theatre turnkey build project, ensuring a smooth and efficient operational handover. It defines the service provider's commitments regarding project completion timelines, issue resolution, and the availability of the constructed operating theatre facility post-handover.
| Service Component | Guaranteed Response Time (Initial Acknowledgment) | Guaranteed Resolution Time (Critical Issues) | Guaranteed Resolution Time (Non-Critical Issues) | Uptime Guarantee (Post-Handover) | Downtime Allowance (Scheduled Maintenance) |
|---|---|---|---|---|---|
| Design & Planning Phase | 2 business days | N/A (Milestone-based) | N/A (Milestone-based) | N/A | N/A |
| Construction Phase | 4 business hours | N/A (Progress tracking) | N/A (Progress tracking) | N/A | N/A |
| Equipment Installation & Testing | 2 business days | N/A (System-dependent) | N/A (System-dependent) | N/A | N/A |
| Commissioning & Handover | 1 business day | N/A (Acceptance verification) | N/A (Acceptance verification) | N/A | N/A |
| Post-Handover Facility Availability | 2 business hours (for critical system failures) | 8 business hours | 48 business hours | 99.5% | Max 4 hours per month (with 7 days advance notice) |
| Building Envelope & Utilities (HVAC, Electrical) | 2 business hours (for critical system failures) | 6 business hours | 24 business hours | 99.8% | Max 2 hours per month (with 7 days advance notice) |
| Medical Gas Systems | 1 business hour (for critical system failures) | 4 business hours | 12 business hours | 99.9% | Max 1 hour per month (with 14 days advance notice) |
Key Performance Indicators (KPIs) for Operating Theatre Turnkey Build SLA
- Project Commencement Date: The official start of the turnkey build project.
- Project Completion Date: The agreed-upon date for the operational handover of the fully constructed operating theatre.
- Acceptance Criteria: Defined standards and benchmarks the completed operating theatre must meet.
- Uptime Guarantee: The percentage of time the operating theatre facility is available for use post-handover, excluding scheduled maintenance.
- Response Time: The maximum time allowed for the service provider to acknowledge and begin addressing a reported issue.
- Resolution Time: The maximum time allowed for the service provider to fully resolve a reported issue.
- Escalation Procedure: The process for escalating issues that are not resolved within the defined resolution times.
- Reporting Frequency: The schedule for providing updates on project progress and facility performance.
Frequently Asked Questions

Ready when you are
Let's scope your Operating Theatre Turnkey Build in Libya project in Libya.
Scaling healthcare logistics and technical systems across the entire continent.

