MRI Quench Pipe Installation Service in Liberia Engineering Excellence & Technical Support

MRI Quench Pipe Installation Service High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Expert-Led Project Management

Our experienced team provides end-to-end project management for MRI quench pipe installations in Liberia, ensuring seamless coordination, adherence to global safety standards, and minimal disruption to your facility operations from initial planning through to commissioning.

Certified Safety & Compliance

We guarantee all MRI quench pipe installations in Liberia are performed by certified technicians, meeting stringent international safety protocols and local regulatory requirements. Our commitment to safety protects your personnel, equipment, and facility.

Advanced Material & Technique Deployment

Leveraging cutting-edge materials and installation techniques, our Liberian service ensures optimal performance and longevity for your MRI quench pipe system. We prioritize durability, leak prevention, and efficient gas venting for reliable MRI operation.

What Is Mri Quench Pipe Installation Service In Liberia?

MRI Quench Pipe Installation Service in Liberia refers to the specialized professional undertaking of installing, inspecting, and maintaining the quench pipe system for Magnetic Resonance Imaging (MRI) scanners within healthcare facilities in Liberia. A quench pipe is a critical component of an MRI system, designed to safely vent the extremely cold liquid helium (used to superconduct the MRI's powerful magnets) during a 'quench' event. A quench is an uncontrolled loss of superconductivity, where the superconducting magnets rapidly warm up, causing the helium to boil off as a gas. The quench pipe's function is to direct this rapidly expanding, cryogenic gas safely out of the MRI suite and away from personnel and sensitive equipment, thereby preventing potential hazards like asphyxiation, frostbite, or equipment damage due to rapid temperature fluctuations and pressure buildup.

RequirementDescriptionWho Needs ItTypical Use Cases
New MRI Facility Construction/RenovationInstallation of a complete, compliant quench pipe system as part of the initial setup or refurbishment of an MRI suite.Hospitals, specialized imaging centers, and private clinics in Liberia undertaking the establishment or significant upgrade of their MRI imaging capabilities.Setting up a new MRI scanner, expanding an existing imaging department, or modernizing an older MRI suite to meet current safety standards.
Existing MRI Scanner RelocationDismantling, re-routing, and re-installing the quench pipe system when an MRI scanner is moved to a new location within the same facility or to a different site.Healthcare providers in Liberia that are relocating their MRI equipment due to facility changes, expansions, or acquisitions.Moving an MRI scanner to a new wing of a hospital, into a newly constructed imaging center, or between different medical campuses.
Quench Pipe System Upgrades/RetrofitsReplacing or modifying an outdated or non-compliant quench pipe system to meet evolving safety regulations or to accommodate a new MRI scanner model.Healthcare facilities in Liberia operating older MRI equipment or those needing to comply with updated national or international safety guidelines for cryogenic systems.Upgrading an existing MRI suite to a higher field strength scanner that may have different venting requirements, or responding to safety audits that identify deficiencies.
Emergency Quench Pipe Repair/MaintenanceAddressing immediate issues with the quench pipe system, such as leaks, blockages, or damage, to ensure the MRI can operate safely or to restore functionality.Any healthcare facility in Liberia operating an MRI scanner experiencing unexpected issues or requiring routine preventative maintenance of their quench pipe infrastructure.Responding to a detected leak in the quench pipe, clearing a potential obstruction after a minor quench event, or performing scheduled inspections to prevent future problems.
Compliance and Safety AuditsEnsuring the MRI quench pipe system meets all relevant local and international safety standards and regulations.Healthcare institutions in Liberia seeking to pass regulatory inspections, maintain accreditation, or proactively ensure the safety of their MRI operations.Preparing for an inspection by health authorities, internal safety review committees, or responding to findings from a previous safety assessment.

What the Service Involves:

  • Site Assessment and Planning: Evaluating the existing MRI suite infrastructure, including the MRI scanner's location, ventilation systems, and structural considerations, to determine the optimal routing and termination points for the quench pipe.
  • Design and Engineering: Developing a precise design for the quench pipe system that complies with relevant safety standards (e.g., local building codes, MRI equipment manufacturer specifications) and accounts for airflow dynamics, pressure ratings, and material compatibility.
  • Material Procurement: Sourcing appropriate materials for the quench pipe, which typically include specific types of copper or stainless steel tubing, insulation, fittings, and connectors designed to withstand cryogenic temperatures and potential pressure surges.
  • Installation: Physically installing the quench pipe from the MRI scanner's cryogen vent valve to an approved exterior exhaust point. This involves precise cutting, joining, and securing of pipe sections, ensuring leak-proof connections and proper insulation.
  • Vent Termination: Installing a safe and compliant termination point for the quench pipe, typically on the exterior of the building, ensuring adequate dispersal of the vented helium gas and adherence to local environmental regulations.
  • System Testing and Commissioning: Performing rigorous testing of the installed quench pipe system to verify its integrity, capacity, and ability to safely vent simulated quench conditions. This often involves pressure testing and flow rate verification.
  • Integration with MRI Scanner: Ensuring seamless integration of the quench pipe with the MRI scanner's cryogen system, often requiring coordination with the MRI manufacturer's service engineers.
  • Post-Installation Inspection and Documentation: Conducting a final inspection to confirm proper installation and providing comprehensive documentation, including as-built drawings, test results, and maintenance recommendations.
  • Emergency Quench Pipe Maintenance and Repair: Offering services for troubleshooting, repairing, or replacing damaged or malfunctioning quench pipe systems to ensure continued operational safety of the MRI scanner.

Who Needs Mri Quench Pipe Installation Service In Liberia?

MRI quench pipe installation is a highly specialized service crucial for the safe and efficient operation of Magnetic Resonance Imaging (MRI) scanners. These pipes are designed to safely vent the extremely cold helium gas that is released during a quench, an event where the superconducting magnets lose their superconductivity. This process protects the surrounding environment and equipment from rapid temperature and pressure changes. Therefore, the need for MRI quench pipe installation services in Liberia is primarily driven by healthcare facilities that utilize or plan to utilize MRI technology.

Customer TypeKey Departments InvolvedRationale for Need
Public HospitalsRadiology Department, Facilities Management, Biomedical Engineering, ProcurementCentral to providing advanced diagnostic services to a broad patient population. Ensuring safety during MRI operations is paramount.
Private HospitalsRadiology Department, Hospital Administration, Engineering/Maintenance, PurchasingOffering premium medical services, including cutting-edge diagnostics, to attract patients and provide competitive healthcare solutions. Safety and operational integrity are critical.
Diagnostic Imaging CentersLead Radiologist, Operations Manager, Technical Director, Procurement SpecialistSpecializing in medical imaging services, these centers rely heavily on MRI functionality. Quench pipe installation ensures their core service delivery is safe and compliant.
Specialized Medical Clinics (e.g., Neurology, Oncology)Clinic Director, Chief of Radiology (if applicable), Facilities Manager, Procurement OfficerClinics focusing on conditions requiring detailed MRI scans for diagnosis and treatment planning. Safe and uninterrupted MRI operation is vital for patient care.
Government Health Ministries/AgenciesDirector of Health Infrastructure, Procurement Department, Technical Standards DivisionResponsible for establishing and maintaining national healthcare standards and infrastructure. They may oversee the installation of quench pipes in public facilities or set guidelines for private ones.
Research InstitutionsPrincipal Investigator (Medical Imaging), Research Facility Manager, Safety Officer, Procurement DepartmentUtilizing MRI for medical research requires reliable and safe equipment. Proper quench pipe installation is essential for the integrity of research studies and the safety of personnel.

Target Customers and Departments for MRI Quench Pipe Installation in Liberia

  • Hospitals with existing or planned MRI suites
  • Diagnostic imaging centers
  • Specialized medical clinics requiring advanced imaging capabilities
  • Government health ministries or agencies responsible for public healthcare infrastructure
  • Research institutions with medical imaging facilities

Mri Quench Pipe Installation Service Process In Liberia

This document outlines the comprehensive MRI Quench Pipe Installation Service Process in Liberia, detailing the workflow from initial inquiry to final execution. Our service ensures a safe, efficient, and compliant installation, minimizing disruption to your medical facility. We adhere to international standards and local regulations, prioritizing the integrity of your MRI system and the safety of your personnel.

PhaseKey ActivitiesResponsible PartiesDeliverables
Inquiry & ConsultationInitial contact, needs assessment, scope discussionClient, Service ProviderUnderstanding of client requirements, preliminary project scope
Site AssessmentOn-site survey, measurements, technical evaluationService Provider TechnicianDetailed site report, photographic documentation
Design & EngineeringDevelop installation plans, CAD drawingsService Provider EngineersApproved installation design, material specifications
Quotation & ProposalPrepare and submit pricing and technical detailsService ProviderFormal quotation and proposal
Contract & PermittingSign contract, obtain necessary permitsClient, Service Provider, Local AuthoritiesSigned contract, permit approvals
Procurement & LogisticsSource and transport materialsService ProviderDelivered materials to site
Pre-Installation PrepPrepare MRI room, system shutdown coordinationClient, Service ProviderReady installation environment
Installation ExecutionPhysical installation of quench pipeService Provider TechniciansInstalled quench pipe system
Testing & CommissioningSystem testing, leak detection, functional checksService Provider, MRI Manufacturer EngineersSuccessful test reports, operational system
Inspection & HandoverClient review, formal system handoverClient, Service ProviderApproved installation, handover documentation
Documentation & WarrantyProvide project documents, initiate warrantyService ProviderAs-built drawings, test reports, warranty certificate
Post-Installation SupportOptional maintenance and support servicesService ProviderOngoing system reliability

MRI Quench Pipe Installation Service Process Workflow

  • {"title":"1. Initial Inquiry & Consultation","description":"The process begins with an official inquiry from the client (hospital/clinic in Liberia) via email, phone, or through our website. Our team will schedule an initial consultation, either remotely or on-site if feasible, to understand your specific needs, the type of MRI machine, existing infrastructure, and any site-specific challenges. We will discuss project scope, timelines, and preliminary budget expectations."}
  • {"title":"2. Site Assessment & Survey","description":"A qualified technician will conduct a thorough on-site assessment. This includes evaluating the MRI room, ventilation systems, potential quench pipe routing pathways, structural considerations, and accessibility. Accurate measurements and detailed photographs will be taken to inform the design and planning phases. We will also assess local power and water availability if relevant to any associated systems."}
  • {"title":"3. Design & Engineering","description":"Based on the site assessment and consultation, our engineering team will develop a detailed installation plan. This includes CAD drawings for the quench pipe layout, material specifications, connection points, safety features (e.g., pressure relief valves), and integration with existing MRI system requirements. The design will comply with relevant international (e.g., IEC, ACR) and any applicable Liberian standards."}
  • {"title":"4. Quotation & Proposal Submission","description":"A comprehensive quotation and technical proposal will be submitted to the client. This document will detail the scope of work, materials to be used, labor costs, installation schedule, payment terms, warranty information, and any required client responsibilities. This stage involves review and negotiation to reach a mutual agreement."}
  • {"title":"5. Contract Agreement & Permitting","description":"Upon acceptance of the proposal, a formal contract will be signed. We will then initiate the process of obtaining any necessary permits or approvals from relevant Liberian authorities, ensuring all work is legally compliant. This may involve coordination with local building or health departments."}
  • {"title":"6. Material Procurement & Logistics","description":"All required materials, including the quench pipe itself, fittings, insulation, and safety components, will be procured. We will manage the logistics of shipping and delivering these materials to the site in Liberia, considering import regulations and customs clearance."}
  • {"title":"7. Pre-Installation Preparation","description":"Prior to commencing installation, the MRI room and surrounding areas will be prepared. This may involve temporary protective measures, clearing access routes, and ensuring the MRI system is safely shut down and secured by the client's MRI service engineers according to manufacturer guidelines. We will liaise closely with the client's internal technical teams."}
  • {"title":"8. Quench Pipe Installation Execution","description":"Our certified installation team will carry out the physical installation of the quench pipe according to the approved design. This includes cutting, joining, securing, and insulating the pipe. All work will be performed with strict adherence to safety protocols and manufacturer specifications. Continuous quality checks will be performed."}
  • {"title":"9. System Testing & Commissioning","description":"Once installation is complete, the quench pipe system will undergo rigorous testing. This includes pressure testing, leak detection, and functional checks to ensure it operates correctly and safely. We will work in conjunction with the MRI manufacturer's service engineers during this phase to ensure seamless integration and operational readiness."}
  • {"title":"10. Client Inspection & Handover","description":"The client's technical representatives will be invited to inspect the completed installation. Upon their approval and satisfaction, a formal handover of the system will occur. Training on the operation and basic maintenance of the quench pipe system, if applicable and agreed upon, will be provided."}
  • {"title":"11. Documentation & Warranty","description":"Final project documentation, including as-built drawings, test reports, and user manuals, will be provided to the client. The warranty period for the installation and materials will commence from the date of handover."}
  • {"title":"12. Post-Installation Support & Maintenance (Optional)","description":"We offer optional ongoing maintenance and support services to ensure the long-term reliability and safety of the quench pipe system. This can include periodic inspections and preventative maintenance schedules."}

Mri Quench Pipe Installation Service Cost In Liberia

Installing an MRI quench pipe in Liberia is a specialized service that requires skilled technicians and adherence to safety protocols. The cost can vary significantly based on several key factors, making it challenging to provide a single definitive price. These factors include the complexity of the installation, the type and length of the quench pipe needed, the accessibility of the MRI room, and the specific service provider chosen. It's crucial to obtain detailed quotes from multiple reputable vendors to ensure competitive pricing and quality service.

Pricing Factor CategoryEstimated Cost Range (Liberian Dollar - LRD)Notes
Basic Installation (Simple, accessible room, standard pipe length)150,000 - 350,000 LRDAssumes straightforward access and minimal structural modifications.
Standard Installation (Moderate complexity, average pipe length)300,000 - 600,000 LRDMay involve some minor building work or longer pipe runs.
Complex Installation (Difficult access, extensive modifications, long pipe runs)500,000 - 1,000,000+ LRDIncludes challenging site conditions, significant structural changes, or specialized ventilation requirements.
Materials (Quench Pipe, insulation, fittings)Included in the overall installation cost, but can represent 20-40% of the total.Varies based on material quality and quantity.
Labor (Skilled Technicians)Often billed hourly or as a project lump sum. Included in the ranges above.Experienced technicians are crucial for safety and performance.
Testing and Certification50,000 - 150,000 LRD (can be bundled)Ensures the system is safe and functioning correctly.

Key Pricing Factors for MRI Quench Pipe Installation in Liberia

  • Complexity of Installation: This refers to the ease or difficulty of accessing the MRI room, any necessary modifications to the existing infrastructure (e.g., wall penetrations, ceiling work), and the overall layout of the MRI suite.
  • Type and Length of Quench Pipe: Different MRI models may require specific types of quench pipes. The length of the pipe needed, determined by the distance from the MRI magnet to the external vent, directly impacts material and labor costs.
  • Accessibility of MRI Room: Installations in higher floors, or rooms with limited access, may incur additional labor and equipment costs (e.g., scaffolding, specialized lifting equipment).
  • Service Provider Expertise and Reputation: Highly experienced and certified service providers may command higher fees due to their specialized knowledge, track record, and adherence to international safety standards.
  • Materials and Equipment: The cost of the quench pipe itself, insulation, fittings, ventilation components, and any specialized tools required for the installation will be factored into the overall price.
  • Testing and Certification: Post-installation testing and certification to ensure proper functionality and safety are essential and contribute to the final cost.
  • Geographical Location within Liberia: While less of a primary driver than the technical aspects, transportation of personnel and equipment to more remote areas might add a surcharge.
  • Urgency of Service: Emergency or expedited installations may incur premium pricing.

Affordable Mri Quench Pipe Installation Service Options

Installing an MRI quench pipe is a critical but often overlooked aspect of MRI facility maintenance and safety. A properly installed and maintained quench pipe prevents uncontrolled gas release, protecting personnel and equipment. While the cost can be a concern, understanding value bundles and employing cost-saving strategies can make this essential service more accessible. This guide explores affordable options, focusing on maximizing value and minimizing expenditure.

Value Bundle/Cost-Saving StrategyDescriptionBenefitsPotential Cost Savings
Comprehensive Service PackagesBundled installation with initial site assessment, pipe fabrication, installation, testing, and certification.Streamlined process, reduced administrative overhead, clearer cost breakdown, single point of contact.10-15% potential savings compared to individual service bookings.
Preventative Maintenance AgreementsIncludes periodic inspections, minor adjustments, and early detection of issues, often bundled with future installation discounts.Minimizes the risk of costly emergency repairs, extends equipment life, predictable budgeting.Up to 20% savings on future installations, avoided emergency call-out fees.
Off-Peak Scheduling & Flexible TimelinesScheduling installation during non-peak hours or when facility usage is low.Reduced labor costs, less disruption to MRI operations, potential for bulk discounts from providers.5-10% savings on labor, minimized downtime.
Bulk Purchasing & Group DiscountsCollaborating with other MRI facilities to negotiate lower rates for multiple installations or combined material purchases.Leverages purchasing power for better pricing on materials and labor.Variable savings, potentially 15-25% for significant volumes.
Local Provider PartnershipsEngaging with local, reputable MRI service providers instead of large national corporations.Lower travel expenses for technicians, quicker response times, supports local economy.5-10% savings on travel and potentially labor.
Modular or Pre-fabricated ComponentsUtilizing pre-fabricated quench pipe sections that can be assembled on-site.Faster installation, reduced on-site labor, higher quality control during fabrication.7-12% savings on installation labor.
Integrated Planning & DesignEarly involvement of installation experts during the facility design or renovation phase.Optimizes pipe routing, minimizes material waste, avoids costly rework.Can prevent significant cost overruns, potentially saving 10-20% of total installation cost.
Negotiate Equipment & Material CostsRequesting multiple quotes for quench pipe materials and associated fittings. Discussing bulk material discounts.Direct reduction in the cost of essential components.5-10% savings on materials.

Factors Influencing MRI Quench Pipe Installation Costs

  • Complexity of installation (e.g., new build vs. retrofit)
  • Length and material of the quench pipe required
  • Accessibility of the MRI room and surrounding infrastructure
  • Type of ventilation and exhaust system needed
  • Site survey and engineering consultation fees
  • Permitting and regulatory compliance
  • Emergency vs. scheduled installation
  • Provider's experience and reputation
  • Geographic location and local labor rates

Verified Providers In Liberia

In Liberia, ensuring access to reliable and skilled healthcare providers is paramount. This is where verified providers, such as those accredited by Franance Health, stand out. Franance Health's rigorous credentialing process meticulously evaluates healthcare professionals and institutions, guaranteeing they meet high standards of competence, ethical practice, and patient safety. This stringent verification offers peace of mind to patients, knowing they are receiving care from qualified and trustworthy sources. Choosing Franance Health-verified providers means prioritizing quality, accountability, and a commitment to excellent healthcare outcomes in Liberia.

Credentialing AspectFranance Health's ApproachBenefit for Patients in Liberia
Professional QualificationsVerification of medical degrees, licenses, and certifications.Ensures providers have the necessary education and legal authorization to practice.
Clinical CompetenceAssessment of practical skills, experience, and performance history.Guarantees that providers are skilled in their respective medical fields.
Ethical ConductReview of professional background for adherence to medical ethics and codes of conduct.Assures patients that providers will act with integrity and prioritize patient well-being.
Patient Safety MeasuresEvaluation of compliance with safety protocols and infection control standards.Minimizes risks and ensures a safe healthcare environment.
Continuous Professional DevelopmentEncouragement and tracking of ongoing training and education.Confirms that providers stay updated with the latest medical advancements and best practices.

Why Franance Health Credentials Matter for Verified Providers in Liberia:

  • Rigorous vetting of qualifications and experience.
  • Ensures adherence to ethical medical practices.
  • Promotes patient safety through established protocols.
  • Enhances trust and confidence in healthcare services.
  • Facilitates access to competent and reliable medical professionals.
  • Upholds international standards of healthcare quality.
  • Contributes to a stronger and more reliable healthcare system in Liberia.

Scope Of Work For Mri Quench Pipe Installation Service

This Scope of Work (SOW) details the services required for the installation of MRI quench pipes. The objective is to ensure the safe and efficient removal of helium gas during an MRI quench event, protecting personnel and equipment. The scope encompasses all necessary labor, materials, equipment, and activities to complete the installation according to the defined technical deliverables and standard specifications.

ActivityDescriptionStandard Specifications/ReferencesKey Considerations
Site Survey and VerificationConduct a thorough site survey to verify existing conditions, confirm routing paths, identify potential obstructions, and ensure compliance with manufacturer's recommendations and local building codes.MRI Manufacturer's Installation Manual, ASHRAE Standards, NFPA Codes, Local Building Regulations.Accurate measurements, identification of all penetrations, access points, and proximity to other services.
Material Procurement and DeliveryProcure all required materials (pipes, fittings, valves, insulation, supports, fasteners, etc.) as per approved submittals and deliver them to the site in good condition.Approved Material Submittals, ASTM Standards, ANSI Standards, Manufacturer Specifications.Material verification against submittals, proper storage to prevent damage, and adherence to delivery schedules.
Pipe Fabrication and AssemblyFabricate and assemble the quench pipe system, including cutting, threading, welding (if applicable), and joining of components according to approved drawings and specifications.ASME B31.3 Process Piping Code, Manufacturer's Fabrication Guidelines, Certified Welding Procedures (if applicable).Precision in measurements, quality of welds (if applicable), cleanliness of components, adherence to specified material grades.
Pipe Installation and SupportInstall the quench pipe system, ensuring proper alignment, slope, and securing it with appropriate supports and hangers to prevent stress, vibration, and movement.Manufacturer's Installation Guidelines, MSS SP-58 Pipe Hangers and Supports, Seismic Design Requirements (if applicable).Correct hanger spacing, appropriate support types, consideration for thermal expansion, secure attachment to building structure.
Ventilation and Exterior TerminationInstall the exterior termination point of the quench pipe, ensuring it meets safety regulations for gas dispersion and is protected from weather and physical damage.NFPA 99 Health Care Facilities Code, Manufacturer's Exterior Venting Recommendations, Local Environmental Regulations.Appropriate height above roofline, clear dispersion area, weatherproofing, insect screening.
Insulation and ProtectionApply insulation to the quench pipe as specified to prevent condensation and protect personnel from extreme cold.ASTM C518 Thermal Conductivity of Materials, Manufacturer's Insulation Specifications, ASHRAE 90.1 Energy Standard.Correct insulation thickness and type, vapor barrier integrity, proper sealing of joints.
Pressure TestingConduct hydrostatic or pneumatic pressure testing of the installed quench pipe system to verify integrity and detect leaks.ASME B31.3 Process Piping Code (Section VIII), Manufacturer's Testing Requirements.Adherence to test pressures, duration, and reporting requirements; use of appropriate safety measures during testing.
System Flushing and CleaningFlush and clean the installed pipe system to remove debris, contaminants, and any residual materials from fabrication and installation.Manufacturer's Cleaning Procedures, Project Specific Cleaning Requirements.Effective flushing medium, verification of cleanliness through visual inspection or particulate testing.
Final Inspection and CommissioningConduct a final inspection of the complete installation, verify all components and connections, and perform system commissioning to ensure proper functionality.Manufacturer's Commissioning Checklist, Project Specifications, Final As-Built Drawings.Verification against all previous stages, functional testing of all components, documentation of performance.
Documentation and HandoverPrepare and submit all required documentation, including as-built drawings, test reports, QC/QA records, and maintenance manuals, for final project handover.Project Specific Document Control Procedures, Contractual Requirements.Complete and accurate documentation, organized for ease of reference and future maintenance.

Technical Deliverables

  • Detailed Installation Plan
  • As-Built Drawings (including pipe routing, supports, and connections)
  • Material Submittals (for all pipe, fittings, valves, insulation, and hangers)
  • Quality Control (QC) and Quality Assurance (QA) Reports
  • Pressure Test Reports
  • Final Inspection and Handover Documentation
  • System Commissioning Report
  • Safety Plan and Risk Assessment Documentation
  • Waste Management Plan

Service Level Agreement For Mri Quench Pipe Installation Service

This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the MRI Quench Pipe Installation Service provided by [Your Company Name] to [Client Company Name]. This agreement is effective as of [Start Date] and will remain in effect until terminated by either party in accordance with the terms of the Master Service Agreement.

Service TypeResponse Time Guarantee (Business Hours)Resolution Time Target (Business Hours)Uptime Guarantee (for maintained systems)
New Installation Scheduling5 Business DaysN/A (projected completion based on client availability and scope)N/A
Routine Maintenance Request1 Business Day5 Business Days (scheduled completion)99.5%
Emergency Repair Request (Critical Failure)2 Business Hours8 Business Hours99.9% (during active repair)
Emergency Repair Request (Non-Critical Failure)4 Business Hours24 Business Hours99.7% (during active repair)

Scope of Service

  • Installation of new MRI Quench Pipes.
  • Replacement of existing MRI Quench Pipes.
  • Routine maintenance and inspection of installed MRI Quench Pipes.
  • Emergency repair services for MRI Quench Pipes.
In-Depth Guidance