Background
Verified Service Provider in Ivory Coast

Bill of Quantities (BOQ) Development Service in Ivory Coast Engineering Excellence & Technical Support

Bill of Quantities (BOQ) Development Service High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Precise Quantity Take-Off & Cost Estimation

Leveraging advanced BIM integration and localized material cost databases, we deliver highly accurate quantity take-offs and competitive cost estimations tailored to Ivory Coast's construction market. This ensures budget predictability and optimized resource allocation.

Customized BOQ for Ivorian Standards & Regulations

Our expert team navigates specific Ivorian construction norms, tender requirements, and regulatory frameworks to produce comprehensive and compliant Bills of Quantities. We ensure your project documentation meets all local legal and contractual obligations.

Digital BOQ Delivery & Cloud Collaboration

Experience streamlined project management with our cloud-based BOQ development. We provide accessible digital formats for easy review, modification, and integration into tender platforms, facilitating seamless collaboration among stakeholders throughout the project lifecycle in Ivory Coast.

What Is Bill Of Quantities (Boq) Development Service In Ivory Coast?

Bill of Quantities (BOQ) Development Service in Ivory Coast refers to the professional process of preparing a detailed list of all the materials, labor, and equipment required for a construction project, along with their estimated quantities. This document serves as a fundamental tool for cost estimation, tendering, procurement, and project management within the Ivorian construction industry. The service involves meticulous measurement and calculation based on architectural and engineering designs, adhering to local standards and practices prevalent in Ivory Coast. It quantifies each item of work, from excavation and concrete works to finishes and specialized installations, providing a standardized basis for bids and contractual agreements.

Who Needs BOQ Development Service?Typical Use Cases
Clients/Developers (Public & Private Sector): To establish project budgets, secure financing, and ensure competitive tendering.Government Agencies (Ministries of Infrastructure, Housing, etc.): For public works projects, infrastructure development, and procurement of construction services.Real Estate Developers: For commercial, residential, and mixed-use developments to ascertain project viability and cost.Architects & Engineers: To provide essential data for design cost analysis and as a basis for their detailed specifications.Project Management Consultants (PMCs): To facilitate cost management, procurement, and contract administration.Contractors (General & Subcontractors): For preparing accurate and competitive bids, planning resource allocation, and managing site operations.Financial Institutions (Banks, Lenders): To assess project feasibility and loan disbursement based on accurate cost estimations.
New Construction Projects: All types of buildings (residential, commercial, industrial), infrastructure (roads, bridges, utilities), and specialized facilities.Renovation and Refurbishment Projects: Quantifying existing elements to be demolished or modified, and new materials for upgrades.Tender Preparation and Evaluation: Providing a standardized document for comparing bids from multiple contractors.Cost Control and Budget Management: Establishing a baseline for tracking actual expenditures against planned costs.Procurement of Materials and Equipment: Informing purchasing decisions and managing inventory.Claims Management: Substantiating variations and claims for additional work or material during the project.Feasibility Studies: Estimating preliminary costs to determine project viability.

Key Components of BOQ Development Service:

  • Measurement and Quantification: Translating design drawings (plans, elevations, sections) and specifications into precise quantities of materials and labor.
  • Itemization of Works: Breaking down the project into discrete work items, each with a clear description and unit of measurement (e.g., m³, m², kg, linear meter, item).
  • Rate Derivation (Optional but often included): Applying unit rates to the quantified items to establish the cost, often based on market research, historical data, or contractor input.
  • Preparation of Tender Documents: Compiling the BOQ as a core component of tender packages issued to prospective contractors.
  • Adherence to Standards: Ensuring compliance with relevant Ivorian construction codes, regulations, and industry best practices.
  • Valuation and Cost Control: Providing a baseline for tracking project expenditure and managing costs throughout the construction lifecycle.
  • Risk Assessment: Identifying potential cost risks through accurate quantity take-offs.

Who Needs Bill Of Quantities (Boq) Development Service In Ivory Coast?

In Ivory Coast's dynamic construction landscape, a comprehensive Bill of Quantities (BOQ) is an indispensable tool for ensuring project success. A BOQ is a detailed document outlining the quantities of materials, labor, and equipment required for a construction project, along with their associated costs. This precise enumeration is critical for accurate budgeting, effective procurement, transparent tendering, and robust project management. Therefore, various stakeholders within the Ivorian construction sector actively seek professional BOQ development services to mitigate risks, optimize resource allocation, and achieve financial control.

Target Customer SegmentKey Departments/Roles InvolvedPrimary Needs from BOQ Development
Government & Public SectorMinistry of Public Works, Ministry of Housing, Ministry of Infrastructure, Public Procurement AgenciesAccurate budgeting for public tenders, transparent cost control, fraud prevention, efficient resource allocation, basis for contract negotiation.
Private Real Estate DevelopersInvestment Department, Project Management Department, Finance DepartmentFeasibility studies, investment appraisal, securing financing, cost optimization, contractor selection, risk management.
Construction CompaniesEstimating Department, Tendering Department, Project Management Department, Commercial DepartmentCompetitive bidding, accurate pricing, cost control, profitability analysis, resource planning, variation assessment, contract administration.
Design & Consultancy FirmsBidding and Documentation Team, Cost Consultancy DepartmentCreating comprehensive tender packages, ensuring design intent is accurately costed, supporting client's procurement process, value engineering.
International Organizations & NGOsProcurement Unit, Project Management Unit, Finance DepartmentEnsuring financial accountability, transparent tender processes, efficient utilization of donor funds, reliable cost estimations for project proposals.
Financial InstitutionsLoan Officers, Risk Assessment Department, Project Finance UnitEvaluating project viability, assessing financial risk, validating project budgets for loan disbursement.

Target Customers and Departments for BOQ Development Services in Ivory Coast

  • Government Ministries and Agencies: Responsible for public infrastructure projects (roads, bridges, public buildings, hospitals, schools, etc.) requiring accurate cost estimations for budget allocation and tendering.
  • Real Estate Developers: Involved in residential, commercial, and industrial property development who need detailed cost breakdowns for investment decisions, financing applications, and contractor negotiations.
  • Construction Companies (Main Contractors and Subcontractors): Require BOQs to prepare competitive bids, manage project costs, control scope, and ensure profitability.
  • Architectural and Engineering Firms: Often responsible for preparing tender documents, including BOQs, on behalf of their clients to ensure design intent is accurately costed.
  • International Development Organizations and NGOs: Funding and overseeing development projects in Ivory Coast, necessitating transparent and reliable cost estimations for project financing and accountability.
  • Financial Institutions and Banks: Involved in project financing, requiring BOQs to assess the financial viability and risk of construction projects.
  • Procurement Departments: Within larger organizations or government bodies, responsible for managing tender processes and ensuring fairness and accuracy in cost evaluation.
  • Project Management Consultants: Overseeing construction projects and needing accurate BOQs for cost control, variation management, and dispute resolution.
  • Individual Investors and Property Owners: Undertaking significant construction or renovation projects who require professional assistance to understand and manage costs.
  • Suppliers of Building Materials and Equipment: While not directly commissioning BOQ development, they benefit from accurate BOQs that ensure predictable demand and facilitate their sales strategies.

Bill Of Quantities (Boq) Development Service Process In Ivory Coast

The Bill of Quantities (BOQ) Development Service Process in Ivory Coast is a structured workflow designed to provide accurate and comprehensive quantity take-offs for construction projects. This process ensures clarity for contractors, facilitates competitive bidding, and serves as a crucial baseline for cost control and project management. The workflow typically commences with an inquiry from a client and culminates in the delivery of the finalized BOQ.

StageDescriptionKey ActivitiesResponsible PartiesDeliverablesTimeline (Typical)
  1. Client Inquiry and Initial Consultation
The process begins when a client expresses interest in BOQ development services.Initial discussion of project scope, requirements, and client expectations. Understanding the project type (new build, renovation, infrastructure), scale, and desired level of detail. Clarification of contractual terms and service agreements.Client, BOQ Service Provider (Consultant/Quantity Surveyor)Service Agreement/Proposal1-3 Days
  1. Project Information Gathering
Collecting all necessary documentation to accurately perform the quantity take-off.Receiving and reviewing architectural drawings, structural drawings, MEP (Mechanical, Electrical, Plumbing) drawings, specifications, design reports, and any other relevant project documents. Requesting missing or incomplete information from the client.BOQ Service Provider, ClientComplete set of project documentation2-5 Days
  1. Site Visit and Measurement (if applicable)
Verifying existing conditions and taking direct measurements on-site, especially for renovation or existing structure projects.Conducting a thorough site inspection to assess existing structures, materials, and site constraints. Taking detailed measurements using appropriate tools (e.g., laser distance meters, tapes). Documenting site conditions with photographs and notes.BOQ Service ProviderSite visit report, photographs, on-site measurements1-3 Days (depending on project size and complexity)
  1. Quantity Take-off and Measurement
The core technical phase of extracting quantities from design documents.Systematically measuring and calculating quantities of materials, labor, and equipment required for each construction element as per recognized standards (e.g., SMM7, NRM). This involves interpreting drawings and specifications accurately.BOQ Service Provider (Quantity Surveyor/Measurer)Detailed measurement sheets, calculation recordsVaries significantly based on project size and complexity (days to weeks)
  1. BOQ Preparation and Structuring
Organizing and presenting the calculated quantities in a standardized BOQ format.Populating the BOQ template (often based on national or international standards) with the derived quantities. Itemizing work elements according to trade disciplines (e.g., earthworks, concrete, masonry, finishes, MEP). Including descriptions, units of measurement, and preliminary rates (if requested).BOQ Service ProviderDraft Bill of QuantitiesConcurrent with or immediately following Stage 4
  1. Internal Review and Quality Assurance
Ensuring the accuracy, completeness, and consistency of the drafted BOQ.A senior quantity surveyor or reviewer checks the entire BOQ for any errors, omissions, or inconsistencies. Cross-referencing quantities with drawings and specifications. Verifying that all project requirements are captured.BOQ Service Provider (Senior QS/Reviewer)Reviewed and quality-assured draft BOQ1-3 Days
  1. Client Review and Clarification
Presenting the draft BOQ to the client for their review and feedback.Sharing the draft BOQ with the client for their examination. Addressing any queries, comments, or requested adjustments from the client. Providing explanations for specific items or quantity calculations.Client, BOQ Service ProviderClient feedback, list of clarifications/amendments3-7 Days
  1. Finalization and Delivery of BOQ
Incorporating client feedback and issuing the final, approved Bill of Quantities.Making necessary revisions to the BOQ based on client feedback and agreed-upon changes. Ensuring the final document is professionally formatted and error-free. Delivering the finalized BOQ in the agreed format (e.g., PDF, Excel).BOQ Service ProviderFinal Bill of Quantities1-2 Days
  1. Post-Delivery Support
Providing ongoing assistance and clarification after the BOQ has been delivered.Answering any further questions from the client or contractors during the bidding or procurement phase. Assisting with tender queries related to the BOQ. Potentially supporting change order assessments based on the BOQ.BOQ Service ProviderOngoing technical supportAs required

Bill of Quantities (BOQ) Development Service Process Workflow in Ivory Coast

  • Client Inquiry and Initial Consultation
  • Project Information Gathering
  • Site Visit and Measurement (if applicable)
  • Quantity Take-off and Measurement
  • BOQ Preparation and Structuring
  • Internal Review and Quality Assurance
  • Client Review and Clarification
  • Finalization and Delivery of BOQ
  • Post-Delivery Support

Bill Of Quantities (Boq) Development Service Cost In Ivory Coast

Developing a Bill of Quantities (BOQ) is a crucial step in any construction project in Ivory Coast. It details the quantities of materials, labor, and services required, forming the basis for costing and tendering. The cost of BOQ development services in Ivory Coast can vary significantly based on several factors. Understanding these factors will help in estimating a realistic budget for this essential service. The primary currency for transactions in Ivory Coast is the West African CFA franc (XOF).

Service TypeEstimated Cost Range (XOF)Notes
Basic BOQ for Small Residential Projects (e.g., single-family home)200,000 - 500,000Focuses on standard materials and common construction methods.
BOQ for Medium-Sized Commercial or Residential Projects (e.g., apartment building, small office)500,000 - 1,500,000Involves more detailed specifications and a wider range of materials.
BOQ for Large-Scale Commercial, Industrial, or Infrastructure Projects (e.g., hospital, factory, road)1,500,000 - 10,000,000+Highly complex, requiring specialized knowledge, extensive site analysis, and detailed breakdowns. Costs can scale significantly with project value.
Hourly Rate for Consultancy/Review25,000 - 75,000 per hourApplicable for specific consultations, reviews of existing BOQs, or preliminary cost advice.

Key Pricing Factors for BOQ Development Services in Ivory Coast

  • Project Size and Complexity: Larger and more intricate projects naturally require more time and expertise to quantify accurately, leading to higher BOQ development costs.
  • Type of Construction: Residential, commercial, industrial, or infrastructure projects have different material and labor requirements, influencing the complexity of the BOQ.
  • Level of Detail Required: A more detailed BOQ with precise specifications and breakdowns will command a higher fee than a more generalized one.
  • Experience and Reputation of the BOQ Developer: Established and highly reputable quantity surveyors or firms with a proven track record often charge more due to their expertise and reliability.
  • Geographic Location within Ivory Coast: While XOF is the national currency, regional variations in cost of living and accessibility might subtly influence service fees, though this is often less pronounced than other factors.
  • Project Stage and Urgency: If a BOQ is needed urgently or at a very preliminary stage requiring significant assumptions, the cost might be adjusted.
  • Inclusion of Other Services: Some BOQ developers may offer additional services like cost estimation, value engineering, or contract administration as part of a package, which will impact the overall price.
  • Use of Technology and Software: Firms employing advanced BIM (Building Information Modeling) or specialized BOQ software might have different pricing structures, potentially offering greater accuracy and efficiency.
  • Market Demand and Competition: The number of available qualified BOQ developers and the overall demand for their services in the market can influence pricing.

Affordable Bill Of Quantities (Boq) Development Service Options

Our Affordable Bill of Quantities (BOQ) Development Service is designed to provide accurate and cost-effective estimations for your construction projects. We understand that managing project costs is crucial, and a well-prepared BOQ is the foundation of effective financial planning and control. We offer flexible value bundles tailored to different project needs and budgets, along with expert cost-saving strategies to ensure you get the most out of your investment in our services.

Cost-Saving StrategyDescriptionHow We Implement It
Standardized TemplatesUtilizing pre-defined, industry-standard BOQ formats to streamline the preparation process.We leverage our extensive library of templates, adapted to local regulations and project types, reducing the time spent on structural layout.
Technology IntegrationEmploying specialized software for quantity take-off and cost estimation to improve accuracy and speed.Our team utilizes advanced BIM (Building Information Modeling) software and dedicated estimation tools for precise measurement and rapid calculation.
Early Stage EngagementInvolving our BOQ specialists at the design development stage to identify potential cost savings.We collaborate closely with designers to highlight opportunities for material substitution, design optimization, and prefabrication before detailed drawings are finalized.
Value EngineeringProactively identifying alternative materials, construction methods, or design modifications that achieve the same functional outcome at a lower cost.Our experts analyze proposed elements, suggesting cost-effective alternatives without compromising quality or performance.
Modular & Prefabricated Construction RecommendationsSuggesting the use of pre-manufactured components where feasible to reduce on-site labor and construction time.We assess project suitability for modular components, offering cost and time benefits where applicable.
Bulk Material Sourcing AdviceProviding insights into potential cost reductions through strategic bulk purchasing of materials.While we don't procure materials, our BOQs can highlight opportunities where bulk buying by the client could yield significant savings, with typical market rates considered.
Phased Development PlanningAdvising on potential cost phasing for larger projects, allowing for staged investment and procurement.We can help structure the BOQ to reflect potential construction phases, enabling better financial management over the project lifecycle.
Risk Mitigation in CostingAccurate take-offs and comprehensive itemization minimize the need for costly unforeseen item claims later.Our meticulous approach reduces ambiguity and the likelihood of unexpected expenses during construction.

Value Bundles:

  • {"title":"Basic BOQ Package","description":"Ideal for small to medium-sized projects. Includes essential quantity take-offs and basic cost breakdowns for core construction elements. Focuses on primary trades and materials."}
  • {"title":"Standard BOQ Package","description":"Suitable for most residential and commercial projects. Offers a more comprehensive quantity take-off, detailed costings for all major trades, preliminary and general expenses, and a contingency allowance. Includes basic value engineering suggestions."}
  • {"title":"Premium BOQ Package","description":"For larger, complex, or high-value projects. Provides an in-depth quantity take-off with granular detail, extensive cost breakdowns including labor, materials, plant, and subcontractors. Includes detailed value engineering analysis, risk assessment, and optional subcontractor pre-qualification support."}
  • {"title":"Custom BOQ Solutions","description":"We can tailor a BOQ package to your specific project requirements, budget constraints, and desired level of detail. Contact us for a personalized quote."}

Verified Providers In Ivory Coast

Ensuring access to high-quality healthcare is paramount, and in Ivory Coast, the identification of verified providers is a crucial step. Franance Health stands out as a leading organization dedicated to credentialing and verifying healthcare professionals and facilities. Their rigorous process not only guarantees a certain standard of care but also provides patients with the confidence and peace of mind they deserve. By choosing Franance Health-verified providers, individuals are opting for a level of professionalism, competence, and ethical practice that is essential for optimal health outcomes.

Provider TypeFranance Health Verification BenefitsWhat Patients Gain
Doctors & SpecialistsConfirms medical expertise, board certifications, and a clean disciplinary record.Access to skilled diagnosticians and surgeons with proven expertise.
Hospitals & ClinicsEvaluates infrastructure, equipment, adherence to safety protocols, and staff qualifications.Safer treatment environments with well-equipped facilities and competent medical teams.
LaboratoriesEnsures accuracy of diagnostic tests, quality control measures, and trained technicians.Reliable test results for accurate diagnosis and treatment planning.
PharmaciesVerifies drug sourcing, storage conditions, and dispensing practices by licensed pharmacists.Access to legitimate medications and safe dispensing of prescriptions.

Why Franance Health Credentials Matter

  • Rigorous Verification Process: Franance Health employs a multi-faceted approach to verify credentials, including educational background, licenses, certifications, and professional experience.
  • Commitment to Quality: Their standards are designed to ensure that providers meet and exceed established benchmarks for patient care and safety.
  • Enhanced Patient Trust: Patients can feel more secure knowing they are receiving services from providers who have undergone thorough vetting.
  • Access to Competent Professionals: Franance Health's network connects individuals with skilled and qualified healthcare practitioners.
  • Ethical Practice Assurance: The credentialing process includes checks for adherence to ethical guidelines and professional conduct.

Scope Of Work For Bill Of Quantities (Boq) Development Service

This Scope of Work (SOW) outlines the services to be provided for the development of a comprehensive Bill of Quantities (BOQ). The BOQ will serve as a detailed list of materials, labor, and equipment required for the successful execution of a construction project, including their estimated quantities and unit costs. The primary objective is to ensure accurate cost estimation, procurement, and project control. The services will encompass a thorough review of project documentation, site assessment, quantity take-off, pricing, and the final compilation of the BOQ in accordance with industry standards.

Section/TradeDescription of WorkUnits of MeasurementStandard Specification ReferenceQuality Assurance/Control Measures
PreliminariesSite establishment, temporary works, project management, site supervision, health and safety provisions.Lump Sum, Months, DaysLocal building codes, client-specific requirements, general industry practice.Verification of site access, safety plan review, contractor mobilization checks.
EarthworksExcavation, filling, compaction, spoil disposal, topsoil stripping.m³, m², tonnesASTM D1556 (Standard Test Method for Density of Soil In-Place by the Sand-Cone Method), project-specific soil reports.Soil testing for compaction, moisture content checks, volumetric calculations.
Concrete WorksFormwork, reinforcement, concrete supply and placement, curing.m², kg, m³, m³ACI 318 (Building Code Requirements for Structural Concrete), BS EN 206 (Concrete – Specification, performance, production and conformity).Concrete mix design verification, reinforcement bar bending and fixing checks, slump tests, cube strength tests.
Masonry WorksBlockwork, brickwork, mortar preparation, pointing, damp-proof courses.m², m³, mBS EN 771 (Specification for masonry units), relevant local codes.Block/brick quality checks, mortar consistency, bond pattern verification, damp-proof course installation checks.
Structural SteelFabrication, erection, bolting, welding, fireproofing.tonnes, m, no., m²AISC (American Institute of Steel Construction) standards, BS EN 1993 (Eurocode 3: Design of steel structures).Material mill certificates, welding inspection reports, bolt tightening checks, fireproofing application thickness verification.
Finishes (Internal & External)Plastering, painting, tiling, flooring, ceilings, cladding.m², m², m², m², m²ASTM C842 (Standard Test Method for Determining the Initial Drying Time of Fiber-Reinforced Cementitious Materials), client-approved material samples.Surface preparation checks, application thickness verification, color consistency checks, adhesion tests.
Doors and WindowsSupply and installation of various types of doors and windows, hardware.no., set, no.Manufacturer's specifications, relevant performance standards (e.g., for acoustic or thermal insulation).Verification of dimensions, material quality, hardware functionality, installation alignment.
Plumbing and DrainagePipes, fittings, sanitary fixtures, water supply systems, drainage systems, testing.m, no., set, no.BS EN 681 (Elastomeric seals - Material requirements for pipe joint seals used in water and drainage applications), local plumbing codes.Material certification, pressure testing of water supply lines, leak testing of drainage systems.
Electrical WorksCabling, conduits, switchgear, lighting fixtures, outlets, earthing, testing.m, m, no., no., m, no.IEC (International Electrotechnical Commission) standards, local electrical codes.Conduit installation checks, cable type verification, termination checks, insulation resistance tests, earth continuity tests.
Mechanical Works (HVAC)Ductwork, insulation, grilles, diffusers, fans, pumps, controls, testing.m, m², no., no., no., no., no.ASHRAE (American Society of Heating, Refrigerating and Air-Conditioning Engineers) standards, SMACNA (Sheet Metal and Air Conditioning Contractors’ National Association) standards.Ductwork joint integrity, insulation thickness verification, airflow measurements, system pressure testing.
Landscaping and External WorksPaving, planting, irrigation, fencing, site lighting.m², m², m, m, no.Local horticultural standards, relevant landscape design specifications.Soil preparation checks, plant health verification, irrigation system functionality tests, fence alignment and stability checks.

Key Project Deliverables

  • Detailed Bill of Quantities (BOQ) document in electronic format (e.g., Microsoft Excel, PDF).
  • Summary of Quantities report.
  • Cost breakdown by trade or work section.
  • Material take-off sheets.
  • Labor hour estimations.
  • Equipment requirement list.
  • Explanatory notes and assumptions made during BOQ development.
  • Final presentation of the BOQ to stakeholders.

Service Level Agreement For Bill Of Quantities (Boq) Development Service

This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Bill of Quantities (BOQ) Development Service provided by [Your Company Name] to [Client Company Name]. This SLA is an integral part of the Master Services Agreement (MSA) between the parties.

Service ElementService Level Objective (SLO)Measurement MethodRemedy for Failure
Initial Project Brief AcknowledgmentAcknowledge receipt of a new BOQ development request within 4 business hours.Timestamp of email/system notification confirming receipt.Service credit of 5% of the monthly fee for the BOQ development service.
Clarification Request ResponseRespond to clarification questions regarding project documentation within 8 business hours.Timestamp of email/system notification with the clarification response.Service credit of 5% of the monthly fee for the BOQ development service.
Draft BOQ SubmissionSubmit the initial draft BOQ for review within the agreed-upon project timeline (e.g., 10 business days for standard projects, as defined in the Statement of Work).Timestamp of email/system notification with the draft BOQ attached.For every 24-hour delay beyond the agreed timeline, a service credit of 2% of the project's BOQ development fee will be applied, up to a maximum of 10%.
Revision Incorporation (Post-Draft Review)Incorporate agreed-upon revisions to the BOQ within 4 business days after receiving client feedback.Timestamp of email/system notification with the revised BOQ.Service credit of 5% of the monthly fee for the BOQ development service for each revision cycle exceeding the 4-business-day target.
Final BOQ DeliveryDeliver the final, approved BOQ within 2 business days of client sign-off on the revised draft.Timestamp of email/system notification with the final BOQ attached.Service credit of 5% of the monthly fee for the BOQ development service.
Service Availability (for Cloud-based platforms/tools used in BOQ development)99.5% Uptime during standard business hours (9 AM - 6 PM [Client's Time Zone], Monday-Friday).Monitoring of service availability through independent third-party tools.For every hour of unscheduled downtime exceeding 0.5% of monthly uptime, a service credit equivalent to 1% of the monthly fee for the BOQ development service will be applied, up to a maximum of 10% of the monthly fee.

Scope of Services

  • Development of accurate and detailed Bills of Quantities (BOQs) based on provided architectural and engineering drawings, specifications, and relevant project documentation.
  • Quantification of materials, labor, and equipment required for construction projects.
  • Categorization and costing of BOQ items according to industry standards and client requirements.
  • Review and validation of existing BOQs for accuracy and completeness (if applicable).
  • Provision of BOQ reports in agreed-upon formats (e.g., Excel, PDF, specific software formats).
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your Bill of Quantities (BOQ) Development Service in Ivory Coast project in Ivory Coast.

Speak to Sales