
Cleanroom Engineering (ISO 5-8) in Guinea
Engineering Excellence & Technical Support
Cleanroom Engineering (ISO 5-8) solutions for Bioprocessing & Manufacturing. High-standard technical execution following OEM protocols and local regulatory frameworks.
Advanced Contamination Control Systems
We design and implement state-of-the-art HEPA/ULPA filtration and air shower systems tailored to meet rigorous ISO 5-8 cleanroom standards in Guinea's demanding industrial and research environments. Our solutions minimize particulate contamination, ensuring product integrity and experimental accuracy.
Precision Airflow and Pressure Management
Our expertise lies in optimizing unidirectional and turbulent airflow patterns and maintaining precise positive/negative pressure differentials essential for ISO 5-8 cleanrooms. This ensures effective contaminant removal and protection of sensitive processes in Guinea's diverse sectors, from pharmaceuticals to microelectronics.
Custom Cleanroom Construction & Validation
We provide end-to-end cleanroom engineering services in Guinea, from initial design and material selection to expert construction and comprehensive performance validation. Our focus is on delivering compliant, energy-efficient ISO 5-8 facilities that meet specific operational needs and regulatory requirements.
What Is Cleanroom Engineering (Iso 5-8) In Guinea?
Cleanroom engineering, specifically adhering to ISO 5-8 standards, in Guinea refers to the specialized design, construction, validation, and maintenance of controlled environments where the concentration of airborne particulate matter is minimized. These environments are crucial for preventing contamination in sensitive manufacturing processes and research activities. ISO 5-8 classification defines specific limits for the maximum number of particles per cubic meter of air for particles of a specified size (e.g., 0.5 µm or larger). The engineering aspects encompass HVAC system design (including HEPA/ULPA filtration, air change rates, pressure differentials), material selection, architectural finishes, gowning procedures, and rigorous monitoring protocols to ensure and maintain the required cleanliness levels throughout the facility's lifecycle. Validation is a critical component, involving a series of tests to confirm that the cleanroom consistently meets its design specifications and regulatory requirements.
| ISO Class | Maximum Permitted Particles (per m³) | Examples of Use |
|---|---|---|
| ISO 5 (Class 100) | ≥ 0.5 µm: 3,520 | Pharmaceutical sterile manufacturing (e.g., aseptic filling), microelectronics fabrication, advanced biotechnology. |
| ISO 6 (Class 1,000) | ≥ 0.5 µm: 35,200 | Certain pharmaceutical operations, medical device manufacturing, laboratory applications with moderate contamination sensitivity. |
| ISO 7 (Class 10,000) | ≥ 0.5 µm: 352,000 | General pharmaceutical manufacturing, laboratory equipment assembly, some optical manufacturing. |
| ISO 8 (Class 100,000) | ≥ 0.5 µm: 3,520,000 | Packaging operations, electronics assembly, general laboratory environments with lower contamination requirements. |
Key Aspects of Cleanroom Engineering (ISO 5-8) in Guinea
- Facility Design and Construction: Architecturally sound design incorporating appropriate layouts, airlocks, and material flow to minimize particle ingress. Selection of low-outgassing and non-shedding construction materials.
- HVAC System Integration: Precise design and implementation of ventilation, filtration (HEPA/ULPA), air change rates, and pressure differentials to control airborne particulates and prevent cross-contamination. Temperature and humidity control are also critical.
- Contamination Control Strategies: Development and implementation of operational protocols, including personnel gowning procedures, material handling, cleaning regimes, and waste disposal, to maintain cleanliness.
- Monitoring and Verification: Continuous or periodic monitoring of particle counts, air velocity, pressure differentials, temperature, and humidity to ensure compliance with ISO standards.
- Validation and Qualification: A structured process of Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) to demonstrate that the cleanroom is designed, installed, and operates according to specifications.
- Maintenance and Recertification: Regular scheduled maintenance of HVAC systems and filters, along with periodic recertification of the cleanroom's performance to ensure ongoing compliance.
Who Needs Cleanroom Engineering (Iso 5-8) In Guinea?
Cleanroom engineering, particularly for ISO 5-8 standards, is crucial for sectors in Guinea that require precise control over airborne particulate contamination. These standards are essential for processes where even microscopic particles can compromise product integrity, safety, or research accuracy. The demand for such controlled environments is growing as Guinea aims to diversify its economy and enhance its capabilities in key industries.
| Industry Sector | Key Departments/Applications | Reasons for ISO 5-8 Cleanroom Requirement |
|---|---|---|
| Pharmaceuticals | Sterile Drug Manufacturing, Aseptic Filling, Lyophilization, Compounding Pharmacies | Prevent microbial contamination, ensure product sterility and efficacy, meet regulatory compliance (e.g., GMP). |
| Medical Devices | Implantable devices, surgical instruments, diagnostic kits, sterile disposables | Prevent particulate contamination that can cause device failure or patient infection, meet regulatory standards. |
| Biotechnology & Life Sciences | Cell culture, DNA sequencing, protein purification, vaccine production, diagnostic test development | Maintain sterile conditions for sensitive biological materials, prevent cross-contamination, ensure experimental integrity. |
| Food & Beverage (Specialty) | Infant formula production, sterile dairy products, high-purity ingredients, flavor encapsulation | Prevent microbial spoilage, ensure food safety, maintain product quality and shelf-life. |
| Electronics (Potential) | Microchip assembly, sensitive component manufacturing | Prevent dust and particle contamination that can cause short circuits or device malfunction. |
| Cosmetics | Sterile cosmetic production, active ingredient handling, preservative-free formulations | Prevent microbial contamination, ensure product safety, maintain stability and efficacy. |
| Research & Academia | Advanced medical research, environmental testing labs, material science | Ensure the accuracy and reproducibility of scientific experiments, protect sensitive samples. |
Target Customers and Departments Requiring ISO 5-8 Cleanroom Engineering in Guinea
- {"title":"Pharmaceutical Manufacturing","description":"This sector is a primary consumer of cleanroom technology. Stringent regulations and the need for sterile products make ISO 5-8 environments indispensable for drug formulation, sterile filling, and packaging."}
- {"title":"Medical Device Manufacturing","description":"Production of implants, surgical instruments, diagnostic equipment, and other medical devices demands controlled environments to prevent contamination that could lead to patient harm."}
- {"title":"Research and Development Laboratories (Biotechnology & Life Sciences)","description":"Laboratories conducting sensitive research, cell culture, genetic analysis, or producing biological products require cleanrooms to ensure the validity of experiments and the purity of research materials."}
- {"title":"Food and Beverage Processing (High-Purity & Specialty Products)","description":"While not all food processing requires cleanrooms, specialized areas for producing infant formula, sterile dairy products, or high-purity ingredients may benefit from ISO 5-8 standards to ensure safety and shelf-life."}
- {"title":"Electronics Manufacturing (Sensitive Components)","description":"Although less prevalent in Guinea currently, any future expansion into manufacturing highly sensitive electronic components or microelectronics would necessitate cleanroom environments to prevent particulate contamination from causing defects."}
- {"title":"Cosmetics Manufacturing","description":"Production of certain cosmetic products, especially those with active ingredients or intended for sensitive skin, can benefit from controlled environments to ensure product safety and stability."}
- {"title":"Government and Academic Research Institutions","description":"Universities and national research centers undertaking advanced scientific projects, particularly in health sciences, agriculture, and environmental monitoring, might require cleanroom facilities."}
Cleanroom Engineering (Iso 5-8) Process In Guinea
This document outlines the typical workflow for Cleanroom Engineering services (ISO 5-8) in Guinea, from initial client inquiry through to project execution and validation. The process is designed to ensure compliance with international standards and client-specific requirements.
| Stage | Description | Key Activities | Deliverables/Outcomes | Typical Duration (Weeks) |
|---|---|---|---|---|
| Initial contact from a client requiring cleanroom engineering services. | Understanding client's application, required ISO class (5-8), operational needs, site constraints, budget, and timeline. Site visit may be required. | Initial project scope understanding, preliminary requirements document. | 1-2 |
| Formal response to the client's inquiry, outlining proposed solutions and costs. | Detailed technical proposal including design concepts, materials, equipment, scope of work, project plan, risk assessment, and a comprehensive quotation. | Formal proposal document, detailed quotation. | 2-4 |
| Formalization of the project commitment between the client and the engineering firm. | Negotiation of terms and conditions, finalization of scope, signing of contract, issuance of Purchase Order (PO). | Signed contract, issued PO. | 1-2 |
| Detailed planning and development of the cleanroom system. | Conceptual design refinement, detailed engineering drawings (P&IDs, HVAC, electrical, structural), material selection, equipment specification, compliance with relevant standards (ISO 14644, GMP, etc.). | Approved detailed design drawings, equipment specifications, bill of materials (BOM). | 4-12 (depending on complexity) |
| Acquisition of materials and fabrication of cleanroom components. | Sourcing and purchasing of materials (wall panels, filters, HVAC units, etc.), fabrication of custom components, quality control checks during manufacturing. | Procured materials, manufactured components, quality inspection reports. | 6-16 (depending on lead times) |
| Assembly and construction of the cleanroom at the client's facility. | Site preparation, installation of structural elements, wall/ceiling/floor systems, HVAC system integration, electrical wiring, lighting, and utility connections. | Installed cleanroom structure, integrated HVAC and electrical systems. | 4-10 (depending on size and complexity) |
| Verification of system functionality and performance. | Start-up of HVAC systems, pressure differential testing, airflow velocity measurements, HEPA filter integrity testing (DOP/PAO), temperature and humidity verification, light intensity measurements. | Commissioning reports, performance test results. | 1-3 |
| Formal confirmation that the cleanroom meets specified requirements and is fit for its intended purpose. | Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) as per regulatory guidelines. Air particle counting, environmental monitoring setup. | IQ, OQ, PQ reports, validation certificates. | 2-6 |
| Transfer of the completed cleanroom to the client with necessary operational knowledge. | Final inspection, documentation handover (as-built drawings, O&M manuals), training for client's operational and maintenance staff. | Handover documentation, training completion records. | 0.5-1 |
| Ongoing support and maintenance to ensure continued optimal performance. | Scheduled maintenance services, repair work, re-validation support, spare parts management, troubleshooting. | Maintenance logs, service reports, ongoing support. | Ongoing |
Cleanroom Engineering (ISO 5-8) Process in Guinea
- Inquiry & Needs Assessment
- Proposal Development & Quotation
- Contract & Agreement
- Design & Engineering
- Procurement & Manufacturing
- On-site Installation & Construction
- Commissioning & Performance Testing
- Validation & Qualification
- Handover & Training
- Post-Execution Support & Maintenance
Cleanroom Engineering (Iso 5-8) Cost In Guinea
Cleanroom engineering projects in Guinea, specifically for ISO 5-8 classifications, involve a complex interplay of factors that significantly influence overall cost. These projects demand meticulous design, specialized materials, advanced HVAC systems, stringent environmental monitoring, and highly skilled labor. The 'cost in Guinea' for such an undertaking is not a simple figure but rather a range influenced by several key pricing factors. Understanding these elements is crucial for accurate budgeting and project planning.
| ISO Classification | Estimated Cost Range (USD per sq meter) | Estimated Cost Range (GNF per sq meter) | Key Cost Drivers |
|---|---|---|---|
| ISO 8 (Class 100,000) | $600 - $1,200 | 3,600,000 - 7,200,000 | Basic HVAC, standard materials, fewer air changes |
| ISO 7 (Class 10,000) | $800 - $1,600 | 4,800,000 - 9,600,000 | Increased HVAC complexity, higher filtration, more air changes |
| ISO 6 (Class 1,000) | $1,000 - $2,200 | 6,000,000 - 13,200,000 | Advanced HVAC, HEPA filtration, significant air changes, tighter controls |
| ISO 5 (Class 100) | $1,500 - $3,500+ | 9,000,000 - 21,000,000+ | Highly specialized HVAC, ULPA filtration, very high air changes, stringent environmental control, potential for isolators/laminar flow hoods |
Key Pricing Factors for Cleanroom Engineering (ISO 5-8) in Guinea
- {"title":"Cleanroom Classification (ISO 5-8)","description":"Higher cleanliness standards (e.g., ISO 5, often referred to as Class 100 or Grade A/B) require more sophisticated filtration (HEPA/ULPA), air changes per hour, and precise environmental control, leading to higher costs than lower classifications (e.g., ISO 8, often referred to as Class 100,000 or Grade D)."}
- {"title":"Size and Footprint of the Cleanroom","description":"Larger cleanroom areas naturally require more materials, labor, and a more extensive HVAC infrastructure, directly increasing the overall project cost."}
- {"title":"Materials and Finishes","description":"The choice of wall panels, flooring (e.g., epoxy, vinyl), ceiling systems, doors, and windows significantly impacts cost. High-performance, durable, and easy-to-clean materials suitable for sterile environments are more expensive."}
- {"title":"HVAC System Design and Complexity","description":"This is often the most substantial cost component. It includes the design of air handling units (AHUs), HEPA/ULPA filters, ductwork, diff-users, return grilles, and sophisticated control systems to maintain precise temperature, humidity, and differential pressure. The number of air changes per hour required by the ISO class is a major driver."}
- {"title":"Ancillary Systems and Equipment","description":"This includes interlocks, air showers, pass-throughs, gowning rooms, emergency power systems, and specialized lighting. The complexity and quantity of these systems add to the cost."}
- {"title":"Instrumentation and Monitoring","description":"Accurate and reliable sensors for particle counting, temperature, humidity, pressure differentials, and potentially other parameters (e.g., CO2) are essential for certification and ongoing operation. The cost of these and their integration into a Building Management System (BMS) can be significant."}
- {"title":"Design and Engineering Fees","description":"Specialized cleanroom design expertise is required. This includes conceptualization, detailed design, architectural plans, mechanical and electrical engineering, and validation protocols. Fees vary based on the consultant's experience and the project's complexity."}
- {"title":"Installation and Labor Costs","description":"Skilled labor with experience in cleanroom construction, HVAC installation, and electrical work is essential. Labor rates in Guinea, while generally lower than in developed nations, can still be a significant factor, especially for specialized skills. Project management and supervision also contribute."}
- {"title":"Regulatory Compliance and Certification","description":"Costs associated with achieving and maintaining compliance with ISO standards, including initial qualification, validation (IQ/OQ/PQ), and ongoing monitoring and re-certification. This often involves third-party validation services."}
- {"title":"Location and Logistics","description":"Import duties, taxes, transportation costs for specialized equipment and materials to the project site in Guinea can add considerably to the overall expense."}
- {"title":"Contractor Markup and Overhead","description":"The profit margins and overhead costs of the contracting firms undertaking the project will be factored into the final price."}
Affordable Cleanroom Engineering (Iso 5-8) Options
Achieving ISO 5-8 cleanroom standards doesn't have to break the bank. This guide explores affordable cleanroom engineering options, focusing on value bundles and cost-saving strategies to help you optimize your investment while maintaining critical environmental controls. We'll delve into how smart design, material selection, and phased implementation can lead to significant savings.
| Strategy/Bundle | Description | Value Proposition | Cost-Saving Potential |
|---|---|---|---|
| Basic ISO 7/8 Bundle | Includes essential HEPA filtration, basic wall/ceiling panels (e.g., PVC-coated steel), standard lighting, and a simplified HVAC system designed for the specific ISO class. | Provides a compliant and functional cleanroom for less sensitive applications. Ideal for research labs, basic assembly, or packaging. | Moderate to High. Reduces upfront material and installation costs by focusing on essential components. |
| ISO 5/6 Modular Kit | A pre-engineered, modular cleanroom system with higher efficiency HEPA filters, advanced sealing, and a more robust HVAC system. Often includes integrated control panels. | Offers a faster deployment for more critical processes, with pre-validated performance. Suitable for pharmaceutical manufacturing, electronics assembly, or cell culture. | Moderate. Saves on design and custom fabrication time. Scalable for future needs. |
| Value Engineering Consultation | An upfront design and planning service focused on identifying cost-saving opportunities without compromising performance. Includes material optimization and airflow analysis. | Ensures your cleanroom is designed efficiently from the start, preventing costly over-specification and rework. | High. Can identify significant savings through informed design choices and material selection. |
| DIY Integration Support | Provides detailed plans, component sourcing guidance, and technical support for clients who wish to handle some aspects of installation and integration themselves. | Reduces labor costs associated with full-service installation, allowing for more budget control. | Moderate to High. Requires client expertise and time commitment. |
| Refurbishment & Upgrade Services | Assessing existing facilities and upgrading them to meet ISO 5-8 standards through targeted improvements to filtration, sealing, or HVAC. | Leverages existing infrastructure, significantly reducing the cost compared to building a new cleanroom from scratch. | High. Maximizes the return on existing investments. |
Key Considerations for Affordable Cleanroom Engineering
- Understanding Your Specific ISO Requirements: Accurately defining your required ISO class (5-8) is crucial to avoid over-engineering and unnecessary costs. Each class has specific particle count limitations.
- Modular vs. Custom-Built Cleanrooms: Modular systems often offer faster installation and can be more cost-effective for standard configurations. Custom-built solutions provide greater flexibility but typically have a higher upfront cost.
- Importance of Airflow and Filtration: The core of cleanroom technology lies in its HEPA/ULPA filtration and controlled airflow. Optimizing these systems for efficiency is paramount.
- Material Selection for Durability and Cost: Balancing the need for sterile, easily cleanable surfaces with budget-friendly materials is key. Consider materials like PVC, FRP, and certain types of laminates.
- Phased Implementation and Scalability: Designing for future expansion or upgrades can save money in the long run. Consider a phased approach to building out your cleanroom capabilities.
- Energy Efficiency and Operational Costs: Factors like HVAC system design and lighting significantly impact ongoing operational expenses. Prioritize energy-efficient solutions.
Verified Providers In Guinea
In Guinea, ensuring access to quality healthcare relies heavily on the credibility and expertise of medical providers. Franance Health stands out as a beacon of trust and excellence, offering a network of rigorously vetted healthcare professionals. This verification process goes beyond basic licensing, encompassing a comprehensive assessment of clinical expertise, ethical conduct, and patient-centric approaches. Choosing a Franance Health-verified provider means opting for a level of care that prioritizes your well-being through qualified professionals committed to the highest standards of medical practice. Their dedication to transparency and excellence makes them the unequivocally best choice for your healthcare needs in Guinea.
| Credential Aspect | Franance Health Verification Standard | Benefit to Patient |
|---|---|---|
| Clinical Expertise | In-depth review of qualifications, ongoing training, and specialized skills. | Access to highly competent medical professionals with advanced knowledge. |
| Ethical Conduct | Scrutiny of professional history, patient feedback, and adherence to medical ethics. | Ensured treatment with integrity and respect for patient rights. |
| Patient Experience | Assessment of communication skills, empathy, and patient satisfaction metrics. | Positive and supportive healthcare interactions. |
| Regulatory Compliance | Confirmation of valid licenses and adherence to Guinean healthcare regulations. | Guaranteed legal and safe medical services. |
| Specialization Recognition | Verification of specific certifications and recognized areas of practice. | Targeted treatment from specialists best suited for specific conditions. |
Why Franance Health Credentials Matter
- Rigorous vetting process exceeding standard licensing.
- Assessment of clinical expertise and up-to-date knowledge.
- Evaluation of ethical conduct and professional integrity.
- Emphasis on patient-centric care and communication.
- Commitment to upholding the highest standards of medical practice.
- Providing peace of mind through trusted and qualified professionals.
Scope Of Work For Cleanroom Engineering (Iso 5-8)
This Scope of Work (SOW) outlines the engineering services required for the design, construction, and validation of cleanroom facilities meeting ISO Class 5 to ISO Class 8 standards. The primary objective is to deliver a fully operational and compliant cleanroom environment suitable for sensitive manufacturing and research activities. This SOW details the technical deliverables, standard specifications, and project phases involved.
| Technical Deliverable | Description | Standard Specification / Reference |
|---|---|---|
| Cleanroom Design Basis Report | Defines project requirements, operational needs, occupancy, processes, equipment, and desired ISO classification. | Client provided requirements, relevant industry best practices. |
| Conceptual Design Drawings | Schematic layouts including room layouts, airflow schematics, general arrangement drawings. | ISO 14644-1, local building codes. |
| Detailed Engineering Drawings | Full set of construction drawings including architectural, mechanical (HVAC), electrical, plumbing, and instrumentation drawings. | ISO 14644-1, ASHRAE standards, NFPA codes, local utility standards, client specific standards. |
| HVAC System Design Report | Detailed calculations for airflow rates, pressure differentials, temperature and humidity control, filtration, and air change rates. | ISO 14644-4, ASHRAE 55, client specific environmental requirements. |
| Material & Finishes Specification | Detailed specifications for all construction materials, wall panels, flooring, ceiling systems, doors, windows, and pass-throughs. | ISO 14644-4, ASTM standards, chemical resistance data, cleanability requirements. |
| Electrical & Instrumentation Design | Design of power distribution, lighting, control systems, monitoring points, and alarm systems. | NEC, local electrical codes, ISA standards, cleanroom specific monitoring requirements. |
| Air Filtration Strategy | Specification of HEPA/ULPA filter types, locations, and performance criteria. | ISO 14644-1, IEST-RP-CC001.6. |
| Pressure Control Strategy | Design of pressure differentials between adjacent areas and the exterior. | ISO 14644-1, ISO 14644-4. |
| Validation Master Plan (VMP) | Outlines the overall qualification strategy for the cleanroom facility. | ISPE Baseline® Pharmaceutical Equipment Validation, ISO 14644-2. |
| Installation Qualification (IQ) Protocol | Verifies that the cleanroom systems and components have been installed correctly. | ISPE Baseline® Pharmaceutical Equipment Validation, ISO 14644-2. |
| Operational Qualification (OQ) Protocol | Verifies that the cleanroom systems operate according to design specifications under normal operating conditions. | ISPE Baseline® Pharmaceutical Equipment Validation, ISO 14644-2. |
| Performance Qualification (PQ) Protocol | Verifies that the cleanroom consistently meets the required ISO classification and environmental parameters under representative operational conditions. | ISPE Baseline® Pharmaceutical Equipment Validation, ISO 14644-2. |
| Test & Balance Report | Documentation of airflow, pressure, temperature, and humidity verification. | ASHRAE, NEBB standards. |
| Cleanliness Validation Report | Documentation of particle counting and air quality testing to confirm ISO classification. | ISO 14644-1, ISO 14644-2, IEST-RP-CC006.4. |
| As-Built Drawings | Updated drawings reflecting the final constructed facility. | Client standards, as-built requirements. |
| Operations & Maintenance Manuals | Comprehensive guides for operating and maintaining all cleanroom systems. | Manufacturer specifications, client O&M requirements. |
Project Phases
- Phase 1: Conceptual Design & Feasibility Study
- Phase 2: Detailed Design & Engineering
- Phase 3: Procurement & Construction
- Phase 4: Commissioning & Qualification
- Phase 5: Handover & Training
Service Level Agreement For Cleanroom Engineering (Iso 5-8)
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for Cleanroom Engineering services, specifically targeting ISO Class 5 through ISO Class 8 environments. It defines the expected performance levels and remedies for service deviations.
| Service Level | Uptime Guarantee (per month) | Response Time (Critical) | Response Time (Major) | Response Time (Minor) | Target Resolution Time (Critical) | Target Resolution Time (Major) | Target Resolution Time (Minor) |
|---|---|---|---|---|---|---|---|
| ISO Class 5 | 99.9% | 15 minutes | 1 hour | 4 hours | 4 hours | 24 hours | 48 hours |
| ISO Class 6 | 99.7% | 30 minutes | 2 hours | 6 hours | 6 hours | 36 hours | 72 hours |
| ISO Class 7 | 99.5% | 1 hour | 4 hours | 8 hours | 8 hours | 48 hours | 96 hours |
| ISO Class 8 | 99.0% | 2 hours | 6 hours | 12 hours | 12 hours | 72 hours | 144 hours |
Key Definitions
- SLA: Service Level Agreement.
- ISO Class: A classification system for cleanrooms, ranging from ISO Class 1 (cleanest) to ISO Class 9 (less clean). This SLA covers ISO Class 5, 6, 7, and 8.
- Uptime: The percentage of time that the cleanroom facility and its associated engineering systems (e.g., HVAC, filtration, monitoring) are operational and meeting the specified ISO class requirements.
- Response Time: The maximum time allowed for the engineering team to acknowledge and begin addressing a reported issue.
- Resolution Time: The maximum time allowed to restore the affected system or the cleanroom environment to its defined operational state and ISO class.
- Critical Incident: An event that significantly impacts the ability to operate within the designated ISO class, poses a risk to product or process integrity, or results in a complete loss of environmental control. (e.g., complete HVAC failure, HEPA filter breach leading to class deviation).
- Major Incident: An event that degrades the cleanroom environment below the specified ISO class but does not necessarily halt all operations, or affects a significant subsystem critical to maintaining the ISO class. (e.g., partial HVAC failure, increased particle counts in a specific zone).
- Minor Incident: An event that is primarily cosmetic or affects a non-critical system, with minimal impact on the overall ISO class compliance. (e.g., minor sensor reading anomaly, localized airflow issue not impacting overall class).
- Scheduled Maintenance: Planned activities performed on engineering systems to ensure optimal performance and prevent failures. This is excluded from uptime calculations.
Frequently Asked Questions

Ready when you are
Let's scope your Cleanroom Engineering (ISO 5-8) in Guinea project in Guinea.
Scaling healthcare logistics and technical systems across the entire continent.

