Background
Verified Service Provider in Ethiopia

Cleanroom Engineering (ISO 5-8) in Ethiopia Engineering Excellence & Technical Support

Cleanroom Engineering (ISO 5-8) solutions for Bioprocessing & Manufacturing. High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Precision Contamination Control

Implementing advanced HEPA/ULPA filtration systems and precise airflow management to achieve ISO 5-8 cleanroom standards, ensuring ultra-low particle counts for sensitive manufacturing processes in Ethiopia's growing high-tech sectors.

Environmental Stability Masters

Expert design and operation of HVAC systems that maintain stringent temperature, humidity, and pressure differentials, critical for the integrity of pharmaceutical and electronic component production facilities in diverse Ethiopian climates.

Regulatory Compliance & Validation

Ensuring Ethiopian facilities meet international ISO 5-8 cleanroom classifications through rigorous validation protocols, IQ/OQ/PQ testing, and detailed documentation, supporting local industries in achieving global market access.

What Is Cleanroom Engineering (Iso 5-8) In Ethiopia?

Cleanroom engineering, particularly within the ISO 5 to ISO 8 classification range, refers to the design, construction, and maintenance of controlled environments that minimize or eliminate particulate contamination. These environments are crucial for processes requiring a high degree of sterility and purity. In Ethiopia, this service is gaining traction as industries increasingly adopt international standards for quality and product integrity, particularly in sectors sensitive to airborne and surface contaminants. ISO 5 (Class 100) and ISO 8 (Class 100,000) represent specific levels of airborne particulate cleanliness, with ISO 5 being significantly cleaner than ISO 8. The engineering aspect involves meticulous control over air filtration (HEPA/ULPA), air changes per hour, pressure differentials, material selection for surfaces, gowning procedures, and validated cleaning protocols to maintain these stringent cleanliness levels. This encompasses not just the physical construction but also the operational procedures and ongoing monitoring to ensure the sustained integrity of the cleanroom environment.

ISO ClassMaximum Particles (≥ 0.5 µm/m³)Typical Applications
ISO 5 (formerly Class 100)3,520Sterile drug manufacturing (aseptic processing), semiconductor fabrication, advanced biotechnology research, critical medical device assembly
ISO 6 (formerly Class 1,000)35,200Assembly of sensitive electronic components, certain pharmaceutical packaging, cell culture operations
ISO 7 (formerly Class 10,000)352,000General electronics assembly, some medical device manufacturing, pharmaceutical powder handling
ISO 8 (formerly Class 100,000)3,520,000Food processing (packaging, storage), basic pharmaceutical manufacturing, certain cosmetic production, laboratory animal facilities

Key Components of Cleanroom Engineering (ISO 5-8)

  • Air Filtration Systems (HEPA/ULPA filters)
  • Airflow Management (laminar, unidirectional, or turbulent)
  • Pressure Differentials and Interlocks
  • Material Selection (non-shedding, easy-to-clean surfaces)
  • HVAC System Design and Integration
  • Gowning and Personnel Protocols
  • Environmental Monitoring (particulate, microbial, temperature, humidity)
  • Validation and Qualification Protocols
  • Maintenance and Recertification Programs

Who Needs Cleanroom Engineering (Iso 5-8) In Ethiopia?

Cleanroom engineering, particularly for ISO classes 5-8, is critical for numerous industries and research sectors in Ethiopia that require controlled environments to prevent contamination. These controlled environments are essential for processes where even microscopic particles can compromise product quality, research integrity, or patient safety. As Ethiopia's industrial base and scientific capabilities expand, the demand for such specialized environments is growing.

Industry/SectorPrimary ISO Class Range (Typical)Key Applications/Reasons for Cleanroom
Healthcare and PharmaceuticalsISO 5-7Sterile drug manufacturing, vaccine production, operating theaters, sterile processing.
Food and Beverage ProcessingISO 7-8 (can be higher for specific processes)Aseptic packaging, infant formula production, high-purity ingredient processing.
Electronics ManufacturingISO 5-8Semiconductor assembly, precision component manufacturing, preventing particle-induced defects.
Research and DevelopmentISO 5-8Biotechnology, life sciences, materials science research, ensuring experimental integrity.
Cosmetics and Personal CareISO 7-8Ensuring product purity, preventing microbial contamination, safety of formulations.

Target Customers and Departments for Cleanroom Engineering (ISO 5-8) in Ethiopia

  • {"title":"Healthcare and Pharmaceuticals","departments":["Pharmaceutical Manufacturing","Sterile Drug Production","Vaccine Development and Manufacturing","Hospital Operating Theaters","Central Sterile Supply Departments (CSSD)","Compounding Pharmacies","Medical Device Manufacturing and Sterilization"],"description":"This is a primary sector requiring high-level cleanroom standards. Pharmaceutical manufacturing, sterile drug production, and vaccine development are highly sensitive to particulate and microbial contamination. Hospitals also require specialized cleanrooms for operating theaters, compounding pharmacies, and sterile processing of medical devices."}
  • {"title":"Food and Beverage Processing","departments":["Aseptic Packaging Lines","Dairy Processing (e.g., infant formula)","Specialty Food Ingredient Manufacturing","Beverage Bottling and Packaging"],"description":"While not always requiring ISO 5, certain food and beverage manufacturing processes, especially those involving sensitive ingredients, aseptic packaging, or the production of infant formula, benefit significantly from controlled environments to ensure product safety, shelf-life, and prevent spoilage."}
  • {"title":"Electronics Manufacturing and Assembly","departments":["Semiconductor Manufacturing","Printed Circuit Board (PCB) Assembly","Precision Electronics Assembly","Optical Component Manufacturing"],"description":"The production and assembly of sensitive electronic components, such as semiconductors, microchips, and precision electronics, demand cleanroom conditions to prevent dust and particles from causing defects, short circuits, or performance degradation."}
  • {"title":"Research and Development (R&D) Institutions","departments":["Biotechnology Labs","Microbiology Labs","Genetics and Genomics Research","Materials Science Labs","University Research Centers","Government Research Institutes"],"description":"Academic institutions and private R&D labs working on cutting-edge scientific research, particularly in biotechnology, life sciences, and advanced materials, require controlled environments for experiments to ensure reliable and reproducible results."}
  • {"title":"Aerospace and Defense","departments":["Aerospace Component Manufacturing (if applicable)","Defense System Assembly and Maintenance"],"description":"Although potentially nascent in Ethiopia, sectors involved in the manufacturing or maintenance of sensitive aerospace or defense components would require cleanroom conditions for assembly and quality control to ensure the reliability of critical systems."}
  • {"title":"Cosmetics and Personal Care","departments":["Cosmetic Manufacturing","Personal Care Product Formulation","Fragrance Production"],"description":"The manufacturing of high-quality cosmetics and personal care products, especially those with natural or sensitive ingredients, often utilizes cleanrooms to maintain product purity, prevent microbial contamination, and ensure consumer safety."}

Cleanroom Engineering (Iso 5-8) Process In Ethiopia

This document outlines the typical workflow for Cleanroom Engineering services in Ethiopia, specifically focusing on ISO 5-8 standards, from initial inquiry to project execution. The process emphasizes a structured approach to ensure compliance, quality, and client satisfaction.

Cleanroom Engineering (ISO 5-8) Process in Ethiopia: From Inquiry to Execution

This workflow details the stages involved in engaging a cleanroom engineering service in Ethiopia for projects requiring ISO 5 to ISO 8 compliant environments. It covers the journey from the initial contact to the final project completion and handover.

StageKey ActivitiesDeliverables/OutcomesISO 5-8 Relevance
Initial Inquiry & Needs AssessmentClient contact, understanding scope, desired ISO class, budget, timeline.Initial project brief, understanding of client's needs.Defines the target ISO class (5-8) as per client requirement.
Site Survey & Detailed ConsultationOn-site assessment, technical discussions with client stakeholders.Site survey report, detailed technical requirements documentation.Identifies site constraints and opportunities for achieving target ISO class.
Proposal Development & QuotationDesigning the solution, estimating costs, outlining methodology.Technical proposal, detailed quotation, project timeline.Proposes design elements and materials to meet the specified ISO class.
Contract Negotiation & AwardAgreement on terms, scope, and pricing.Signed contract.Formalizes the commitment to deliver the specified ISO class cleanroom.
Detailed Design & EngineeringCreating blueprints, schematics, 3D models.Final design drawings, engineering specifications.Engineered for optimal airflow, filtration, and pressure control to meet ISO standards.
Procurement of Materials & EquipmentSourcing and purchasing components.Procured certified materials and equipment.Ensures all components are suitable for cleanroom environments and meet ISO requirements.
Construction & InstallationBuilding the cleanroom structure, installing systems.Physically constructed cleanroom, installed HVAC and filtration.Execution of design to create the physical barrier and controlled environment.
Pre-Commissioning & System TestingTesting individual components and subsystems.System test reports, identified and resolved initial issues.Ensures foundational elements are functional before full system integration.
Commissioning & Performance Qualification (PQ)Testing the integrated system under operational conditions.Commissioning reports, PQ test results (particle counts, air changes, pressures).Verifies that the cleanroom actually meets the specified ISO 5-8 performance criteria.
Validation & CertificationDocumenting compliance and issuing certification.Validation reports, ISO class certification.Provides formal proof of compliance with ISO 5-8 standards.
Training & HandoverEducating client staff, transferring project documentation.Trained personnel, complete project documentation package.Enables client to maintain and operate the cleanroom to preserve ISO standards.
Post-Completion Support & MaintenanceOngoing services, maintenance, re-validation.Service contracts, maintenance reports, re-validation certificates.Ensures continued adherence to ISO 5-8 standards through proactive measures.

Key Stages in the Cleanroom Engineering Workflow

  • 1. Initial Inquiry & Needs Assessment: The process begins with a potential client reaching out to a cleanroom engineering firm with their project requirements. This often involves initial discussions to understand the application, the desired ISO class, the facility's existing infrastructure, budget, and timeline.
  • 2. Site Survey & Detailed Consultation: A comprehensive site survey is conducted by the engineering team. This involves a thorough assessment of the proposed cleanroom location, including existing building structures, HVAC systems, power supply, water supply, and any potential constraints. Detailed consultations with the client's stakeholders (e.g., production managers, quality control, architects) are held to gather all necessary technical specifications and operational needs.
  • 3. Proposal Development & Quotation: Based on the site survey and consultations, the engineering firm develops a detailed technical proposal. This document outlines the proposed cleanroom design, materials, equipment (e.g., HEPA filters, air showers, pass boxes), HVAC system design, installation methodology, validation plan, and a comprehensive cost quotation. It will clearly specify how the design meets the required ISO 5-8 standards.
  • 4. Contract Negotiation & Award: The client reviews the proposal and quotation. Negotiations may occur regarding scope, timeline, payment terms, and contractual obligations. Upon agreement, a formal contract is signed, signifying the award of the project.
  • 5. Detailed Design & Engineering: Once the contract is awarded, the engineering team proceeds with the detailed design phase. This involves creating precise blueprints, schematics, and 3D models for the cleanroom structure, airflow patterns, filtration systems, lighting, utilities, and control systems. This stage ensures all aspects are engineered to meet the specified ISO class requirements and relevant Ethiopian building codes and standards.
  • 6. Procurement of Materials & Equipment: Following the finalization of the detailed design, all necessary materials (e.g., modular wall panels, flooring, ceiling tiles) and specialized equipment (e.g., air handling units, HEPA filters, differential pressure gauges) are procured from approved suppliers. Emphasis is placed on sourcing certified components that meet international cleanroom standards.
  • 7. Construction & Installation: The physical construction of the cleanroom begins. This includes building the modular structure, installing the HVAC system, integrating filtration units, setting up the electrical and lighting systems, and installing any ancillary equipment (e.g., interlocks, monitoring systems). Strict adherence to safety protocols and cleanroom construction best practices is maintained.
  • 8. Pre-Commissioning & System Testing: Before introducing any process equipment or personnel, the installed systems undergo rigorous pre-commissioning. This involves testing individual components and subsystems to ensure they function as designed. This includes leak tests, airflow balance, and initial pressure checks.
  • 9. Commissioning & Performance Qualification (PQ): This is a critical phase where the entire cleanroom system is tested under operational conditions. Performance Qualification (PQ) is conducted to demonstrate that the cleanroom consistently meets the specified ISO 5-8 standards. This involves measuring particle counts, air change rates, temperature, humidity, and differential pressures. Airflow visualization studies might also be performed.
  • 10. Validation & Certification: Upon successful completion of commissioning and PQ, the cleanroom is validated. This involves generating comprehensive validation reports that document the entire process and confirm compliance with ISO 5-8 requirements. A certification is then issued by the engineering firm, formally declaring the cleanroom as compliant.
  • 11. Training & Handover: The client's operational staff are trained on the proper operation and maintenance of the cleanroom systems, including the use of monitoring equipment and emergency procedures. All documentation, including design drawings, operation & maintenance manuals, and validation reports, are handed over to the client. This marks the official completion of the project.
  • 12. Post-Completion Support & Maintenance: Many cleanroom engineering firms offer ongoing support, including periodic maintenance, re-validation services, and troubleshooting to ensure the continued integrity and performance of the cleanroom environment. This is crucial for maintaining ISO compliance over time.

Cleanroom Engineering (Iso 5-8) Cost In Ethiopia

Estimating the cost of cleanroom engineering for ISO 5-8 in Ethiopia involves a complex interplay of factors. These facilities are crucial for industries like pharmaceuticals, electronics, and advanced manufacturing where strict environmental controls are paramount. The pricing will vary significantly based on the specific ISO class required, the size and complexity of the cleanroom, materials used, equipment integration, and the expertise of the engineering and construction firms involved. Local Ethiopian market conditions, including material availability, labor rates, and import duties on specialized equipment, also play a significant role. It's important to note that detailed quotations can only be obtained after a thorough site assessment and a clear definition of project requirements.

Cleanroom Category (ISO Class)Estimated Cost Range (ETB - Ethiopian Birr)Notes
ISO 8 (Class 100,000)2,500,000 - 7,500,000+Basic controlled environments. Might involve simpler filtration, standard construction materials.
ISO 7 (Class 10,000)5,000,000 - 15,000,000+Requires more sophisticated air handling, better filtration (e.g., more HEPA filters), and higher quality finishes.
ISO 6 (Class 1,000)8,000,000 - 25,000,000+Significant investment in advanced HVAC, multiple HEPA filters, precise airflow control, and specialized construction.
ISO 5 (Class 100)15,000,000 - 50,000,000+ (and often significantly higher)The most stringent requirements. Demands extremely high-efficiency filtration (HEPA/ULPA), complex air change rates, meticulous sealing, and advanced monitoring. Often requires dedicated cleanroom specialists.

Key Pricing Factors for Cleanroom Engineering (ISO 5-8) in Ethiopia:

  • ISO Class Specification: Higher ISO classes (e.g., ISO 5) demand more stringent particle control, requiring more sophisticated filtration, air handling systems, and materials, thus increasing costs.
  • Cleanroom Size and Layout: Larger cleanrooms naturally require more materials, labor, and a more extensive HVAC system, leading to higher overall expenses. The complexity of the layout (e.g., multiple zones, airlocks) also impacts cost.
  • Materials and Finishes: The selection of wall panels, flooring (e.g., epoxy, vinyl), ceilings, and doors is critical. High-performance, durable, and easy-to-clean materials suitable for cleanroom environments come at a premium.
  • HVAC and Air Filtration Systems: This is often the most significant cost component. It includes HEPA/ULPA filters, fan filter units (FFUs), air showers, pressure differentials, and sophisticated airflow control systems tailored to the specific ISO class.
  • Contamination Control Measures: This includes items like airlocks, gowning rooms, pass-throughs, and specialized waste disposal systems designed to maintain the clean environment.
  • Instrumentation and Monitoring: Sensors for temperature, humidity, particle counts, and pressure, along with data logging and control systems, contribute to the overall cost.
  • Electrical and Utility Services: Specialized power requirements, clean electrical outlets, and integrated gas/vacuum lines can add to the project cost.
  • Design and Engineering Services: The expertise of cleanroom design and engineering firms, including site surveys, detailed design, CAD drawings, and project management, is a crucial cost factor.
  • Construction and Installation Labor: Skilled labor experienced in cleanroom construction is essential. Labor rates in Ethiopia will influence this aspect.
  • Equipment Integration: If the cleanroom needs to accommodate specific manufacturing or laboratory equipment, its integration and any necessary modifications will add to the cost.
  • Testing, Validation, and Certification: Post-construction testing to ensure the cleanroom meets its specified ISO class is mandatory and incurs costs.
  • Import Duties and Taxes: Many specialized cleanroom components and materials may need to be imported into Ethiopia, incurring import duties, taxes, and shipping costs.
  • Project Timeline and Urgency: Expedited projects may incur higher costs due to overtime labor or premium pricing for materials and services.
  • Location within Ethiopia: Accessibility of the project site, local availability of materials, and regional labor rates can cause variations.

Affordable Cleanroom Engineering (Iso 5-8) Options

Achieving ISO 5-8 cleanroom compliance doesn't have to break the bank. This guide explores cost-effective engineering solutions and value bundles that deliver the necessary environmental controls for sensitive processes, manufacturing, and research. We'll delve into strategies to minimize upfront investment and ongoing operational expenses while maintaining stringent air quality standards.

Value Bundle/StrategyDescriptionCost-Saving AspectSuitable For (ISO Class)
Pre-Engineered Modular Cleanroom KitsPre-fabricated wall panels, ceiling grids, HEPA filters, and integrated HVAC units designed for specific ISO classes. Often includes basic monitoring.Reduced design time, faster installation, standardized components, lower labor costs.ISO 7, ISO 8 (often scalable to ISO 6)
Hybrid Construction (Partially Modular, Partially Permanent)Utilizes modular components for critical areas (e.g., ISO 5 booths) integrated into a more conventionally constructed surrounding facility.Optimizes cost by using high-performance modular systems only where strictly necessary, while using standard construction for less critical zones.ISO 5 (within a larger ISO 7/8 facility)
Optimized Turbulent Airflow SystemsFocuses on achieving required air changes per hour (ACH) and pressure differentials using strategically placed supply and return air grilles without full laminar flow hoods. Often utilizes a single pass system with high-efficiency filtration.Significantly lower capital cost and energy consumption compared to laminar flow systems.ISO 7, ISO 8
Basic Environmental Monitoring PackagesIncludes essential particle counters, temperature, and humidity sensors with data logging capabilities, but may omit advanced trend analysis or integration with complex Building Management Systems (BMS).Lower upfront cost for instrumentation, reduced integration complexity.ISO 6, ISO 7, ISO 8
Energy-Efficient HVAC & RecirculationSpecifying Variable Frequency Drives (VFDs) for fan motors, utilizing energy recovery ventilators (ERVs) where appropriate, and maximizing air recirculation within filter limitations.Reduced operational (electricity) costs, lower carbon footprint.ISO 5, ISO 6, ISO 7, ISO 8
Standard Grade Materials with Strategic ReinforcementUsing durable materials like PVC or vinyl-coated steel for walls and floors, with specific reinforced areas only where impact or heavy traffic is expected.Lower material and installation costs compared to premium finishes.ISO 7, ISO 8 (and for less critical zones in ISO 6)

Key Considerations for Affordable Cleanroom Engineering (ISO 5-8)

  • Modular vs. Permanent Construction: Evaluate the long-term needs and flexibility required. Modular cleanrooms offer faster deployment and easier relocation, often at a lower initial cost.
  • Airflow Design (Laminar vs. Non-Laminar): ISO 7 and 8 can often be achieved with non-laminar (turbulent) airflow, which is less complex and costly than the unidirectional (laminar) airflow typically required for ISO 5.
  • Filtration Strategy: High-efficiency particulate air (HEPA) filters are essential, but the type and quantity can be optimized based on room class and process requirements. Recirculation rates also play a role.
  • HVAC System Optimization: Right-sizing the HVAC system to avoid over-engineering and implementing energy-efficient components can lead to significant operational savings.
  • Material Selection: Choose durable yet cost-effective materials for walls, floors, and ceilings that meet cleanroom standards.
  • Instrumentation & Monitoring: Employ reliable but not overly complex sensors for critical parameters like particle counts, temperature, and humidity.
  • Phased Implementation: For larger projects, consider building to a higher standard than initially required for certain areas, and then upgrading specific zones as needed, rather than building the entire facility to the highest ISO class from day one.
  • Supplier Partnerships: Develop strong relationships with reputable cleanroom suppliers who can offer bundled solutions and bulk discounts.

Verified Providers In Ethiopia

In Ethiopia's evolving healthcare landscape, discerning the best and most reliable providers is paramount for ensuring quality care. Franance Health has emerged as a beacon of trust, offering a comprehensive suite of services backed by rigorous credentialing and a commitment to patient well-being. Their dedication to upholding the highest standards makes them a standout choice for individuals and families seeking exceptional healthcare.

Credential AspectFranance Health StandardBenefit to Patients
Medical Licensing & CertificationUp-to-date and valid Ethiopian medical licenses; recognized international certifications where applicable.Ensures providers are legally qualified and possess foundational medical knowledge.
Professional Experience & Track RecordThorough review of past practice, including patient feedback and peer evaluations.Guarantees practical experience and a history of positive patient care.
Specialty QualificationsVerification of postgraduate training and board certifications in specific medical disciplines.Access to highly skilled specialists for accurate diagnosis and treatment of complex conditions.
Ethical Conduct & ProfessionalismBackground checks, adherence to medical ethics codes, and patient rights advocacy.Promotes a safe, respectful, and trustworthy healthcare environment.
Facility & Equipment StandardsPartnerships with accredited facilities equipped with modern medical technology.Facilitates advanced diagnostics and treatment options, leading to better outcomes.

Why Franance Health Credentials Represent the Best Choice in Ethiopia:

  • Stringent Verification Processes: Franance Health doesn't take shortcuts. They implement a multi-layered vetting system for all their affiliated healthcare professionals, ensuring that each provider meets and exceeds national and international standards of competence and ethical practice.
  • Focus on Specialized Expertise: Beyond general qualifications, Franance Health prioritizes providers with specialized training and proven experience in various medical fields. This ensures that patients receive care from experts best suited to their specific needs, from pediatrics to complex surgical procedures.
  • Commitment to Continuous Professional Development: The healthcare world is constantly advancing. Franance Health mandates and supports ongoing training and skill enhancement for its network, guaranteeing that their providers are up-to-date with the latest medical advancements and best practices.
  • Adherence to Ethical Guidelines and Patient Rights: Patient trust is foundational. Franance Health's credentialing process thoroughly assesses a provider's commitment to ethical conduct, patient privacy, and the promotion of patient autonomy and informed decision-making.
  • Seamless Integration with Advanced Medical Technology: Franance Health partners with facilities and professionals who leverage modern medical technology and equipment. This integration, combined with skilled practitioners, leads to more accurate diagnoses, effective treatments, and improved patient outcomes.
  • Patient-Centric Approach: The credentialing extends beyond technical skills to encompass a provider's ability to communicate effectively, show empathy, and prioritize the patient's comfort and concerns throughout their healthcare journey.

Scope Of Work For Cleanroom Engineering (Iso 5-8)

This Scope of Work (SOW) outlines the engineering services required for the design, validation, and commissioning of cleanroom facilities compliant with ISO 5 to ISO 8 standards. The objective is to deliver functional, robust, and validated cleanrooms that meet stringent contamination control requirements for sensitive manufacturing and research processes. The project encompasses all engineering aspects from conceptual design through to final handover, ensuring adherence to relevant industry standards and regulatory guidelines. The technical deliverables and standard specifications are detailed below.

CategoryDescriptionStandard Specification / Reference
Cleanroom ClassificationDesign and operation of cleanroom environments meeting ISO 5 (Class 100), ISO 6 (Class 1,000), ISO 7 (Class 10,000), and ISO 8 (Class 100,000) standards.ISO 14644-1: Cleanrooms and associated controlled environments - Part 1: Classification of air cleanliness
HVAC System DesignDesign of HEPA/ULPA filtration systems, airflow patterns (laminar, unidirectional, turbulent), pressure differentials, temperature and humidity control, air change rates, and energy efficiency.ISO 14644-4: Cleanrooms and associated controlled environments - Part 4: Design, construction and start-upASHRAE 52.2: Method of Testing General Ventilation Air-Cleaning Devices for Use in General Ventilation for Particulate MatterSMACNA HVAC Design Manual
Electrical SystemsDesign of power distribution, lighting (including UVC integration if required), emergency power, grounding, and cleanroom-compatible electrical components.NFPA 70 (National Electrical Code)IES Lighting Handbook
Plumbing and Process PipingDesign of clean utilities (DI water, compressed air, nitrogen), waste management systems, and specialized process piping adhering to material compatibility and cleanability requirements.ASME BPE: Bioprocessing Equipment StandardsLocal plumbing codes and standards
Material and FinishesSelection of appropriate cleanroom construction materials, wall systems, flooring, ceiling tiles, doors, windows, and pass-throughs to ensure low particle generation and ease of cleaning.ISO 14644-5: Cleanrooms and associated controlled environments - Part 5: OperationsManufacturer's specifications for cleanroom materials
Airflow and Particle MonitoringDesign and integration of systems for real-time monitoring of airflow velocity, particle counts, temperature, and humidity.ISO 14644-2: Cleanrooms and associated controlled environments - Part 2: Monitoring of air cleanliness by particle countingManufacturer's specifications for monitoring equipment
Validation DocumentationDevelopment of Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) protocols and reports.ISPE Baseline® Pharmaceutical Equipment Validation GuidanceFDA Guidelines on General Principles of Process Validation
Commissioning PlanDevelopment and execution of a comprehensive commissioning plan for all cleanroom systems.ASHRAE Guideline 0: The Commissioning ProcessNIBS Guideline 3: Building Enclosure Commissioning Process
Training MaterialsDevelopment of training materials for facility operators on cleanroom protocols, gowning procedures, and equipment operation.Company-specific SOPs and training guidelines

Key Activities & Deliverables

  • Conceptual Design and Feasibility Studies
  • Detailed Engineering Design (HVAC, Electrical, Plumbing, Process Piping)
  • Cleanroom Construction and Installation Oversight
  • System Validation (IQ, OQ, PQ)
  • Commissioning and Handover
  • As-Built Documentation and Training

Service Level Agreement For Cleanroom Engineering (Iso 5-8)

This Service Level Agreement (SLA) outlines the guaranteed response times and uptime for cleanroom engineering services, specifically for ISO Class 5 through ISO Class 8 environments. This agreement ensures the operational continuity and performance of critical cleanroom facilities for [Client Name].

Service LevelUptime GuaranteeResponse Time (Critical Issue)Response Time (Standard Issue)Resolution Target
ISO 5 (Critical Environment)99.99%30 minutes (On-site within 2 hours)2 hours (Remote diagnosis)4-8 hours (depending on complexity)
ISO 6 (High-Performance)99.95%1 hour (On-site within 4 hours)4 hours (Remote diagnosis)8-12 hours (depending on complexity)
ISO 7 (Controlled Environment)99.90%2 hours (On-site within 8 hours)8 hours (Remote diagnosis)12-24 hours (depending on complexity)
ISO 8 (General Cleanroom)99.80%4 hours (On-site within 12 hours)24 hours (Remote diagnosis)24-48 hours (depending on complexity)

Scope of Services

  • Emergency support and troubleshooting for cleanroom systems (HVAC, filtration, pressure control, environmental monitoring).
  • Scheduled preventative maintenance and calibration.
  • On-site engineering presence for critical operations.
  • System performance analysis and optimization.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your Cleanroom Engineering (ISO 5-8) in Ethiopia project in Ethiopia.

Speak to Sales