Background
Verified Service Provider in Equatorial Guinea

PSA Oxygen Plant Installation Service in Equatorial Guinea Engineering Excellence & Technical Support

PSA Oxygen Plant Installation Service High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Advanced Process Control & Automation

Our PSA Oxygen Plant installations in Equatorial Guinea leverage cutting-edge process control systems and PLC-based automation. This ensures optimized oxygen purity, efficient energy consumption, and real-time performance monitoring, minimizing downtime and maximizing operational lifespan for critical medical and industrial applications.

Logistics & Site Integration Expertise

Navigating Equatorial Guinea's unique logistical landscape, we specialize in the secure and efficient transport of all PSA plant components. Our team excels in seamless site integration, including foundation preparation, utility connections, and adherence to all local environmental and safety regulations, ensuring a swift and compliant project execution.

Localized Training & Ongoing Support

We provide comprehensive, on-site training for local operators and maintenance staff in Equatorial Guinea, empowering them with the skills to manage and sustain PSA oxygen plant operations effectively. Our commitment extends beyond installation with robust remote monitoring capabilities and readily available technical support to guarantee uninterrupted oxygen supply.

What Is Psa Oxygen Plant Installation Service In Equatorial Guinea?

PSA Oxygen Plant Installation Service in Equatorial Guinea refers to the specialized engineering, procurement, and construction (EPC) activities required for the setup and commissioning of Pressure Swing Adsorption (PSA) oxygen generation systems within Equatorial Guinea. This service encompasses the entire lifecycle of a PSA oxygen plant installation, from initial site assessment and design to the final operational handover. It involves the deployment of skilled personnel, specialized equipment, and adherence to stringent safety and quality standards relevant to the specific environmental and regulatory landscape of Equatorial Guinea. The core function of a PSA oxygen plant is to produce medical or industrial-grade oxygen from ambient air through a process of selective adsorption and desorption of nitrogen and other impurities using molecular sieves, thereby yielding a high-purity oxygen stream. The installation service ensures that the plant is correctly assembled, integrated with existing infrastructure (if applicable), tested for performance, and made ready for continuous operation, meeting the specific oxygen purity, flow rate, and pressure requirements of the end-user. This service is crucial for ensuring reliable and cost-effective on-site oxygen supply, reducing dependency on external logistics and potentially hazardous transportation of oxygen cylinders or liquid oxygen.

Who Needs PSA Oxygen Plant Installation Service in Equatorial Guinea?Typical Use Cases
Hospitals and Healthcare Facilities: For medical oxygen supply in operating theaters, recovery rooms, intensive care units, and general wards, especially in remote or underserved areas.Medical Oxygen Generation: Ensuring a continuous and reliable supply of medical-grade oxygen for respiratory support, anesthesia, and other therapeutic applications.
Industrial Operations: For sectors requiring oxygen for welding, cutting, smelting, chemical synthesis, and wastewater treatment.Industrial Gas Supply: Providing on-site oxygen for processes in metallurgy, chemical manufacturing, and environmental services.
Mining and Extractive Industries: For applications such as pyrotechnic cutting or specific mineral processing where oxygen is a critical input.Process Enhancement: Utilizing oxygen to improve efficiency and safety in mining and oil & gas operations.
Emergency Response and Disaster Relief Organizations: To rapidly establish oxygen supply in crisis situations or areas with damaged infrastructure.Contingency Planning: Deploying portable or modular PSA units for immediate oxygen needs during emergencies.
Remote Research and Development Facilities: Where localized oxygen production is more feasible than transportation.Specialized Applications: Supporting scientific research and experimental processes requiring controlled oxygen environments.

Key Components of PSA Oxygen Plant Installation Service:

  • Site Survey and Feasibility Study: Assessing land availability, accessibility, power supply, and other site-specific conditions.
  • Detailed Engineering and Design: Developing plant layouts, P&IDs, electrical schematics, structural designs, and procurement specifications tailored to the project's requirements and local regulations.
  • Procurement of Equipment and Materials: Sourcing and acquiring all necessary components, including PSA adsorbers, compressors, dryers, storage tanks, piping, instrumentation, and control systems.
  • Civil and Structural Works: Preparing the site, constructing foundations, enclosures, and associated infrastructure.
  • Mechanical Installation: Assembling and installing all mechanical equipment, including compressors, adsorber vessels, piping, valves, and heat exchangers.
  • Electrical and Instrumentation (E&I) Installation: Installing power distribution systems, control panels, sensors, actuators, and communication networks.
  • Piping and Welding: Fabricating and installing all required piping networks for air intake, oxygen output, inert gas venting, and auxiliary systems, adhering to relevant codes (e.g., ASME, API).
  • System Commissioning and Testing: Conducting pre-commissioning checks, functional tests, performance validation (purity, flow, pressure), safety system verification, and environmental impact assessments.
  • Operator Training: Providing comprehensive training to the end-user's personnel on plant operation, maintenance, troubleshooting, and safety protocols.
  • Documentation and Handover: Furnishing all relevant project documentation, including as-built drawings, operating manuals, maintenance logs, and commissioning reports, followed by formal handover.
  • After-Sales Support and Maintenance (Optional): Offering ongoing technical assistance, spare parts supply, and planned maintenance services.

Who Needs Psa Oxygen Plant Installation Service In Equatorial Guinea?

Equatorial Guinea, with its growing industrial and healthcare sectors, presents a consistent and increasing demand for reliable oxygen supply. Specifically, the need for on-site PSA (Pressure Swing Adsorption) oxygen plant installation services arises from entities requiring a secure, cost-effective, and continuous source of medical or industrial-grade oxygen. These installations are crucial for ensuring operational efficiency, patient safety, and adherence to stringent quality standards.

Target Customer CategoryKey Departments/Units Requiring OxygenSpecific Needs/Benefits of PSA Installation
Hospitals and Healthcare FacilitiesIntensive Care Units (ICUs), Operating Theaters, Emergency Rooms, General Wards, Respiratory Therapy DepartmentsUninterrupted medical oxygen supply, reduced reliance on external suppliers, improved patient safety, cost savings on oxygen procurement, potential for oxygen generation for hyperbaric chambers.
Industrial OperationsManufacturing plants, metal fabrication workshops, chemical processing units, wastewater treatment facilitiesConsistent and high-purity oxygen for welding, cutting, combustion enhancement, and chemical synthesis; reduced transportation costs and risks associated with traditional oxygen cylinders; operational uptime.
Mining and Exploration CompaniesOn-site operations, remote exploration sitesReliable oxygen for potential rescue operations, welding/maintenance of equipment in remote locations, and breathing apparatus in hazardous environments; self-sufficiency.
Oil and Gas SectorRefineries, offshore platforms, processing plantsOxygen for combustion processes, welding, and emergency applications; increased safety and efficiency in remote and demanding operational environments.
Emergency Response and Disaster Relief OrganizationsField hospitals, disaster zonesRapid deployment of oxygen generation capabilities to areas lacking infrastructure; immediate access to life-saving medical oxygen.
Research and Development LaboratoriesBiotechnology, chemical researchSpecific purity levels of oxygen for experiments and analytical processes; controlled and consistent supply.

Target Customers for PSA Oxygen Plant Installation Services in Equatorial Guinea:

  • Hospitals and Healthcare Facilities
  • Industrial Operations (especially those utilizing oxygen for welding, cutting, or chemical processes)
  • Mining and Exploration Companies
  • Oil and Gas Sector
  • Emergency Response and Disaster Relief Organizations
  • Research and Development Laboratories

Psa Oxygen Plant Installation Service Process In Equatorial Guinea

This document outlines the comprehensive service process for the installation of Pressure Swing Adsorption (PSA) Oxygen Plants in Equatorial Guinea, covering the entire workflow from the initial customer inquiry to the final execution and handover. We aim to provide a clear, efficient, and transparent process to ensure successful project delivery and customer satisfaction.

StageDescriptionKey ActivitiesDeliverablesTypical Timeline (Equatorial Guinea Context)
  1. Inquiry and Initial Consultation
The customer expresses interest in a PSA Oxygen Plant installation service.Receive and review customer inquiry, understand project requirements (oxygen purity, flow rate, application), initial technical discussions, identify key stakeholders.Preliminary understanding of project scope, customer needs documented.1-2 weeks
  1. Site Assessment and Feasibility Study
Evaluating the proposed installation site to ensure suitability and identify potential challenges.On-site visit (if feasible, or detailed remote assessment), environmental condition analysis (temperature, humidity, altitude), power availability assessment, space requirements, accessibility for equipment delivery, local regulations check.Site assessment report, feasibility determination, preliminary site layout recommendations.2-4 weeks
  1. Proposal Development and Quotation
Presenting a detailed technical and commercial offer based on the gathered information.Developing a tailored technical solution, specifying equipment models, system design, engineering drawings (preliminary), project execution plan, cost breakdown, payment terms, warranty information.Comprehensive technical and commercial proposal, detailed quotation.2-3 weeks
  1. Contract Negotiation and Agreement
Finalizing the terms and conditions of the service agreement.Reviewing and negotiating the proposal, finalizing contract clauses, scope of work, timelines, responsibilities, and payment schedule.Signed Service Agreement/Contract.1-2 weeks
  1. Project Planning and Design
Detailed engineering and meticulous planning for the installation.Finalizing detailed engineering designs, P&ID (Piping and Instrumentation Diagrams), electrical schematics, civil/structural drawings, safety protocols, detailed project schedule, resource allocation (personnel, equipment).Approved detailed engineering designs, final project execution plan.3-6 weeks
  1. Procurement and Logistics
Acquiring all necessary equipment, materials, and arranging transportation.Ordering PSA plant components, spare parts, consumables, tools, and any required civil works materials. Planning and executing international and local transportation to Equatorial Guinea, including customs clearance.Procured equipment and materials, shipping documents, customs clearance.4-12 weeks (highly dependent on lead times and customs)
  1. Site Preparation
Preparing the installation location according to the design specifications.Civil works (foundation, pad installation, building construction/modification if needed), electrical power supply setup, utility connections (water, compressed air if applicable), safety barriers, access routes.Ready installation site with necessary utilities and infrastructure.2-6 weeks
  1. Equipment Delivery and Unloading
Safely transporting and unloading all plant components at the site.Coordination of arrival at port/site, specialized lifting equipment deployment, careful unloading and placement of modules and components, initial inventory check.All equipment and components delivered and safely stored on-site.1-3 weeks
  1. Installation and Assembly
Physically assembling and connecting all parts of the PSA oxygen plant.Module assembly, piping connections (oxygen, air, nitrogen, vacuum), electrical wiring and connections, instrument installation, structural assembly, welding, and bolting.Assembled PSA oxygen plant structure.4-8 weeks
  1. Pre-Commissioning and Testing
Initial checks and dry runs to ensure everything is connected correctly and safely.Electrical continuity tests, insulation resistance tests, leak tests on piping, functional checks of individual components (valves, sensors, actuators) without power or product gas.Pre-commissioning report, identified and rectified minor issues.1-2 weeks
  1. Commissioning and Performance Validation
Starting up the plant and verifying its performance against specifications.Plant startup, system purging, introduction of feed air, PSA cycle activation, oxygen generation, purity and flow rate verification using calibrated instruments, stability testing, performance under various load conditions.Commissioning report, performance validation certificate, operational plant.2-4 weeks
  1. Training and Handover
Empowering the customer's personnel to operate and maintain the plant.Comprehensive training on plant operation, maintenance procedures, troubleshooting, safety protocols, spare parts management. Formal handover of documentation (manuals, drawings, test reports).Trained operational staff, complete documentation package, formal project acceptance.1-2 weeks
  1. Post-Installation Support and Maintenance
Ongoing support to ensure continued optimal performance.Warranty support, routine maintenance services (scheduled), remote monitoring (if applicable), troubleshooting assistance, spare parts supply, performance optimization.Ongoing operational efficiency, customer satisfaction, minimized downtime.Continuous (as per service agreement)

PSA Oxygen Plant Installation Service Workflow

  • Inquiry and Initial Consultation
  • Site Assessment and Feasibility Study
  • Proposal Development and Quotation
  • Contract Negotiation and Agreement
  • Project Planning and Design
  • Procurement and Logistics
  • Site Preparation
  • Equipment Delivery and Unloading
  • Installation and Assembly
  • Pre-Commissioning and Testing
  • Commissioning and Performance Validation
  • Training and Handover
  • Post-Installation Support and Maintenance

Psa Oxygen Plant Installation Service Cost In Equatorial Guinea

Installing a Pressure Swing Adsorption (PSA) oxygen plant in Equatorial Guinea involves a significant investment, with costs influenced by a multitude of factors. These factors can broadly be categorized into plant specifications, logistical challenges, and local operational considerations. Pricing is typically quoted in US Dollars (USD) for international projects, but for local budgeting and understanding the on-the-ground expenditure, it's crucial to consider the exchange rate to the local currency, the Central African CFA franc (XAF). While a direct 'price list' for PSA oxygen plant installation in Equatorial Guinea is not readily available due to the custom nature of each project, we can outline the key drivers of cost and provide indicative ranges.

ParameterIndicative Range (USD)Indicative Range (XAF/USD Rate: ~590 XAF/USD)*
Small Industrial/Laboratory PSA Oxygen Plant (e.g., < 5 Nm³/hr)$50,000 - $150,00029,500,000 - 88,500,000 XAF
Medium Industrial/Hospital PSA Oxygen Plant (e.g., 5 - 20 Nm³/hr)$150,000 - $400,00088,500,000 - 236,000,000 XAF
Large Industrial/High-Demand Hospital PSA Oxygen Plant (e.g., > 20 Nm³/hr)$400,000 - $1,000,000+236,000,000 - 590,000,000+ XAF
Installation & Commissioning Services (Percentage of Plant Cost)15% - 30%Varies based on USD cost and exchange rate
Site Preparation & Civil Works (Highly Variable)$10,000 - $100,000+5,900,000 - 59,000,000+ XAF
Logistics & Transportation (Highly Variable)$5,000 - $50,000+2,950,000 - 29,500,000+ XAF

Key Pricing Factors for PSA Oxygen Plant Installation in Equatorial Guinea:

  • Plant Capacity and Purity: The most significant driver. Larger capacity plants (measured in Nm³/hr or SCFM) and higher purity requirements (e.g., medical grade oxygen vs. industrial grade) will naturally cost more.
  • Technology and Manufacturer: Different PSA technologies exist, and the reputation, innovation, and after-sales support offered by the manufacturer will impact the price.
  • Scope of Installation Services: This includes site assessment, civil works (foundations, building), electrical connections, piping, water supply, compressor installation, air dryer, filtration systems, oxygen buffer tanks, and final commissioning. The extent of these services directly affects the labor and material costs.
  • Location and Accessibility: Equatorial Guinea's infrastructure can be challenging. Remote or difficult-to-access installation sites will incur higher costs for transportation of equipment, personnel, and materials, as well as potentially requiring specialized equipment for delivery.
  • Site Preparation and Civil Works: The existing condition of the site will determine the cost of land clearing, foundation construction, building erection (if required), and other civil engineering aspects.
  • Ancillary Equipment: This includes air compressors, dryers, filtration systems, oxygen buffer tanks, backup oxygen supply systems, and medical gas manifold systems (for healthcare applications).
  • Logistics and Import Duties: Shipping costs to Equatorial Guinea, insurance, and any applicable import duties or taxes on the plant components and equipment will add to the overall price.
  • Labor Costs: While often quoted in USD, the availability and cost of skilled local labor for construction, installation, and ongoing maintenance need to be factored in. Expatriate labor will significantly increase costs.
  • Power Supply and Infrastructure: The reliability and capacity of the local power grid are critical. If a dedicated generator is required, this will be an additional expense. The cost of power itself for running the plant is an ongoing operational expense but can influence the initial installation choice (e.g., energy-efficient models).
  • Permits and Regulatory Compliance: Obtaining necessary permits and ensuring compliance with local regulations and safety standards can incur fees and require specialized consulting.
  • Training and Commissioning: Comprehensive training for local operators and technicians, along with the final commissioning of the plant, are essential components of the installation service.
  • After-Sales Support and Maintenance: While not strictly installation cost, long-term service agreements, spare parts availability, and warranty support are often bundled or considered during the initial decision-making process.
  • Currency Exchange Rate: Fluctuations in the XAF to USD exchange rate will impact the final cost in local currency.

Affordable Psa Oxygen Plant Installation Service Options

Installing a Pressure Swing Adsorption (PSA) oxygen plant is a significant investment, but finding affordable options is achievable through careful planning and strategic choices. This service focuses on providing cost-effective solutions for PSA oxygen plant installation, ensuring businesses can access on-site oxygen generation without exorbitant upfront costs. We offer a range of value bundles and cost-saving strategies to make this technology accessible.

Cost-Saving StrategyDescriptionPotential Benefit
Phased InstallationBreaking down the installation into manageable phases, allowing for staggered payments and aligning with budget cycles.Reduced immediate capital outlay, improved cash flow management.
Off-Peak Installation SchedulingScheduling installation during periods of lower demand or facility downtime.Potentially lower labor costs, reduced disruption to operations.
Standardized Equipment SelectionOpting for widely used and readily available PSA unit models and components.Lower equipment procurement costs, faster delivery times, easier access to spare parts.
DIY Site Preparation (where applicable)Client undertakes certain site preparation tasks (e.g., foundation, basic utilities) under our guidance.Significant reduction in labor and subcontractor costs for the installation provider.
Refurbished or Certified Pre-Owned UnitsOffering installation services for high-quality, refurbished PSA units with a warranty.Substantially lower upfront equipment cost compared to new units.
Energy-Efficient Component IntegrationSelecting components and optimizing system design for lower energy consumption.Reduced operational electricity costs over the plant's lifespan.
Long-Term Service AgreementsBundling installation with a multi-year service contract for predictable maintenance costs.Potential for discounted service rates, avoiding unexpected repair bills.

Value Bundles for Affordable PSA Oxygen Plant Installation

  • {"title":"Basic Installation Package","description":"Includes core installation, essential piping, basic electrical hook-up, and functional testing. Ideal for straightforward deployments with minimal customization."}
  • {"title":"Standard Integration Bundle","description":"Expands on the Basic package by including integration with existing facility systems, initial operator training, and a slightly extended warranty. Suitable for most standard industrial applications."}
  • {"title":"Comprehensive Solution Suite","description":"Our premium offering, encompassing full site preparation, advanced system integration, comprehensive operator and maintenance training, extended warranty, and a preventative maintenance plan. Best for facilities requiring seamless integration and long-term operational support."}
  • {"title":"Modular & Scalable Options","description":"We provide modular PSA units that can be scaled up as your oxygen demand grows, allowing for phased investment and avoiding over-provisioning initially."}

Verified Providers In Equatorial Guinea

In Equatorial Guinea, ensuring access to quality healthcare is paramount. This involves partnering with healthcare providers who not only possess the necessary medical expertise but also adhere to the highest ethical and operational standards. Franance Health has established itself as a leader in this regard, offering a comprehensive suite of services backed by a strong commitment to patient well-being and verifiable credentials. Their dedication to excellence makes them a premier choice for individuals and organizations seeking reliable and trustworthy healthcare solutions in the region.

Franance Health's Credentialing PillarsDescription
Medical Licenses & Certifications:Verification of all required national and international medical licenses and specialized certifications for every practitioner.
Educational Background Verification:Thorough scrutiny of medical degrees, diplomas, and postgraduate qualifications from accredited institutions.
Professional Experience Validation:Confirmation of previous work experience, including roles, responsibilities, and the duration of practice.
Peer Review & References:Inclusion of a robust system for peer assessment and background checks to ensure professional integrity and competence.
Continuous Professional Development (CPD):Ensuring that all providers actively participate in ongoing training and education to stay abreast of the latest medical advancements.
Ethical Conduct & Disciplinary Records:A stringent review of any past disciplinary actions or ethical breaches from relevant medical boards.

Why Franance Health is the Best Choice for Verified Providers in Equatorial Guinea

  • Unwavering Commitment to Quality Care: Franance Health prioritizes patient safety, efficacy of treatment, and ethical medical practices in all its operations.
  • Rigorous Credentialing Process: All medical professionals associated with Franance Health undergo a thorough vetting process, ensuring they meet stringent qualification and experience benchmarks.
  • Compliance with International Standards: Franance Health aligns its practices with internationally recognized healthcare standards, guaranteeing a high level of service delivery.
  • Comprehensive Service Offerings: From primary care to specialized medical services, Franance Health provides a broad spectrum of healthcare solutions tailored to diverse needs.
  • Patient-Centric Approach: The organization places a strong emphasis on patient comfort, clear communication, and personalized treatment plans.
  • Technological Integration: Franance Health leverages modern medical technology and infrastructure to enhance diagnostic capabilities and treatment outcomes.
  • Local Expertise with Global Perspective: Their team combines deep understanding of the Equatorial Guinean healthcare landscape with access to global best practices and innovations.

Scope Of Work For Psa Oxygen Plant Installation Service

This Scope of Work (SOW) outlines the requirements for the installation services of a Pressure Swing Adsorption (PSA) Oxygen Plant. It details the technical deliverables, standard specifications, and general responsibilities of the service provider to ensure a successful and compliant installation.

The PSA Oxygen Plant is designed to produce medical-grade oxygen from atmospheric air. The installation process will encompass all necessary activities from site preparation to commissioning and handover of the operational plant.

The service provider will be responsible for the safe, efficient, and timely execution of all installation activities in accordance with the provided design documents, manufacturer's instructions, and relevant industry standards and regulations.

Technical DeliverableDescriptionStandard Specification/Reference
Foundation and Structural WorksInstallation of concrete foundations and any required structural supports for the PSA unit, air compressor, dryer, receiver tanks, and associated piping. Ensuring stability and load-bearing capacity.Refer to approved civil engineering drawings. Relevant national building codes and seismic design standards.
PSA Unit InstallationUnpacking, positioning, and securing of the PSA adsorbent beds, valves, control systems, and electrical components.Manufacturer's installation manual, layout drawings.
Air Compressor and Dryer InstallationInstallation and alignment of the air compressor, air dryer, and associated electrical and pneumatic connections.Manufacturer's installation manual, alignment specifications.
Piping and Tubing InstallationInstallation of process piping (oxygen, compressed air, vent), utility piping (cooling water, instrument air), and interconnecting tubing. Ensuring proper material selection, joint integrity, and pressure ratings.ASME B31.3 (Process Piping), manufacturer's piping diagrams, material certificates.
Electrical InstallationInstallation of power supply cabling, control wiring, instrumentation, grounding, and earthing. Ensuring compliance with electrical codes and safety standards.NFPA 70 (National Electrical Code), manufacturer's electrical schematics, site-specific electrical design.
Instrumentation and Control System InstallationInstallation and connection of sensors (pressure, temperature, flow, oxygen purity), control valves, PLCs, HMIs, and communication interfaces.Manufacturer's instrumentation and control manuals, wiring diagrams, P&ID (Piping and Instrumentation Diagram).
Safety Systems InstallationInstallation of safety relief valves, emergency shutdown systems, oxygen concentration monitors, and other safety interlocks.Relevant safety standards (e.g., ISO 13485 for medical devices if applicable), manufacturer's safety documentation.
Ventilation and Exhaust SystemsInstallation of ventilation and exhaust ducting for the plant enclosure, ensuring adequate air exchange and removal of any potential contaminants.Local building codes, HVAC design specifications.
Pre-Commissioning ChecksCompletion of all pre-commissioning activities, including visual inspections, cleaning, leak testing, and functional checks of individual components.Manufacturer's pre-commissioning checklist, project-specific test procedures.
Commissioning and Performance TestingSupervised start-up of the PSA oxygen plant, performance verification against design parameters (oxygen purity, flow rate, pressure), and functional testing of all systems under operational load.Manufacturer's commissioning procedures, performance test protocols, agreed-upon acceptance criteria.
As-Built DocumentationProvision of updated drawings and documentation reflecting the final installed configuration of the PSA oxygen plant, including all modifications made during installation.Approved drawing standards, ISO 9001 requirements.
Training Manuals and Operator TrainingDelivery of comprehensive operator and maintenance training manuals, and provision of on-site training for plant personnel.Manufacturer's training materials, agreed-upon training syllabus.

Key Sections of the Scope of Work

  • Project Overview and Objectives
  • Scope of Services
  • Technical Deliverables
  • Standard Specifications and Compliance
  • Site Preparation Requirements
  • Installation Procedures
  • Testing and Commissioning
  • Training and Handover
  • Project Management and Reporting
  • Safety, Health, and Environmental (SHE) Requirements
  • Exclusions

Service Level Agreement For Psa Oxygen Plant Installation Service

This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the installation services provided by PSA Oxygen Plant Solutions for the installation of your PSA oxygen plant. This SLA is an integral part of the main service contract.

Service ComponentResponse Time (Business Hours*)Uptime Guarantee (During Installation Phase)
Critical Installation Issue: (e.g., Failure to power on, major component connection error)1 HourN/A (Focus is on immediate resolution)
Major Installation Issue: (e.g., Performance deviation, incorrect calibration)4 Business HoursN/A (Focus is on timely resolution)
Minor Installation Issue: (e.g., Cosmetic defect, minor misconfiguration)8 Business HoursN/A (Focus is on scheduled resolution)
Installation Progress Updates:Daily Briefing (End of day)N/A

Key Definitions

  • Installation Service: Refers to the entire process of setting up, connecting, testing, and commissioning the PSA oxygen plant at the client's designated site.
  • Downtime: Refers to a period during which the PSA oxygen plant is not operational due to installation-related issues or failures in the installation process itself, as determined by PSA Oxygen Plant Solutions.
  • Response Time: The maximum time allowed for PSA Oxygen Plant Solutions to acknowledge and begin working on a reported installation issue.
  • Critical Issue: An installation-related problem that prevents the PSA oxygen plant from being powered on, functioning, or producing oxygen as per specifications.
  • Major Issue: An installation-related problem that impairs the performance or safety of the PSA oxygen plant but does not completely prevent its operation.
  • Minor Issue: An installation-related problem that does not significantly impact the operation or safety of the PSA oxygen plant.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your PSA Oxygen Plant Installation Service in Equatorial Guinea project in Equatorial Guinea.

Speak to Sales