Background
Verified Service Provider in Djibouti

PSA Oxygen Plant Installation Service in Djibouti Engineering Excellence & Technical Support

PSA Oxygen Plant Installation Service High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

Rapid Deployment & Site Assessment

Expert-led, swift site surveys and rapid deployment of specialized teams ensure optimal placement and efficient setup of your PSA oxygen plant, minimizing downtime and maximizing operational readiness in Djibouti's unique logistical environment.

Customized Engineering & Robust Design

Leveraging Djibouti's climate and operational demands, our engineers provide bespoke PSA oxygen plant designs with durable components, ensuring reliable and continuous oxygen generation, even under challenging environmental conditions.

Full-Spectrum Installation & Commissioning

From meticulous installation of all plant components to comprehensive system testing and final commissioning, our certified technicians guarantee a seamless and compliant operational start-up, delivering high-purity oxygen on demand.

What Is Psa Oxygen Plant Installation Service In Djibouti?

PSA Oxygen Plant Installation Service in Djibouti refers to the comprehensive process of designing, engineering, procuring, assembling, commissioning, and providing ongoing support for Pressure Swing Adsorption (PSA) oxygen generation systems within Djibouti. These systems are designed to produce medical or industrial-grade oxygen directly at the point of use by leveraging the principle of adsorption. The service encompasses all technical and logistical aspects required to establish a functional and reliable PSA oxygen supply infrastructure. This includes site assessment, equipment selection, civil works integration, electrical and piping hookups, operational training, and post-installation maintenance.

Who Needs PSA Oxygen Plant Installation Service in Djibouti?Typical Use Cases
Hospitals and Healthcare Facilities: For critical medical oxygen supply to patients, particularly in intensive care units, operating rooms, and general wards. Crucial for ensuring uninterrupted patient care, especially in regions with unreliable bulk oxygen supply chains.Refurbishment or Expansion of Existing Medical Infrastructure: Upgrading older oxygen systems or building new facilities where on-site generation is more cost-effective and secure than relying on liquid oxygen cylinders or dewars.Emergency Response and Disaster Relief Operations: Providing rapid deployment of oxygen generation capabilities in critical situations where traditional supply lines are disrupted.Industrial Applications: While less common than medical, industries requiring high-purity oxygen for processes such as welding, cutting, fish farming (aquaculture), and wastewater treatment.Research and Educational Institutions: For laboratories and facilities requiring a consistent and controlled supply of oxygen for experimental purposes.
Medical Oxygen Generation: Supplying breathable oxygen to patients for respiratory support, anesthesia, and other therapeutic applications.Industrial Cutting and Welding: Providing a concentrated oxygen source to enhance combustion efficiency in metal fabrication processes.Aquaculture: Increasing dissolved oxygen levels in fishponds and aquaculture systems to improve fish health and growth rates.Wastewater Treatment: Enhancing aerobic digestion processes by supplying pure oxygen, leading to more efficient pollutant removal and reduced odor.Ozone Generation (as a precursor): While the primary product is oxygen, it can be used as a feedstock for on-site ozone generators for water purification or sterilization.

Key Components of PSA Oxygen Plant Installation Service

  • Site Survey and Feasibility Study: Evaluating the intended installation site for space availability, utility access (power, water), environmental conditions, and specific oxygen requirements (flow rate, purity).
  • System Design and Engineering: Developing detailed blueprints and specifications for the PSA oxygen plant, including adsorbent selection, vessel sizing, process flow diagrams, and safety interlocks, tailored to Djibouti's operational environment and relevant international standards.
  • Equipment Procurement and Logistics: Sourcing and transporting all necessary components, including air compressors, dryers, PSA adsorber vessels, oxygen buffer tanks, control systems, and piping, to the installation site in Djibouti.
  • On-site Assembly and Installation: Erecting the PSA unit, connecting all mechanical and electrical components, and ensuring proper integration with existing infrastructure.
  • Pre-Commissioning and Commissioning: Conducting rigorous system checks, leak tests, functional tests, and performance validation to ensure the plant operates according to design specifications and achieves the required oxygen purity and flow.
  • Operator Training: Providing comprehensive training to local personnel on the operation, routine maintenance, troubleshooting, and safety protocols of the PSA oxygen plant.
  • Documentation and Handover: Delivering all relevant technical documentation, including user manuals, maintenance schedules, and certification, to the client.
  • After-Sales Support and Maintenance: Offering ongoing technical support, spare parts supply, and scheduled maintenance services to ensure long-term operational efficiency and reliability.

Who Needs Psa Oxygen Plant Installation Service In Djibouti?

Establishing a reliable and efficient source of medical-grade oxygen is crucial for healthcare facilities. A PSA (Pressure Swing Adsorption) oxygen plant offers a self-sufficient and cost-effective solution for generating oxygen on-site. This makes them invaluable for a range of institutions and organizations operating in Djibouti, particularly those with significant and consistent oxygen demands or those seeking to reduce reliance on imported oxygen cylinders.

Target Customer TypeRelevant Departments/UsersPrimary Need for PSA Oxygen
Hospitals (Public and Private)Anesthesiology, Intensive Care Units (ICUs), Emergency Departments, Respiratory Therapy, General Wards, Neonatal Intensive Care Units (NICUs), Operating RoomsContinuous, high-volume supply for patient care, ventilation, anesthesia, and resuscitation. Reduces logistical challenges and costs of cylinder management.
Clinics and Health CentersEmergency care areas, general treatment rooms, specific respiratory treatment areasOn-site oxygen generation ensures immediate availability for common respiratory distress cases, minor procedures, and emergency response without relying on external supply chains.
Surgical CentersOperating Rooms, pre-operative and post-operative care areasEssential for anesthesia delivery during surgical procedures and for post-operative respiratory support.
Emergency Medical Services (EMS)Ambulances, emergency response vehicles, dispatch centers (for equipment planning)Provides a reliable source of oxygen for pre-hospital care, stabilizing patients during transport, and addressing respiratory emergencies.
Military BasesMedical facilities on base, field hospitals, emergency response unitsEnsures a self-sufficient oxygen supply for military medical personnel and operations, especially in potentially remote or austere environments.
Remote Healthcare FacilitiesAll medical service areas within the facilityOvercomes challenges of difficult access and long supply lines for traditional oxygen cylinders, guaranteeing consistent availability in isolated locations.
Research Institutions and LaboratoriesBiomedical research labs, pathology departmentsMay require high-purity oxygen for specific experiments, cell culture, or analytical instrumentation, though often less volume than clinical settings.
Disaster Relief OrganizationsField hospitals, temporary medical shelters, mobile clinicsCrucial for rapidly establishing medical support in emergency situations where existing infrastructure is compromised or unavailable, ensuring immediate oxygen access.
Industrial ApplicationsWelding and cutting operations, metal fabrication shops, aquaculture farmsWhile this service primarily targets medical needs, some industrial clients may also benefit from on-site oxygen generation for specific processes requiring high-purity oxygen.
Large Educational Institutions with medical training programsSimulation labs, teaching hospitals, research facilitiesProvides a consistent and readily available oxygen supply for training medical students, conducting research, and supporting any on-campus clinical services.

Target Customers for PSA Oxygen Plant Installation Service in Djibouti

  • Hospitals (Public and Private)
  • Clinics and Health Centers
  • Surgical Centers
  • Emergency Medical Services (EMS)
  • Military Bases
  • Remote Healthcare Facilities
  • Research Institutions and Laboratories
  • Disaster Relief Organizations
  • Industrial Applications Requiring High-Purity Oxygen (e.g., welding, metal fabrication, aquaculture - though medical grade is the primary focus here)
  • Large Educational Institutions with medical training programs

Psa Oxygen Plant Installation Service Process In Djibouti

This document outlines the comprehensive service process for PSA (Pressure Swing Adsorption) Oxygen Plant installations in Djibouti, from the initial client inquiry to the final handover and ongoing support. Our aim is to provide a clear, structured, and efficient workflow, ensuring client satisfaction and a successful project execution.

PhaseKey ActivitiesDeliverablesDuration (Estimated)
Inquiry & ConsultationInitial contact, requirement discussion, preliminary needs analysisMeeting minutes, understanding of client needs1-3 Business Days
Needs Assessment & Site SurveyDetailed oxygen demand analysis, site visit to Djibouti, feasibility studySite survey report, technical requirements document3-7 Business Days
Proposal & DesignCustom plant design, quotation generation, technical drawings, project planFormal proposal, technical specifications, cost estimate, project schedule7-14 Business Days
Procurement & LogisticsEquipment sourcing, quality control, shipping arrangements to DjiboutiProcurement orders, shipping documents, customs clearance2-8 Weeks (depending on lead times)
Site PreparationFoundation construction, electrical and air line installation, access road setupReady installation site, confirmed utility access1-3 Weeks
Installation & AssemblyOn-site erection of PSA plant components, piping, electrical connectionsAssembled PSA oxygen plant2-5 Weeks
Commissioning & TestingSystem start-up, performance verification, safety checks, operational tuningCommissioning report, validated performance data, stable oxygen output1-2 Weeks
Training & HandoverOperator and technician training, documentation delivery, final sign-offTrained personnel, operation & maintenance manuals, final acceptance certificate2-5 Business Days
Post-Installation SupportWarranty period, scheduled maintenance, spare parts, remote supportOngoing plant performance, service reportsOngoing (as per service agreement)

PSA Oxygen Plant Installation Service Process in Djibouti

  • {"title":"Phase 1: Inquiry and Initial Consultation","description":"The process begins with a client's formal inquiry, leading to detailed discussions about their specific oxygen requirements and site conditions in Djibouti."}
  • {"title":"Phase 2: Needs Assessment and Site Survey","description":"A thorough assessment of the client's oxygen demand, purity requirements, and existing infrastructure is conducted. This includes an on-site survey in Djibouti to evaluate space, power availability, and accessibility."}
  • {"title":"Phase 3: Proposal and Design","description":"Based on the assessment, a customized proposal is developed, outlining the recommended PSA oxygen plant specifications, technical drawings, project timeline, and cost breakdown. Client review and approval are crucial at this stage."}
  • {"title":"Title: Phase 4: Procurement and Logistics","description":"Following proposal acceptance, all necessary equipment and components are procured. This phase also involves meticulous planning for the safe and efficient transportation of the PSA plant and associated materials to Djibouti."}
  • {"title":"Phase 5: Site Preparation","description":"Pre-installation work at the Djibouti site, including foundation preparation, civil works, and utility connections (power, air), is completed to ensure readiness for equipment installation."}
  • {"title":"Phase 6: Installation and Assembly","description":"Our expert technicians arrive in Djibouti to meticulously install and assemble the PSA oxygen plant components, adhering to the approved design and safety standards."}
  • {"title":"Phase 7: Commissioning and Testing","description":"The installed plant undergoes rigorous testing and commissioning to verify its performance, including oxygen purity, flow rate, and operational stability. Performance parameters are validated against project specifications."}
  • {"title":"Phase 8: Training and Handover","description":"Comprehensive training is provided to the client's operational and maintenance staff on the safe and efficient operation of the PSA oxygen plant. A formal handover of the installed system and all relevant documentation is conducted."}
  • {"title":"Phase 9: Post-Installation Support and Maintenance","description":"We offer ongoing support services, including scheduled maintenance, troubleshooting, and spare parts supply, to ensure the continued optimal performance of the PSA oxygen plant in Djibouti."}

Psa Oxygen Plant Installation Service Cost In Djibouti

Installing a PSA (Pressure Swing Adsorption) oxygen plant in Djibouti involves a complex set of costs influenced by various factors. These plants are crucial for medical, industrial, and research applications, and their pricing in Djibouti is determined by a combination of global market dynamics, local logistical challenges, and specific project requirements. Understanding these elements is key to accurately budgeting for such an installation.

Cost ComponentEstimated Range (DJF)Notes
PSA Oxygen Plant (Equipment Only)10,000,000 - 100,000,000+Highly dependent on capacity (e.g., 5-50 Nm³/hr), manufacturer, and technology. Lower end for smaller, basic units; higher end for large, advanced systems.
Shipping and Logistics (to Djibouti)1,000,000 - 10,000,000+Varies significantly based on plant size, origin, shipping method, insurance, and customs. International freight is a major contributor.
Inland Transportation (Djibouti)500,000 - 3,000,000For moving components from port to site. Specialized transport might be needed.
Installation & Commissioning Labor2,000,000 - 15,000,000+Includes international experts and local support. Duration and complexity of the setup are key.
Site Preparation & Infrastructure1,000,000 - 7,000,000Foundation, power upgrades, compressed air system, cooling. Can be higher if extensive work is required.
Ancillary Equipment (Tanks, Dryers, Filters)1,000,000 - 10,000,000Depending on the system's needs and desired redundancy.
Permits & Regulatory Fees200,000 - 1,000,000Variable based on Djiboutian authorities' requirements.
Contingency (10-15%)VariableRecommended to cover unforeseen expenses.

Key Pricing Factors for PSA Oxygen Plant Installation in Djibouti

  • Plant Capacity and Technology: The primary driver of cost is the required oxygen output (measured in Nm³/hr or m³/hr) and the sophistication of the PSA technology employed. Higher capacity plants and more advanced systems with features like remote monitoring or redundant compressors will naturally be more expensive.
  • Equipment Manufacturing Origin and Quality: PSA units are often manufactured in countries with established industrial bases (e.g., China, Europe, North America). The country of origin and the reputation of the manufacturer for quality and reliability significantly impact the base equipment cost.
  • Logistics and Transportation: Djibouti's geographical location presents unique logistical challenges. Shipping the plant components, which can be bulky and heavy, to the port of Djibouti, and then inland to the installation site, incurs substantial costs. This includes freight, insurance, customs duties, and potential local transportation fees, which can be higher due to infrastructure or specialized handling requirements.
  • Installation and Commissioning Services: The cost of skilled labor for on-site assembly, connection of utilities (power, compressed air), system testing, and final commissioning is a significant component. This includes the wages of specialized engineers, technicians, and support staff, as well as their accommodation and per diem if they are international personnel.
  • Site Preparation and Infrastructure: The installation site may require specific preparation, such as foundation work, provision of a stable power supply, a suitable compressed air system, and potentially water cooling if required by the plant design. The cost of these preparatory works varies based on the existing site conditions.
  • Ancillary Equipment and Consumables: Beyond the main PSA unit, costs may include supplementary equipment such as air dryers, filters, storage tanks, filling manifolds, and a backup oxygen source (e.g., liquid oxygen cylinder). Initial consumable supplies like molecular sieves and catalysts also add to the upfront cost.
  • Permits, Licenses, and Local Regulations: Obtaining necessary permits and licenses for the installation and operation of an industrial plant in Djibouti can incur fees. Compliance with local safety and environmental regulations is also a factor.
  • After-Sales Support and Maintenance Contracts: While not strictly an installation cost, many suppliers offer extended warranty and maintenance packages that are often factored into the overall project budget. This includes training for local personnel and scheduled servicing.
  • Economic Conditions and Exchange Rates: Fluctuations in the Djiboutian Franc (DJF) against major currencies like USD or EUR can impact the final cost, especially if the equipment or services are priced in foreign currency.

Affordable Psa Oxygen Plant Installation Service Options

When considering the installation of a Pressure Swing Adsorption (PSA) oxygen plant, focusing on affordability without compromising quality is paramount. This involves understanding various installation service options, leveraging value bundles, and implementing smart cost-saving strategies. PSA oxygen plants are crucial for medical, industrial, and commercial applications, and their installation requires specialized expertise. By carefully evaluating service packages and adopting cost-efficient approaches, organizations can significantly reduce the overall investment while ensuring a reliable and efficient oxygen supply.

Cost-Saving StrategyDescriptionPotential Impact
Early Planning & Design OptimizationThorough site assessment and detailed design before installation begins. Involving experienced engineers early can identify potential challenges and optimize equipment selection.Reduces the need for costly rework, minimizes material waste, and ensures the most efficient plant configuration.
Bulk Purchasing & Package DealsNegotiating discounts for purchasing equipment and installation services as a package. Some manufacturers offer bundled deals.Lower upfront equipment and service costs through volume discounts and integrated pricing.
Local Sourcing of Materials & Labor (where feasible)Utilizing local suppliers for auxiliary materials (e.g., concrete, basic piping) and local skilled labor for non-specialized tasks.Reduces transportation costs and potentially labor expenses. Requires careful vetting of local providers.
Standardized Component SelectionOpting for standard, readily available components and modules rather than highly customized ones.Lower equipment costs, faster delivery times, and easier future maintenance and part replacement.
Efficient Project Management & Timeline AdherenceStrict adherence to project schedules to avoid delays, which can incur additional costs (e.g., extended site rental, idle labor).Minimizes overhead costs associated with project delays and ensures quicker ROI.
Energy-Efficient Plant Design & OperationSelecting PSA technology and plant configurations that are optimized for energy efficiency.Significant long-term savings on electricity bills, which is a major operating cost for PSA plants.
Negotiating Payment Terms & MilestonesStructuring payment plans to align with project progress and available budget.Improves cash flow management and can provide leverage during negotiations.
Focus on Reliability & DurabilityInvesting in high-quality components and expert installation to ensure longevity and minimize unexpected breakdowns.Reduces long-term maintenance and repair costs, and avoids costly downtime.

Key Service Options for Affordable PSA Oxygen Plant Installation

  • Standard Installation Package: Typically includes basic site preparation, equipment mounting, piping, electrical connections, and initial system testing. This is the most straightforward option but may not cover extensive customization or advanced integration.
  • Value-Added Installation Bundle: Combines standard installation with additional services such as extended warranty, remote monitoring setup, operator training, and maintenance contract initiation. These bundles offer a more comprehensive solution and can provide long-term cost benefits.
  • Customized Installation Solution: Tailored to specific site requirements, including complex infrastructure integration, specialized safety features, and integration with existing systems. While potentially more expensive upfront, it ensures optimal performance and can prevent costly future modifications.
  • Turnkey Installation Service: Encompasses the entire process from initial consultation and design to installation, commissioning, and handover. This option offers maximum convenience and minimizes the client's involvement, but often comes at a premium.
  • Phased Installation Approach: For larger projects, breaking down the installation into manageable phases can help in spreading costs and managing resources more effectively. This allows for incremental investment and reduces the immediate financial burden.

Verified Providers In Djibouti

In Djibouti, ensuring you are receiving healthcare from verified and qualified providers is paramount. Franance Health stands out as a leader in this regard, offering a robust network of medical professionals and facilities that meet stringent credentialing standards. This commitment to verification not only guarantees a higher quality of care but also provides patients with essential peace of mind. Franance Health's rigorous credentialing process delves deep into the qualifications, experience, and ethical standing of each provider, ensuring they align with international best practices and Djibouti's healthcare regulations. This meticulous approach makes them the optimal choice for anyone seeking reliable and trustworthy medical services in the region.

Credentialing AspectFranance Health's Verification ProcessPatient Benefit
Medical Licenses and CertificationsThorough validation of all official licenses and board certifications from recognized institutions.Ensures providers are legally qualified and have met recognized educational and training benchmarks.
Professional ExperienceVerification of past employment, surgical logs (where applicable), and peer reviews.Confirms practical skills and a proven track record in their field.
Education and TrainingScrutiny of medical school diplomas, residency completion, and specialized training.Guarantees a strong theoretical and practical foundation in their area of expertise.
Background Checks and SanctionsComprehensive checks for any disciplinary actions, malpractice claims, or criminal history.Protects patients from providers with a history of unethical or harmful practices.
Continuing Medical Education (CME)Verification of ongoing participation in CME programs to stay updated with advancements.Ensures providers are current with the latest medical knowledge and techniques.

Why Franance Health's Verified Providers are the Best Choice:

  • Uncompromising Quality of Care: Franance Health's stringent verification ensures all providers meet the highest standards of medical expertise and practice.
  • Enhanced Patient Safety: Rigorous background checks and credential validation significantly reduce risks associated with unqualified practitioners.
  • Access to Specialized Expertise: Their network includes a diverse range of specialists, all thoroughly vetted for their credentials.
  • Trust and Reliability: Patients can be confident in the legitimacy and competence of the healthcare professionals they are referred to.
  • Adherence to International Standards: Franance Health aligns its verification processes with global healthcare benchmarks.

Scope Of Work For Psa Oxygen Plant Installation Service

This Scope of Work (SOW) outlines the services required for the installation of a Pressure Swing Adsorption (PSA) Oxygen Plant. It details the technical deliverables and standard specifications to ensure a successful and compliant installation. The project aims to provide a reliable and efficient on-site oxygen generation system.

ItemStandard Specification/RequirementDescription
PSA TechnologyISO 9001 Certified ManufacturersAdsorption beds using Zeolite Molecular Sieve (ZMS) for oxygen production.
Oxygen PurityDependent on application (e.g., 90-95% for industrial, 93-95% for medical)Achieved through efficient PSA cycle and purging.
Air CompressorEnergy-efficient, low-noise, oil-free (if required by application)Meets or exceeds the required compressed air flow and pressure for the PSA unit.
Air DryerRefrigerated or Desiccant type, dew point compliantReduces moisture content of compressed air to prevent ZMS degradation and freezing.
FiltrationMulti-stage filtration (pre-filters, micro-filters, activated carbon)Removes particulate matter, oil, and odors from compressed air.
Piping MaterialsStainless steel (SS316L or equivalent) or approved carbon steelResistant to corrosion and suitable for oxygen service as per relevant standards.
Electrical ComponentsCertified to international standards (e.g., CE, UL)Includes motors, switches, sensors, PLC, and HMI components.
Control SystemPLC-based with HMI for monitoring and controlProvides automated operation, process control, and safety interlocks.
Safety DevicesPressure relief valves, rupture discs, emergency shut-down (ESD) systemEnsures safe operation and protects personnel and equipment.
Noise LevelAs per local environmental regulations (e.g., < 85 dBA at 1 meter)Mitigation measures such as acoustic enclosures and silencers.
Foundation & StructureAs per civil engineering drawings and local building codesProvides a stable and secure platform for the plant.
DocumentationComprehensive and in EnglishIncludes P&IDs, electrical schematics, manuals, test reports, and certificates.

Technical Deliverables

  • Detailed Engineering Design and Drawings (P&ID, Electrical Schematics, Civil Drawings)
  • Procurement and Delivery of All PSA Oxygen Plant Components and Ancillaries
  • On-site Assembly and Installation of the PSA Oxygen Plant Skid
  • Installation of Associated Piping (Air Intake, Oxygen Output, Purge Gas, etc.)
  • Electrical Connection and Integration (Power Supply, Control Panel Wiring)
  • Instrumentation and Control System Setup and Configuration
  • Pneumatic and Control Air System Installation
  • Installation of Ancillary Equipment (Air Compressors, Air Dryers, Filters, Storage Tanks)
  • Installation of Safety Systems (Pressure Relief Valves, Emergency Shutdowns)
  • Pre-commissioning Checks and System Inspections
  • Commissioning and Performance Testing of the PSA Oxygen Plant
  • User Training on Operation and Maintenance
  • As-Built Drawings and Documentation Package
  • Operation and Maintenance (O&M) Manuals
  • Spare Parts List and Recommendations

Service Level Agreement For Psa Oxygen Plant Installation Service

This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the installation services of the PSA (Pressure Swing Adsorption) Oxygen Plant provided by [Your Company Name] (hereinafter referred to as the "Provider") to [Client Name] (hereinafter referred to as the "Client"). This SLA is an integral part of the overall installation contract.

Service ComponentService Level ObjectiveMetricsRemedy for Failure
Installation Support - Critical IssueResponse Time: Within 2 business hours. Resolution Time: Within 8 business hours.Time from reporting a critical issue (e.g., installation halted due to major technical defect) to acknowledgement and commencement of work. Time from acknowledgement to resolution.10% discount on the next service invoice for each instance of exceeding resolution time.
Installation Support - Major IssueResponse Time: Within 4 business hours. Resolution Time: Within 24 business hours.Time from reporting a major issue (e.g., significant functionality impediment) to acknowledgement and commencement of work. Time from acknowledgement to resolution.5% discount on the next service invoice for each instance of exceeding resolution time.
Installation Support - Minor IssueResponse Time: Within 8 business hours. Resolution Time: Within 48 business hours.Time from reporting a minor issue (e.g., cosmetic defect, minor operational adjustment) to acknowledgement and commencement of work. Time from acknowledgement to resolution.2% discount on the next service invoice for each instance of exceeding resolution time.
Planned Downtime NotificationMinimum 48 hours advance notice for scheduled maintenance or testing.Time between provider's notification of planned downtime and the commencement of downtime.N/A (This is a proactive notification requirement)
Installation CompletionCompletion within the agreed-upon project timeline ± 5 business days, barring Force Majeure events.Difference between the planned completion date and the actual completion date.Extension of warranty period by the duration of the delay (if caused by Provider's fault).

Key Service Level Objectives

  • Response Time: The time taken by the Provider's technical support team to acknowledge and begin working on a reported issue.
  • Resolution Time: The time taken by the Provider to resolve a reported issue, depending on its severity.
  • Uptime Guarantee: The percentage of time the PSA Oxygen Plant is expected to be operational and capable of producing oxygen as per its design specifications, excluding scheduled maintenance and planned downtime.
  • Service Availability: The hours during which the installation service support is available.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your PSA Oxygen Plant Installation Service in Djibouti project in Djibouti.

Speak to Sales