
PSA Oxygen Plant Installation Service in Congo (Brazzaville)
Engineering Excellence & Technical Support
PSA Oxygen Plant Installation Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Advanced PSA Technology Integration
Our installation services in Congo (Brazzaville) utilize state-of-the-art Pressure Swing Adsorption (PSA) technology, ensuring the highest purity oxygen output and exceptional energy efficiency for your medical or industrial needs.
Robust On-Site Generation & Reliability
We specialize in setting up robust, on-site PSA oxygen plants that guarantee a continuous and reliable supply of medical-grade oxygen, mitigating logistical challenges and ensuring uninterrupted operations in remote or challenging environments within Congo.
Expert Installation & Commissioning by Certified Engineers
Our team of certified engineers provides seamless installation and meticulous commissioning of PSA oxygen plants in Brazzaville, adhering to international safety standards and local regulations for optimal performance and long-term operational integrity.
What Is Psa Oxygen Plant Installation Service In Congo (Brazzaville)?
PSA Oxygen Plant Installation Service in Congo (Brazzaville) refers to the comprehensive process of designing, procuring, installing, commissioning, and providing ongoing support for Pressure Swing Adsorption (PSA) oxygen generation systems within the Republic of Congo, specifically its capital, Brazzaville. These systems leverage the principle of selective adsorption of atmospheric nitrogen onto a solid adsorbent material (typically zeolite molecular sieves) at elevated pressure, allowing oxygen to pass through. When the pressure is reduced, the adsorbent is regenerated, releasing the captured nitrogen. This service encompasses all technical and logistical aspects required to establish a functional and reliable on-site oxygen production facility.
| Stakeholder/Industry | Necessity for PSA Oxygen Plant Installation Service | Typical Use Cases |
|---|---|---|
| Healthcare Facilities (Hospitals, Clinics) | Critical need for reliable and continuous supply of medical-grade oxygen for patient care, respiratory support, and surgical procedures. Reduces reliance on bulk liquid oxygen supply and associated logistical complexities and costs. | Patient oxygen therapy, anesthesia, emergency respiratory support, hyperbaric oxygen therapy. |
| Industrial Manufacturing | Requirement for high-purity oxygen as an oxidizer in various manufacturing processes, improving efficiency and product quality. On-site generation offers cost savings and operational independence. | Metal cutting and welding (oxy-fuel), chemical synthesis, wastewater treatment (aeration), pulp and paper production, electronics manufacturing. |
| Mining and Metallurgy | Essential for processes such as smelting, refining, and extraction of metals, where oxygen is used as a combustion enhancer and reactant. | Blast furnace enrichment, autogenous grinding, ladle metallurgy, precious metal extraction. |
| Emergency Services and Disaster Relief | Rapid deployment of oxygen generation capabilities in areas affected by natural disasters or emergencies where traditional supply chains are disrupted. | Field hospitals, remote medical outposts, emergency response units. |
| Research and Development Laboratories | Need for controlled oxygen atmospheres for various experimental procedures and analytical techniques. | Combustion research, atmospheric simulation, material science testing. |
Key Components and Stages of PSA Oxygen Plant Installation Service:
- Site assessment and feasibility studies to determine optimal plant location, capacity requirements, and integration with existing infrastructure.
- Detailed engineering design, including process flow diagrams (PFDs), piping and instrumentation diagrams (P&IDs), electrical schematics, and structural considerations.
- Procurement of all necessary components, including air compressors, dryers, filtration systems, PSA modules (adsorbent beds), oxygen analyzers, control systems, and storage tanks.
- Fabrication and assembly of plant modules and skid-mounted units.
- On-site installation of all equipment, piping, electrical connections, and control systems.
- Pre-commissioning checks, including pressure testing, leak detection, and functional verification of individual components.
- Commissioning and performance testing to ensure the plant meets specified oxygen purity, flow rate, and pressure requirements.
- Operator training for routine operation, maintenance, and troubleshooting.
- Post-installation support, including warranty, spare parts management, and planned maintenance services.
Who Needs Psa Oxygen Plant Installation Service In Congo (Brazzaville)?
The installation of a Pressure Swing Adsorption (PSA) oxygen plant is a critical infrastructure need for a variety of organizations in Congo (Brazzaville). These plants provide a reliable and cost-effective on-site source of medical-grade or industrial-grade oxygen, reducing reliance on external suppliers and ensuring consistent availability. The demand for such services stems from sectors that require continuous and substantial oxygen supply for their operations and patient care.
| Customer Segment | Key Departments/Applications |
|---|---|
| Hospitals/Clinics | ICU/CCU, Operating Theatres, Emergency Rooms, Respiratory Therapy, General Wards |
| Industrial Manufacturing | Welding & Cutting, Metal Fabrication, Chemical Processing, Food & Beverage (e.g., modified atmosphere packaging) |
| Mining Operations | Ventilation, Process Applications |
| Academic & Research Institutions | Biomedical Research Labs, Chemistry Labs, Environmental Science |
| Government Agencies (Defense/Emergency) | Military Hospitals, Disaster Relief Operations, Fire Services |
| Non-Governmental Organizations (NGOs) | Field Hospitals, Mobile Clinics, Humanitarian Aid Programs |
Target Customers and Departments for PSA Oxygen Plant Installation Service in Congo (Brazzaville)
- {"title":"Healthcare Sector","description":"Hospitals and healthcare facilities are the primary beneficiaries of PSA oxygen plant installations. They require a constant and high-purity supply of oxygen for patient respiration, anesthesia, and various medical treatments, especially in critical care units."}
- {"title":"Industrial Sector","description":"Various industries rely on oxygen for their processes, including welding, cutting, metal fabrication, wastewater treatment, and in certain chemical manufacturing operations."}
- {"title":"Mining and Exploration","description":"These sectors may require oxygen for specialized applications like underground ventilation, or for processes involved in mineral extraction and processing."}
- {"title":"Research and Development Institutions","description":"Laboratories and research facilities conducting experiments that require controlled oxygen environments or specific gas mixtures will benefit from on-site oxygen generation."}
- {"title":"Emergency Services and Disaster Relief","description":"Organizations involved in emergency response and disaster relief operations need rapid and scalable oxygen supply solutions to set up temporary medical facilities or support existing ones during crises."}
Psa Oxygen Plant Installation Service Process In Congo (Brazzaville)
This document outlines the comprehensive service process for PSA (Pressure Swing Adsorption) Oxygen Plant installation in Congo (Brazzaville), guiding clients from initial inquiry to successful project execution. Our commitment is to provide a seamless and efficient experience, ensuring the delivery of high-quality oxygen generation solutions.
| Phase | Key Activities | Client Involvement | Deliverables/Outcomes |
|---|---|---|---|
| 1. Initial Inquiry & Consultation | Client expresses interest in PSA oxygen plant. Initial discussions to understand specific oxygen requirements (purity, flow rate, pressure), application, and location. Technical experts provide preliminary advice. | Provide detailed oxygen needs, facility information, and contact details. Engage in initial technical discussions. | Understanding of project feasibility, preliminary scope definition, and introduction to our capabilities. |
| 2. Site Assessment & Planning | Our technical team visits the Congo (Brazzaville) site. Detailed assessment of existing infrastructure (power, space, ventilation, foundation), environmental conditions, and local regulations. Develop a preliminary site layout and technical plan. | Grant access to the site. Provide relevant building plans and utility information. Discuss any site-specific constraints or preferences. | Comprehensive site assessment report, preliminary technical design, and identified site preparation needs. |
| 3. Proposal & Contract | Based on site assessment and requirements, a detailed technical proposal and commercial quotation are prepared. This includes plant specifications, scope of work, timeline, pricing, and payment terms. Negotiation and finalization of the contract. | Review and provide feedback on the proposal. Negotiate terms and conditions. Sign the contract. | Approved technical proposal, finalized commercial quotation, and legally binding installation contract. |
| 4. Procurement & Manufacturing | Order placement for all necessary components and materials. Manufacturing of the PSA oxygen plant according to agreed specifications in our certified facility. Strict quality control measures are implemented throughout the production process. | Make initial payments as per contract terms. Respond to any clarifying queries from the manufacturing team. | Manufactured PSA oxygen plant components, quality control reports, and pre-shipment inspection readiness. |
| 5. Logistics & Site Preparation | Secure necessary export/import permits and arrange for transportation of the plant components to Congo (Brazzaville). Client prepares the installation site as per agreed-upon specifications (foundation, power supply, pipe connections, ventilation). | Facilitate customs clearance, provide site access for delivery, and ensure site preparation is completed on schedule. | Components arrive at the site. Ready and prepared installation area. |
| 6. Installation & Commissioning | Our experienced installation team arrives on-site. Assemble and install the PSA oxygen plant. Connect all utilities and piping. Perform rigorous testing and commissioning to ensure optimal performance, safety, and achievement of specified oxygen parameters. | Provide site access and necessary support for the installation team. Ensure availability of required utilities. Supervise installation progress. | Fully installed and functional PSA oxygen plant, comprehensive test reports, and certification of operational readiness. |
| 7. Training & Handover | Conduct thorough training for client's operational and maintenance staff on plant operation, routine checks, troubleshooting, and safety procedures. Formal handover of the plant and all relevant documentation (manuals, warranties). | Ensure designated personnel attend training sessions. Sign off on plant handover. | Trained operational staff, complete set of plant documentation, and official plant handover certificate. |
| 8. After-Sales Support & Maintenance | Provide ongoing technical support, spare parts availability, and optional preventative maintenance services. Address any issues that may arise post-installation to ensure long-term plant reliability and performance. | Maintain communication for support needs. Schedule routine maintenance as required. Order spare parts as needed. | Reliable oxygen supply, continued operational efficiency, and long-term plant support. |
PSA Oxygen Plant Installation Service Process in Congo (Brazzaville)
- Phase 1: Initial Inquiry & Consultation
- Phase 2: Site Assessment & Planning
- Phase 3: Proposal & Contract
- Phase 4: Procurement & Manufacturing
- Phase 5: Logistics & Site Preparation
- Phase 6: Installation & Commissioning
- Phase 7: Training & Handover
- Phase 8: After-Sales Support & Maintenance
Psa Oxygen Plant Installation Service Cost In Congo (Brazzaville)
Installing a Pressure Swing Adsorption (PSA) oxygen plant in Congo (Brazzaville) involves a multifaceted cost structure influenced by several key factors. These include the plant's capacity (measured in Nm³/h or m³/h), purity requirements, the complexity of the installation, site preparation needs, transportation logistics, the supplier's reputation, and the level of after-sales support. The local economic conditions and availability of specialized labor in Brazzaville also play a significant role in the final pricing. The prices are typically quoted in US Dollars and then converted to Congolese Francs (XAF) based on the prevailing exchange rates, which can fluctuate.
| Plant Capacity (Nm³/h) | Estimated Cost Range (USD) | Estimated Cost Range (XAF - Approx.) | Notes |
|---|---|---|---|
| 5 - 10 | $50,000 - $150,000 | 29,000,000 - 87,000,000 | Suitable for small clinics, laboratories, or specific industrial applications. Includes basic installation and commissioning. |
| 20 - 50 | $150,000 - $400,000 | 87,000,000 - 232,000,000 | Designed for medium-sized hospitals, workshops, or small manufacturing units. May include more robust ancillary equipment. |
| 100 - 200 | $400,000 - $1,000,000+ | 232,000,000 - 580,000,000+ | For larger hospitals, industrial complexes, or facilities with high oxygen demand. Comprehensive site preparation and advanced control systems are usually included. |
200 | Custom Quotation Required | Custom Quotation Required | Large-scale industrial applications, city-wide medical oxygen supply. These are highly specialized projects requiring detailed engineering and bespoke solutions. |
Key Pricing Factors for PSA Oxygen Plant Installation in Congo (Brazzaville):
- Plant Capacity (e.g., 5 Nm³/h, 10 Nm³/h, 50 Nm³/h): Larger capacities require more substantial equipment and infrastructure, leading to higher costs.
- Oxygen Purity Level: Higher purity requirements (e.g., 99.999%) necessitate more advanced PSA technology and filtration systems, increasing the price.
- Site Preparation and Infrastructure: This includes foundation work, electrical connections, ventilation, and potential civil engineering for a dedicated plant building. Costs vary based on existing site conditions.
- Transportation and Logistics: Shipping the plant components from the manufacturer to Brazzaville can be a significant expense, especially considering customs duties and local transportation challenges.
- Installation Labor and Expertise: The cost of skilled technicians and engineers for assembly, commissioning, and testing is a major component. Availability of local expertise can influence this.
- Ancillary Equipment: This may include air compressors, dryers, boosters, storage tanks, and medical/industrial gas distribution manifolds.
- Training and Commissioning: Comprehensive training for plant operators and thorough commissioning procedures are essential and contribute to the overall cost.
- Warranty and After-Sales Support: The duration and scope of warranty, along with ongoing maintenance and spare parts availability, will impact the initial investment.
- Supplier and Brand Reputation: Reputable international suppliers often command higher prices due to proven reliability and support, while local or less-known suppliers might offer more competitive rates.
Affordable Psa Oxygen Plant Installation Service Options
Installing a PSA (Pressure Swing Adsorption) oxygen plant is a significant investment for healthcare facilities, industries, and remote locations. This service focuses on providing reliable, cost-effective installation solutions tailored to various needs. We understand that budget is a critical factor, and therefore, we offer flexible value bundles and proven cost-saving strategies to ensure you receive the best possible return on your investment.
| Cost-Saving Strategy | Description | Potential Savings |
|---|---|---|
| Early Planning & Site Assessment | Thorough evaluation of your site before installation minimizes unexpected issues, modifications, and delays. Identifying optimal placement and utility requirements upfront is crucial. | Reduces rework, minimizes material waste, and prevents costly schedule overruns. |
| Bulk Procurement of Components | Leveraging our established supplier network allows for competitive pricing on PSA components and auxiliary equipment when procured in larger quantities. | Lower equipment costs due to volume discounts. |
| Optimized Logistics and Transportation | Efficient planning of equipment delivery to minimize shipping costs and transit times. Consolidating shipments where possible. | Reduced freight charges and potential for faster installation timelines. |
| Standardized Design & Modular Components | Utilizing standardized plant designs and modular components can streamline the installation process and reduce the need for custom fabrication. | Faster installation, reduced labor costs, and potential for easier future expansion or upgrades. |
| Phased Installation & Commissioning | For larger projects, a phased approach can allow for partial operation while subsequent stages are completed, distributing costs and enabling early revenue generation or use. | Improved cash flow management and staggered capital expenditure. |
| Employee Training for Basic Maintenance | Investing in training your in-house staff for routine maintenance and troubleshooting can reduce reliance on external technicians for minor issues. | Lower ongoing operational and maintenance expenses. |
| Energy-Efficient Equipment Selection | Choosing PSA units with lower energy consumption can significantly reduce operational costs over the lifespan of the plant. | Long-term reduction in electricity bills. |
| Negotiated Long-Term Service Agreements | Securing a comprehensive service and maintenance contract upfront can often be more cost-effective than ad-hoc repairs. | Predictable maintenance costs and potential for discounted service rates. |
Value Bundles for PSA Oxygen Plant Installation
- {"title":"Basic Installation Package","description":"Includes essential services for a standard PSA oxygen plant setup. Ideal for clients with existing infrastructure and basic technical knowledge."}
- {"title":"Standard Installation Package","description":"Encompasses a comprehensive installation, including site preparation assistance, quality checks, and initial operational guidance. Suitable for most common installation scenarios."}
- {"title":"Premium Turnkey Package","description":"Our most inclusive offering, providing end-to-end service from detailed site assessment and design to full commissioning, training, and ongoing maintenance support. Perfect for clients seeking a hassle-free, fully managed solution."}
- {"title":"Customizable Bundles","description":"We can tailor any of our packages to meet your specific project requirements and budget constraints. Discuss your needs with our experts for a personalized solution."}
Verified Providers In Congo (Brazzaville)
Navigating the healthcare landscape in Congo (Brazzaville) can be challenging. Identifying reliable and trustworthy medical professionals and facilities is paramount for ensuring quality care. Franance Health stands out as a leading credentialing body, meticulously verifying healthcare providers and services. This rigorous process ensures that all Franance Health-certified entities meet stringent standards of professionalism, ethical practice, and clinical competence. Choosing a Franance Health-verified provider means prioritizing your well-being with the assurance of expert, dependable medical attention.
| Provider Type | Key Verification Areas | Benefits of Franance Health Verification |
|---|---|---|
| Hospitals | Medical Equipment, Staff Qualifications, Infection Control, Patient Services | Access to advanced medical technology, highly trained specialists, and comprehensive patient care. |
| Clinics (General & Specialty) | Physician Credentials, Diagnostic Capabilities, Treatment Protocols, Patient Confidentiality | Reliable diagnoses, effective treatment plans, and assurance of privacy for all medical information. |
| Laboratories | Equipment Calibration, Quality Control Procedures, Staff Expertise, Turnaround Times | Accurate and timely laboratory results, crucial for effective diagnosis and treatment. |
| Specialist Physicians (e.g., Cardiologists, Dermatologists) | Board Certifications, Continuing Medical Education, Patient Outcomes, Ethical Practice | Consultations with highly specialized and experienced medical professionals dedicated to specific health concerns. |
Why Choose Franance Health Verified Providers?
- Unwavering Commitment to Quality: Franance Health's verification process meticulously assesses medical expertise, facility standards, and patient safety protocols.
- Enhanced Patient Trust: The Franance Health credential acts as a powerful indicator of reliability, fostering confidence in the care received.
- Access to Top-Tier Professionals: We identify and endorse healthcare providers who demonstrate a consistent track record of excellence and adherence to best practices.
- Streamlined Healthcare Navigation: Our verification simplifies the process of finding reputable healthcare options, saving you time and reducing uncertainty.
- Promotion of Ethical Standards: Franance Health upholds ethical conduct and patient-centered care as core tenets of its verification criteria.
Scope Of Work For Psa Oxygen Plant Installation Service
This Scope of Work (SOW) outlines the services required for the installation of a Pressure Swing Adsorption (PSA) Oxygen Plant. It details the technical deliverables, standard specifications, and responsibilities of the service provider. The objective is to ensure a safe, efficient, and compliant installation, meeting all performance and quality requirements.
| Deliverable Item | Description | Standard Specification/Reference | Responsibility (Service Provider) |
|---|---|---|---|
| Installation Work Plan | Detailed plan outlining all installation activities, timelines, resource allocation, and safety procedures. | Client Approved Project Management Plan | Develop and submit for approval |
| Site Readiness Report | Verification of site conditions, including foundation, civil works, and utility availability. | Client Provided Site Survey Report | Conduct site survey, document readiness, and report any discrepancies |
| Equipment Foundation & Supports | Installation of all necessary foundations, mounting structures, and supports for plant equipment. | Approved Engineering Drawings | Fabricate/install and ensure alignment |
| PSA Module Installation | Proper placement, bolting, and alignment of PSA adsorbent vessels and associated components. | Manufacturer's Installation Manual | Follow manual, ensure vibration isolation |
| Air Compressor Installation | Installation, alignment, and connection of the air compressor unit. | Manufacturer's Installation & Operation Manual | Ensure correct alignment, foundation grouting, and vibration damping |
| Piping & Tubing Installation | Installation of all process air, oxygen, nitrogen, instrument air, and utility piping. | ASME B31.1/B31.3 (or equivalent), Client Piping Specifications | Welding as per certified welders, NDT, hydro-testing, and leak testing |
| Electrical Power Distribution | Installation of main power panels, sub-panels, cable trays, and conduit systems. | NEC (or equivalent), Client Electrical Design Drawings | All electrical work performed by certified electricians |
| Instrumentation & Control System Installation | Installation of all sensors, transmitters, control valves, junction boxes, and local control panels. | Client Instrumentation & Control Design Drawings | Proper wiring, calibration, and loop testing |
| Safety Systems Installation | Installation of safety relief valves, emergency shutdown systems, and interlocks. | Relevant Safety Standards (e.g., API 14C, NFPA) | Ensure proper integration and functionality |
| Pre-commissioning Checklists | Completion of detailed checklists for mechanical, electrical, and instrumentation checks. | Manufacturer's Pre-commissioning Procedures | Sign-off on all checklist items |
| Piping System Integrity Test Report | Documentation of hydro-testing and leak testing results for all piping. | ASME Standards, Client Specifications | Provide certified test reports |
| Electrical System Continuity & Insulation Test Report | Documentation of electrical continuity, insulation resistance, and grounding tests. | Client Electrical Standards | Provide test results and certifications |
| Instrumentation Loop Test Report | Verification of all instrument loops from sensor to control system. | Client Instrumentation Standards | Document loop functionality and calibration |
| Commissioning Procedure | Detailed step-by-step procedure for bringing the PSA plant online. | Manufacturer's Commissioning Manual | Execute procedures, monitor parameters |
| Performance Test Report | Demonstration of the plant's oxygen purity, flow rate, and energy consumption. | Contractual Performance Guarantees | Conduct tests, record data, and prepare report |
| As-Built Drawings | Updated drawings reflecting the final installed configuration. | Client Drawing Standards | Produce and submit final as-built drawings |
| Operation & Maintenance (O&M) Manuals | Comprehensive manuals for operating and maintaining the installed plant. | Manufacturer's Manuals, Client Requirements | Compile and submit comprehensive O&M manuals |
| Training Program | Training sessions for client's operational and maintenance staff. | Client's Training Needs Assessment | Deliver effective training sessions |
| Punch List Close-out Report | Documentation of all punch list items and their satisfactory completion. | Client's Punch List | Address and close out all punch list items |
Key Project Phases
- Pre-installation & Site Preparation
- Equipment Delivery & Offloading
- Mechanical Installation
- Electrical & Instrumentation Installation
- Piping & Ancillary Systems Installation
- Pre-commissioning & Testing
- Commissioning & Performance Testing
- Handover & Training
- Post-installation Support
Service Level Agreement For Psa Oxygen Plant Installation Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the installation services of a Pressure Swing Adsorption (PSA) Oxygen Plant provided by [Your Company Name] (hereinafter referred to as "Provider") to [Client Name] (hereinafter referred to as "Client"). This SLA is an integral part of the main installation contract.
1. Definitions
- Installation Period: The agreed-upon timeframe for the physical installation of the PSA Oxygen Plant at the Client's site, commencing upon mobilization of the Provider's team and concluding with the provisional acceptance of the installed plant.
- Downtime: Any period during which the PSA Oxygen Plant is not operational due to issues directly attributable to the installation process, as determined by the Provider and agreed upon with the Client. Excludes planned maintenance, client-induced issues, or external factors beyond the Provider's control.
- Response Time: The maximum time allowed for the Provider's technical team to acknowledge a reported issue and commence troubleshooting after notification from the Client.
- Resolution Time: The maximum time allowed for the Provider to resolve a reported issue and restore the PSA Oxygen Plant to its operational state. This is dependent on the complexity of the issue and availability of necessary parts.
- Emergency: A critical failure of the PSA Oxygen Plant that results in a complete cessation of oxygen production, posing an immediate threat to operations or safety.
- Major Issue: A significant fault that impairs the efficiency or output of the PSA Oxygen Plant but does not lead to a complete shutdown.
- Minor Issue: A non-critical fault that does not significantly impact the functionality or output of the PSA Oxygen Plant.
- Service Window: Standard business hours of [Client's Location] (e.g., Monday to Friday, 09:00 to 17:00 local time), excluding public holidays.
| Issue Severity | Notification Method | Response Time Target | Escalation Point |
|---|---|---|---|
| Emergency | Phone, Email | Within 2 hours | On-site Project Manager & Senior Technical Lead |
| Major Issue | Email, Phone | Within 4 business hours | On-site Project Manager |
| Minor Issue | Within 8 business hours | Assigned Technical Engineer |
Service Level Objectives
- During the Installation Period, the Provider commits to achieving the following Service Level Objectives (SLOs). These SLOs are designed to ensure efficient and timely installation and to address any issues that may arise during this critical phase.
- 1. Response Times:
- Emergency: Within 2 hours of notification.
- Major Issue: Within 4 business hours of notification.
- Minor Issue: Within 8 business hours of notification.
- 2. Uptime Guarantees (During Installation Period):
- Provisional Acceptance Uptime: The Provider guarantees that the PSA Oxygen Plant, once fully installed and undergoing commissioning (prior to provisional acceptance), will achieve a minimum uptime of 98% during scheduled working hours, excluding any downtime explicitly agreed upon for testing or client-requested modifications.
- Note: This uptime guarantee is applicable to the installation and commissioning phase. Post-provisional acceptance, a separate maintenance and support agreement with its own uptime guarantees will be applicable.
Frequently Asked Questions

Ready when you are
Let's scope your PSA Oxygen Plant Installation Service in Congo (Brazzaville) project in Congo (Brazzaville).
Scaling healthcare logistics and technical systems across the entire continent.

