Background
Verified Service Provider in Chad

Cleanroom Engineering (ISO 5-8) in Chad Engineering Excellence & Technical Support

Cleanroom Engineering (ISO 5-8) solutions for Bioprocessing & Manufacturing. High-standard technical execution following OEM protocols and local regulatory frameworks.

Talk To Sales

ISO 5 Cleanroom Airflow Optimization

Engineered and implemented optimized HEPA/ULPA filtration and laminar airflow patterns within ISO 5 cleanroom environments, achieving critical particle count reduction and minimizing cross-contamination risks for sensitive manufacturing processes in Chad.

Precision Pressure Differential Management (ISO 6-8)

Designed and calibrated sophisticated pressure control systems for ISO 6-8 cleanrooms, ensuring precise positive and negative pressure differentials vital for controlling airborne contaminants in pharmaceutical and electronics assembly facilities across Chad.

Advanced Contamination Monitoring & Control

Deployed state-of-the-art particle counters and environmental monitoring systems to continuously track and report on airborne particulate levels and critical environmental parameters (temperature, humidity) within ISO 5-8 cleanrooms, providing real-time data for proactive contamination control strategies in Chad.

What Is Cleanroom Engineering (Iso 5-8) In Chad?

Cleanroom engineering in Chad, adhering to ISO 5-8 standards, refers to the design, construction, and maintenance of controlled environments with specific limits on airborne particulate contamination. These standards, established by the International Organization for Standardization (ISO), dictate the maximum allowable number of particles of a given size per cubic meter of air. ISO 5 represents a significantly cleaner environment than ISO 8. The service involves a comprehensive approach to contamination control, encompassing HVAC system design and installation, air filtration technologies (HEPA and ULPA filters), material selection, facility layout, workflow optimization, and rigorous monitoring protocols. It is crucial for industries where even microscopic particles can compromise product integrity, process yields, or human health. The implementation of ISO 5-8 cleanrooms in Chad is driven by the need to meet international quality standards, ensure product safety and efficacy, and enable advanced manufacturing and research activities.

Industry/ApplicationTypical ISO Class RequirementRationale for Cleanroom Use
Pharmaceutical ManufacturingISO 5-7 (for sterile drug products, APIs)Prevent microbial and particulate contamination during drug synthesis, formulation, and aseptic filling, ensuring product sterility and efficacy.
Biotechnology ResearchISO 5-7Maintain sterile conditions for cell culture, genetic engineering, and sensitive biological assays, preventing contamination that could invalidate research results.
Electronics Manufacturing (Semiconductors)ISO 5-7 (depending on fabrication stage)Minimize particulate contamination on silicon wafers and microchips during fabrication processes, which can lead to device failure and reduced yields.
Medical Device ManufacturingISO 5-8 (especially for sterile implants and diagnostic equipment)Ensure the sterility and biocompatibility of medical devices, preventing patient infections and ensuring device functionality.
Food and Beverage Processing (Specialized)ISO 7-8 (for sensitive processing and packaging)Control airborne microorganisms and particulates in the production of high-risk food products, extending shelf life and ensuring food safety.
Cosmetics ManufacturingISO 7-8Prevent microbial contamination and ensure the quality and safety of cosmetic products, particularly those with a high water content.

Key Components of Cleanroom Engineering (ISO 5-8)

  • Controlled Airflow and HVAC Design: Utilizing specialized air handling units (AHUs) for unidirectional (laminar) or turbulent airflow to sweep contaminants away from critical areas.
  • High-Efficiency Filtration: Deployment of High-Efficiency Particulate Air (HEPA) and Ultra-Low Penetration Air (ULPA) filters to remove microscopic particles.
  • Material Selection and Surface Finishes: Specifying non-shedding, easy-to-clean materials for walls, floors, ceilings, and equipment.
  • Facility Layout and Workflow: Designing the cleanroom to minimize contamination ingress and facilitate efficient, contamination-controlled operations.
  • Sealing and Integrity: Ensuring the physical integrity of the cleanroom envelope to prevent uncontrolled air ingress and egress.
  • Environmental Monitoring: Continuous or periodic monitoring of particle counts, temperature, humidity, and pressure differentials.
  • Personnel Protocols and Training: Implementing strict gowning procedures, access controls, and comprehensive training for personnel working within the cleanroom.

Who Needs Cleanroom Engineering (Iso 5-8) In Chad?

Cleanroom engineering, particularly for ISO classes 5-8, is crucial for industries where the control of airborne particles is paramount to product integrity, patient safety, and research accuracy. While often associated with high-tech manufacturing and advanced healthcare, these controlled environments are also essential in specific sectors within developing economies like Chad, addressing unique challenges and opportunities. The demand for ISO 5-8 cleanrooms in Chad stems from the need to ensure the quality and reliability of critical products and processes, often supported by international collaborations and standards. This drives the necessity for specialized engineering services that can design, build, and validate these environments.

Customer TypeKey Departments/Functions Requiring CleanroomsPrimary Need for ISO 5-8 Control
Pharmaceutical ManufacturersSterile Manufacturing Suites, Aseptic Filling, Packaging, Quality Control LabsPreventing microbial and particulate contamination of sterile drugs, injectables, and APIs.
Medical Device ManufacturersAssembly Lines for Implants, Diagnostic Kits, Sterilization PreparationEnsuring the sterility and integrity of medical devices to prevent patient harm.
Biotechnology R&DCell Culture Labs, Gene Sequencing Labs, Fermentation Suites, Diagnostic Assay DevelopmentProtecting sensitive biological experiments from contamination, ensuring data accuracy and reproducibility.
Public Health Research InstitutionsVirology Labs, Bacteriology Labs, Serology LabsSafe handling of pathogens, preventing cross-contamination in diagnostic and research work.
High-Value Food ProcessorsSterile Packaging Lines, Aseptic Processing, Quality Assurance LabsMinimizing microbial spoilage and ensuring the safety and shelf-life of specialized food products.
Water Bottling Plants (Premium/Sterile)Filling and Packaging Areas, Quality ControlGuaranteeing the microbiological purity of bottled water for consumer safety.
Humanitarian Logistics HubsCold Chain Storage, Sensitive Material Handling ZonesMaintaining the integrity and efficacy of temperature-sensitive medical supplies and vaccines during storage.

Target Customers and Departments in Chad Requiring ISO 5-8 Cleanroom Engineering

  • {"title":"Pharmaceutical and Medical Device Manufacturing","description":"Companies involved in the local production or assembly of pharmaceuticals, diagnostic kits, and medical devices. This includes sterile manufacturing, packaging, and quality control processes that demand stringent particulate control to prevent contamination and ensure efficacy and patient safety."}
  • {"title":"Research and Development Laboratories (Biotechnology, Health Sciences)","description":"Academic institutions, government research bodies, and private R&D facilities focusing on areas like disease research (e.g., tropical diseases prevalent in the region), vaccine development, or advanced diagnostics. Sensitive experiments and the handling of biological agents require controlled environments to prevent cross-contamination and ensure reproducible results."}
  • {"title":"Food and Beverage Processing (High-Value Products)","description":"Specific segments of the food and beverage industry, particularly those producing high-value, sensitive products like infant formula, specialized dietary supplements, or sterile-packaged ready-to-eat meals. Maintaining hygiene and preventing microbial contamination during critical processing and packaging stages is vital."}
  • {"title":"Water Purification and Bottling Plants","description":"Facilities involved in the advanced purification and sterile bottling of drinking water, especially for export or for sensitive populations. Ensuring the absence of particulate and microbial contaminants in the final product is a primary concern."}
  • {"title":"International Aid and Humanitarian Organizations (Logistics & Storage)","description":"Organizations involved in the storage and handling of sensitive medical supplies, vaccines, or research materials that require temperature and particulate-controlled environments during transit and before distribution, especially in challenging climates."}
  • {"title":"Specialized Electronics Assembly (Emerging Sectors)","description":"While less common, any emerging sector in Chad focused on the precise assembly of sensitive electronic components for specific applications (e.g., telecommunications, renewable energy equipment) might require controlled environments for critical assembly steps."}

Cleanroom Engineering (Iso 5-8) Process In Chad

This document outlines the typical workflow for Cleanroom Engineering services in Chad, specifically focusing on ISO 5-8 classification. The process spans from the initial client inquiry to the successful execution and handover of the cleanroom project.

PhaseStageKey ActivitiesDeliverables/OutcomesConsiderations (Chad Specific)
  1. Inquiry & Scoping
Initial ContactClient expresses need for cleanroom. Discussion of project scope, intended use, required ISO classification (5-8), budget, timeline, and site location.Understanding of client requirements, preliminary project scope, identification of key stakeholders.Establish clear communication channels. Understand local business practices. Assess accessibility of client facilities.
  1. Inquiry & Scoping
Site Survey (if applicable)On-site assessment of the proposed cleanroom location. Evaluation of existing infrastructure (HVAC, electrical, water), structural integrity, and potential integration challenges.Detailed site assessment report, identification of any site-specific constraints or requirements.Logistical planning for travel and site access. Understanding of local building codes and regulations.
  1. Proposal & Design
Conceptual DesignDevelopment of preliminary cleanroom layout, airflow diagrams, material selection, and identification of key equipment (e.g., HEPA filters, air handling units, pass boxes).Conceptual design drawings, preliminary equipment list, indicative cost estimate.Consideration of readily available materials and local supply chains for certain components.
  1. Proposal & Design
Detailed DesignCreation of detailed engineering drawings (mechanical, electrical, architectural), specifications for all components and systems, material submittals, and a comprehensive project plan.Approved detailed design package, project specification document, bill of materials (BOM).Ensuring compliance with international cleanroom standards while considering local availability of specialized materials and expertise.
  1. Proposal & Design
Proposal SubmissionFormal submission of a detailed proposal outlining scope of work, design, equipment, timeline, costs, and terms and conditions.Formal project proposal document.Clarity on payment terms and local currency considerations.
  1. Procurement & Manufacturing
Material & Equipment SourcingProcurement of all necessary materials (e.g., cleanroom panels, flooring, lighting) and specialized equipment based on approved design and BOM.Ordered materials and equipment, supplier agreements.Lead times for imported specialized equipment. Potential for local sourcing of standard construction materials. Customs clearance processes.
  1. Procurement & Manufacturing
Off-site Fabrication (if applicable)Pre-fabrication of certain cleanroom components or modular units in a controlled environment.Fabricated components ready for assembly on-site.Logistics for transporting pre-fabricated elements to Chad.
  1. Installation & Construction
Site PreparationPreparation of the installation area, including any necessary demolition, structural modifications, or utility rough-ins.Prepared installation site.Coordination with local contractors for civil works.
  1. Installation & Construction
Cleanroom AssemblyInstallation of cleanroom panels, doors, windows, flooring, ceiling grid, and integrated services (electrical, HVAC ducting).Physically constructed cleanroom shell.Supervision by experienced cleanroom technicians. Training of local labor for specific installation tasks.
  1. Installation & Construction
HVAC & Electrical IntegrationInstallation and connection of air handling units (AHUs), HEPA/ULPA filters, diffusers, control systems, lighting, and power outlets within the cleanroom environment.Functional HVAC and electrical systems installed.Ensuring compatibility with local power supply standards and availability of maintenance expertise for specialized equipment.
  1. Commissioning & Validation
System Testing & BalancingTesting of all installed systems (HVAC, electrical, filtration) to ensure they meet design specifications. Airflow balancing to achieve uniform air distribution and pressure differentials.System test reports, airflow balancing data, pressure differential readings.Calibration of instruments. Ensuring technicians are trained on specific equipment.
  1. Commissioning & Validation
Cleanliness VerificationParticulate and microbial (if applicable) testing to confirm the cleanroom meets the specified ISO classification (ISO 5-8) through air sampling and surface monitoring.Validation reports confirming ISO classification, certificates of analysis.Availability of accredited local or international testing laboratories. Timely sample analysis.
  1. Commissioning & Validation
Performance Qualification (PQ)Testing under simulated operational conditions to ensure the cleanroom performs as intended throughout its intended use.PQ reports.Client involvement in defining PQ scenarios relevant to their operations.
  1. Handover & Support
Documentation & TrainingProvision of comprehensive documentation, including as-built drawings, operation and maintenance manuals, and training for the client's personnel on cleanroom operation, monitoring, and basic maintenance.Complete documentation package, trained client personnel.Documentation translated into relevant local languages if necessary. Tailored training based on client's operational needs.
  1. Handover & Support
Project CloseoutFinal inspection, sign-off, and formal handover of the completed cleanroom facility to the client.Project completion certificate, final invoice.Clear understanding of warranty periods and after-sales support procedures.
  1. Handover & Support
After-Sales SupportOngoing support, including maintenance services, recalibration, troubleshooting, and potential future upgrades or expansions.Ongoing client satisfaction.Establishing reliable channels for communication and support, considering potential logistical challenges for remote service calls.

Cleanroom Engineering (ISO 5-8) Process Workflow in Chad

  • Phase 1: Inquiry & Scoping
  • Phase 2: Proposal & Design
  • Phase 3: Procurement & Manufacturing
  • Phase 4: Installation & Construction
  • Phase 5: Commissioning & Validation
  • Phase 6: Handover & Support

Cleanroom Engineering (Iso 5-8) Cost In Chad

Cleanroom engineering in Chad, specifically for ISO 5-8 classifications, involves significant investment due to specialized materials, equipment, skilled labor, and adherence to stringent international standards. The cost will vary widely based on the specific ISO class required (lower ISO classes like ISO 5 are significantly more expensive than higher classes like ISO 8), the size and complexity of the cleanroom, the chosen construction methods, and the availability of local expertise and materials. As Chad is a developing nation, sourcing advanced cleanroom components and highly specialized technicians might necessitate imports, adding to the overall price. Furthermore, ongoing operational costs such as filtration, energy consumption, and maintenance are critical considerations.

FeatureDescriptionEstimated Price Range (XAF)Notes
Basic ISO 8 Cleanroom (Small Scale)Minimal particle control, suitable for general manufacturing or packaging.15,000,000 - 40,000,000Assumes relatively simple design and use of readily available materials. May involve modular construction.
Mid-Range ISO 7 Cleanroom (Medium Scale)Higher particle control, often used in pharmaceuticals or electronics assembly.40,000,000 - 90,000,000Requires more advanced HVAC, better sealing, and specialized finishes.
Advanced ISO 6 Cleanroom (Medium to Large Scale)Strict particle control, critical for sensitive processes.90,000,000 - 200,000,000Significant investment in HEPA filtration, precise air balancing, and robust monitoring.
High-End ISO 5 Cleanroom (Medium to Large Scale)Very low particle count, essential for semiconductor manufacturing, advanced biotech, or sterile environments.200,000,000+Extremely demanding specifications, often involving multiple stages of filtration, laminar flow, and sophisticated control systems. Costs can escalate rapidly for larger or more complex facilities.
Consultancy & Design FeesExpert planning and engineering services.5,000,000 - 15,000,000Varies based on project complexity and the reputation of the consultancy.
Imported Materials & Equipment (per project)Specialized filters, cleanroom panels, equipment.10,000,000 - 100,000,000+Heavily dependent on the quantity and sophistication of imported items. Includes customs duties and shipping.
Annual Operational Costs (per 100 sq. m.)Filtration replacement, energy, maintenance, validation.3,000,000 - 10,000,000Higher ISO classes and continuous operation will significantly increase these costs.

Key Pricing Factors for Cleanroom Engineering (ISO 5-8) in Chad

  • ISO Classification Requirements (Lower classes are more expensive)
  • Cleanroom Size and Area (Square footage/meters)
  • Complexity of Design and Layout
  • Materials and Finishes (e.g., specialized wall panels, flooring, sealants)
  • HVAC System Design and Installation (HEPA/ULPA filters, air changes per hour, pressure differentials)
  • Lighting Systems (UV-resistant, anti-static)
  • Access Control and Interlocking Doors
  • Monitoring and Control Systems (Temperature, humidity, particle counters)
  • Labor Costs (Skilled technicians, engineers, construction workers)
  • Equipment and Furniture (Workbenches, laminar flow hoods, pass-throughs)
  • Project Management and Consultancy Fees
  • Permits and Certifications
  • Logistics and Transportation (Especially for imported components)
  • Site Preparation and Infrastructure Modifications
  • Ongoing Operational Costs (Filtration replacement, energy, maintenance, validation)

Affordable Cleanroom Engineering (Iso 5-8) Options

Achieving ISO 5-8 cleanroom standards can be a significant investment. This guide explores affordable cleanroom engineering options, focusing on value bundles and cost-saving strategies to make controlled environments accessible for a wider range of applications. We'll cover modular systems, material selection, and smart design choices that minimize upfront and ongoing costs without compromising essential cleanliness.

Value Bundle ComponentDescriptionCost-Saving StrategyTypical ISO Range Supported
Modular Wall & Ceiling SystemPre-fabricated panels for rapid assembly.Reduced labor costs, less waste, faster project completion.ISO 5-8
Standard HEPA/ULPA FiltrationHigh-efficiency particulate air (HEPA) or ultra-low penetration air (ULPA) filters.Opt for standard sizes and readily available filter types. Optimize fan speeds for reduced energy use.ISO 5-8
Basic Controlled Airflow (Single Pass)Air is supplied and exhausted, maintaining positive or negative pressure. Single pass is more economical than recirculation for certain applications.Simpler HVAC design, lower initial equipment cost compared to complex recirculation systems.ISO 7-8 (with appropriate filtration)
Standard LED LightingEnergy-efficient and long-lasting lighting solutions.Lower energy bills, reduced maintenance and replacement costs.ISO 5-8
Simple Airlock / Pass-ThroughBasic pressure transition zones or inert transfer cabinets.Focus on functionality over complex features. Manual interlocks are often sufficient for lower ISO classes.ISO 6-8
Durable, Easy-to-Clean FlooringVinyl, epoxy, or linoleum options.Balancing cost with longevity and ease of decontamination. Avoid specialized, high-cost materials unless strictly necessary.ISO 5-8
Basic Monitoring PackageEssential sensors for temperature, humidity, and differential pressure.Focus on critical parameters. Advanced real-time data logging may not be required for all applications.ISO 5-8

Key Considerations for Affordable Cleanroom Engineering

  • Modular vs. Traditional Construction: Modular cleanrooms offer faster installation, less site disruption, and often lower initial costs compared to stick-built structures.
  • Material Selection: Choosing appropriate, cost-effective materials for walls, floors, and ceilings is crucial. Consider materials that meet the required ISO classification and offer good durability and ease of cleaning.
  • HVAC Optimization: Efficient HVAC design that meets airflow and filtration requirements (HEPA/ULPA filters) can significantly reduce energy consumption and operational expenses.
  • Lighting Efficiency: LED lighting is standard for cleanrooms due to its longevity, low heat output, and energy efficiency.
  • Entry and Exit Strategies: Implementing cost-effective airlocks, pass-throughs, and gowning areas that maintain the required pressure differentials and minimize particle ingress.
  • Future Scalability: Designing with future expansion in mind can prevent costly rebuilds down the line. Modular systems are particularly adept at this.
  • Phased Implementation: For larger projects, consider a phased approach, starting with essential clean zones and expanding as needs and budget allow.

Verified Providers In Chad

In Chad, ensuring access to quality healthcare is paramount. For individuals and organizations seeking reliable medical services, identifying verified providers is a critical step. This guide focuses on Franance Health, a prominent healthcare entity in Chad, and outlines the credentials that solidify its position as the best choice for healthcare needs.

Credential TypeDescriptionSignificance for Patients
Medical LicensesAll practitioners at Franance Health hold valid medical licenses issued by the Chadian Ministry of Public Health, ensuring they are legally authorized to practice medicine.Guarantees that medical professionals are qualified and adhere to national regulations.
Specialty CertificationsDoctors and specialists possess certifications in their respective fields, such as cardiology, pediatrics, surgery, etc.Ensures access to expert care for specific medical conditions.
Professional MembershipsMembership in reputable national and international medical associations signifies a commitment to ongoing professional development and ethical practice.Indicates dedication to staying current with medical advancements and best practices.
Continuing Medical Education (CME)Franance Health mandates that its staff regularly participate in CME programs to update their knowledge and skills.Ensures that patients receive care based on the latest medical research and techniques.
Accreditation (if applicable)While specific accreditations can vary, institutions that pursue recognized accreditations demonstrate a commitment to meeting high operational and clinical standards.Provides an external validation of the quality and safety of healthcare services.
Experience and Track RecordA history of successful patient outcomes and positive feedback from the community highlights the effectiveness and reliability of Franance Health's services.Offers confidence in the provider's ability to deliver excellent healthcare.

Why Franance Health is the Best Choice in Chad:

  • Comprehensive Service Offering: Franance Health provides a wide spectrum of medical services, from primary care and diagnostics to specialized treatments and emergency services. This all-encompassing approach ensures that patients can receive continuous care under one trusted umbrella.
  • Highly Qualified Medical Professionals: The cornerstone of Franance Health's excellence lies in its team of experienced and credentialed doctors, nurses, and specialists. They are committed to upholding the highest standards of medical practice and patient care.
  • Advanced Medical Technology: Investing in state-of-the-art medical equipment and technology allows Franance Health to offer accurate diagnoses and effective treatments. This commitment to innovation ensures patients benefit from the latest advancements in healthcare.
  • Patient-Centric Approach: Franance Health prioritizes the well-being and comfort of its patients. Their approach is characterized by empathy, clear communication, and personalized care plans tailored to individual needs.
  • Strong Community Partnerships: By collaborating with local health initiatives and organizations, Franance Health demonstrates a deep commitment to improving the overall health landscape in Chad.
  • Rigorous Quality Assurance: Adherence to strict quality control measures and international healthcare standards ensures that every service provided by Franance Health meets stringent benchmarks for safety and efficacy.

Scope Of Work For Cleanroom Engineering (Iso 5-8)

This Scope of Work (SOW) outlines the engineering services required for the design, implementation, and validation of cleanroom facilities meeting ISO 5 to ISO 8 standards. The objective is to establish controlled environments suitable for sensitive manufacturing processes, research, and development activities, ensuring compliance with international standards and best practices.

ISO ClassMaximum Particle Count (per m³)Typical Applications
ISO 5 (Class 100)≥0.5 µm: 3,520Sterile injectable drug manufacturing, semiconductor fabrication.
ISO 6 (Class 1,000)≥0.5 µm: 35,200Pharmaceutical tablet manufacturing, advanced electronics assembly.
ISO 7 (Class 10,000)≥0.5 µm: 352,000General pharmaceutical manufacturing, biotech research.
ISO 8 (Class 100,000)≥0.5 µm: 3,520,000Clean storage, assembly of less sensitive components, general laboratory work.

Key Project Phases and Deliverables

  • {"items":["Requirement gathering and definition (process needs, particle counts, environmental parameters).","Feasibility studies and site selection considerations.","Preliminary design concepts and layouts.","Development of a detailed Cleanroom Design Basis Document (DBD)."],"title":"Phase 1: Conceptualization & Design"}
  • {"items":["Architectural and structural design drawings.","HVAC system design (airflow, filtration, pressure cascades, temperature/humidity control).","Electrical system design (power distribution, lighting, controls).","Plumbing and process piping design.","Material selection for cleanroom surfaces (walls, floors, ceilings, doors).","Detailed equipment specifications.","Development of construction drawings and specifications.","3D BIM modeling (optional, but recommended)."],"title":"Phase 2: Detailed Engineering Design"}
  • {"items":["Assistance with vendor selection and bid evaluation.","Review of contractor submittals.","On-site supervision and quality control during construction.","Progress reporting and issue resolution."],"title":"Phase 3: Procurement & Construction Oversight"}
  • {"items":["Installation supervision of all cleanroom components and systems.","Pre-commissioning checks and testing.","Functional performance testing of all installed systems (HVAC, electrical, process).","Development of commissioning plans and protocols."],"title":"Phase 4: Installation & Commissioning"}
  • {"items":["Installation Qualification (IQ) - verification of correct installation.","Operational Qualification (OQ) - verification of system operation within defined parameters.","Performance Qualification (PQ) - verification of the cleanroom's ability to meet specified performance requirements under normal operating conditions.","Particle count testing.","Airflow visualization studies.","HEPA filter integrity testing (DOP/PAO).","Differential pressure testing.","Temperature and humidity mapping.","Static and dynamic air sampling.","Microbial monitoring program development.","Final validation report generation."],"title":"Phase 5: Validation & Qualification"}
  • {"items":["As-built drawings and documentation.","Operation and Maintenance (O&M) manuals.","Training for facility operators and maintenance personnel.","Post-occupancy support (optional)."],"title":"Phase 6: Handover & Training"}

Service Level Agreement For Cleanroom Engineering (Iso 5-8)

This Service Level Agreement (SLA) outlines the response times and uptime guarantees for Cleanroom Engineering services, specifically for ISO Class 5 to ISO Class 8 environments. This agreement ensures the consistent operation and performance of critical cleanroom facilities.

Service TierUptime GuaranteeResponse Time (Critical)Response Time (Standard)Resolution Target (Critical)Resolution Target (Standard)
Platinum (24/7 Monitoring & Support)99.9% (excluding scheduled maintenance)1 Hour4 Business Hours4 Hours1 Business Day
Gold (Business Hours Monitoring & Support)99.5% (excluding scheduled maintenance)2 Business Hours8 Business Hours8 Hours3 Business Days
Silver (Scheduled Maintenance & On-Demand Support)99.0% (excluding scheduled maintenance)4 Business Hours24 Business Hours1 Business Day5 Business Days

Scope of Services

  • Preventive maintenance and calibration of cleanroom systems (HVAC, HEPA filtration, pressure control, environmental monitoring).
  • Corrective maintenance and troubleshooting for all cleanroom equipment.
  • Validation and re-validation services as per ISO 14644 standards.
  • Emergency repair services for critical system failures.
  • Performance monitoring and reporting.
In-Depth Guidance

Frequently Asked Questions

Background
Phase 02: Execution

Ready when you are

Let's scope your Cleanroom Engineering (ISO 5-8) in Chad project in Chad.

Speak to Sales