Critical Care Isolation Transformer Installation

Ensuring 100% power reliability for OT/ICU environments in Burundi through the specialized installation of medical-grade isolation transformers. Our service guarantees protection against electrical faults, noise, and leakage currents, vital for patient safety and medical equipment integrity.

Certified Burundi Medical Site Compliance

Adhering to stringent national and international medical electrical safety standards for OT/ICU installations across Burundi. Our expert technicians ensure all isolation transformer setups meet or exceed regulatory requirements for safe and efficient operation.

Optimized OT/ICU Power Continuity

Implementing advanced isolation transformer solutions specifically designed for the demanding power needs of Operating Theaters and Intensive Care Units in Burundi. We focus on minimizing downtime, reducing harmonic distortion, and providing a stable power source for life-support systems.

What Is Isolation Transformer Setup Service (Ot/icu) In Burundi?

The Isolation Transformer Setup Service (OT/ICU) in Burundi refers to the specialized installation and configuration of isolation transformers within Operating Theatres (OT) and Intensive Care Units (ICU). These transformers are critical medical electrical equipment designed to enhance patient safety by preventing accidental electric shock in these high-risk environments. They provide galvanic isolation between the patient and the main power supply, significantly reducing the risk of micro-shocks and macro-shocks. This service ensures that these life-support areas have a robust and compliant electrical infrastructure that meets international safety standards for medical facilities.

Requirement CategoryDescriptionRelevance to OT/ICU
Electrical Safety Standards ComplianceAdherence to IEC 60364-7-710, IEC 60601 series, and local Burundian electrical codes for medical installations.Mandatory for ensuring patient and staff safety in critical care areas where direct contact with electrical pathways is common.
Medical Equipment Load CompatibilityEnsuring the transformer can support the combined power demands of life-support systems (ventilators, monitors, infusion pumps, anesthesia machines).Prevents power interruptions or voltage sags that could compromise patient care and device functionality.
Redundancy and ReliabilityDesigning for continuous power supply even in the event of minor electrical disturbances.Crucial for uninterrupted operation of life-sustaining equipment in ICUs and during surgical procedures in OTs.
Environmental ConsiderationsInstallation within environments requiring specific temperature, humidity, and ventilation controls to ensure optimal transformer performance.Maintains the integrity and longevity of the electrical system within controlled medical spaces.
Skilled PersonnelRequirement for certified electricians and biomedical engineers with expertise in medical electrical installations and safety protocols.Ensures the service is executed correctly, minimizing risks and ensuring compliance.

Service Components and Requirements

  • Isolation Transformer Installation: Physical mounting and connection of the isolation transformer unit, ensuring proper grounding and earthing.
  • System Wiring and Integration: Connecting the transformer to the hospital's main electrical panel and distributing its isolated output to critical medical equipment circuits within the OT/ICU.
  • Monitoring and Alarm System Setup: Configuring integrated insulation monitoring devices (IMDs) and associated alarm systems to detect insulation faults in real-time.
  • Load Balancing and Capacity Assessment: Ensuring the transformer's capacity is adequate for the connected medical equipment loads and that power is distributed efficiently.
  • Testing and Commissioning: Performing comprehensive electrical safety tests, including insulation resistance, dielectric strength, and earth continuity tests, followed by functional testing of the alarm system.
  • Documentation and Certification: Providing detailed installation manuals, test reports, and compliance certifications as per national and international medical electrical safety standards.
  • Training: Educating hospital biomedical engineers and maintenance staff on the operation, maintenance, and troubleshooting of the isolation transformer system.

Who Needs Isolation Transformer Setup Service (Ot/icu) In Burundi?

Isolation transformer setup services are crucial for ensuring patient safety and reliable operation of sensitive medical equipment, especially in environments where electrical interference and power fluctuations can be problematic. In Burundi, these services are particularly vital for healthcare facilities that handle critical patient care and utilize advanced medical technologies. The primary purpose is to prevent electrical shock to patients and staff, and to protect sensitive equipment from damage, ensuring continuity of care.

Customer TypeKey Departments Requiring ServiceSpecific Needs/Considerations
Public HospitalsOperating Theatres (OT), Intensive Care Units (ICU), Neonatal Intensive Care Units (NICU), Cardiac Catheterization Labs, Dialysis UnitsHigh patient volume, critical equipment reliance, potential for aged infrastructure, need for reliable and safe power for life-support systems, compliance with national health standards.
Private HospitalsOperating Rooms, Intensive Care Units (ICU), Post-Anesthesia Care Units (PACU), Advanced Imaging Suites (MRI, CT scans), Neurology DepartmentsEmphasis on patient comfort and safety, utilization of state-of-the-art medical equipment, need for uninterrupted power supply for sensitive diagnostic and therapeutic devices, potential for higher budget allocation for infrastructure.
Specialized ClinicsDialysis Centers, Cardiology Clinics (with ECG, Holter monitoring), Neurology Clinics (with EEG)Focus on specific critical procedures, direct patient contact with equipment, protection against stray currents, consistent power for accurate readings and treatment delivery.
Diagnostic LaboratoriesLabs with sensitive analytical equipment (e.g., PCR machines, advanced microscopes), imaging departmentsProtection of precision instruments from electrical noise and surges, ensuring accuracy of diagnostic results, preventing equipment downtime.
Government Health Agencies & NGOsFacilities involved in public health initiatives, disaster relief, or remote healthcare deliveryEstablishing safe and reliable power in underserved areas, setting up temporary or mobile medical units, ensuring safety standards are met in challenging environments.

Target Customers and Departments for Isolation Transformer Setup Service (OT/ICU) in Burundi:

  • Hospitals (Public and Private)
  • Specialized Clinics (e.g., Dialysis Centers, Cardiac Centers)
  • Research and Diagnostic Laboratories with specialized equipment
  • Field Hospitals or Mobile Medical Units (requiring robust and safe power)

Isolation Transformer Setup Service (Ot/icu) Process In Burundi

This document outlines the standard workflow for the setup service of Isolation Transformers (OT/ICU) in Burundi, from the initial customer inquiry to the successful execution and handover. The process is designed to ensure a seamless and efficient installation, meeting the specific requirements of healthcare facilities for critical care environments.

PhaseStepDescriptionKey StakeholdersDeliverables/Outcomes
  1. Inquiry & Initial Assessment
1.1. Customer InquiryHealthcare facility (e.g., hospital, clinic) expresses interest in acquiring and installing an isolation transformer for Operating Theatres (OT) or Intensive Care Units (ICU). Inquiry can be via phone, email, or website.Client (Facility Management, Biomedical Engineering Department), Service Provider Sales TeamInitial understanding of client's needs and project scope.
  1. Inquiry & Initial Assessment
1.2. Needs AnalysisService provider gathers preliminary information about the facility's existing electrical infrastructure, specific OT/ICU requirements, desired transformer capacity, and any regulatory compliance considerations.Service Provider Sales Team, Client RepresentativesClarified project requirements, preliminary technical specifications.
  1. Site Survey & Technical Evaluation
2.1. Site Visit SchedulingA date and time are scheduled for a technical team from the service provider to visit the facility.Service Provider Technical Team, Client Facilities ManagerConfirmed site visit appointment.
  1. Site Survey & Technical Evaluation
2.2. On-site AssessmentThe technical team conducts a detailed inspection of the proposed installation location. This includes assessing available space, structural integrity, power supply access, ventilation, earthing systems, and existing electrical panels. They will also verify compliance with local electrical codes and healthcare facility standards.Service Provider Technical Team (Engineers, Technicians), Client Biomedical Engineering DepartmentDetailed site assessment report, identification of potential challenges and requirements.
  1. Site Survey & Technical Evaluation
2.3. Technical Specification FinalizationBased on the site survey, the technical team finalizes the exact specifications for the isolation transformer, including capacity (kVA), voltage ratings, enclosure type, monitoring features, and any required accessories (e.g., circuit breakers, alarm systems).Service Provider Technical Team, Client Biomedical Engineering DepartmentFinalized technical specifications for the isolation transformer.
  1. Proposal & Quotation
3.1. Proposal DevelopmentA comprehensive proposal is prepared, detailing the scope of work, technical specifications of the proposed isolation transformer, installation methodology, project timeline, and all associated costs (equipment, labor, testing, commissioning).Service Provider Sales Team & Technical TeamFormal project proposal.
  1. Proposal & Quotation
3.2. Quotation SubmissionThe proposal and detailed quotation are submitted to the client for review and approval.Service Provider Sales Team, Client Procurement/Finance DepartmentOfficial quotation for the isolation transformer setup service.
  1. Proposal & Quotation
3.3. Negotiation & ClarificationDiscussions and clarifications may occur between the service provider and the client to address any queries or negotiate terms and conditions.Service Provider Sales Team, Client RepresentativesAgreed-upon terms and conditions.
  1. Order Confirmation & Logistics
4.1. Order PlacementUpon client approval and signing of the contract/purchase order, the order for the isolation transformer and associated materials is officially placed.Client Procurement Department, Service Provider Sales TeamConfirmed purchase order/contract.
  1. Order Confirmation & Logistics
4.2. Procurement & ManufacturingThe isolation transformer is either manufactured or procured from the supplier based on the finalized specifications. Lead times for manufacturing and delivery are communicated to the client.Service Provider Procurement & Manufacturing/SupplierIsolation transformer manufactured/procured.
  1. Order Confirmation & Logistics
4.3. Logistics & Delivery PlanningArrangements are made for the safe transportation and delivery of the isolation transformer and any other necessary equipment to the client's site in Burundi. This includes customs clearance and local transportation.Service Provider Logistics Team, Client Site ManagerDelivery schedule and logistics plan confirmed.
  1. Installation & Commissioning
5.1. Site PreparationThe installation area is prepared according to the site survey report, ensuring it is clean, accessible, and safe for the installation team.Service Provider Installation Team, Client Facilities StaffPrepared installation site.
  1. Installation & Commissioning
5.2. Transformer InstallationQualified technicians install the isolation transformer, connecting it to the facility's main power supply and the designated OT/ICU circuits. This involves mounting, wiring, and securing the unit.Service Provider Installation TeamIsolation transformer physically installed.
  1. Installation & Commissioning
5.3. System Integration & Pre-commissioning ChecksConnections to monitoring systems, alarms, and any other integrated components are made. Basic checks are performed to ensure all connections are secure and as per design.Service Provider Installation TeamInitial system connections established.
  1. Installation & Commissioning
5.4. CommissioningThe isolation transformer is powered up, and initial operational parameters are set. This phase involves verifying the transformer's functionality, checking output voltage, and ensuring all safety features are active.Service Provider Commissioning EngineersIsolation transformer operational and basic parameters set.
  1. Testing & Handover
6.1. Performance TestingComprehensive tests are conducted to verify the transformer's performance under load and its ability to isolate the power supply. This may include insulation resistance tests, dielectric strength tests, and load balance tests.Service Provider Testing Team, Client Biomedical Engineering DepartmentTest reports confirming transformer performance.
  1. Testing & Handover
6.2. Safety & Compliance VerificationAll safety mechanisms, alarms, and interlocking systems are tested to ensure they function correctly and comply with relevant standards and regulations.Service Provider Testing Team, Client Biomedical Engineering Department, potentially regulatory bodiesConfirmation of safety and compliance.
  1. Testing & Handover
6.3. Final Walkthrough & Client AcceptanceA final walkthrough is conducted with the client to demonstrate the installed system, explain its operation, and address any final concerns. Upon satisfaction, the client formally accepts the installation.Service Provider Project Manager, Client RepresentativesClient acceptance of the installed isolation transformer system.
  1. Testing & Handover
6.4. Documentation HandoverAll relevant documentation, including user manuals, maintenance guides, test reports, warranty information, and as-built drawings, are provided to the client.Service Provider Project ManagerComplete documentation package provided.
  1. Post-Installation Support & Training
7.1. User TrainingTraining is provided to the facility's technical staff (biomedical engineers, maintenance personnel) on the operation, basic troubleshooting, and routine maintenance of the isolation transformer system.Service Provider Training Specialist, Client Technical StaffTrained facility staff.
  1. Post-Installation Support & Training
7.2. Warranty & Maintenance SupportThe service provider offers ongoing warranty support and optional planned maintenance services to ensure the longevity and optimal performance of the isolation transformer.Service Provider Technical Support & Maintenance Teams, ClientEnsured system reliability and availability.

Isolation Transformer Setup Service (OT/ICU) Process in Burundi

  • Phase 1: Inquiry & Initial Assessment
  • Phase 2: Site Survey & Technical Evaluation
  • Phase 3: Proposal & Quotation
  • Phase 4: Order Confirmation & Logistics
  • Phase 5: Installation & Commissioning
  • Phase 6: Testing & Handover
  • Phase 7: Post-Installation Support & Training

Isolation Transformer Setup Service (Ot/icu) Cost In Burundi

The cost of setting up an isolation transformer for OT/ICU (Operating Theatre/Intensive Care Unit) applications in Burundi can vary significantly based on several factors. Isolation transformers are critical for patient safety in these sensitive medical environments, as they provide electrical isolation to prevent the flow of current through the patient in case of a fault. The pricing is influenced by the transformer's specifications, the complexity of the installation, the expertise of the service provider, and the specific location within Burundi. It's crucial to obtain detailed quotes from reputable medical equipment suppliers and qualified electricians or biomedical engineers experienced in hospital installations.

Item/ServiceEstimated Cost Range (Burundian Francs - BIF)Notes
Medical-Grade Isolation Transformer (e.g., 3kVA - 10kVA)2,000,000 - 10,000,000+Varies greatly by kVA, brand, and specific medical certifications. Higher ratings and premium brands will be at the upper end.
Ancillary Equipment (breakers, alarms, wiring, etc.)500,000 - 2,000,000+Depends on the number and complexity of required safety features and monitoring systems.
Professional Installation Labor (Electricians & Biomedical Engineers)800,000 - 3,000,000+This is a project-based cost, dependent on the complexity and duration. Expert services will be higher.
Testing, Calibration, and Certification300,000 - 1,000,000Essential for compliance and safety assurance. Rates depend on the complexity of the system.
Total Estimated Setup Cost (Excluding potential UPS)3,600,000 - 16,000,000+ BIFThis is a broad estimate. Individual quotes are essential.

Key Pricing Factors for Isolation Transformer Setup (OT/ICU) in Burundi:

  • Transformer Specifications: This is the most significant factor. Key specifications include the kVA rating (power capacity), voltage ratings (input and output), frequency, and the level of isolation required (e.g., medical-grade isolation transformer with a specific leakage current limit). Higher kVA ratings and specialized features will naturally increase the cost.
  • Brand and Quality: Reputable international brands known for their reliability and adherence to medical standards will typically be more expensive than generic or locally sourced options. However, for critical applications like OT/ICU, investing in high-quality equipment is paramount.
  • Installation Complexity: The ease or difficulty of the physical installation impacts labor costs. This includes factors like the distance from the main power source, the need for new electrical conduits, ceiling mounts, or custom enclosures, and the accessibility of the installation site within the hospital.
  • Ancillary Equipment and Materials: Beyond the transformer itself, the setup may require additional components such as circuit breakers, surge protectors, monitoring systems, audible and visual alarms, appropriate wiring, grounding materials, and potentially UPS (Uninterruptible Power Supply) integration. The cost of these will add to the overall expense.
  • Labor Costs: The hourly rates or project-based fees of qualified electricians and biomedical engineers will vary. Specialized expertise in medical electrical systems commands higher fees. The number of technicians required and the duration of the installation also play a role.
  • Location within Burundi: While not as significant a differentiator as the transformer's specifications, logistical costs for transporting equipment and personnel to more remote regions might slightly influence pricing compared to major cities like Bujumbura.
  • Testing and Certification: Thorough testing, calibration, and certification of the isolation transformer system by a qualified professional are essential to ensure it meets all safety and performance standards. These services add to the overall cost but are non-negotiable for patient safety.
  • Permits and Approvals: Depending on local regulations, obtaining necessary permits or approvals for electrical installations within a healthcare facility might incur additional fees.
  • After-Sales Support and Warranty: The terms of the warranty and the availability of after-sales support and maintenance services can influence the initial purchase and installation price.

Affordable Isolation Transformer Setup Service (Ot/icu) Options

Our Affordable Isolation Transformer Setup Service (OT/ICU) is designed to provide critical medical facilities with reliable and cost-effective solutions for ensuring patient safety and equipment protection. We understand the unique demands of Operating Rooms (OR) and Intensive Care Units (ICU) and offer tailored setup packages that prioritize safety, compliance, and budget adherence. Our services encompass professional installation, rigorous testing, and essential documentation to ensure your isolation transformer system meets all necessary standards.

Cost-Saving StrategyDescriptionImpact on Service Cost
**Bundle SelectionChoosing a value bundle that precisely matches your facility's needs, rather than ad-hoc services, can lead to significant savings through integrated pricing and streamlined processes.Reduced overall cost compared to selecting individual services.
**Pre-Planning & Site AssessmentThoroughly assessing your site's existing electrical infrastructure and identifying all requirements before our technicians arrive minimizes on-site adjustments and unforeseen complications.Lower labor costs due to reduced on-site work time and fewer return visits.
**Bulk Installation DiscountsScheduling the setup of multiple isolation transformers for different OT/ICU rooms within a single project or timeframe can qualify for volume-based discounts.Percentage discount applied to the total cost of multiple installations.
**Supplying Your Own TransformerIf your facility has already procured a certified isolation transformer, our service focuses purely on the professional installation and testing, which can be more cost-effective.Cost savings on the transformer unit itself; service fee reflects labor and expertise only.
**Standardized Components & MaterialsUtilizing readily available, high-quality, and compliant standard electrical components and wiring materials can be more economical than custom or specialized solutions.Lower material costs, contributing to a more affordable overall service.
**Scheduled Maintenance PackagesBundling initial setup with a preventative maintenance agreement for your isolation transformer can offer discounted rates on future servicing, preventing costly emergency repairs.Discounted rates on future maintenance services, improving long-term cost efficiency.

Value Bundles for OT/ICU Isolation Transformer Setup

  • Basic Setup & Verification: Includes professional installation of your supplied isolation transformer, primary wiring connections, grounding, and initial functional verification. Ideal for facilities with existing infrastructure and minimal additional requirements.
  • Standard Safety Package: Encompasses the Basic Setup & Verification, plus essential safety checks, basic labeling of critical circuits, and a simplified test report. Suitable for standard OT/ICU rooms requiring robust, but straightforward, isolation.
  • Comprehensive Compliance Bundle: Our premium offering. Includes Standard Safety Package, advanced system testing (e.g., insulation resistance, leakage current), comprehensive documentation package compliant with relevant medical electrical equipment standards, and a detailed commissioning report. Essential for new installations or facilities undergoing stringent regulatory reviews.
  • Emergency & Redundancy Upgrade: Focuses on adding an additional isolation transformer or a secondary power source for critical equipment in OT/ICU, ensuring continuous operation during maintenance or unexpected failures. This bundle includes setup and integration of the redundant system.

Verified Providers In Burundi

In Burundi's evolving healthcare landscape, identifying reliable and qualified providers is paramount for individuals and organizations seeking quality medical services. Franance Health has emerged as a leading entity, distinguishing itself through its rigorous credentialing process and unwavering commitment to excellence. This makes Franance Health a trusted partner for accessing verified healthcare professionals and facilities across the nation.

Credentialing AspectFranance Health's ApproachBenefit for Users
Educational BackgroundVerification of degrees, diplomas, and certifications from accredited institutions.Ensures providers have foundational medical knowledge and training.
Professional LicensesConfirmation of valid and current medical licenses issued by the relevant Burundian authorities.Guarantees legal authorization to practice medicine.
Specialized Training & CertificationsValidation of postgraduate training, fellowships, and specialized certifications.Identifies expertise in specific medical fields.
Clinical ExperienceReview of prior work experience and references.Provides insight into practical application of skills and patient management.
Ethical Conduct & Disciplinary HistoryBackground checks and inquiries into any past disciplinary actions.Ensures providers adhere to ethical medical practices and patient well-being.
Commitment to Continuing Medical Education (CME)Encourages and verifies ongoing professional development.Confirms providers stay updated with the latest medical advancements.

Why Franance Health Credentials Represent the Best Choice in Burundi:

  • Rigorous Vetting and Verification: Franance Health employs a multi-stage verification process for all its listed providers. This includes meticulous examination of educational qualifications, professional licenses, specialized training, and peer reviews. This ensures that only genuinely qualified and ethical practitioners are included.
  • Commitment to Quality Standards: Franance Health aligns its credentialing with recognized national and international healthcare quality standards. Providers must demonstrate adherence to best practices in patient care, safety, and ethical conduct.
  • Transparency and Accessibility: The credentials of Franance Health's providers are readily accessible and transparent. This empowers patients and organizations to make informed decisions by understanding the qualifications and experience of the healthcare professionals they engage with.
  • Continuous Monitoring and Re-evaluation: Franance Health does not rely on a one-time credentialing. They implement a system of continuous monitoring and periodic re-evaluation of their providers to ensure ongoing compliance with standards and to address any emerging concerns.
  • Focus on Patient Safety and Trust: At its core, Franance Health's credentialing process is driven by a dedication to patient safety and building trust within the healthcare ecosystem. By vouching for the qualifications of their providers, they mitigate risks and foster confidence.
  • Broad Network of Specialists: Franance Health's network extends across various medical disciplines, ensuring access to a wide range of specialists and general practitioners, all of whom have undergone their stringent verification.
  • Facilitating Access to Reputable Healthcare: For businesses, NGOs, and individuals seeking healthcare services in Burundi, partnering with Franance Health means guaranteed access to providers who have been thoroughly vetted and are recognized for their competence and integrity. This streamlines the process of finding reliable medical care and significantly reduces the risk of encountering unqualified practitioners.

Scope Of Work For Isolation Transformer Setup Service (Ot/icu)

This Scope of Work (SOW) outlines the services required for the setup of isolation transformer systems within Operating Theatre (OT) and Intensive Care Unit (ICU) environments. The objective is to ensure safe and reliable electrical power distribution, compliant with relevant medical electrical equipment standards.

Technical DeliverableDescriptionStandard Specification / Reference
Isolation Transformer UnitMedical-grade isolation transformer with appropriate kVA rating, shielding, and surge protection.IEC 61558-2-15 (or equivalent national standard), UL 60601-1
Surge Protection Device (SPD)Type 1 or Type 2 SPD to protect the isolation transformer and downstream circuits from transient overvoltages.IEC 61643-11, UL 1449
Insulation Monitoring Device (IMD)Device to continuously monitor the insulation resistance of the IT system and provide audible and visual alarms.IEC 61557-8, IEC 60364-7-710
Wiring and CablingMedical-grade, fire-retardant cables with appropriate cross-sectional area for the load and installed according to electrical codes.IEC 60364-7-710, NEC Article 517 (or equivalent national standard)
Grounding SystemProperly designed and implemented equipotential grounding for the transformer and all connected equipment.IEC 60364-7-710, IEEE Std 1100
Enclosure / PanelAppropriate enclosure for the isolation transformer and associated protective devices, providing IP rating as required for the environment.IEC 60529, UL 50
Testing and Commissioning ReportDocument detailing all tests performed (e.g., insulation resistance, impedance, load testing) and confirmation of system compliance.IEC 60364-7-710, manufacturer's guidelines
As-Built DrawingsUpdated electrical drawings reflecting the installed isolation transformer system.Industry best practices, facility standards
User Manual and Training MaterialDocumentation covering operation, maintenance, and troubleshooting of the isolation transformer system, along with user training.Manufacturer's specifications, facility training protocols

Key Service Components

  • Site assessment and planning for isolation transformer installation.
  • Procurement and delivery of specified isolation transformers and associated hardware.
  • Installation of isolation transformers, including mounting, wiring, and grounding.
  • Connection to existing power distribution systems and integration with OT/ICU electrical infrastructure.
  • Configuration and testing of the isolation transformer system, including insulation monitoring.
  • Commissioning and handover of the operational system.
  • Provision of comprehensive documentation and training.

Service Level Agreement For Isolation Transformer Setup Service (Ot/icu)

This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Isolation Transformer Setup Service (OT/ICU). The purpose of this service is to ensure that isolation transformers are correctly installed, configured, and maintained to provide reliable and safe power for critical medical environments like Operating Rooms (OR) and Intensive Care Units (ICU).

Service TypeIncident PriorityResponse Time GuaranteeResolution Time Guarantee (for critical incidents)Uptime Guarantee (Monthly)
Isolation Transformer Setup Service (OT/ICU)Critical (System Failure, Power Outage)15 minutes (acknowledgement)4 hours (full restoration)99.9%
Isolation Transformer Setup Service (OT/ICU)High (Performance Degradation, Partial Failure)1 hour (acknowledgement)8 business hours (resolution)99.9%
Isolation Transformer Setup Service (OT/ICU)Medium (Non-critical alerts, Minor configuration issues)4 business hours (acknowledgement)24 business hours (resolution)N/A (Non-impact on uptime)
Isolation Transformer Setup Service (OT/ICU)Low (Information requests, Routine checks)1 business day (acknowledgement)As agreed upon (resolution)N/A (Non-impact on uptime)

Key Performance Indicators (KPIs)

  • Response Time to Critical Incidents: The maximum time allowed for our technical team to acknowledge and begin addressing a reported critical issue.
  • Resolution Time for Critical Incidents: The maximum time allowed to restore the isolation transformer system to full operational status for critical incidents.
  • Uptime Guarantee: The minimum percentage of time the isolation transformer system is expected to be operational and functional.
  • Scheduled Maintenance Window: Pre-defined periods for planned maintenance activities, designed to minimize disruption.
In-Depth Guidance