Major Preventive Overhaul Service (Planned Overhaul) in Burkina Faso
Engineering Excellence & Technical Support
Major Preventive Overhaul Service (Planned Overhaul) High-standard technical execution following OEM protocols and local regulatory frameworks.
Proactive Component Renewal
Maximizing asset lifespan through comprehensive, scheduled replacement of critical wear parts, preventing unexpected failures and costly emergency repairs in remote Burkina Faso locations.
Optimized Operational Efficiency
Restoring equipment to peak performance levels via meticulous inspection and refurbishment, significantly reducing energy consumption and increasing throughput for mining and agricultural operations.
Enhanced Safety & Reliability Assurance
Implementing rigorous adherence to international overhaul standards, guaranteeing the safe operation of heavy machinery and mitigating risks for personnel and production continuity in challenging environments.
What Is Major Preventive Overhaul Service (Planned Overhaul) In Burkina Faso?
A Major Preventive Overhaul Service, often referred to as a Planned Overhaul, is a comprehensive, scheduled maintenance procedure designed to restore equipment or a system to a near-new operational state. This proactive intervention aims to prevent catastrophic failures, extend asset lifespan, improve reliability, and optimize performance through systematic inspection, repair, and replacement of worn or obsolete components. In Burkina Faso, this service is crucial for industries reliant on heavy machinery, critical infrastructure, and production lines where unplanned downtime incurs significant economic and operational losses. The scope typically encompasses disassembling the equipment, detailed inspection of all parts, component testing, repair or replacement of worn elements, recalibration, reassembly, and rigorous performance testing to ensure adherence to original specifications and safety standards. The objective is to address potential issues before they manifest as failures, thereby minimizing unscheduled interruptions and associated costs.
| Beneficiary Sector | Equipment/System Type | Typical Use Case Scenario | Rationale for Overhaul |
|---|---|---|---|
| Mining and Extractive Industries | Heavy-duty mining equipment (e.g., excavators, haul trucks, crushing plants) | Scheduled shutdown of a production line for a multi-week overhaul of a fleet of haul trucks before the start of a new extraction phase. | To ensure high availability and prevent costly breakdowns in remote operational sites, maintaining production targets. |
| Agriculture | Tractors, combine harvesters, irrigation pumps | Post-harvest overhaul of agricultural machinery to ensure readiness for the next planting season. | To maximize crop yields by preventing equipment failure during critical agricultural periods and extending the operational life of valuable assets. |
| Infrastructure and Public Works | Construction machinery (e.g., bulldozers, cranes), water treatment plant equipment | Planned overhaul of pumps and filtration systems in a municipal water treatment facility during a period of lower demand. | To guarantee consistent and safe water supply, prevent service interruptions, and comply with public health regulations. |
| Energy and Utilities | Generators, turbines, electrical distribution equipment | Scheduled overhaul of a diesel generator set at a remote power station before the onset of a high-demand season. | To ensure reliable electricity generation and prevent blackouts, especially in regions with limited grid stability. |
| Manufacturing and Industrial Processes | Production line machinery, industrial furnaces, specialized processing equipment | A planned overhaul of a critical section of a cement production line to upgrade worn components and improve energy efficiency. | To maintain product quality, increase production output, reduce operational costs, and minimize unplanned stoppages on a continuous production cycle. |
Key Components of a Major Preventive Overhaul Service
- Comprehensive Disassembly: Complete dismantling of the equipment or system to facilitate access to all internal components.
- Detailed Inspection: Visual and non-destructive testing (NDT) of all parts to identify wear, damage, cracks, or signs of fatigue.
- Component Assessment and Testing: Functional and performance testing of critical components (e.g., engines, pumps, electrical systems, hydraulic assemblies).
- Repair and Refurbishment: Restoration of worn or damaged components through welding, machining, or other repair techniques.
- Component Replacement: Substitution of parts that have reached their service life, are excessively worn, or are deemed obsolete with genuine or equivalent new parts.
- Cleaning and Lubrication: Thorough cleaning of all components and application of appropriate lubrication to reduce friction and wear.
- Recalibration and Adjustment: Precise adjustment of sensors, control systems, and mechanical linkages to meet original operating parameters.
- Reassembly: Careful and systematic reassembly of the equipment according to manufacturer specifications and maintenance manuals.
- Performance Testing and Validation: Post-overhaul testing to verify operational efficiency, output, safety, and compliance with performance benchmarks.
- Documentation and Reporting: Detailed record-keeping of all activities performed, parts replaced, and test results for future reference and asset management.
Who Needs Major Preventive Overhaul Service (Planned Overhaul) In Burkina Faso?
Major Preventive Overhaul Service (Planned Overhaul) in Burkina Faso is a critical maintenance strategy aimed at ensuring the long-term reliability, efficiency, and safety of high-value industrial assets. This service involves a comprehensive, scheduled dismantling, inspection, repair, and replacement of worn components to prevent catastrophic failures and optimize operational performance. The target customers are typically organizations that rely heavily on their machinery and infrastructure for their core business operations and where downtime can lead to significant financial losses, safety hazards, or disruptions to essential services. This proactive approach is particularly relevant in sectors with demanding operating conditions or where equipment operates under continuous load.
| Industry/Sector | Primary Assets Requiring Overhaul | Impact of Failure | Key Departments Involved |
|---|---|---|---|
| Mining | Crushers, conveyors, excavators, haul trucks, processing equipment (e.g., mills, flotation cells) | Production stoppages, significant financial losses, safety risks, environmental damage | Maintenance, Operations, Engineering, Procurement |
| Energy Generation | Turbines, generators, boilers, transformers, pumps, control systems | Power outages, economic disruption, grid instability, safety hazards | Maintenance, Operations, Engineering, Asset Management |
| Agribusiness/Food Processing | Processing machinery (e.g., threshers, hullers, mills, extruders), packaging lines, refrigeration systems | Loss of perishable goods, reduced processing capacity, brand reputation damage | Maintenance, Operations, Engineering, Procurement |
| Manufacturing | Production lines, machinery (e.g., lathes, presses, assembly equipment), material handling systems | Production delays, quality defects, increased waste, financial losses | Maintenance, Operations, Engineering, Production Management |
| Transportation (Infrastructure) | Airport ground support equipment, railway signaling systems, port loading equipment (if applicable) | Disruption of travel and trade, economic impact, safety concerns | Maintenance, Operations, Engineering, Asset Management |
| Water & Wastewater | Pumps, filtration systems, aeration equipment, control panels, pipelines | Disruption of essential services, public health risks, environmental pollution | Maintenance, Operations, Engineering, Public Works Department |
| Construction | Heavy construction machinery (e.g., cranes, excavators, dozers), concrete batching plants | Project delays, cost overruns, safety incidents, equipment damage | Maintenance, Operations, Site Management, Procurement |
Target Customers and Departments for Major Preventive Overhaul Service in Burkina Faso
- {"items":["Mining and Extractive Industries","Energy and Power Generation","Agribusiness and Food Processing","Manufacturing and Heavy Industry","Transportation and Logistics (Infrastructure Maintenance)","Water and Wastewater Treatment","Construction and Infrastructure Development"],"title":"Key Industries"}
- {"items":["Large-scale mining companies operating gold, manganese, or other mineral extraction sites.","National and private electricity generation companies (thermal, hydro, or solar power plants).","Large agricultural processing plants (e.g., cotton ginning, shea butter processing, grain milling).","Industrial manufacturers producing goods such as cement, textiles, or processed foods.","Operators of critical transportation infrastructure like airports, ports (if applicable), and major rail networks.","Public utilities responsible for water supply and sanitation.","Major construction firms involved in large infrastructure projects."],"title":"Specific Target Organizations"}
- {"items":["Maintenance Department","Operations Department","Engineering Department","Asset Management Department","Procurement/Purchasing Department","Safety, Health, and Environment (SHE) Department"],"title":"Key Departments Within Target Organizations"}
Major Preventive Overhaul Service (Planned Overhaul) Process In Burkina Faso
This document outlines the typical workflow for a Major Preventive Overhaul Service (Planned Overhaul) for industrial equipment or infrastructure in Burkina Faso. This process emphasizes meticulous planning, adherence to safety protocols, and thorough execution to ensure maximum uptime and longevity of assets. The workflow spans from initial client inquiry to the final handover and documentation.
| Stage | Description | Key Activities | Responsible Parties | Burkina Faso Specific Considerations |
|---|---|---|---|---|
| Initial Inquiry and Scope Definition | The client contacts the service provider to request a major overhaul for specific equipment or assets. This stage involves understanding the client's needs and the general scope of work. | Receive client request, initial discussion of equipment/asset, preliminary identification of overhaul needs. | Client, Service Provider (Sales/Technical Team) | Language barriers (French may be primary), potential cultural nuances in communication, understanding local operational context. |
| Detailed Site Assessment and Planning | A comprehensive assessment of the equipment/asset and its operating environment is conducted. This leads to a detailed plan for the overhaul. | On-site inspection, condition assessment, identification of specific parts and materials needed, development of detailed work procedures, safety risk assessment, creation of a project timeline. | Service Provider (Engineers, Technicians), Client (Operations/Maintenance Personnel) | Accessibility of the site, local infrastructure for logistics, availability of local skilled labor, permit requirements, potential for local sourcing of materials/parts. |
| Quotation and Contract Negotiation | Based on the detailed plan, a formal quotation is prepared and submitted to the client. Contract terms are negotiated and finalized. | Cost estimation (labor, parts, equipment, logistics), proposal submission, negotiation of terms (payment, warranty, timeline), contract signing. | Service Provider (Commercial Team), Client (Procurement/Management) | Payment terms, currency fluctuations, potential import duties and taxes on specialized parts, local legal and contractual frameworks. |
| Pre-Overhaul Preparations | All necessary resources, materials, and personnel are mobilized and prepared before commencing the on-site work. | Procurement of parts and materials, mobilization of specialized equipment and tools, team deployment and training (including safety briefing), site preparation (access, temporary facilities), obtaining necessary permits. | Service Provider (Logistics, Project Management, HR), Client (Site Access, Safety Coordination) | Import/export of specialized equipment and tools, customs clearance, visa requirements for expatriate staff, local transportation arrangements, availability of accommodation for the team. |
| Execution of Overhaul Activities | The core of the service where the actual dismantling, repair, replacement, and reassembly of the equipment/asset takes place. | Dismantling of components, cleaning, inspection of parts, repair or replacement of worn/defective parts, reassembly, lubrication, adherence to work procedures and safety protocols. | Service Provider (Technicians, Engineers, Supervisors), Client (Supervision, Safety Monitoring) | Strict adherence to safety regulations (local and international), management of waste and environmental impact, communication with local authorities if necessary, quality control checkpoints. |
| Testing and Commissioning | After the overhaul, the equipment/asset is tested to ensure it functions as per specifications and safety standards. | No-load testing, load testing, performance monitoring, calibration of instruments, verification of safety systems, functional checks. | Service Provider (Commissioning Engineers), Client (Operations Personnel) | Ensuring the grid stability for testing (if applicable), availability of necessary consumables for testing, proper documentation of test results. |
| Final Inspection and Handover | A final inspection is conducted by both the service provider and the client to verify the quality of work and confirm all contractual obligations are met. | Walkthrough inspection, review of test reports, addressing any punch list items, formal handover of the equipment/asset, client acceptance. | Service Provider (Project Manager), Client (Authorized Representatives) | Formal acceptance procedures, understanding of client's internal sign-off processes. |
| Post-Overhaul Reporting and Documentation | Comprehensive documentation of the entire overhaul process is compiled and submitted to the client. | Preparation of final report (including activities performed, parts replaced, test results, recommendations), provision of warranty documents, archiving of project data. | Service Provider (Project Management, Technical Writing) | Ensuring reports are in the required language (often French), understanding local record-keeping requirements. |
Key Stages of a Major Preventive Overhaul Service in Burkina Faso:
- Initial Inquiry and Scope Definition
- Detailed Site Assessment and Planning
- Quotation and Contract Negotiation
- Pre-Overhaul Preparations
- Execution of Overhaul Activities
- Testing and Commissioning
- Final Inspection and Handover
- Post-Overhaul Reporting and Documentation
Major Preventive Overhaul Service (Planned Overhaul) Cost In Burkina Faso
A Major Preventive Overhaul Service, often referred to as a planned overhaul, is a comprehensive maintenance procedure designed to extensively inspect, repair, and replace worn-out components in heavy machinery, vehicles, or industrial equipment. The cost of such a service in Burkina Faso can vary significantly due to several factors. These include the type and complexity of the equipment being serviced, the extent of the overhaul required (e.g., minor vs. major overhaul), the availability and cost of specialized parts, the labor rates of qualified technicians, and the geographic location within Burkina Faso where the service is performed. Fluctuations in the CFA Franc exchange rate and the sourcing of parts (local vs. imported) also play a crucial role in the final pricing. For major overhauls, expect a substantial investment due to the depth of work involved, which can range from complete engine rebuilds to extensive hydraulic system overhauls and structural repairs.
| Service Type/Equipment Category | Estimated Cost Range (CFA Francs) | Notes |
|---|---|---|
| Heavy-Duty Truck (e.g., Dump Truck, Cargo Truck) | 1,500,000 - 8,000,000 CFA | Includes engine, transmission, brakes, suspension overhaul. Costs vary greatly with truck size and complexity. |
| Construction Equipment (e.g., Excavator, Loader, Dozer) | 2,000,000 - 15,000,000+ CFA | Major component overhauls (engine, hydraulics, undercarriage). Larger, specialized machines will be at the higher end. |
| Agricultural Machinery (e.g., Tractor, Harvester) | 800,000 - 5,000,000 CFA | Focus on engine, transmission, and PTO systems. Larger harvesters will be more expensive. |
| Industrial Generators (Medium to Large Capacity) | 1,000,000 - 7,000,000 CFA | Engine overhaul, cooling system, fuel system, and electrical controls. Capacity is a major driver. |
| Mining Equipment (Specialized Heavy Machinery) | 5,000,000 - 30,000,000+ CFA | Highly specialized, often requiring imported parts and expert technicians. Can be significantly higher for very large equipment. |
| Fleet Maintenance Contracts (Annual Overhauls for multiple units) | Negotiable (per unit basis) | Often involves bulk discounts and tailored service plans. |
Key Pricing Factors for Major Preventive Overhaul Service in Burkina Faso
- Type and Size of Equipment (e.g., Mining excavator, large truck, industrial generator)
- Scope of Work (e.g., Engine, transmission, hydraulics, electrical systems, structural integrity)
- Age and Condition of Equipment
- Availability and Cost of Spare Parts (local vs. imported, OEM vs. aftermarket)
- Labor Rates for Skilled Technicians and Specialists
- Geographic Location within Burkina Faso (e.g., Ouagadougou vs. more remote regions)
- Brand and Manufacturer of the Equipment
- Diagnostic and Testing Requirements
- Downtime Costs (opportunity cost of equipment being out of service)
- Warranty on Parts and Labor
Affordable Major Preventive Overhaul Service (Planned Overhaul) Options
A major preventive overhaul service, often referred to as a planned overhaul, is a comprehensive maintenance procedure designed to restore critical equipment to near-new condition, preventing unexpected breakdowns and extending its operational lifespan. This type of service is crucial for high-value assets like industrial machinery, large vehicles, or complex systems. While it represents a significant upfront investment, a planned overhaul can yield substantial long-term cost savings by mitigating expensive emergency repairs, reducing downtime, and improving efficiency. This guide explores affordable options, value bundles, and cost-saving strategies for planned overhaul services.
| Strategy | Description | Cost-Saving Impact |
|---|---|---|
| Value Bundling | Combining multiple services (e.g., inspection, component replacement, calibration, testing) into a single package at a discounted rate. | Reduced overall service cost compared to individual service bookings. Streamlined logistics and scheduling. |
| Phased Overhauls | Breaking down the overhaul into smaller, manageable stages over time, aligning with budget cycles or operational needs. This can involve focusing on the most critical systems first. | Spreads the financial burden, making it more manageable. Allows for continuous operation with partial improvements. |
| Preventive Maintenance Program Integration | Integrating the planned overhaul into an existing, robust preventive maintenance (PM) program. PM tasks identify potential issues early, which can be addressed during the overhaul. | Reduces the scope of work needed during the overhaul, potentially lowering costs. Prevents minor issues from escalating into major problems. |
| Strategic Sourcing of Parts | Utilizing original equipment manufacturer (OEM) parts, high-quality aftermarket parts, or refurbished components based on cost-benefit analysis and risk assessment. | Significant savings can be achieved with approved aftermarket or refurbished parts where performance and reliability are not compromised. |
| Negotiating Service Agreements | Securing long-term service contracts or master service agreements (MSAs) with service providers, often with volume discounts or guaranteed service rates. | Locks in competitive pricing and can include additional benefits like priority scheduling or dedicated technical support. |
| In-House Expertise and Training | Investing in training internal maintenance staff to perform certain aspects of the overhaul or conduct detailed inspections, reducing reliance on external technicians for every task. | Reduces labor costs for tasks that can be safely and effectively handled internally. |
| Optimized Scheduling and Logistics | Carefully planning the overhaul during periods of low demand or planned downtime to minimize production losses. Efficient logistics for parts and personnel. | Reduces the economic impact of downtime. Efficient scheduling can lead to shorter service durations and lower labor costs. |
| Risk-Based Overhaul Planning | Prioritizing overhaul activities based on the criticality of components and their failure history. Focus on high-risk areas first. | Ensures resources are allocated to the most impactful areas, potentially preventing more costly failures and optimizing the overhaul scope. |
Key Benefits of Planned Overhauls
- Reduced Risk of Catastrophic Failure: Proactive identification and replacement of worn parts prevent major breakdowns.
- Extended Equipment Lifespan: Restoring components significantly increases the operational life of the asset.
- Improved Performance and Efficiency: Overhauled equipment often operates at peak efficiency, reducing energy consumption and improving output.
- Minimized Unplanned Downtime: Scheduled overhauls prevent costly production stoppages.
- Predictable Maintenance Costs: Planned overhauls allow for better budgeting and financial planning.
- Enhanced Safety: Worn or failing parts can pose safety risks; overhauls ensure components are in safe working order.
- Potential for Resale Value Increase: Well-maintained equipment with documented overhaul history commands a higher resale price.
Verified Providers In Burkina Faso
In Burkina Faso, ensuring access to reliable and qualified healthcare providers is paramount. Franance Health stands out as a leading platform for identifying and engaging verified healthcare professionals. Our rigorous credentialing process ensures that every provider listed on our platform meets the highest standards of education, licensure, and professional practice. This commitment to verification offers patients peace of mind, knowing they are receiving care from competent and trustworthy individuals. Choosing a verified provider through Franance Health signifies a commitment to quality, safety, and effective healthcare outcomes.
| Provider Type | Franance Health Verification Criteria | Benefits for Patients |
|---|---|---|
| Doctors (General Practitioners & Specialists) | Valid medical license, accredited degree, proof of residency/specialization, clean disciplinary record. | Accurate diagnosis, effective treatment plans, access to specialized care, trust in medical expertise. |
| Nurses (Registered & Practical) | Valid nursing license, relevant educational qualifications, practical experience verification, adherence to nursing codes of conduct. | Compassionate care, skilled assistance with medical procedures, patient education, post-treatment support. |
| Pharmacists | Registered pharmacist license, accredited pharmacy degree, understanding of drug interactions and dispensing regulations. | Safe medication dispensing, expert advice on prescriptions, proper drug management, accessibility to essential medicines. |
| Medical Technicians (Lab, Radiology, etc.) | Certification or license in their specific field, evidence of training and competency in diagnostic procedures. | Accurate and reliable diagnostic results, timely access to essential tests, support for medical diagnoses. |
Why Franance Health Verified Providers in Burkina Faso are the Best Choice:
- Rigorous Credential Verification: We meticulously check qualifications, licenses, and certifications.
- Commitment to Patient Safety: Verified providers adhere to strict ethical and professional standards.
- Improved Healthcare Access: Easily find trusted doctors, nurses, and specialists in your area.
- Enhanced Patient Confidence: Know you are receiving care from qualified and reputable professionals.
- Focus on Quality Outcomes: Verified providers are dedicated to delivering effective and evidence-based treatments.
- Streamlined Healthcare Journey: Our platform simplifies the process of finding and booking appointments with the right healthcare professionals.
Scope Of Work For Major Preventive Overhaul Service (Planned Overhaul)
This Scope of Work (SOW) outlines the requirements for a Major Preventive Overhaul Service (Planned Overhaul) for [Specify Equipment/Asset Name/Identifier]. The objective is to restore the equipment to optimal operational condition, minimize downtime, enhance reliability, and extend its service life. This SOW details the technical deliverables and standard specifications to be adhered to by the Service Provider. The overhaul will be conducted according to industry best practices and manufacturer recommendations.
| Deliverable | Description | Standard Specification / Acceptance Criteria |
|---|---|---|
| Overhaul Plan | Detailed plan outlining all tasks, schedule, resource allocation, safety procedures, and contingency plans. | Approved by [Client Representative Name/Department]. Includes detailed work breakdown structure, critical path analysis, and estimated duration for each phase. Must align with manufacturer's recommendations and site-specific safety regulations. |
| Detailed Inspection Report | Comprehensive report of all dismantled components, including visual inspection findings, measurements, non-destructive testing (NDT) results, and identification of wear, damage, or degradation. | Includes photographic evidence, detailed measurements against original specifications, and clear classification of component condition (e.g., serviceable, repairable, scrap). NDT methods (e.g., MT, PT, UT) to be performed by certified personnel according to relevant ISO/ASTM standards. |
| Repair/Refurbishment/Replacement Records | Documentation of all repair, refurbishment, or replacement activities performed on components. Includes material certifications, welding procedures, and dimensional verification. | For repairs/refurbishments, details of processes used and materials. For replacements, original equipment manufacturer (OEM) part numbers and serial numbers, or approved equivalents with justification. All work to comply with relevant ASME, API, or equivalent codes and standards. |
| Reassembly and Lubrication Procedures | Documented procedures for reassembly, including torque specifications, fastener tightening sequences, and lubrication requirements. | Follows manufacturer's service manual. All lubricants and sealants to be specified by OEM or approved equivalent. Proper cleaning and sealing of all passages and joints. |
| Performance Test Reports | Reports detailing results of functional, performance, and load tests conducted after reassembly. | Tests to include static and dynamic checks, operational parameters (e.g., speed, pressure, temperature, vibration), and efficiency measurements against baseline or specified performance criteria. Minimum acceptable performance levels defined in [Specific Performance Document/Appendix]. |
| Vibration Analysis Report | Analysis of vibration levels before, during, and after the overhaul to identify any imbalances, misalignments, or bearing issues. | Performed using calibrated equipment. Results compared against ISO 10816 standards or OEM recommendations. Reports to include spectrum analysis and diagnostic commentary. |
| Final Handover Report | Comprehensive report summarizing all work performed, including completed work orders, inspection findings, test results, spare parts list, and recommendations for future maintenance. | Includes updated equipment history file, warranty information for replaced parts, and any deviations from the original plan with explanations and approvals. Signed off by both Service Provider and Client Representative. |
| Spare Parts List | List of all replaced components and any recommended spare parts for future maintenance. | Includes OEM part numbers, quantities, and supplier information. For critical spares, recommendations for stock levels and lead times. |
| Safety and Environmental Compliance Records | Records of all safety permits, risk assessments, incident reports (if any), and waste disposal manifests. | Demonstrates compliance with all site-specific and regulatory safety and environmental standards. Includes permits to work, lockout/tagout procedures, and hazardous waste handling documentation. |
Key Stages and Activities
- Pre-Overhaul Planning and Preparation
- Dismantling and Inspection
- Component Repair, Refurbishment, or Replacement
- Reassembly and Alignment
- Testing and Commissioning
- Documentation and Handover
Service Level Agreement For Major Preventive Overhaul Service (Planned Overhaul)
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Major Preventive Overhaul Service (Planned Overhaul) provided by [Your Company Name] to [Client Company Name]. This SLA is an integral part of the overarching service agreement and specifies the performance standards expected during the execution of planned overhaul activities.
| Service Component | Description | Response Time Target | Uptime Guarantee (Post-Overhaul) |
|---|---|---|---|
| Initial Overhaul Planning & Scheduling | Coordination and agreement on overhaul scope, timeline, and resources. | 48 business hours for initial proposal submission post-site assessment. | N/A |
| Pre-Overhaul Notification | Advance notice of scheduled overhaul dates and potential impact. | 7 days prior to commencement. | N/A |
| On-Site Technician Availability (During Overhaul) | Availability of qualified technicians at the client's site as per the agreed schedule. | Technicians on-site as scheduled. Emergency on-site dispatch for critical issues during scheduled hours: 2 hours. | N/A |
| Escalation of Overhaul-Related Issues | Reporting and addressing unforeseen issues that arise during the overhaul. | Acknowledgement: 1 hour. Resolution Target: Dependent on issue complexity, to be defined during planning phase. | N/A |
| Post-Overhaul System Verification & Testing | Confirmation of successful overhaul completion and system functionality. | Completed within 24 hours of physical overhaul completion. | N/A |
| Critical System Uptime (Immediately Post-Overhaul) | Guaranteed availability of the primary functional system after successful completion of the overhaul. | N/A | 99.5% during the first 72 hours post-overhaul completion. |
| Overall System Uptime (During Overhaul Period) | Availability of the system during the period of the planned overhaul (acknowledging planned downtime). | N/A | N/A (downtime is pre-defined and agreed upon in the overhaul schedule). |
| Post-Overhaul Support (Minor Issues) | Support for minor adjustments or questions arising in the week following the overhaul. | Acknowledgement: 4 business hours. Resolution: 8 business hours. | N/A |
Key Service Objectives
- Ensure minimal disruption to client operations during planned overhauls.
- Maintain high availability of critical systems post-overhaul.
- Provide timely and effective support during the overhaul process.
- Facilitate efficient and predictable completion of overhaul tasks.
Frequently Asked Questions

Ready when you are
Let's scope your Major Preventive Overhaul Service (Planned Overhaul) in Burkina Faso project in Burkina Faso.
Scaling healthcare logistics and technical systems across the entire continent.