
PSA Oxygen Plant Installation Service in Burkina Faso
Engineering Excellence & Technical Support
PSA Oxygen Plant Installation Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Critical Oxygen Supply Reliability
Ensuring uninterrupted, high-purity oxygen vital for medical facilities, industrial processes, and emergency response in remote and challenging regions of Burkina Faso. Our expert installation guarantees peak performance and minimal downtime.
Robust Plant Engineering & Commissioning
We meticulously engineer and commission PSA oxygen plants tailored to the specific environmental conditions and power infrastructure of Burkina Faso, guaranteeing efficient operation and longevity through rigorous testing and validation.
Local Expertise & Rapid Deployment
Leveraging extensive experience in African infrastructure projects, our dedicated teams provide swift on-site installation and commissioning, minimizing project timelines and ensuring a seamless transition to self-sufficient oxygen production for vital needs across Burkina Faso.
What Is Psa Oxygen Plant Installation Service In Burkina Faso?
PSA (Pressure Swing Adsorption) oxygen plant installation service in Burkina Faso refers to the comprehensive process of designing, procuring, assembling, commissioning, and integrating an on-site PSA oxygen generation system within a facility in Burkina Faso. This service ensures a reliable, cost-effective, and self-sufficient supply of medical-grade or industrial-grade oxygen, eliminating reliance on external cylinders or liquid oxygen deliveries. The core technology involves using adsorbent materials (typically zeolites) that selectively adsorb nitrogen from ambient air under pressure, allowing oxygen to pass through. When the pressure is reduced, the nitrogen is desorbed and vented, regenerating the adsorbent for the next cycle.
| Who Needs PSA Oxygen Plant Installation Service? | Typical Use Cases | |||
|---|---|---|---|---|
| Hospitals and Healthcare Facilities: To guarantee a continuous and sufficient supply of medical oxygen for patient care, especially in remote areas or during emergencies where supply chain disruptions are a concern. | Surgical Operations: Providing oxygen for anesthesia and respiratory support during procedures. | Intensive Care Units (ICUs) and Emergency Rooms: Meeting the high and often variable demand for supplemental oxygen. | COVID-19 Response and Future Pandemic Preparedness: Ensuring readily available oxygen capacity. | |
| Industrial Manufacturing: For processes requiring oxygen as a reactant or for combustion enhancement. | Welding and Cutting Operations: Supplying oxygen for high-temperature metal fabrication. | Water and Wastewater Treatment: For advanced oxidation processes. | Chemical Processing: As an oxidant in various chemical syntheses. | Aquaculture: To enhance dissolved oxygen levels in fish farms, improving growth rates and survival. |
| Mining Operations: For specific processes requiring oxygen enrichment. | Research and Development Laboratories: For controlled atmospheric conditions in experiments. | Remote Communities and Clinics: Addressing the challenge of accessing reliable medical oxygen supplies in geographically isolated regions. |
Key Aspects of PSA Oxygen Plant Installation Service:
- Site Assessment and Feasibility Study: Evaluating the existing infrastructure, power availability, ambient conditions, and specific oxygen demand requirements of the facility.
- System Design and Engineering: Tailoring the PSA unit's capacity, purity, and configuration to meet the client's precise needs, adhering to relevant international and local standards (e.g., medical oxygen purity standards).
- Procurement and Logistics: Sourcing and transporting all necessary components, including the PSA generator, air compressors, dryers, filters, storage tanks, and instrumentation, to the installation site in Burkina Faso.
- Mechanical and Electrical Installation: Rigorous assembly of all plant components, ensuring proper pipework, electrical connections, and structural integrity according to engineering drawings and safety protocols.
- Commissioning and Performance Testing: Thoroughly testing the installed plant to verify oxygen purity, flow rate, pressure, and overall operational efficiency against design specifications.
- Operator Training: Providing comprehensive training to the facility's personnel on the operation, routine maintenance, and troubleshooting of the PSA oxygen generation system.
- Post-Installation Support and Maintenance: Offering ongoing technical support, spare parts supply, and scheduled maintenance services to ensure sustained optimal performance and longevity of the plant.
- Compliance and Certification: Ensuring the installation meets all relevant regulatory requirements and obtaining necessary certifications for operation, particularly for medical facilities.
Who Needs Psa Oxygen Plant Installation Service In Burkina Faso?
A PSA (Pressure Swing Adsorption) oxygen plant installation service is crucial for organizations and facilities requiring a consistent, on-site supply of medical-grade or industrial-grade oxygen. This technology offers independence from external oxygen cylinder delivery, leading to cost savings, improved reliability, and enhanced safety. In Burkina Faso, the demand for such services is driven by the critical need for oxygen in various sectors, particularly healthcare.
| Customer Segment | Key Departments/Areas of Need | Specific Requirements/Benefits |
|---|---|---|
| Hospitals and Clinics (Public & Private) | Intensive Care Units (ICU), Operating Theaters, Emergency Rooms, Respiratory Therapy Departments, General Wards | Reliable and continuous oxygen supply for patient care, reduced reliance on expensive and logistically challenging cylinder deliveries, improved patient outcomes, cost-efficiency, potential for oxygen generation for nebulizers and ventilators. |
| Health Centers and Dispensaries | Maternity Wards, Minor Surgery Units, General Patient Care | Access to essential medical oxygen in remote or underserved areas, improved capacity to handle respiratory distress cases, cost savings compared to cylinder transport. |
| Mining and Metallurgy Industries | Smelting, Welding, Cutting, Metal Fabrication, Chemical Processes | On-demand oxygen for industrial processes, improved productivity, safety enhancements through localized oxygen supply, reduced operational costs. |
| Food and Beverage Industry | Modified Atmosphere Packaging (MAP), Fermentation Processes, Inerting | High-purity oxygen for food preservation and extending shelf life, controlled fermentation for beverage production, enhanced product quality and safety. |
| Research Laboratories and Universities | Biotechnology Research, Medical Research, Chemistry Labs, Industrial Training Centers | Consistent and customizable oxygen concentrations for experiments, specialized gas mixtures, educational purposes, support for advanced research projects. |
| Emergency Medical Services (EMS) | Ambulance Services, First Responders | On-board oxygen generation for critical patients during transport, ensuring immediate availability of life-saving gas in emergency situations. |
| Non-Governmental Organizations (NGOs) and Humanitarian Aid Organizations | Mobile Clinics, Disaster Relief Operations, Health Programs in remote regions | Sustainable oxygen solutions for areas lacking infrastructure for cylinder supply, enabling critical medical interventions during crises and humanitarian efforts. |
Target Customers and Departments for PSA Oxygen Plant Installation Services in Burkina Faso
- Healthcare Facilities
- Industrial Operations
- Research and Educational Institutions
- Emergency Services and Disaster Relief Organizations
Psa Oxygen Plant Installation Service Process In Burkina Faso
This document outlines the standard workflow for PSA Oxygen Plant Installation Service in Burkina Faso, from the initial customer inquiry to the successful execution and handover of the plant. The process is designed to ensure clarity, efficiency, and successful project completion, adhering to local regulations and international standards.
| Phase | Key Activities | Deliverables/Outcomes | Responsible Parties | Timeline (Estimated) |
|---|---|---|---|---|
| 1. Inquiry & Pre-Qualification | Initial contact from client, clarification of needs, preliminary understanding of project scope, client's financial and technical capability assessment. | Acknowledgement of inquiry, preliminary project scope document, client pre-qualification report. | Client, Service Provider Sales & Technical Teams. | 1-2 Weeks |
| 2. Site Assessment & Technical Proposal | Detailed site visit, assessment of space, utilities (power, water), environmental conditions, local regulations. Development of a tailored technical solution and cost estimate. | Site assessment report, detailed technical proposal, preliminary bill of materials, budget proposal. | Service Provider Technical Team, Site Engineers, Client Representatives. | 2-4 Weeks |
| 3. Contract Negotiation & Signing | Discussion and finalization of contract terms, pricing, payment schedule, scope of work, warranty, and responsibilities. Formal contract signing. | Signed contract agreement, payment milestones defined. | Client, Service Provider Management & Legal Teams. | 1-3 Weeks |
| 4. Design & Engineering | Detailed engineering design of the PSA oxygen plant, including P&IDs, electrical schematics, civil works design, and safety features. Compliance with international and local standards. | Approved engineering drawings and documents, manufacturing specifications. | Service Provider Engineering Team, Client for approvals. | 4-8 Weeks |
| 5. Procurement & Logistics | Sourcing of raw materials, components, and equipment. Planning and management of logistics for international and domestic transportation. | Procured components, logistics plan, import/export documentation. | Service Provider Procurement & Logistics Teams, Suppliers. | 8-16 Weeks (concurrent with fabrication) |
| 6. Plant Fabrication & Pre-Assembly | Manufacturing of PSA modules, skids, and associated equipment. Partial or full pre-assembly in a controlled environment to facilitate on-site installation. | Fabricated plant components, pre-assembled skids, quality control reports. | Service Provider Manufacturing & QC Teams. | 12-20 Weeks |
| 7. Site Preparation | Construction of foundations, installation of utility connections (power, water), erection of supporting structures, and preparation of the installation area as per engineering drawings. | Prepared installation site, utility connections ready, civil works completed. | Client (for civil works often), Service Provider Site Management Team. | 4-8 Weeks (can overlap with fabrication) |
| 8. Transportation & Delivery | Safe and efficient transportation of all fabricated components and equipment from the fabrication facility to the project site in Burkina Faso. | Delivered plant components at the site, customs clearance. | Service Provider Logistics Team, Freight Forwarders, Client. | 2-4 Weeks (depending on origin) |
| 9. Installation & Erection | On-site assembly and erection of the PSA oxygen plant. Connection of all modules, piping, electrical systems, and instrumentation. | Physically installed PSA oxygen plant, connected systems. | Service Provider Installation Team, Site Engineers, Technicians. | 4-6 Weeks |
| 10. Commissioning & Testing | Systematic startup of the plant, functional testing of all components, performance verification, and safety checks. Fine-tuning for optimal performance. | Successfully commissioned plant, performance test reports, safety certificates. | Service Provider Commissioning Engineers, Technicians, Client Representatives. | 2-4 Weeks |
| 11. Training & Handover | Comprehensive training for client's personnel on plant operation, maintenance, troubleshooting, and safety procedures. Formal handover of the plant and documentation. | Trained personnel, operation & maintenance manuals, spare parts list, warranty certificates, official handover document. | Service Provider Training Team, Client's Operations & Maintenance Staff. | 1 Week |
| 12. Post-Installation Support & Warranty | Provision of ongoing technical support, routine maintenance, spare parts supply, and warranty services as per the contract. Remote monitoring and troubleshooting. | Ongoing technical support, resolved issues, maintained plant performance. | Service Provider After-Sales Service Team, Client's Maintenance Department. | Ongoing (Warranty Period: typically 12-24 months) |
PSA Oxygen Plant Installation Service Process Workflow in Burkina Faso
- Phase 1: Inquiry & Pre-Qualification
- Phase 2: Site Assessment & Technical Proposal
- Phase 3: Contract Negotiation & Signing
- Phase 4: Design & Engineering
- Phase 5: Procurement & Logistics
- Phase 6: Plant Fabrication & Pre-Assembly
- Phase 7: Site Preparation
- Phase 8: Transportation & Delivery
- Phase 9: Installation & Erection
- Phase 10: Commissioning & Testing
- Phase 11: Training & Handover
- Phase 12: Post-Installation Support & Warranty
Psa Oxygen Plant Installation Service Cost In Burkina Faso
The installation cost of a PSA (Pressure Swing Adsorption) oxygen plant in Burkina Faso is a complex figure influenced by numerous factors. These factors can significantly alter the overall price, making it crucial for potential buyers to understand them thoroughly to budget effectively and negotiate fair pricing. The cost is typically presented in Burkina Faso's local currency, the West African CFA franc (XOF). It's important to note that these are estimates, and actual costs can vary based on specific project requirements, supplier quotes, and market conditions.
| Capacity (m³/hr) | Estimated Cost Range (XOF) | Typical Application |
|---|---|---|
| 0.5 - 2 | 1,500,000 - 7,000,000 | Small clinics, laboratories, individual welding operations |
| 2 - 5 | 7,000,000 - 20,000,000 | Medium-sized hospitals, larger workshops, small-scale industrial processes |
| 5 - 10 | 20,000,000 - 50,000,000 | Regional hospitals, significant industrial applications (e.g., metal fabrication, glass manufacturing) |
| 10+ | 50,000,000+ | Large industrial complexes, major medical centers, mining operations |
Key Pricing Factors for PSA Oxygen Plant Installation in Burkina Faso
- Plant Capacity (m³/hr): This is the most significant determinant of cost. Larger capacity plants require more sophisticated and larger equipment, leading to higher purchase and installation expenses. Costs can range from a few million XOF for smaller, modular units to tens or even hundreds of millions for large industrial-scale plants.
- Oxygen Purity Requirements: Higher purity oxygen (e.g., medical grade >95% or industrial grade >99%) necessitates more advanced PSA technology, including specialized adsorbent materials and potentially additional purification stages, thus increasing the overall cost.
- Technology and Manufacturer: Different PSA technologies (e.g., single-bed, twin-bed, multi-bed) and manufacturers have varying price points. Renowned international brands may command premium prices due to their reputation for quality, reliability, and after-sales service, while local or regional suppliers might offer more competitive pricing.
- Scope of Installation Services: This includes the extent of site preparation, foundation work, electrical connections, piping, control system integration, commissioning, and operator training. A comprehensive 'turnkey' solution will naturally be more expensive than a basic installation.
- Site Accessibility and Logistics: The cost of transporting the plant components to the installation site in Burkina Faso can be substantial, especially if the location is remote or has poor infrastructure. This includes shipping, customs duties, and local transportation.
- Environmental Conditions: Extreme temperatures, high humidity, or dusty environments might require specialized enclosures, enhanced cooling systems, or more robust filtration, adding to the installation cost.
- Ancillary Equipment: The need for supplementary equipment such as air compressors, air dryers, oxygen storage tanks, buffer tanks, oxygen analyzers, and backup systems will add to the total project cost.
- Local Labor and Expertise: While some specialized installation tasks might require expatriate technicians, the cost of local labor for civil works, assembly, and general support will be a factor. The availability of skilled local technicians can influence the price.
- Permits and Regulatory Compliance: Obtaining necessary permits and ensuring compliance with local building codes and safety regulations can incur administrative costs and potentially require specific modifications to the plant or installation process.
- Warranty and After-Sales Support: The length and scope of the warranty offered, as well as the availability and cost of ongoing maintenance and spare parts, are important considerations that can be factored into the initial installation pricing.
- Power Supply Reliability: In areas with unreliable power grids, the cost of backup generators and associated electrical infrastructure will increase the overall project expenses.
Affordable Psa Oxygen Plant Installation Service Options
Installing a PSA (Pressure Swing Adsorption) oxygen plant is a significant investment for healthcare facilities, industrial operations, and other organizations requiring a reliable on-site oxygen supply. Choosing the right installation service is crucial for ensuring a smooth, efficient, and cost-effective setup. This guide explores affordable PSA oxygen plant installation service options, focusing on understanding value bundles and implementing cost-saving strategies.
| Cost-Saving Strategy | Description | Potential Savings |
|---|---|---|
| Negotiate Bundle Discounts | Actively negotiate with installation providers for better pricing on value bundles. Highlight your budget constraints and explore if they can offer additional discounts for early commitment or bulk orders. | Can range from 5% to 15% or more on the total package. |
| Compare Multiple Quotes | Obtain detailed quotes from at least three reputable installation service providers. Ensure quotes are for comparable services and clearly outline what is included. | Helps identify the most competitive pricing and best value for money. |
| Phased Installation Options | Discuss with the provider if a phased installation is feasible. For instance, basic installation first, followed by training and extended support at a later stage, if budget is a primary concern. | Allows for better cash flow management and spreading costs. |
| Leverage Manufacturer Rebates/Promotions | Inquire about any manufacturer-backed installation rebates, promotions, or partnerships that your chosen installer might be able to pass on. | Can lead to immediate upfront savings. |
| In-House Training Contribution | If your facility has skilled personnel, explore if a portion of the operator training can be conducted internally with the provider offering guidance, potentially reducing the dedicated training hours billed. | Can reduce the cost of training services. |
| Long-Term Maintenance Contracts | While an upfront cost, a well-structured long-term maintenance contract bundled with installation can sometimes offer better value and predictable operational costs over the plant's lifespan. | May offer discounts compared to ad-hoc maintenance contracts. |
| Off-Peak Installation Scheduling | If your operational schedule allows, inquire if installation providers offer discounts for scheduling during less busy periods or on specific days. | May result in a small percentage discount on labor costs. |
| DIY Site Preparation (where applicable) | For certain aspects of site preparation (e.g., clearing the area, basic structural work if within your team's capabilities), discuss with the provider if any of these tasks can be completed by your staff to reduce their billable hours. | Reduces labor costs associated with site preparation. |
Understanding Value Bundles in PSA Oxygen Plant Installation
- {"title":"What are Value Bundles?","description":"Value bundles are packages of services and features offered by installation providers that go beyond basic installation. They are designed to offer a comprehensive solution, often at a more attractive price point than purchasing individual services separately. These bundles aim to maximize the value a client receives for their investment."}
- {"title":"Common Components of Value Bundles","description":"Value bundles for PSA oxygen plant installation typically include a combination of the following:"}
- {"title":"Basic Installation","description":"The core service, involving the physical setup, connection, and initial testing of the PSA oxygen plant according to manufacturer specifications and local regulations."}
- {"title":"Site Assessment and Planning","description":"Pre-installation evaluation of the site to determine optimal placement, assess structural requirements, and plan for utility connections (power, water, ventilation)."}
- {"title":"Commissioning and Startup","description":"Thorough testing of the plant's performance, calibration of systems, and initial operational startup to ensure it meets desired oxygen purity and flow rates."}
- {"title":"Operator Training","description":"Comprehensive training for facility staff on the operation, routine maintenance, and basic troubleshooting of the PSA oxygen plant."}
- {"title":"Warranty and Support","description":"Extended warranty periods and access to technical support for a specified duration post-installation."}
- {"title":"Spare Parts Kit","description":"A pre-selected kit of essential spare parts to minimize downtime in case of minor component failures."}
- {"title":"Documentation and Compliance","description":"Provision of all necessary documentation, including manuals, schematics, and certificates of compliance with relevant safety and environmental standards."}
- {"title":"Benefits of Value Bundles","description":"Opting for a value bundle can lead to:"}
- {"title":"Cost Savings","description":"Bundled services are often priced at a discount compared to individual service purchases."}
- {"title":"Streamlined Process","description":"A single point of contact and a coordinated approach from the provider simplify project management."}
- {"title":"Reduced Risk","description":"Comprehensive services ensure all aspects of installation are covered, minimizing potential issues and delays."}
- {"title":"Enhanced Operational Readiness","description":"Effective training and support ensure the plant is operated efficiently from day one."}
Verified Providers In Burkina Faso
In Burkina Faso, ensuring access to reliable and high-quality healthcare is paramount. Identifying verified providers is crucial for individuals seeking medical assistance. Franance Health stands out as a leading entity in this regard, offering a robust network of credentialed healthcare professionals. Their rigorous vetting process, combined with a commitment to patient well-being, positions them as the premier choice for healthcare services in the region. This document outlines the critical aspects of Franance Health's verification process and illuminates why it signifies the best choice for accessible and trustworthy medical care in Burkina Faso.
| Franance Health Verification Criteria | Description | Significance for Patients |
|---|---|---|
| Medical License Verification | Ensuring all listed providers hold valid and current medical licenses issued by the relevant Burkinabe authorities. | Guarantees that practitioners are legally authorized and have met the minimum educational and professional requirements. |
| Educational and Training Background Checks | Thorough review of degrees, certifications, and specialized training from accredited institutions. | Confirms that healthcare professionals possess the necessary expertise and have received appropriate training for their respective fields. |
| Professional Experience Assessment | Evaluation of previous work experience, including internships and residencies, to gauge practical skills and experience. | Indicates a provider's familiarity with common and complex medical scenarios, leading to more effective treatment. |
| Reputation and Performance Monitoring | Gathering feedback from patients and, where applicable, collaborating with medical boards for performance reviews. | Provides assurance of a provider's ethical conduct, patient-centered approach, and consistent delivery of quality care. |
| Specialty Certification Validation | Confirming that specialists possess recognized certifications in their area of expertise. | Ensures that patients are receiving care from appropriately qualified professionals for specific medical needs. |
Why Franance Health is the Best Choice for Verified Providers in Burkina Faso:
- Rigorous Credentialing and Verification Process
- Commitment to Patient Safety and Quality of Care
- Extensive Network of Specialized Healthcare Professionals
- Focus on Accessibility and Affordability
- Adherence to International Healthcare Standards
- Positive Patient Outcomes and Testimonials
- Continuous Professional Development and Training
Scope Of Work For Psa Oxygen Plant Installation Service
This Scope of Work (SOW) outlines the services required for the installation of a Pressure Swing Adsorption (PSA) Oxygen Plant. It details the technical deliverables and standard specifications to ensure a successful and compliant installation. The project encompasses all necessary activities from site preparation and equipment delivery to commissioning and final handover.
| Technical Deliverable | Description | Standard Specifications / Compliance |
|---|---|---|
| Site Survey and Layout Plan | Detailed site assessment, including foundation requirements, access, utilities, and generation of a comprehensive plant layout drawing. | Adherence to client-provided site drawings, relevant building codes, and safety regulations. Layout to ensure optimal accessibility for operation and maintenance. |
| Foundation Design and Construction | Design and construction of appropriate foundations for the PSA unit, air compressor, buffer vessels, and other heavy equipment. | Concrete strength as per engineering standards (e.g., ACI standards). Load-bearing capacity to withstand equipment weight and operational vibrations. Anti-corrosion treatment where applicable. |
| Equipment Installation | Unloading, positioning, and secure installation of all PSA module(s), air compressor, air dryer, buffer vessels, oxygen receiver, downstream piping, and ancillary equipment. | Manufacturer's installation guidelines, industry best practices for heavy equipment handling. Proper alignment and leveling of all rotating machinery. |
| Piping and Plumbing | Installation of all process, instrument, and utility piping, including air intake, compressed air, process air, oxygen product lines, vent lines, and drainage. | ASME B31.3 (Process Piping) or equivalent standards. Material of construction as per process design (e.g., Stainless Steel for oxygen lines, Carbon Steel for compressed air). Proper welding procedures and NDT as required. Leak testing of all joints. |
| Electrical Installation | Installation of power supply, motor control centers (MCCs), wiring, cable trays, grounding, and lighting for all equipment and control systems. | NEC (National Electrical Code) or local equivalent. IP ratings for enclosures suitable for the environment. Proper cable sizing and protection. Earthing and bonding in accordance with safety standards. |
| Instrumentation and Control System | Installation and wiring of all sensors (pressure, temperature, flow, oxygen purity), control valves, indicators, and the PLC/DCS system. Configuration of control logic. | ISA standards for instrumentation. Loop checking and functional testing of all instruments. PLC/DCS programming as per P&ID and control philosophy. Calibration of all instruments. |
| Insulation and Painting | Insulation of relevant piping and vessels (e.g., cold lines, hot air lines) and application of appropriate paint coatings for corrosion protection and identification. | As per client specifications and environmental requirements. Thermal insulation to meet energy efficiency targets. Paint systems conforming to relevant industry standards (e.g., SSPC). |
| Safety Systems Installation | Installation of pressure relief valves (PRVs), emergency shutdown (ESD) systems, alarms, and safety signage. | ASME Section VIII (Pressure Vessels) for PRVs. Compliance with local safety regulations and client's safety protocols. Functional testing of all safety interlocks. |
| Pre-Commissioning Reports | Completion of all pre-commissioning checks and submission of documented reports, including cleaning, flushing, pressure testing, electrical continuity checks, and functional checks. | Detailed checklists and sign-off sheets for each pre-commissioning activity. Evidence of compliance with all prior steps. |
| Commissioning and Performance Test Report | Execution of commissioning procedures, including startup, functional testing under load, and performance verification. Generation of a detailed report demonstrating oxygen purity, flow rate, and power consumption. | Demonstration of oxygen purity meeting specified percentage (e.g., 93-95%). Oxygen flow rate at specified conditions. Specific power consumption per Nm³ of oxygen. Testing to be witnessed by client representatives. |
| As-Built Drawings | Updated drawings reflecting the actual installed configuration, including P&IDs, electrical schematics, piping isometrics, and layout drawings. | Accuracy and completeness of all modifications from original design drawings. Marked-up drawings provided in electronic and hard copy formats. |
| Operation and Maintenance (O&M) Manuals | Provision of comprehensive O&M manuals, including equipment manuals, troubleshooting guides, and recommended maintenance schedules. | Manufacturer-supplied manuals, augmented with site-specific information. Clear and concise language for operator and maintenance personnel. |
| Training Certificates | Proof of training delivered to client's personnel on operation, maintenance, and troubleshooting of the PSA oxygen plant. | Attendance records and certificates issued for training sessions. |
Key Project Stages
- Site Preparation and Assessment
- Equipment Delivery and Logistics
- Installation and Assembly
- Piping and Electrical Connections
- Instrumentation and Control System Integration
- Pre-Commissioning and Testing
- Commissioning and Performance Verification
- Training and Handover
- Documentation
Service Level Agreement For Psa Oxygen Plant Installation Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the installation service of your PSA Oxygen Plant. This SLA is designed to ensure timely support and reliable operation of your newly installed facility.
| Issue Category | Response Time (During Business Hours) | Response Time (Outside Business Hours) | Target Resolution Time (During Business Hours) | Uptime Guarantee |
|---|---|---|---|---|
| Critical Failure | 1 hour | 4 hours | 8 business hours | 99.5% |
| Major Failure | 2 hours | 8 hours | 16 business hours | 98.0% |
| Minor Issue | 4 business hours | Next Business Day | 3 business days | 99.0% |
Key Definitions
- Installation Service: Encompasses all activities related to the setup, commissioning, and initial testing of the PSA Oxygen Plant at your designated site.
- Critical Failure: A malfunction of the PSA Oxygen Plant that completely halts oxygen production or poses an immediate safety hazard.
- Major Failure: A malfunction that significantly degrades oxygen production capacity or performance, but does not constitute a Critical Failure.
- Minor Issue: A non-critical problem or performance deviation that does not significantly impact oxygen production.
- Business Hours: Monday to Friday, 9:00 AM to 5:00 PM (local time), excluding public holidays.
- Response Time: The maximum time allowed to acknowledge and initiate troubleshooting for a reported issue.
- Resolution Time: The target time to resolve the reported issue, excluding time required for parts delivery or complex on-site repairs that may be outside our direct control.
- Uptime Guarantee: The percentage of time the PSA Oxygen Plant is expected to be operational and producing oxygen as per specifications.
Frequently Asked Questions

Ready when you are
Let's scope your PSA Oxygen Plant Installation Service in Burkina Faso project in Burkina Faso.
Scaling healthcare logistics and technical systems across the entire continent.

