
Cleanroom Engineering (ISO 5-8) in Botswana
Engineering Excellence & Technical Support
Cleanroom Engineering (ISO 5-8) solutions for Bioprocessing & Manufacturing. High-standard technical execution following OEM protocols and local regulatory frameworks.
Precision Airflow Management
Engineered ISO 5-8 cleanroom environments in Botswana, meticulously controlling unidirectional and turbulent airflow patterns to achieve <a href='#particle-counts'>optimal particle counts</a> and ensure product integrity for sensitive manufacturing and research.
Differential Pressure Integrity
Designed and implemented robust differential pressure control systems across ISO 5-8 cleanrooms in Botswana, guaranteeing containment and preventing cross-contamination between zones through advanced monitoring and automated adjustments.
Advanced HEPA/ULPA Filtration
Installed and validated state-of-the-art HEPA and ULPA filtration systems for ISO 5-8 cleanrooms in Botswana, exceeding <a href='#iso-standards'>ISO 14644-1 requirements</a> for particulate cleanliness and providing a controlled atmosphere for critical processes.
What Is Cleanroom Engineering (Iso 5-8) In Botswana?
Cleanroom engineering, particularly within the ISO 5 to ISO 8 classification range, refers to the design, construction, and validation of controlled environments with stringent particulate contamination limits. These environments are crucial for processes where even microscopic particles can compromise product integrity, research validity, or patient safety. The primary objective is to maintain an atmosphere with a defined maximum number of airborne particles per unit volume, measured according to ISO 14644-1 standards. This involves meticulous attention to air filtration (HEPA/ULPA), airflow patterns (laminar, turbulent), material selection, construction techniques to minimize particle generation and ingress, and rigorous environmental monitoring (particulate counts, temperature, humidity, pressure differentials).
| ISO Class | Maximum Particles per Cubic Meter (≥0.5 µm) | Typical Applications in Botswana |
|---|---|---|
| ISO 5 (Class 100) | 3,520 | Pharmaceutical aseptic processing, microelectronics manufacturing, critical sterile medical device assembly. |
| ISO 6 (Class 1,000) | 35,200 | High-precision optical assembly, certain sensitive laboratory analysis. |
| ISO 7 (Class 10,000) | 352,000 | General pharmaceutical manufacturing, some biological research, sterile product packaging. |
| ISO 8 (Class 100,000) | 3,520,000 | Less critical laboratory operations, electronics assembly, cosmetic manufacturing, food processing (specific areas). |
Key Aspects of Cleanroom Engineering (ISO 5-8)
- Facility Design and Layout: Strategic placement of cleanrooms, airlocks, and gowning areas to manage airflow and prevent cross-contamination.
- HVAC System Design: Implementation of specialized ventilation systems incorporating HEPA or ULPA filters to remove airborne particulates. Control of air changes per hour (ACH) to meet ISO class requirements.
- Airflow Management: Establishment of unidirectional (laminar) or multidirectional (turbulent) airflow patterns to sweep contaminants away from critical areas.
- Material Selection and Construction: Utilization of smooth, non-shedding, and easily cleanable materials for walls, floors, ceilings, and equipment. Minimization of joints and crevices.
- Sealing and Integrity: Ensuring a high degree of sealing to prevent ingress of unfiltered air and maintain pressure differentials between adjacent areas.
- Environmental Monitoring: Continuous or periodic measurement of particulate counts, temperature, humidity, and pressure differentials to verify compliance with ISO standards.
- Validation and Qualification: Documented processes to demonstrate that the cleanroom consistently meets its design specifications and contamination control objectives (IQ/OQ/PQ).
- Operational Procedures: Development and implementation of Standard Operating Procedures (SOPs) for gowning, material transfer, personnel movement, and cleaning to maintain cleanliness.
- Maintenance and Recertification: Scheduled maintenance of HVAC systems, filters, and regular recertification of the cleanroom to ensure ongoing compliance.
Who Needs Cleanroom Engineering (Iso 5-8) In Botswana?
Cleanroom engineering, particularly for ISO 5-8 classifications, is crucial for specific industries in Botswana that require highly controlled environments to prevent contamination. These environments are vital for processes where even microscopic particles can compromise product integrity, research accuracy, or patient safety. While Botswana's economy is diverse, the need for these sophisticated cleanroom standards is concentrated in sectors with a focus on advanced manufacturing, healthcare, and scientific research.
| Industry Sector | Primary Need for Cleanroom (ISO 5-8) | Key Departments Involved | Examples of Processes |
|---|---|---|---|
| Pharmaceuticals/Biotech | Sterility, prevention of particulate contamination, ensuring product efficacy and safety. | Manufacturing, QC, R&D, Sterile Operations | Aseptic filling, sterile powder handling, cell culture, API synthesis. |
| Medical Devices | Minimizing bioburden and particulate contamination for safe medical use. | Assembly, Packaging, Sterilization, QA | Implant manufacturing, sterile instrument assembly, disposable device production. |
| Healthcare (Hospitals) | Preventing surgical site infections, ensuring sterile drug preparations, maintaining diagnostic integrity. | Operating Theatres, SPD, Pharmacy, Laboratories | Complex surgeries, IV admixture, sterile instrument reprocessing, sample analysis. |
| Research Institutions | Ensuring experimental reliability, preventing cross-contamination in sensitive experiments. | Research Labs, Biotech Labs, Genomics Labs | Cell line development, gene editing, molecular biology experiments, drug discovery. |
| Specialty Food Processing | Maintaining product safety and quality in high-risk or sensitive food production. | Production, QA, Packaging | Infant formula production, sterile nutrient solutions, specialized dietary supplements. |
Target Customers & Departments for ISO 5-8 Cleanroom Engineering in Botswana
- {"title":"Pharmaceutical & Biotechnology Companies","departments":["Manufacturing/Production","Quality Control (QC)","Research & Development (R&D)","Sterile Operations"],"description":"Manufacturing of sterile drugs, vaccines, and sensitive biological products. This includes API (Active Pharmaceutical Ingredient) production and formulation."}
- {"title":"Medical Device Manufacturers","departments":["Assembly","Packaging","Sterilization","Quality Assurance (QA)"],"description":"Production of implants, surgical instruments, diagnostic equipment, and other medical devices where sterility and particle control are paramount to patient safety and device functionality."}
- {"title":"Hospitals & Specialized Healthcare Facilities","departments":["Surgery/Operating Theatres","Sterile Processing Department (SPD)","Pharmacy (Compounding)","Diagnostic Laboratories","Intensive Care Units (ICUs)"],"description":"Operating rooms, sterile processing departments (SPDs) for instrument sterilization, compounding pharmacies for sterile drug preparation, and laboratories requiring aseptic techniques."}
- {"title":"Electronics Manufacturing & Assembly","departments":["Assembly","Testing","Quality Control"],"description":"While not as prevalent in Botswana as other sectors, companies involved in sensitive electronics assembly, particularly for medical or high-precision devices, may require controlled environments."}
- {"title":"Research & Development Institutions (Universities & Private Labs)","departments":["Research Laboratories","Biotechnology Labs","Microbiology Labs","Genomics Labs"],"description":"Laboratories conducting advanced scientific research, genetic engineering, or requiring sterile conditions for experimental procedures."}
- {"title":"Food & Beverage (Specialty/High-Risk)","departments":["Production","Quality Assurance","Packaging"],"description":"While many food processing plants don't require ISO 5-8, specialized sectors like infant formula production or certain sensitive processed foods may benefit from enhanced environmental controls."}
Cleanroom Engineering (Iso 5-8) Process In Botswana
This document outlines the typical workflow for implementing ISO 5-8 cleanroom engineering processes in Botswana, from initial inquiry to successful execution. The process is designed to ensure compliance with international standards for controlling airborne particulate contamination, crucial for industries like pharmaceuticals, biotechnology, electronics manufacturing, and healthcare.
| Stage | Key Activities | Deliverables | Typical Duration (Weeks) |
|---|---|---|---|
| Inquiry & Initial Consultation | Client expresses requirement, initial discussion of scope and objectives. | Preliminary understanding of project scope, initial quotation (if applicable). | 1-2 |
| Needs Assessment & Site Survey | Detailed operational requirements gathering, site inspection, assessment of existing infrastructure. | Needs assessment report, site survey report, refined scope definition. | 2-4 |
| Conceptual Design & Proposal | Develop preliminary cleanroom layout, classification strategy, key system concepts, cost estimation. | Conceptual design drawings, technical proposal, cost breakdown, project timeline. | 3-6 |
| Detailed Design & Engineering | Develop full engineering drawings, P&IDs, HVAC schematics, electrical layouts, specifications. | Complete engineering drawings, Bill of Materials (BOM), equipment specifications, construction plan. | 6-12 |
| Procurement & Fabrication | Sourcing and purchasing of all cleanroom components and equipment. | Ordered materials, fabricated components, supplier lead times managed. | Variable (dependent on lead times, typically 8-20) |
| Construction & Installation | Building the cleanroom structure, installing HVAC, electrical, and utility systems. | Completed cleanroom shell, installed HVAC and electrical systems. | 10-30 (dependent on size and complexity) |
| Commissioning & Validation | Testing and verification of all systems, air particle counts, air changes per hour, pressure differentials, HEPA filter integrity testing. | Commissioning reports, validation protocols and reports, ISO classification certificates. | 4-8 |
| Training & Handover | Training operators and maintenance staff on system operation and upkeep. | Training materials, operation and maintenance manuals, as-built drawings, handover documentation. | 1-2 |
| Post-Execution Support & Maintenance | Routine maintenance, performance monitoring, scheduled re-validation. | Maintenance schedules, performance reports, re-validation certificates. | Ongoing |
Key Stages of ISO 5-8 Cleanroom Engineering Process
- Inquiry and Initial Consultation: The process begins with a client expressing a need for a cleanroom facility or upgrades.
- Needs Assessment & Site Survey: A detailed understanding of the client's operational requirements, contamination control needs, and existing infrastructure is gathered.
- Conceptual Design & Proposal: Based on the needs assessment, a preliminary design concept is developed, outlining room layout, classification, airflow, filtration, and other critical parameters. A formal proposal is submitted.
- Detailed Design & Engineering: Upon proposal acceptance, a comprehensive design is created, including P&IDs (Piping and Instrumentation Diagrams), HVAC schematics, electrical layouts, material specifications, and construction drawings.
- Procurement & Fabrication: All necessary components, including HEPA/ULPA filters, air handling units (AHUs), ductwork, cleanroom panels, doors, windows, and control systems, are sourced and fabricated.
- Construction & Installation: The cleanroom structure is built, and all HVAC, electrical, and utility systems are installed according to the detailed design.
- Commissioning & Validation: This is a critical phase involving testing and verification of all systems to ensure they meet the specified performance criteria and the required ISO cleanroom classification.
- Training & Handover: The client's personnel are trained on the operation and maintenance of the cleanroom systems. All documentation and warranties are handed over.
- Post-Execution Support & Maintenance: Ongoing support, routine maintenance, and re-validation services are provided to ensure continued compliance and optimal performance.
Cleanroom Engineering (Iso 5-8) Cost In Botswana
Cleanroom engineering services in Botswana, specifically for ISO 5-8 classifications, involve a complex interplay of factors that influence the overall cost. These classifications represent progressively higher levels of cleanliness, with ISO 5 being extremely stringent (very few particles) and ISO 8 being less so (more particulate matter allowed). The cost is not a simple per-square-meter figure and depends heavily on the specific project requirements, the complexity of the design, the materials used, and the expertise of the engineering and construction firms involved. Factors such as the chosen filtration systems (HEPA, ULPA), the air change rates required, pressure differentials, humidity and temperature control, material selection for surfaces (e.g., stainless steel, specialized laminates), lighting, and the integration of specialized equipment will all contribute to the final price. Furthermore, the geographical location within Botswana, accessibility to the site, and the availability of skilled labor can also impact pricing. Obtaining accurate quotes typically involves detailed site surveys and consultations with specialized cleanroom contractors.
| ISO Classification | Estimated Cost Range (BWP) | Notes |
|---|---|---|
| ISO 8 | 300,000 - 750,000+ | Basic clean areas, often used for less critical processes. Costs can vary significantly based on size and specific requirements. |
| ISO 7 | 600,000 - 1,500,000+ | Moderate cleanliness. Requires more stringent filtration and air handling than ISO 8. |
| ISO 6 | 900,000 - 2,000,000+ | Higher level of cleanliness, often used in electronics manufacturing or pharmaceutical preparation. Increased HVAC and filtration complexity. |
| ISO 5 | 1,500,000 - 5,000,000+ | Very high cleanliness standards, essential for sterile manufacturing, advanced pharmaceuticals, and sensitive electronics. Requires ULPA filtration and highly sophisticated control systems. |
Key Pricing Factors for ISO 5-8 Cleanroom Engineering in Botswana
- ISO Classification Level: Higher cleanliness standards (lower ISO numbers) require more sophisticated and expensive technology.
- Cleanroom Size and Layout: Larger areas and more complex layouts naturally increase material and labor costs.
- Filtration System: The type and number of HEPA/ULPA filters significantly impact cost. ULPA filters are more expensive than HEPA.
- Air Change Rates (ACPH): Higher ACPH requirements necessitate more powerful HVAC systems and more filters, increasing costs.
- Pressure Differentials: Maintaining positive or negative pressure between rooms requires specialized HVAC design and control systems.
- Temperature and Humidity Control: Precise control systems add to the complexity and cost.
- Materials and Finishes: High-grade, non-shedding, and easy-to-clean materials (e.g., stainless steel, epoxy flooring) are more expensive.
- Lighting Requirements: Specialized cleanroom lighting with appropriate lumen output and color rendering can add to the cost.
- Ancillary Equipment: Integration of pass boxes, air showers, fume hoods, and other specialized equipment will increase the overall price.
- Design and Engineering Fees: The complexity of the design and the expertise of the engineers will influence these fees.
- Construction and Installation Labor: Skilled labor experienced in cleanroom construction is crucial and can be more costly.
- Testing and Certification: Post-construction validation and certification are essential and add to the project cost.
- Geographical Location and Site Accessibility: Remote locations can incur higher transportation and logistical costs.
- Project Timeline: Rush projects may command premium pricing.
- Regulatory Compliance: Adherence to specific industry standards beyond ISO (e.g., GMP, pharmaceutical requirements) can influence design and cost.
Affordable Cleanroom Engineering (Iso 5-8) Options
This guide explores cost-effective solutions for achieving ISO 5-8 cleanroom compliance. We focus on value bundles and practical cost-saving strategies to make advanced cleanroom technology accessible for a wider range of industries. Understanding your specific needs is paramount; therefore, we offer flexible options to meet diverse project scopes and budgets.
| Value Bundle | Key Features | Target ISO Classes | Cost-Saving Strategies Incorporated | Ideal For |
|---|---|---|---|---|
| 'Essential' ISO 8/7 Kit | Pre-fabricated modular panels, basic HEPA filtration, standard LED lighting, simple HVAC integration. | ISO 7, ISO 8 | Standardized components, simplified design, minimized custom fabrication. | Research labs, packaging areas, basic manufacturing requiring moderate contamination control. |
| 'Advanced' ISO 6/5 Modular System | High-performance HEPA/ULPA filtration, advanced airflow management, integrated control systems for temperature/humidity, durable flooring and wall materials. | ISO 5, ISO 6 | Optimized energy efficiency in HVAC, modular design for scalability, bulk purchasing of high-quality filtration. | Pharmaceutical manufacturing, microelectronics production, critical medical device assembly. |
| 'Hybrid' Retrofit Solution | Focuses on upgrading existing spaces with targeted cleanroom elements like a hardwall enclosure, localized HEPA filtration, and specialized airlocks. | ISO 5-8 (depending on existing infrastructure) | Leverages existing building structure, targeted improvements rather than full new construction, phased implementation. | Existing manufacturing facilities needing to meet new cleanroom standards in specific process areas. |
| 'DIY-Friendly' Basic Enclosure | Lightweight panel systems, basic air filtration units, and simple sealing solutions. | ISO 8 (potentially ISO 7 with careful design) | Reduced labor costs through simpler assembly, focus on foundational elements, ability for in-house installation. | Hobbyists, small-scale R&D, or low-criticality applications where budget is the primary constraint. |
Key Considerations for Affordable Cleanroom Engineering:
- Defining Your Cleanroom Classification Needs: Accurately determining the required ISO class (5-8) is the first step. Over-specifying can lead to unnecessary costs. ISO 8 is the least stringent and therefore the most economical to achieve, while ISO 5 demands rigorous control.
- Modular vs. Traditional Construction: Modular cleanrooms offer faster installation and scalability, often at a lower upfront cost than traditional stick-built structures. They are also easier to relocate or reconfigure.
- Material Selection: Choosing appropriate and cost-effective materials for walls, floors, and ceilings is crucial. While high-end materials offer superior durability and ease of cleaning, more budget-friendly alternatives can still meet ISO requirements.
- Air Filtration and HVAC Systems: High-efficiency particulate air (HEPA) filters are standard, but the number and placement of filters, along with the sophistication of the HVAC system, significantly impact cost. Optimized airflow design can reduce energy consumption.
- Lighting and Utilities: Standard LED lighting and carefully planned utility integration can minimize expenses without compromising functionality.
- Project Scope and Scale: Smaller, simpler cleanroom designs will naturally be more affordable than larger, complex environments with specialized equipment requirements.
Verified Providers In Botswana
In Botswana's rapidly evolving healthcare landscape, discerning trustworthy and qualified medical providers is paramount. Franance Health stands out as a premier organization, distinguished by its rigorous credentialing process and commitment to patient well-being. Their verified providers represent the pinnacle of medical expertise and ethical practice, offering unparalleled care across a spectrum of health needs. This document outlines Franance Health's stringent credentialing criteria and explains why choosing a Franance Health-verified provider is the most assured path to receiving high-quality, reliable healthcare in Botswana.
| Provider Type | Key Benefits of Choosing a Franance Health Verified Provider | Why They Are the Best Choice |
|---|---|---|
| General Practitioners | Accurate diagnosis, personalized treatment plans, holistic health management. | Access to primary care physicians with proven track records of comprehensive patient care and a deep understanding of local health challenges. |
| Specialists (Cardiologists, Dermatologists, etc.) | Expert diagnosis and treatment of complex conditions, access to cutting-edge medical knowledge. | Ensures you are consulting with board-certified specialists who meet the highest international standards of expertise in their respective fields. |
| Surgeons | Skilled surgical procedures, focus on patient safety and optimal recovery outcomes. | Verification confirms surgical proficiency, adherence to strict safety protocols, and a commitment to successful surgical interventions. |
| Dentists | Preventative dental care, restorative treatments, cosmetic dentistry. | Provides confidence in oral health professionals who practice with precision, hygiene, and patient comfort as top priorities. |
| Mental Health Professionals | Confidential counseling, evidence-based therapeutic approaches, mental well-being support. | Guarantees that practitioners are licensed, ethically bound, and skilled in providing effective and compassionate mental health services. |
| Diagnostic Services (Labs, Imaging) | Accurate and timely test results, reliable diagnostic information. | Ensures that diagnostic facilities meet stringent quality control measures, leading to more precise and dependable results for your medical care. |
Franance Health Credentialing Process: A Mark of Excellence
- Comprehensive Background Checks: Franance Health meticulously verifies all aspects of a provider's professional history, including academic qualifications, licenses, and past employment.
- Verification of Medical Licenses and Certifications: Ensuring that all practitioners hold current and valid licenses and certifications from recognized national and international bodies.
- Peer Review and Performance Evaluation: Independent assessment of clinical skills, treatment outcomes, and adherence to best medical practices through peer review panels.
- Criminal Record and Disciplinary Action Checks: Thorough investigation to ensure no history of malpractice, criminal convictions, or disciplinary actions that could compromise patient safety.
- Continuing Medical Education (CME) Compliance: Confirmation that providers are actively engaged in ongoing professional development to stay abreast of the latest medical advancements.
- Ethical Conduct and Professionalism Standards: Evaluation of a provider's commitment to ethical medical practice, patient confidentiality, and respectful patient interaction.
- Insurance and Malpractice Coverage Verification: Ensuring providers maintain adequate professional liability insurance.
Scope Of Work For Cleanroom Engineering (Iso 5-8)
This Scope of Work outlines the engineering services required for the design, construction, and commissioning of cleanrooms conforming to ISO 5, ISO 6, ISO 7, and ISO 8 standards. The project encompasses all necessary technical deliverables and adherence to relevant standard specifications to ensure a fully functional and compliant cleanroom environment.
| Deliverable | Description | Standard Specification/Reference | Associated ISO Class |
|---|---|---|---|
| Cleanroom Design Report | Comprehensive report detailing the layout, airflow strategy, HVAC design, material selection, and utility requirements. | ISO 14644-4 (Design and construction), ASHRAE Standard 170 (Ventilation of Health Care Facilities), relevant national building codes. | ISO 5, ISO 6, ISO 7, ISO 8 |
| HVAC System Design Drawings | Detailed P&ID, ductwork layout, equipment schedules, control schematics for the cleanroom HVAC system. | ISO 14644-4, ASHRAE Standard 170. | ISO 5, ISO 6, ISO 7, ISO 8 |
| Filtration System Specification | Detailed specifications for HEPA/ULPA filters, pre-filters, filter housings, and seal integrity testing. | ISO 14644-1 (Classification of air cleanliness), ISO 14644-3 (Testing and measurement methods), IEST RP-CC001. | ISO 5, ISO 6, ISO 7, ISO 8 |
| Airflow and Pressure Control Strategy | Document outlining strategies for unidirectional, turbulent, or mixed airflow, and pressure differentials between zones. | ISO 14644-4, ISO 14644-2 (Monitoring). | ISO 5, ISO 6, ISO 7, ISO 8 |
| Material and Finishes Specification | Specifications for wall panels, ceiling systems, flooring, doors, windows, and seals, ensuring low particle generation and cleanability. | ISO 14644-4, GMP guidelines (if applicable), material manufacturer specifications. | ISO 5, ISO 6, ISO 7, ISO 8 |
| Utility and Services Integration Plan | Detailed plans for electrical, data, compressed air, nitrogen, and other required services, including point-of-use specifications. | Relevant national electrical codes, gas codes, and industry-specific standards. | ISO 5, ISO 6, ISO 7, ISO 8 |
| Commissioning Plan (IQ/OQ/PQ) | Detailed plan for Installation Qualification, Operational Qualification, and Performance Qualification to verify system functionality and compliance. | ISO 14644-3, GAMP 5 (Good Automated Manufacturing Practice). | ISO 5, ISO 6, ISO 7, ISO 8 |
| As-Built Drawings | Finalized drawings reflecting the actual installed configuration of the cleanroom and its systems. | As per original design standards. | ISO 5, ISO 6, ISO 7, ISO 8 |
| Validation Reports | Comprehensive reports detailing the results of IQ, OQ, and PQ activities. | ISO 14644-3, GAMP 5. | ISO 5, ISO 6, ISO 7, ISO 8 |
Key Activities and Deliverables
- Detailed Engineering Design (Conceptual, Basic, and Detailed)
- Cleanroom Construction and Installation
- HVAC System Design and Integration
- Filtration System Specification and Integration
- Airflow and Pressure Control System Design
- Material and Equipment Selection (Walls, Ceilings, Floors, Doors, Windows)
- Utility and Services Integration (Power, Data, Gases)
- Validation and Qualification (IQ, OQ, PQ)
- As-Built Documentation and Handover
- Training and Knowledge Transfer
Service Level Agreement For Cleanroom Engineering (Iso 5-8)
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for Cleanroom Engineering services, specifically catering to ISO Class 5 through ISO Class 8 environments. This agreement is intended to ensure the continuous and reliable operation of critical cleanroom facilities, minimizing disruption and maintaining the integrity of sensitive processes.
| Service Level | Uptime Guarantee | Response Time (Critical Failure) | Response Time (Major Failure) | Response Time (Minor Issue) | Target Resolution Time (Critical Failure) | Target Resolution Time (Major Failure) | Target Resolution Time (Minor Issue) |
|---|---|---|---|---|---|---|---|
| ISO Class 5 | 99.95% | 1 Hour | 2 Hours | 4 Business Hours | 4 Hours | 8 Business Hours | 2 Business Days |
| ISO Class 6 | 99.90% | 1.5 Hours | 3 Hours | 6 Business Hours | 6 Hours | 12 Business Hours | 3 Business Days |
| ISO Class 7 | 99.85% | 2 Hours | 4 Hours | 8 Business Hours | 8 Hours | 16 Business Hours | 4 Business Days |
| ISO Class 8 | 99.75% | 3 Hours | 6 Hours | 12 Business Hours | 12 Hours | 24 Business Hours | 5 Business Days |
Key Definitions
- Service Request: Any communication from the Client to the Service Provider requesting support, maintenance, or troubleshooting for the cleanroom environment.
- Critical Failure: A situation where the cleanroom environment's performance falls below the specified ISO class requirements, posing an immediate risk to product integrity or personnel safety.
- Major Failure: A situation where the cleanroom environment's performance degrades significantly, potentially impacting product quality or process efficiency but not posing an immediate critical risk.
- Minor Issue: A non-critical problem that affects a non-essential system or feature within the cleanroom, with minimal impact on overall operations.
- Uptime: The percentage of time the cleanroom environment is operational and meeting the agreed-upon performance specifications.
- Downtime: The percentage of time the cleanroom environment is non-operational or not meeting the agreed-upon performance specifications.
- Response Time: The maximum time allowed from the initiation of a Service Request to the first acknowledgment and initial assessment by the Service Provider.
- Resolution Time: The maximum time allowed from the initiation of a Service Request to the complete restoration of normal operations and performance.
Frequently Asked Questions

Ready when you are
Let's scope your Cleanroom Engineering (ISO 5-8) in Botswana project in Botswana.
Scaling healthcare logistics and technical systems across the entire continent.

