
Bill of Quantities (BOQ) Development Service in Botswana
Engineering Excellence & Technical Support
Bill of Quantities (BOQ) Development Service High-standard technical execution following OEM protocols and local regulatory frameworks.
Accurate Quantity Take-Off & Cost Estimation
Leveraging advanced software and industry-standard methodologies, we ensure precise quantity take-offs from architectural and structural drawings, providing clients in Botswana with meticulously detailed and cost-effective Bills of Quantities (BOQs) that form the bedrock of reliable project budgeting.
Compliance with Botswana Building Regulations & Standards
Our BOQ development service is deeply rooted in an understanding of Botswana's specific building codes, material availability, and local construction practices, guaranteeing that all documented quantities and specifications adhere to national standards and regulatory requirements for seamless project execution.
Risk Mitigation & Transparent Procurement Support
We empower Botswana developers and contractors by delivering transparent and comprehensive BOQs that minimize ambiguity, facilitate fair tender evaluations, and proactively identify potential cost overruns, thereby mitigating project risks and fostering a foundation for successful procurement and construction.
What Is Bill Of Quantities (Boq) Development Service In Botswana?
Bill of Quantities (BOQ) Development Service in Botswana refers to the specialized professional service of preparing a detailed, itemized list of materials, labor, and their respective quantities required for the construction or renovation of a building or infrastructure project. This document serves as a fundamental tender and contract document, forming the basis for cost estimation, bidding, and subsequent project execution. The service involves a systematic process of deconstructing architectural and engineering drawings, specifications, and schedules to accurately quantify all elements of the construction project. This includes site preparation, excavation, concrete works, masonry, structural steel, roofing, finishes, mechanical, electrical, and plumbing (MEP) systems, and any other project-specific requirements. The BOQ is crucial for ensuring transparency, cost control, and fair competition among contractors.
| Stakeholder Group | Need for BOQ Development Service | Typical Use Cases |
|---|---|---|
| Project Owners/Clients (Public & Private Sector) | To establish a benchmark for project cost, facilitate competitive bidding, manage budgets effectively, and ensure fair contractor remuneration. | New building construction (residential, commercial, industrial), infrastructure development (roads, bridges, water systems), renovations and refurbishments, feasibility studies. |
| Architects and Engineers | To translate design intent into measurable quantities, ensure design feasibility from a cost perspective, and produce essential tender documentation. | Design development, preparation of tender packages, design review for cost implications, coordination with cost consultants. |
| Quantity Surveyors/Cost Consultants | This is their core service offering. They are the primary providers of BOQ development. | Cost planning, cost control, procurement advice, contract administration, dispute resolution, life cycle costing. |
| Contractors/Bidders | To understand the full scope of work, prepare accurate and competitive bids, and manage project resources and costs during execution. | Bid preparation for public tenders and private projects, sub-contractor pricing, material procurement planning, site progress monitoring. |
| Government and Municipalities | To ensure transparency and accountability in public procurement, manage taxpayer funds efficiently, and standardize project costing. | Procurement of public works, infrastructure projects funded by government, development of public facilities, regulatory compliance for construction projects. |
Key Components of BOQ Development Service
- Detailed Measurement and Quantification: Precise calculation of quantities for all construction elements based on design documentation.
- Itemization and Description: Classification and descriptive nomenclature of each work item according to recognized industry standards (e.g., SMM7, NRM2) or project-specific requirements.
- Specification Cross-Referencing: Linking BOQ items to relevant technical specifications and drawings for clarity and contractual enforceability.
- Cost Estimation Support: Providing a basis for contractors to prepare their financial bids by itemizing costs.
- Tender Document Preparation: Integrating the BOQ as a critical component of the tender package for procurement.
- Valuation and Payment Certification: Facilitating interim payment assessments based on measured work completed against BOQ items.
- Change Order Management: Quantifying the impact of variations and additions to the original scope of work.
- Risk Identification: Highlighting potential cost implications associated with specific items or work sequences.
Who Needs Bill Of Quantities (Boq) Development Service In Botswana?
A Bill of Quantities (BOQ) development service is crucial for various stakeholders involved in construction and infrastructure projects in Botswana. It provides a detailed breakdown of the materials, labor, and plant required for a project, allowing for accurate cost estimation, tendering, and project management. This transparency and precision are invaluable for ensuring projects are delivered within budget and on schedule.
| Target Customer/Department | Specific Needs and Benefits of BOQ Development | Example Project Types |
|---|---|---|
| Government Ministries and Departments (e.g., Ministry of Transport and Communications, Ministry of Lands and Housing, Ministry of Health) | Ensures fair and competitive tendering, facilitates budget allocation and control, supports value for money, and forms the basis for contract administration. Essential for public infrastructure projects. | Road construction, public buildings (hospitals, schools), water and sanitation infrastructure, government housing projects. |
| Local Authorities (e.g., Gaborone City Council, Francistown City Council) | Supports local infrastructure development and maintenance, enables accurate costing for public works, and aids in financial planning and resource allocation. | Local roads, community halls, market stalls, waste management facilities, public parks. |
| Private Developers and Property Owners | Provides accurate cost estimates for investment decisions, facilitates mortgage applications, enables effective contractor selection and negotiation, and helps manage construction budgets. | Residential complexes, commercial buildings (shopping malls, office blocks), industrial warehouses, hotels. |
| Construction Companies and Contractors | Forms the basis for submitting competitive and accurate bids, aids in procurement of materials and labor, supports site management and progress claims, and helps identify potential cost overruns. | All types of construction projects, from small renovations to large-scale developments. |
| Real Estate Developers | Crucial for feasibility studies, financial modeling, investor presentations, and ensuring profitability by accurately forecasting project costs. | Large-scale housing estates, mixed-use developments, commercial properties. |
| Project Management Firms | Provides a fundamental tool for cost control, risk management, procurement planning, and contract monitoring throughout the project lifecycle. | Any complex project requiring professional management and oversight. |
| Consulting Engineers and Architects | Enables them to accurately translate design specifications into quantifiable cost elements, ensuring their designs are buildable and within budget. | Building designs, civil engineering structures, urban planning projects. |
| Financial Institutions and Lenders | Used to assess the viability and financial risk of construction projects, ensuring the loan amounts are adequate and properly managed. | Any project requiring external financing, such as mortgages for developers or loans for large infrastructure. |
| Parastatal Organizations (e.g., Water Utilities Corporation, Botswana Power Corporation) | Essential for planning and budgeting of their capital expenditure projects, ensuring efficient delivery of services. | Water treatment plants, power substations, pipelines, network expansions. |
| Non-Governmental Organizations (NGOs) with infrastructure projects | Ensures that donor funds are used effectively and transparently for community development projects, providing accountability. | Community centers, schools, clinics, water boreholes, sanitation facilities. |
Who Needs Bill of Quantities (BOQ) Development Service in Botswana?
- Government Ministries and Departments
- Local Authorities (Councils)
- Private Developers and Property Owners
- Construction Companies and Contractors
- Real Estate Developers
- Project Management Firms
- Consulting Engineers and Architects
- Financial Institutions and Lenders
- Parastatal Organizations
- Non-Governmental Organizations (NGOs) with infrastructure projects
Bill Of Quantities (Boq) Development Service Process In Botswana
This document outlines the typical workflow for a Bill of Quantities (BOQ) Development Service in Botswana, from the initial client inquiry to the final execution and delivery of the BOQ. The process is designed to ensure accuracy, clarity, and compliance with relevant standards and client requirements.
| Phase | Key Activities | Deliverables | Typical Duration (Botswana Context) |
|---|---|---|---|
| Inquiry & Consultation | Initial client contact, scope discussion, requirement gathering. | Understanding of project needs, preliminary service scope. | 1-3 days |
| Proposal & Agreement | Proposal preparation, negotiation, contract signing. | Signed agreement/contract, agreed fee and timeline. | 2-7 days |
| Information Gathering | Receiving documents, site visits (if needed), clarification requests. | Complete set of project documents, site survey data. | 3-10 days (depending on complexity and site access) |
| Quantity Take-off | Measuring and calculating all quantities from drawings. | Detailed quantity take-off sheets/database. | 7-30 days (highly variable based on project size and complexity) |
| BOQ Compilation & Costing | Structuring the BOQ, applying descriptions, adding rates (if applicable). | Draft Bill of Quantities. | 5-20 days |
| Review & QA | Internal checks, client review, feedback incorporation. | Revised draft BOQ, client approval on draft. | 3-10 days |
| Finalization & Delivery | Final checks, formatting, submission of final BOQ. | Final approved Bill of Quantities. | 1-3 days |
| Post-Delivery Support | Answering queries, providing additional information. | Client satisfaction, project records. | Ongoing (as per agreement) |
Bill of Quantities (BOQ) Development Service Process in Botswana
- {"steps":["Client submits an inquiry for BOQ development, typically providing project details, drawings, and specifications.","Service provider acknowledges the inquiry and schedules an initial consultation.","During consultation, scope of work, project complexity, deadlines, and client expectations are discussed.","Clarification of project requirements, design intent, and any specific BOQ formatting preferences."],"title":"Phase 1: Inquiry and Initial Consultation"}
- {"steps":["Based on the consultation, the service provider prepares a detailed proposal outlining the scope, methodology, timeline, and fees.","Proposal is submitted to the client for review and feedback.","Negotiation and refinement of proposal terms if necessary.","Upon agreement, a formal contract or service level agreement (SLA) is signed by both parties."],"title":"Phase 2: Proposal and Agreement"}
- {"steps":["Service provider receives all relevant project documentation (architectural drawings, structural drawings, mechanical, electrical, plumbing drawings, specifications, schedules).","For building projects, a site visit may be scheduled to verify existing conditions, take measurements, and assess site accessibility and constraints. This is crucial in Botswana for accurate quantity take-offs.","Clarification and requests for any missing or ambiguous information from the design team or client."],"title":"Phase 3: Information Gathering and Site Assessment (if applicable)"}
- {"steps":["Systematic measurement and calculation of quantities for all materials, labor, and plant required for the project, based on the provided drawings and specifications.","Utilizing specialized BOQ software or standard measurement practices (e.g., SMM7, NRM2, CESMM).","Detailed breakdown of quantities for each item in accordance with the agreed-upon BOQ format.","Cross-referencing with specifications to ensure accurate unit of measurement and description."],"title":"Phase 4: Quantity Take-off"}
- {"steps":["Organizing the take-off data into a structured Bill of Quantities document.","Applying standard descriptions and coding systems (e.g., POMI, PSC).","Inclusion of preliminaries, general conditions, and any specific clauses relevant to projects in Botswana.","If cost estimation is part of the service, market-related rates or historical cost data for Botswana are used to price the quantities.","Calculation of total estimated project cost."],"title":"Phase 5: BOQ Compilation and Cost Estimation (if applicable)"}
- {"steps":["Internal review of the compiled BOQ by senior quantity surveyors or project managers.","Checking for accuracy, completeness, consistency, and adherence to standards.","Verification of calculations and data entry.","Client review of the draft BOQ for feedback, clarifications, and any requested amendments."],"title":"Phase 6: Review and Quality Assurance"}
- {"steps":["Incorporation of client feedback and making necessary revisions to the BOQ.","Final quality assurance check.","Issuance of the final, approved Bill of Quantities in the agreed-upon format (e.g., PDF, Excel).","Optional: Providing guidance on the use and interpretation of the BOQ."],"title":"Phase 7: Finalization and Delivery"}
- {"steps":["Addressing any post-delivery queries or requests for further clarification from the client.","Archiving of project documentation and the final BOQ for future reference."],"title":"Phase 8: Post-Delivery Support"}
Bill Of Quantities (Boq) Development Service Cost In Botswana
Developing a Bill of Quantities (BOQ) is a crucial step in any construction project, providing a detailed list of materials, labor, and services required, along with their estimated quantities and costs. The cost of BOQ development services in Botswana can vary significantly based on several factors. This document outlines these pricing factors and provides an estimated range in Botswana Pula (BWP).
| Project Type | Estimated BOQ Development Cost Range (BWP) | Typical Project Scope |
|---|---|---|
Key Pricing Factors for BOQ Development Services in Botswana
- {"title":"Project Size and Complexity","description":"Larger and more complex projects (e.g., multi-story buildings, commercial complexes, industrial facilities) require more detailed measurements, calculations, and specialized knowledge, thus increasing the BOQ development cost. Simple residential projects will be less expensive."}
- {"title":"Type of Project","description":"The nature of the construction significantly impacts the cost. For instance, residential, commercial, industrial, infrastructure (roads, bridges), and specialized projects (e.g., hospitals, laboratories) each have unique requirements and necessitate different levels of expertise and detail in the BOQ."}
- {"title":"Level of Detail and Accuracy Required","description":"A highly detailed BOQ with precise measurements and material specifications will command a higher fee than a more generalized estimate. The client's specific requirements for accuracy and the intended use of the BOQ (e.g., for tender, budgeting, cost control) play a vital role."}
- {"title":"Experience and Reputation of the Quantity Surveyor/Consultant","description":"Established firms or highly experienced individual quantity surveyors with a strong track record and reputation in Botswana will typically charge more due to their expertise, reliability, and proven success in delivering accurate BOQs."}
- {"title":"Turnaround Time","description":"Urgent BOQ development requests often incur a premium due to the expedited nature of the work, requiring surveyors to prioritize and allocate resources accordingly."}
- {"title":"Geographical Location within Botswana","description":"While the core cost may be similar, travel and accommodation expenses for site visits in remote areas of Botswana might be factored into the overall fee, potentially increasing the cost for projects outside major urban centers like Gaborone or Francistown."}
- {"title":"Inclusion of Additional Services","description":"Some BOQ development services may bundle additional offerings such as preliminary cost estimates, tender analysis, variation assessments, or post-contract cost management. These extras will naturally add to the final price."}
- {"title":"Availability of Design Information","description":"The completeness and clarity of architectural and engineering drawings provided by the client significantly affect the time required for BOQ development. Poorly prepared or incomplete drawings will necessitate more effort in interpretation and clarification, potentially increasing costs."}
Affordable Bill Of Quantities (Boq) Development Service Options
Developing an accurate and comprehensive Bill of Quantities (BOQ) is crucial for any construction project, ensuring cost control, efficient procurement, and transparent bidding. Our affordable BOQ development services offer flexible options designed to meet your specific project needs and budget. We understand that cost-effectiveness is paramount, and our value bundles and cost-saving strategies are tailored to deliver maximum value without compromising quality.
Value Bundles: These packages are curated to provide a holistic solution for your BOQ needs, combining essential services with added benefits. Each bundle is designed to offer a more cost-effective solution than procuring individual services separately. We offer tiered options to cater to projects of varying scales and complexities.
Cost-Saving Strategies: Beyond our bundled offerings, we employ several strategies to reduce your BOQ development costs:
- Standardized Templates: Utilizing pre-developed, industry-standard templates significantly reduces drafting time.
- Efficient Data Collection: Implementing streamlined processes for gathering project information ensures accuracy and minimizes rework.
- Technology Integration: Leveraging specialized BOQ software streamlines calculations and improves accuracy.
- Clear Scope Definition: A well-defined project scope from the outset prevents scope creep and associated cost overruns.
- Phased Development: For larger projects, we can offer phased BOQ development, allowing you to manage costs incrementally.
- Client Collaboration: Active client involvement in reviewing and approving stages helps to catch errors early, saving time and money.
- Experienced Professionals: Our team of skilled quantity surveyors possesses the expertise to deliver accurate BOQs efficiently, reducing the likelihood of costly errors during construction.
| Value Bundle Name | Key Features | Ideal For | Estimated Price Range (Indicative) |
|---|---|---|---|
| Starter Bundle | Core Quantity Take-off, Basic Measurement Units | Small Residential Projects, Concept Designs | $X - $Y |
| Pro Bundle | Comprehensive Quantity Take-off, Unit Rate Application, Preliminary Cost Breakdown | Medium Commercial Projects, Renovations | $Y - $Z |
| Enterprise Bundle | Detailed Quantity Take-off, Full Unit Rate Analysis, Cost Planning, Risk Identification | Large Scale Developments, Industrial Projects, Complex Infrastructure | $Z+ |
| Add-on Services (Can be bundled or standalone) | Tender Document Preparation, Value Engineering Input, Contract Administration Support | Various Project Scales | Variable (Project Dependent) |
Our Affordable BOQ Service Options
- Basic BOQ Package: Ideal for smaller projects or early-stage estimates. Includes essential quantity take-off from provided drawings.
- Standard BOQ Package: Comprehensive BOQ development for most standard construction projects. Includes quantity take-off, basic pricing units, and preliminary cost estimates.
- Premium BOQ Package: Full-service BOQ development for complex projects. Includes detailed quantity take-off, unit rate analysis, preliminary cost plans, and risk assessment integration.
- Custom BOQ Solutions: Tailored packages to address unique project requirements and specific client needs.
Verified Providers In Botswana
Finding reliable and trustworthy healthcare providers is paramount for a positive and effective healthcare experience. In Botswana, Franance Health stands out as a beacon of excellence, consistently delivering high-quality medical services and upholding stringent credentialing standards. This commitment to verification ensures that patients receive care from qualified professionals who are dedicated to their well-being. Choosing Franance Health means opting for a healthcare partner that prioritizes your health through a rigorously vetted network of medical practitioners.
| Franance Health Provider Attribute | Benefit to the Patient |
|---|---|
| Verified Medical Licenses and Certifications | Assurance of basic competency and legal authorization to practice. |
| Thorough Background Checks | Ensures a history of good standing and ethical conduct. |
| Verification of Educational Qualifications | Confirms the provider has completed recognized medical training. |
| Assessment of Professional Experience | Guarantees practical application of knowledge and skills. |
| Specialty Board Certifications (where applicable) | Indicates advanced training and expertise in a specific field. |
| Ongoing Professional Development Tracking | Ensures providers stay current with medical advancements. |
| Patient Feedback and Satisfaction Monitoring | Provides insights into the patient experience and provider performance. |
Why Franance Health Represents the Best Choice in Botswana:
- Rigorous Credentialing Process: Franance Health employs a comprehensive vetting system for all its affiliated healthcare providers. This process goes beyond basic licensing, examining qualifications, experience, specializations, and adherence to ethical standards. This meticulous approach guarantees that only the most competent and trustworthy professionals are part of their network.
- Commitment to Quality Care: By selecting providers with verified credentials, Franance Health ensures a consistently high standard of medical care. Patients can be confident that they are receiving treatment from individuals who possess the necessary expertise and are dedicated to evidence-based practices.
- Patient Trust and Safety: The emphasis on verified providers fosters an environment of trust and safety for patients. Knowing that a healthcare professional has undergone thorough scrutiny provides peace of mind and reduces anxieties often associated with seeking medical attention.
- Access to Specialized Expertise: Franance Health's verification process allows them to identify and partner with specialists across various medical disciplines. This ensures that patients can access the specific expertise they need for a wide range of health concerns.
- Enhanced Patient Experience: A network of verified and dedicated professionals naturally leads to a more positive patient experience. From attentive consultations to effective treatment plans, the focus on quality permeates every aspect of the service.
- Reputation for Excellence: Franance Health has built a strong reputation in Botswana for its commitment to providing superior healthcare. This reputation is a direct result of their unwavering dedication to partnering with only the most qualified and ethical medical practitioners.
Scope Of Work For Bill Of Quantities (Boq) Development Service
This Scope of Work (SOW) outlines the requirements for the development of a Bill of Quantities (BOQ) for the [Project Name] project. The service provider will be responsible for generating accurate, comprehensive, and meticulously detailed BOQ documents that serve as a fundamental basis for tendering, cost estimation, and project management. The BOQ will adhere to industry-standard practices, relevant building codes, and the project-specific technical specifications.
| Category | Standard Specification/Requirement | Description |
|---|---|---|
| Measurement Standards | Unified Facilities Criteria (UFC) / SMM (Standard Method of Measurement) | All quantity measurements shall adhere to established industry standards such as UFC or SMM. Specific adoption of a particular standard will be clarified. |
| Unit of Measurement | Project Specific / Industry Standard | Each item in the BOQ shall have a clearly defined and consistent unit of measurement (e.g., m², m³, linear meter, each, kg, tonne). |
| Item Description | Clear and Concise | Descriptions of BOQ items shall be unambiguous, detailing the nature of the work, materials, and finishes. Reference to specific drawing numbers and specification sections is mandatory. |
| Drawing Interpretation | Accurate and Detailed | Quantities derived from architectural, structural, MEP, and other relevant engineering drawings must be accurately calculated, accounting for all dimensions and complexities. |
| Specification Compliance | Adherence to Project Specifications | The BOQ shall reflect the requirements and quality standards outlined in the project's technical specifications. Any discrepancies or ambiguities in specifications must be flagged for clarification. |
| Exclusions and Inclusions | Explicitly Stated | Where necessary, the BOQ shall clearly define what is included and excluded within an item to avoid ambiguity and potential disputes. |
| Rate Format | Standardized | The BOQ will be formatted to allow for the insertion of unit rates. If preliminary rates are required, they will be developed according to established cost estimation principles. |
| Preliminary and General (P&G) Items | Comprehensive Listing | All anticipated P&G items, essential for project execution but not attributable to specific work sections, will be identified and quantified. |
| Contingency and Provisional Sums | As Directed | Provisions for contingencies and provisional sums will be included as per client instructions and project risk assessment. |
| Software Compatibility | Industry Standard Software | The final BOQ will be delivered in a format compatible with common cost management and tendering software. |
Technical Deliverables
- Comprehensive Bill of Quantities (BOQ) document
- Detailed itemized breakdown of all materials, labor, and equipment required for each construction activity.
- Inclusion of unit rates (if specified in tender requirements) or a clear indication of where these will be inserted.
- Measurement and calculation of quantities based on approved architectural, structural, and MEP (Mechanical, Electrical, and Plumbing) drawings, specifications, and any other relevant project documentation.
- Cross-referencing of BOQ items to specific drawing sheets and specification clauses.
- Identification and quantification of preliminary and general items (e.g., site establishment, temporary works, insurance, etc.).
- Inclusion of allowances for contingencies and potential variations, as directed by the client.
- A summary of total quantities per trade or section.
- A formatted BOQ suitable for tender submission, adhering to client-provided templates or industry best practices.
- A digital version of the BOQ in a universally compatible format (e.g., Microsoft Excel, CSV) for ease of analysis and import into cost management software.
Service Level Agreement For Bill Of Quantities (Boq) Development Service
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Bill of Quantities (BOQ) Development Service provided by [Your Company Name] (hereinafter referred to as "Provider") to [Client Name] (hereinafter referred to as "Client"). This SLA is an integral part of the Master Service Agreement between the Provider and the Client.
| Service Component | Service Level Objective (SLO) | Measurement Method | Remedy for Failure |
|---|---|---|---|
| Initial Response to Request (Standard Complexity) | Within 4 Business Hours | Timestamp of Client's Request vs. Provider's Acknowledgment | 10% discount on the next BOQ development invoice for that specific request. |
| Initial Response to Request (High Complexity) | Within 8 Business Hours | Timestamp of Client's Request vs. Provider's Acknowledgment | 10% discount on the next BOQ development invoice for that specific request. |
| Resolution Time (Standard Complexity BOQ) | As per agreed project timeline for each specific BOQ request. | Timestamp of Request vs. Timestamp of Final Deliverable | The Client may be entitled to a refund of up to 25% of the fee for that specific BOQ, at the Provider's discretion, if the delay significantly impacts the Client's project timeline. |
| Resolution Time (High Complexity BOQ) | As per agreed project timeline for each specific BOQ request. | Timestamp of Request vs. Timestamp of Final Deliverable | The Client may be entitled to a refund of up to 25% of the fee for that specific BOQ, at the Provider's discretion, if the delay significantly impacts the Client's project timeline. |
| Uptime Guarantee (BOQ Submission/Delivery Portal) | 99.5% during Business Hours | Monitoring of service availability using industry-standard uptime monitoring tools. Calculated monthly. | For each full 0.5% decrease below the 99.5% Uptime Guarantee in a given month, the Client will receive a credit of 5% of their monthly service fee for the BOQ Development Service. |
| Scheduled Maintenance Notification | Minimum 48 hours prior notice | Email notification to Client's designated contact. | Not applicable (as this is a notification requirement). |
Definitions
- BOQ Development Service: The service of preparing detailed, itemized lists of materials, labor, and other resources required for a construction or engineering project, typically used for cost estimation, tendering, and project management.
- Request: Any formal communication from the Client to the Provider requesting a specific BOQ development task or revision, submitted via the agreed-upon communication channel (e.g., email, client portal).
- Response Time: The maximum time allowed for the Provider to acknowledge a Request and provide an initial assessment or confirmation.
- Resolution Time: The maximum time allowed for the Provider to complete and deliver the requested BOQ development service to the Client's satisfaction, based on the agreed scope.
- Uptime Guarantee: The percentage of time the BOQ Development Service is available and operational for the Client to submit requests and receive deliverables.
- Downtime: Any period during which the BOQ Development Service is not available or operational, excluding Scheduled Maintenance.
- Scheduled Maintenance: Pre-announced periods during which the BOQ Development Service may be unavailable due to planned system updates, upgrades, or maintenance activities.
- Business Hours: The standard operating hours of the Provider, typically Monday to Friday, 9:00 AM to 5:00 PM [Time Zone].
Frequently Asked Questions

Ready when you are
Let's scope your Bill of Quantities (BOQ) Development Service in Botswana project in Botswana.
Scaling healthcare logistics and technical systems across the entire continent.

