Major Preventive Overhaul Service (Planned Overhaul) in Benin
Engineering Excellence & Technical Support
Major Preventive Overhaul Service (Planned Overhaul) High-standard technical execution following OEM protocols and local regulatory frameworks.
Proactive Component Lifecycle Management
Our Major Preventive Overhaul service in Benin meticulously assesses and replaces critical components nearing their end-of-life. This proactive approach mitigates the risk of unexpected failures, extending the operational lifespan of your assets and preventing costly downtime.
Optimized Performance & Efficiency Audits
Beyond routine maintenance, our Benin-based overhauls include comprehensive performance and efficiency audits. We identify and rectify performance degradation, ensuring your machinery operates at peak efficiency, leading to reduced energy consumption and improved output.
Enhanced Safety & Compliance Assurance
Prioritizing safety and regulatory adherence in Benin, our Major Preventive Overhaul service rigorously inspects and reinforces all safety mechanisms. This ensures your operations meet stringent safety standards and compliance requirements, safeguarding personnel and assets.
What Is Major Preventive Overhaul Service (Planned Overhaul) In Benin?
A Major Preventive Overhaul Service, also known as a Planned Overhaul, is a comprehensive, scheduled maintenance procedure designed to restore a piece of equipment, facility, or infrastructure to a near-new operational state. This proactive approach aims to mitigate the risk of unexpected failures, extend asset lifespan, and optimize performance by addressing potential issues before they manifest as breakdowns. In Benin, this service is critical for assets operating in potentially harsh environmental conditions, with varying levels of infrastructure support, and where unplanned downtime can have significant economic and operational repercussions.
| Who Needs It | Typical Use Cases in Benin | Benefits | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Industrial Facilities: Manufacturers, chemical plants, food processing units, textile mills operating heavy machinery. | Power Generation: Overhaul of turbines (gas, steam, hydro), generators, transformers, and associated control systems in thermal, hydro, and potentially renewable energy plants. | Mining and Extractive Industries: Maintenance of large-scale excavators, crushers, conveyor systems, and processing equipment. | Transportation Infrastructure: Overhaul of critical components in railway systems (locomotives, signaling), port equipment (cranes, pumps), and potentially airport ground support equipment. | Agricultural Machinery: Scheduled maintenance for large agricultural equipment like harvesters, tractors, and irrigation systems, especially for commercial farming operations. | Water and Wastewater Treatment Plants: Overhaul of pumps, filtration systems, aeration equipment, and control mechanisms. | Large Commercial Buildings: Maintenance of HVAC systems, elevators, and critical electrical infrastructure. | Telecommunications Infrastructure: Overhaul of base station equipment, power supply units, and cooling systems. | Reduced Unplanned Downtime: Significantly minimizes the probability of catastrophic equipment failure, leading to continuous operations. | Extended Asset Lifespan: By replacing worn components and addressing minor issues, the overall service life of an asset is extended. | Optimized Performance and Efficiency: Restores equipment to its original performance standards, often leading to improved energy efficiency and output. | Enhanced Safety: Ensures all safety mechanisms are functioning correctly, reducing the risk of accidents and injuries. | Predictable Maintenance Costs: Replaces the unpredictable and often higher costs associated with emergency repairs with planned, budgeted expenses. | Compliance with Regulations: Helps ensure compliance with industry standards and regulatory requirements for equipment operation and safety. |
Key Aspects of Major Preventive Overhaul Service:
- Systematic Disassembly and Inspection: Complete dismantling of the equipment to allow for thorough visual and non-destructive testing (NDT) of all critical components. This includes examining for wear, corrosion, fatigue, and other forms of degradation.
- Component Replacement and Refurbishment: Replacement of worn-out parts, such as bearings, seals, filters, and control elements, with genuine or equivalent components. Refurbishment of reusable parts, where feasible, to restore their original specifications.
- Performance Calibration and Testing: Re-calibration of all control systems, sensors, and actuators to ensure optimal operational parameters. This is followed by rigorous testing under various load conditions to verify performance against design specifications.
- Lubrication and Cleaning: Thorough cleaning of all components and re-lubrication using specified lubricants and greasing schedules.
- Software and Firmware Updates: For digitally controlled assets, updating software and firmware to the latest stable versions, addressing known bugs and enhancing functionality.
- Documentation and Reporting: Comprehensive documentation of all work performed, including inspection reports, replaced parts, test results, and recommended future maintenance actions. A detailed report is typically provided to the asset owner.
- Safety System Verification: Rigorous testing and certification of all safety interlocks, emergency shutdown systems, and protective devices.
Who Needs Major Preventive Overhaul Service (Planned Overhaul) In Benin?
Major preventive overhaul service, also known as planned overhaul, is crucial for maintaining the operational integrity, safety, and longevity of critical infrastructure and industrial equipment. In Benin, several sectors and departments rely heavily on these services to avoid unexpected breakdowns, minimize downtime, and ensure compliance with safety and environmental regulations.
| Sector/Industry | Key Equipment/Infrastructure | Reason for Overhaul |
|---|---|---|
| Energy and Utilities | Turbines, Generators, Transformers, Pumps, Boilers | Ensure stable power/water supply, prevent catastrophic failures, maintain efficiency |
| Manufacturing | Production Lines, CNC Machines, Presses, Assembly Robots | Maintain product quality, reduce downtime, optimize production efficiency |
| Transportation (Rail, Road, Maritime) | Engines, Braking Systems, Locomotives, Ships, Trucks | Ensure safety, reliability, and operational continuity |
| Mining and Extractive | Excavators, Haul Trucks, Crushers, Conveyors, Processing Equipment | Prevent breakdowns in harsh environments, ensure safety, maximize resource extraction |
| Agribusiness and Food Processing | Harvesters, Tractors, Processing Machinery, Packaging Lines | Maintain seasonal production cycles, ensure food safety and quality |
| Infrastructure (Ports, Civil Works) | Cranes, Material Handling Systems, Heavy Construction Equipment | Ensure efficient logistics, prevent project delays, maintain public safety |
Target Customers and Departments in Benin for Major Preventive Overhaul Service
- Industries with heavy machinery and critical production lines: This includes sectors like manufacturing, mining, oil and gas, and large-scale agriculture where continuous operation is essential for profitability. Unexpected failures can lead to significant financial losses.
- Energy and Utilities Sector: Power generation plants (thermal, hydro, renewable), transmission and distribution networks, and water treatment facilities require regular overhauls of turbines, generators, pumps, transformers, and other vital equipment to ensure a stable supply of essential services.
- Transportation and Logistics: Operators of large fleets of vehicles (trucks, buses, ships), railway companies, and airport authorities need to maintain their rolling stock and infrastructure. Overhauls of engines, braking systems, and other critical components are vital for safety and operational efficiency.
- Telecommunications Infrastructure: Companies managing large cellular networks, data centers, and satellite ground stations require maintenance of power generation equipment, cooling systems, and transmission hardware. While not always a 'major overhaul' in the mechanical sense, the principle of planned, extensive maintenance applies.
- Large-Scale Construction and Civil Engineering Projects: Companies involved in building and maintaining major infrastructure like dams, bridges, ports, and roads utilize heavy construction equipment that necessitates periodic, comprehensive servicing to prevent failures during critical project phases.
- Government and Public Works Departments: These departments are responsible for maintaining public infrastructure such as water supply systems, sewage treatment plants, public transportation, and critical government buildings. Planned overhauls ensure these services remain functional and safe for the public.
- Mining and Extractive Industries: Benin has a growing mining sector. Equipment like excavators, haul trucks, crushers, and conveyor systems in mines are subject to extreme wear and tear and require regular, in-depth maintenance to prevent costly downtime and ensure worker safety.
- Agribusiness and Food Processing: Large-scale agricultural operations and food processing plants often rely on heavy machinery for harvesting, processing, and packaging. Planned overhauls of these sophisticated systems are essential to maintain production cycles and food quality.
- Port Authorities and Logistics Hubs: Benin's ports are vital for trade. Cranes, conveyor systems, and other material handling equipment require rigorous maintenance schedules, including planned overhauls, to ensure efficient cargo operations.
- Large Hospitals and Healthcare Facilities: While not industrial, major hospitals have complex life-support systems, backup power generators, and specialized medical equipment that often require planned, comprehensive maintenance and potential overhauls to ensure uninterrupted critical care.
- Manufacturing Companies: Beyond just heavy machinery, manufacturers of all types require planned overhauls of production lines, specialized machinery (e.g., injection molding, CNC machines), and supporting systems to maintain product quality and meet production targets.
Major Preventive Overhaul Service (Planned Overhaul) Process In Benin
This document outlines the typical workflow for a Major Preventive Overhaul Service (Planned Overhaul) for industrial equipment in Benin. This process is crucial for ensuring the longevity, reliability, and safety of critical machinery, minimizing unplanned downtime, and optimizing operational efficiency.
| Stage | Description | Key Activities |
|---|---|---|
| Client expresses interest in a planned overhaul service. | Initial contact, request for information, preliminary needs assessment. |
| Detailed assessment and cost estimation. | Site visit, equipment inspection, technical data gathering, quotation preparation and submission. |
| Detailed planning and resource allocation. | Work plan development, parts procurement, timeline finalization, client coordination for shutdowns. |
| Deployment of resources to the client's site. | Team mobilization, tool and equipment transport, site safety setup, preliminary preparation. |
| Core service delivery for the preventive overhaul. | Disassembly, cleaning, inspection, repair/replacement of parts, reassembly, adjustments. |
| Verification of equipment functionality and performance. | Component testing, functional tests, performance verification, safety checks, operational run-in. |
| Ensuring service quality and comprehensive record-keeping. | In-process quality checks, final inspection, report generation, documentation compilation. |
| Formal transfer of the overhauled equipment and knowledge transfer. | Client sign-off, equipment handover, operational training, maintenance training. |
| Ongoing support and performance monitoring. | Warranty management, performance follow-up, future maintenance recommendations. |
Major Preventive Overhaul Service (Planned Overhaul) Process in Benin
- The process begins with an 'Inquiry' from a client seeking a planned overhaul for their equipment. This inquiry typically includes details about the equipment, its current condition, and the desired scope of work.
- Following the inquiry, a 'Pre-assessment and Quotation' phase takes place. This involves a site visit, detailed inspection of the equipment, and gathering all necessary technical data. Based on this, a comprehensive quotation outlining the scope, timeline, and cost is prepared and submitted to the client.
- Upon acceptance of the quotation, a 'Planning and Scheduling' phase commences. This involves detailed work planning, procurement of necessary parts and materials, and coordination with the client for site access and operational shutdown schedules.
- The 'Mobilization and Site Preparation' phase involves the mobilization of the technical team, tools, and equipment to the client's site. Site preparation includes ensuring a safe working environment and any necessary preliminary work.
- The 'Execution of Overhaul' is the core phase, where the planned preventive overhaul is carried out. This includes disassembly, thorough cleaning, inspection of all components, repair or replacement of worn-out parts, reassembly, and precise adjustments.
- Following the overhaul execution, a series of 'Testing and Commissioning' activities are performed. This ensures that the equipment is functioning correctly, meets performance specifications, and operates safely. This may include static and dynamic testing.
- A 'Quality Assurance and Documentation' phase is critical. This involves rigorous quality checks at various stages of the overhaul and the creation of detailed documentation, including inspection reports, repair logs, and updated maintenance records.
- The 'Handover and Training' phase signifies the completion of the service. The equipment is formally handed over to the client, and any necessary training for their personnel on the newly overhauled equipment or its maintenance is provided.
- Finally, a 'Post-Service Support and Follow-up' phase may be offered, which can include warranty support, performance monitoring, and recommendations for future maintenance strategies.
Major Preventive Overhaul Service (Planned Overhaul) Cost In Benin
A Major Preventive Overhaul Service, often referred to as a Planned Overhaul, is a comprehensive maintenance procedure aimed at restoring equipment or machinery to optimal operational condition. This goes beyond routine servicing and involves extensive inspection, component replacement, repair, and calibration to prevent major failures and extend the lifespan of assets. In Benin, the cost of such a service is highly variable and depends on a multitude of factors. These factors influence the complexity of the work, the required expertise, the availability of spare parts, and the overall economic conditions within the country. Understanding these elements is crucial for budgeting and planning any major overhaul project.
| Equipment Type | Estimated Cost Range (XOF) | Notes |
|---|---|---|
| Small to Medium Industrial Generator (e.g., 50-200 kVA) | 1,500,000 - 5,000,000 | Includes engine overhaul, radiator, fuel system, and electrical components. |
| Large Industrial Generator (e.g., 500 kVA+) | 5,000,000 - 20,000,000+ | More complex engines, advanced control systems, and larger auxiliary components. |
| Manufacturing Machinery (e.g., basic assembly line) | 3,000,000 - 15,000,000 | Depends on the number of machines, complexity of operations, and automation level. |
| Heavy Construction Equipment (e.g., excavator, bulldozer) | 2,000,000 - 10,000,000 | Focus on engine, transmission, hydraulics, and structural components. |
| Marine Engine (e.g., small commercial vessel) | 4,000,000 - 18,000,000 | Includes engine, gearbox, cooling systems, and potentially propulsion components. |
| Specialized Industrial Equipment (e.g., pumps, compressors) | 1,000,000 - 7,000,000 | Highly dependent on the specific type and size of the unit. |
Key Pricing Factors for Major Preventive Overhaul Services in Benin
- Type and Size of Equipment: The nature of the machinery (e.g., industrial generator, manufacturing line, heavy construction equipment, marine engine) and its scale directly impact the complexity and duration of the overhaul. Larger and more complex equipment naturally require more labor and potentially more specialized parts.
- Scope of Work: The extent of the overhaul is a primary cost driver. This includes the number of components to be inspected, repaired, or replaced. A full strip-down and rebuild will be significantly more expensive than a targeted overhaul focusing on specific critical systems.
- Condition of Equipment: The current state of the equipment plays a significant role. If components are heavily worn, corroded, or have suffered previous damage, the overhaul will involve more extensive repairs and replacements, increasing costs.
- Availability and Cost of Spare Parts: The accessibility and price of genuine or high-quality compatible spare parts in Benin are critical. Imported parts can incur substantial customs duties, shipping fees, and taxes, driving up the overall cost. Local availability can significantly reduce these ancillary expenses.
- Labor Costs and Expertise: Skilled technicians and engineers are required for major overhauls. The cost of their wages, which can vary based on specialization and experience, is a significant component. The availability of local expertise versus the need to import specialized personnel also affects pricing.
- Location and Accessibility: The geographical location of the equipment within Benin can influence costs. Remote locations might incur higher transportation costs for personnel and parts, as well as potential accommodation expenses.
- Downtime Cost and Urgency: While not a direct service cost, the economic impact of the equipment being out of service is often a consideration. Urgent overhauls might command premium pricing due to the need for expedited service and potentially overtime labor.
- Service Provider: Different maintenance companies or workshops will have varying overheads, pricing structures, and profit margins, leading to price discrepancies for the same service.
- Manufacturer's Recommendations: Adhering to the manufacturer's specified overhaul intervals and procedures often dictates the scope of work and the types of parts required, influencing the cost.
- Currency Exchange Rates: For imported parts and specialized services, fluctuations in exchange rates between the CFA Franc (XOF) and other currencies can impact the final cost.
Affordable Major Preventive Overhaul Service (Planned Overhaul) Options
A Major Preventive Overhaul Service, also known as a Planned Overhaul, is a comprehensive maintenance procedure designed to identify and address potential issues before they lead to costly breakdowns and downtime. This proactive approach ensures the longevity, reliability, and optimal performance of your critical assets. This service goes beyond routine maintenance, involving detailed inspections, component replacements, and system recalibrations. Investing in a planned overhaul can significantly reduce unexpected repair costs, improve operational efficiency, and extend the lifespan of your equipment. We offer various value bundles to cater to different needs and budgets, along with strategic cost-saving strategies.
| Value Bundle Name | Included Services | Key Benefits | Targeted Use Case | Estimated Cost Savings (vs. reactive maintenance) |
|---|---|---|---|---|
| Essential Overhaul | Core component inspection & replacement (e.g., bearings, seals, filters), essential fluid changes, system lubrication, basic electrical checks. | Addresses critical wear points, prevents common failures, ensures fundamental operational integrity. | Standard equipment with moderate usage, clients prioritizing core reliability. | 20-30% |
| Comprehensive Overhaul | Includes Essential Overhaul plus: advanced diagnostics (vibration analysis, thermography), calibration of critical control systems, detailed wear assessment of major sub-assemblies, software updates. | Maximizes performance, identifies subtle issues, optimizes energy consumption, enhances precision. | High-value assets, demanding operational environments, clients seeking peak performance. | 30-45% |
| Premium Lifecycle Overhaul | Includes Comprehensive Overhaul plus: proactive component upgrades for improved efficiency/longevity, complete system flushing and refilling, extensive wear analysis with potential for minor refurbishment, extended warranty on replaced parts. | Future-proofs your equipment, maximizes return on investment, minimizes future upgrade needs, offers peace of mind. | Critical infrastructure, long-term asset planning, clients aiming for maximum operational lifespan and minimal disruption. | 40-60%+ |
| Customized Overhaul | Tailored to specific equipment, operational history, and client priorities. Can include a combination of services from other bundles. | Addresses unique needs, provides the most cost-effective solution for specific scenarios. | Specialized equipment, unique operational challenges, clients with precise maintenance requirements. | Variable, but optimized for the specific situation. |
Key Benefits of a Major Preventive Overhaul Service
- Reduced Risk of Catastrophic Failure
- Extended Equipment Lifespan
- Improved Operational Efficiency and Performance
- Minimized Unscheduled Downtime
- Lower Overall Maintenance Costs (long-term)
- Enhanced Safety Standards
- Predictable Maintenance Budgeting
- Increased Asset Value
Verified Providers In Benin
In Benin's evolving healthcare landscape, identifying trustworthy and effective medical providers is paramount. Franance Health distinguishes itself by rigorously vetting its network of healthcare professionals and facilities, ensuring that patients receive the highest standard of care. This commitment to verification is not merely a formality; it's a cornerstone of their patient-centric approach, offering peace of mind and access to reliable health services. Choosing a Franance Health credentialed provider means opting for quality, expertise, and a healthcare experience built on trust.
| Credentialing Aspect | Franance Health's Approach |
|---|---|
| Professional Qualifications | Verification of degrees, certifications, and ongoing training. |
| Clinical Experience | Assessment of years in practice and specific areas of expertise. |
| Patient Feedback and Outcomes | Monitoring of patient satisfaction surveys and treatment results. |
| Ethical Conduct and Compliance | Adherence to professional codes of conduct and regulatory guidelines. |
| Facility Standards | Evaluation of infrastructure, equipment, and hygiene for partner facilities. |
Why Franance Health Credentials Matter
- Rigorous Vetting Process: Franance Health employs a multi-faceted verification system that goes beyond basic licensing. This includes scrutinizing qualifications, experience, patient reviews, and adherence to ethical standards.
- Focus on Quality of Care: Credentials are awarded based on a provider's demonstrated ability to deliver exceptional patient outcomes and a positive healthcare experience.
- Access to Specialized Expertise: The network includes specialists across various medical disciplines, ensuring patients can find the right care for their specific needs.
- Enhanced Patient Trust and Confidence: Knowing that a provider has been thoroughly vetted by a reputable organization like Franance Health significantly boosts patient confidence and reduces anxiety.
- Streamlined Healthcare Navigation: Franance Health simplifies the process of finding reliable healthcare, saving patients time and effort in their search.
Scope Of Work For Major Preventive Overhaul Service (Planned Overhaul)
This Scope of Work (SOW) outlines the requirements for a Major Preventive Overhaul Service (Planned Overhaul) for [Equipment/Asset Name or Type]. The objective of this overhaul is to restore the equipment to its optimal operational condition, extend its service life, enhance reliability, and minimize the risk of unexpected failures through comprehensive inspection, maintenance, repair, and component replacement. This SOW details the technical deliverables and standard specifications that must be adhered to.
| Section | Description | Technical Deliverables | Standard Specifications / References | |
|---|---|---|---|---|
| Initial site assessment, detailed planning, resource allocation, and mobilization of personnel and equipment. | Detailed Project Plan, Risk Assessment Report, Safety Plan, Mobilization Schedule. | Industry best practices for project management, ISO 20000 for Service Management, Manufacturer's recommended planning guidelines. | |
| Safe isolation, cleaning, and preparation of the equipment for overhaul. | Equipment Isolation Certificates, Cleaning & Degreasing Reports, Pre-overhaul Inspection Report. | Lockout/Tagout (LOTO) procedures as per OSHA, API Recommended Practices (e.g., API 700 Series for equipment). | Manufacturer's recommended cleaning procedures. |
| Systematic disassembly of the equipment, detailed inspection of all components. | Component Inspection Reports (including non-destructive testing - NDT results), Measurement Records, Photography/Videography of findings. | Manufacturer's Service Manuals, API Standards (e.g., API 510 for Pressure Vessels, API 570 for Piping), ASME Codes. | NDT methods (e.g., UT, MT, PT, RT) as per ASTM or ISO standards. |
| Execution of all identified repairs, machining, welding, and refurbishment activities. | Repair Work Orders, Weld Procedure Specifications (WPS) & Procedure Qualification Records (PQR), Machining Reports, Surface Preparation & Coating Reports. | ASME Section IX for welding, Manufacturer's repair guidelines, relevant ASTM standards for materials. | Coating specifications as per SSPC/NACE standards. |
| Procurement and replacement of worn-out or life-limited components. | Bill of Materials (BOM) for replaced parts, Material Test Certificates (MTCs) for new parts, Replaced Component Disposition Report. | Manufacturer's recommended spare parts list, OEM specifications, relevant ISO or ASTM standards for new materials. | Traceability records for all replaced components. |
| Systematic reassembly of the equipment, application of lubricants. | Torqueing Records for bolted connections, Lubrication Schedule & Reports, Reassembly Checklists. | Manufacturer's assembly procedures and torque values, API 610 (for pumps) or similar for rotating equipment. | Lubricant specifications as per manufacturer or industry standards (e.g., NLGI). |
| Performance testing, functional testing, and final commissioning of the overhauled equipment. | Pre-commissioning Checklists, Performance Test Reports (including parameters like pressure, flow, temperature, vibration, efficiency), Functional Test Reports, Commissioning Certificate. | Manufacturer's performance curves and acceptance criteria, relevant industry standards (e.g., ISO 10816 for vibration, API standards for specific equipment types). | Start-up procedures as per manufacturer's manual. |
| Compilation of all project documentation and formal handover of the equipment. | Final Overhaul Report (including all sub-reports), As-Built Drawings (if applicable), Warranty Certificates, Handover Certificate. | Client-specific documentation requirements, Manufacturer's warranty terms and conditions. | Service record updates in client's CMMS (Computerized Maintenance Management System). |
| Adherence to all safety protocols and environmental regulations throughout the project lifecycle. | Safety Permit to Work (PTW) Records, Incident Reports (if any), Environmental Compliance Documentation (e.g., waste disposal records). | OSHA regulations, local environmental protection agency regulations, Client's HSE policies. | Hazard Identification and Risk Assessment (HIRA) procedures. |
Key Objectives of Major Preventive Overhaul
- Restore equipment to original or improved performance standards.
- Identify and rectify existing wear and tear, potential failure points, and anomalies.
- Replace critical components that have reached their service life or exhibit significant degradation.
- Perform detailed inspections and testing to verify functionality and compliance with specifications.
- Update maintenance records and provide comprehensive documentation of all activities.
- Ensure compliance with all relevant safety and environmental regulations.
- Minimize downtime through efficient planning and execution.
Service Level Agreement For Major Preventive Overhaul Service (Planned Overhaul)
This Service Level Agreement (SLA) outlines the response times and uptime guarantees for the Major Preventive Overhaul Service (Planned Overhaul). This SLA is an addendum to the Master Service Agreement (MSA) between [Your Company Name] and [Client Company Name].
| Service Component | Description | Response Time Target (during scheduled maintenance window) | Uptime Guarantee (post-overhaul) |
|---|---|---|---|
| Initial Service Request Acknowledgement | Confirmation of receipt of the planned overhaul request and initial scheduling. | Within 2 business days of notification. | N/A |
| Service Commencement (as per agreed schedule) | The actual start of the planned overhaul activities on-site. | As per the agreed-upon schedule in the Service Contract. No specific target beyond scheduled time. | N/A |
| Critical Issue Resolution (during overhaul) | Addressing unexpected significant issues discovered during the overhaul that may impact the completion timeline. | Within 4 business hours of identification, with a plan of action. | N/A |
| Service Completion Notification | Formal notification that the planned overhaul is complete and the equipment is ready for operational testing. | Within 1 business day of final testing. | N/A |
| Post-Overhaul Performance Validation | Ensuring the equipment meets or exceeds specified performance benchmarks after the overhaul. | Within 3 business days of completion. | N/A |
| Equipment Uptime Post-Overhaul | The percentage of time the equipment is available for use after the successful completion of the planned overhaul. | N/A | 98% within the first 12 months post-overhaul (excluding scheduled downtime for subsequent planned maintenance). |
| Breakdown Resolution (post-overhaul, related to overhaul work) | Addressing any failures directly attributable to the performed overhaul work, reported within the warranty period. | Within 24 hours for critical failures, within 48 hours for non-critical failures. Remote diagnostics prioritized. | N/A |
Scope of Service
- The Major Preventive Overhaul Service (Planned Overhaul) involves scheduled, comprehensive maintenance and refurbishment of critical equipment as defined in the associated Service Contract.
- This service is designed to proactively address potential failures, optimize performance, and extend the operational lifespan of the equipment.
- Activities include, but are not limited to, detailed inspection, component replacement, calibration, testing, and software updates.
Frequently Asked Questions

Ready when you are
Let's scope your Major Preventive Overhaul Service (Planned Overhaul) in Benin project in Benin.
Scaling healthcare logistics and technical systems across the entire continent.